Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Skip to main content
Assessment of risks is a key task in the project management. In this process, Risk Breakdown Structure (RBS) approach can be utilized to identify project relevant risks. In the previous classical method, only Limited number of attributes... more
    • by 
    •   6  
      TunnelingTOPSISMADMRisk Assessment
    • by 
    • LA
    • by 
    •   9  
      AntropologíaCultura2001AMP
laporan praktikum c++
    • by 
    •   4  
      Laporan PraktikumLaporan AkhirLALA gunadarma
    • by 
    • LA
    • by 
    •   4  
      EmotionCollective ActionIdentityLA
We conduct the first empirical investigation of common-pool resource users ’ dynamic and strategic behavior at the micro level using real-world data. Fishermen’s strategies in a fully dynamic game account for latent resource dynamics and... more
    • by 
    •   3  
      Open AccessDynamic GamesLA
    • by 
    •   20  
      BiochemistryChemistryMass SpectrometryNuclear Magnetic Resonance
Are the surviving copies of schooltexts representative of what was popularly used in schools in the medieval period? In other words, was the survival of these manuscripts a random or selective process? To approach this question, this... more
    • by 
    •   8  
      HistoryLatin LiteratureHistory of the BookManuscript Studies
    • by 
    • LA
    • by 
    • LA