Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Skip to main content
    • by 
    •   9  
      Civil EngineeringHydrogeologySystem ManagementGroundwater Contamination
    • by 
    •   6  
      Environmental EngineeringCivil EngineeringClimatologyClimate variability
    • by 
    •   10  
      Civil EngineeringHydrologyIrrigation ManagementGroundwater recharge
    • by 
    •   4  
      Water Resources ManagementSeasonalityThree DimensionalSimulation Model
    • by  and +1
    •   3  
      Civil EngineeringSeismic analysis and designSeismic resistant design of structures
    • by  and +1
Water resources are affected by development activities and land use change which is undeniable and most significant. Land use change can alter the hydrology of a watershed. The present study has been carried out for Rawal and Simly Dams... more
    • by  and +1
    • by  and +2
    •   5  
      Remote SensingHydrologyLand Use ChangeLife Science
Sediment deposition in a reservoir decreases storage capacity and effects many other parameters of the reservoir adversely. It reduces benefits and useful life of a hydro power project that have huge socioeconomic impacts. Flushing is one... more
    • by 
    •   4  
      HydropowerReservoir SedimentationHEC-RASSediment Flushing
    • by  and +1
This technical note studies the supercritical junction flow occurring at the right-angled confluence of four equal-width channels in which two upstream channels carry flow towards the junction. The note seeks to investigate, firstly, the... more
    • by 
    •   3  
      Modeling and SimulationHydraulics EngineeringSupercritical Flow
Purpose – This paper aims at collecting and reviewing the published literature on the Six Sigma in construction along with its critical success factors (CSFs). Design/methodology/approach – The research is based on literature review.... more
    • by  and +1
    •   4  
      Six SigmaConstruction IndustryLiterature ReviewCritical Success Factors
Almost all construction projects face delays resulting in extension of time (EOT) or liquidated damages, depending upon which of the two parties absorbs the responsibility as per terms of the contract. A number of factors influence the... more
    • by  and +1
    •   2  
      Empirical StudyExtension of Time in Construction
In the building construction, discrepancies frequently occur between the design and construction pertaining to architectural details, structural details, materials and quality of construction. The objective of this paper is to identify... more
    • by 
    •   2  
      Construction Project ManagementConstruction Engineering and Management
Sediment deposition in a reservoir decreases storage capacity and effects many other parameters of the reservoir adversely. It reduces benefits and useful life of a hydro power project that have huge socioeconomic impacts. Flushing is one... more
    • by  and +1
    • Sediment Management In Reservoir
Water is essential for life, agriculture, and industrialization; however, a rapid increase in population is constantly causing water scarcity and pollution in Pakistan. Mining activities produce the potential toxic element (PTE)... more
    • by  and +1
    •   4  
      EcologyCoal MiningIndus BasinPotentially Toxic Elements
Climatic data archives, including grid-based remote-sensing and general circulation model (GCM) data, are used to identify future climate change trends. The performances of climate models vary in regions with spatio-temporal climatic... more
    • by 
    •   3  
      Climate Change ImpactsJhelum River BasinChenab River Basin
Wastewater treatment plants are used to reduce pollution depending upon their effectiveness, treatment-efficiency, available-land, energy-sources, topography, climate and prevailing-winds, seasonal and climatic variations, and... more
    • by  and +1
    •   3  
      Environmental EngineeringEnvironmental ScienceEnvironmental Sustainability
Water is essential for life, agriculture, and industrialization; however, a rapid increase in population is constantly causing water scarcity and pollution in Pakistan. Mining activities produce the potential toxic element (PTE)... more
    • by 
    •   6  
      EcologyMultidisciplinaryCoal MiningEnvironmental public health
In the building construction, discrepancies frequently occur between the design and construction pertaining to architectural details, structural details, materials and quality of construction. The objective of this paper is to identify... more
    • by 
    •   4  
      Construction Project ManagementConstruction Engineering and ManagementBuildingConstruction Delays in Developing Countries