CNC Active Library

ENTSO-E, for reasons of transparency, has been monitoring the implementation process in the European countries reporting all the necessary and publicly available information. This is an ongoing activity until Maybe 2018 for RfG NC and until September for DCC and HVDC NC. Available information, documents, websites, contacts can be found below.

In addition, ENTSO-E successfully deployed the Implementation Monitoring Platform (IMP) for the Connection Network Codes for handling internal monitoring activities (please check the Monitoring box on the right). On IMP can be found the Implementation Monitoring Report which identifies any divergence in the implementation of the European CNCs at national level by each member State, as well as the non-exhaustive requirements for all Connection Network Codes for all the countries under the scope.

Choose a country in order to track the progress of Connection Network Code implementation.

Please, see below the implementation maps

Countries

DCC

DCC-Anforderungs-VO - National regulation of non-exhaustive DCC requirements
Download
TOR Netze und Lasten mit Übertragungsnetzanschluss - National Grid Code for DCC
Downloads

RFG

RfG-Anforderungs-VO - National regulation of non-exhaustive RfG requirements
Download
RfG-Schwellenwert-VO - National regulation of A/B/C/D thresholds
Download
TOR Erzeuger Type A, B, C, D - National grid code for Type A,B,C,D
Download

DCC

Proposal for general requirements for Demand Connection (DCC)
Download

RFG

Proposal for general requirements for grid connection of generators (RfG)
Download

HVDC

Proposal for general requirements for grid connection of high-voltage direct-current systems and direct current-connected power park modules (HVDC)
Download
Bosnia and Herzegovina

DCC

RFG

HVDC

Bulgaria

DCC

Decision of approval of non-exhaustive requirements for demand connection
Download
Non exhaustive requirements for Demand Connection
Download

RFG

Decision of approval of national maximum power thresholds for type A, B, C and D of power park modules and non-exhaustive requirements of all types of production modules
Download
National maximum power thresholds for type A, B, C and D of power park modules
Download
Non-exhaustive requirements of all types of production modules
Download

HVDC

Decision of establishing non-exhaustive requirements for high voltage direct current systems and direct current-connected power park modules
Download
Non-exhaustive requirements for high voltage direct current systems and direct current-connected power park modules
Download
Cyprus
Czech Republic

DCC

Requirements laid down pursuant to EU regulation 2016/1388 – Demand Connection Code (DCC)
Download

RFG

Requirements laid down under EU regulation 2016/631 – Requirements for grid connection of Generators (RfG)
Download

HVDC

Requirements set under EU regulation 2016/1447: Requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (HVDC), articles 11-54
Download
Estonia

DCC

Grid Code Specifications for Demand Connections KJV2018
Download

RFG

Grid Code Specifications for Power Generating Facilities VJV2018
Download

HVDC

Suurjännitteisten tasasähköjärjestelmien järjestelmätekniset vaatimukset HVDC2018
Download

DCC

Documentation Technique de Référence
Download

RFG

Documentation Technique de Référence
Download

HVDC

Documentation Technique de Référence
Download

DCC

Technical Connection Rules (TCR) for Extra High Voltage Network (VDE-AR-N 4130) (EN, DE)
Downloads
Technical Connection Rules (TCR) for High Voltage Network (VDE-AR-N 4120) (EN, DE)
Downloads
Technical Connection Rules (TCR) for Medium Voltage Network (VDE-AR-N 4110) (EN, DE)
Downloads
Power Generating Plants Connected to the Low-voltage Network (VDE-AR-N 4105) (EN, DE)
Downloads
Interface TSOs & DSOs (VDE-AR-N 4141-1) (DE)
Downloads
Cascading Measures for the System Safety of Power Grids (VDE-AR-N 4140) (DE)
Downloads

RFG

Technical Connection Rules (TCR) for Extra High Voltage Network (VDE-AR-N 4130) (EN, DE)
Download
Technical Connection Rules (TCR) for High Voltage Network (VDE-AR-N 4120) (EN, DE)
Download
Technical Connection Rules (TCR) for Medium Voltage Network (VDE-AR-N 4110) (EN, DE)
Download
Power Generating Plants Connected to the Low-voltage Network (VDE-AR-N 4105) (EN, DE)
Download
Collaboration of network operators during critical grid states (VDE-AR-N 4140) (DE)
Download

HVDC

Technical Connection Rule (TCR) for the connection of HVDC systems and generation plants connected via HVDC systems (VDE-AR-N 4131) (EN, DE)
Download

DCC

Decision RAE 1166/2020 (Official Gazette of the Hellenic Republic B’ 3698 of 03.09.2020)
Download

RFG

Decision RAE 1165/2020 (Official Gazette of the Hellenic Republic B’ 3757 of 07.09.2020).
Download

HVDC

Decision RAE 1167/2020 (Official Gazette of the Hellenic Republic B’ 3762 of 07.09.2020).
Download

DCC

International Network Code
Download

RFG

International Network Code
Download

HVDC

International Network Code
Download
Iceland

DCC

EirGrid's proposal for the general application of technical requirements in accordance with Articles 12-21 and Articles 27-30 of the Commission Regulation (EU) 2016/1388 establishing a Network Code on Demand Connection
Download

RFG

Proposal for generaal application of technical requirements in accordance with Articles 13-28 of the Commission Regulation (EU) 2016/631 establishing a network code on requirements for grid connection of generators
Download

HVDC

Not yet implemented
Download

DCC

Recepimento Regolamento UE 2016/1388 del 17/08/2016
Download

RFG

Recepimento Regolamento UE 2016/631
Download

HVDC

Recepimento Regolamento UE 2016/1477 del 26/08/2016
Download
Latvia

DCC

General technical requirements of DCC Netwrk code (in Lithuanian)
Download

RFG

General technical requirements of RfG Network code (in English)
Download

HVDC

General technical requirements of HVDC Network code (in Lithuanian):
Download
Luxembourg

DCC

RFG

HVDC

Macedonia
Montenegro
Netherlands
Norway

DCC

NC DC Requirements for general application PL version
Download
NC DC Requirements for general application ENG version
Download
NC DC Requirements for general application NRA approval
Download

RFG

NC RfG Requirements for general application PL version
Download
NC RfG Requirements for general application ENG version
Download
NC RfG Requirements for general application NRA approval
Download
NC RfG Maximum capacity thresholds NRA approval
Download

HVDC

NC HVDC Requirements for general application PL version
Download
NC HVDC Requirements for general application ENG version
Download
NC HVDC Requirements for general application NRA approval
Download
Portugal

RFG

Order no. 72 of 02.08.2017 approving the technical norm on the technical requirements to connect synchronous power-generating modules to public electrical grids
Download
Order no. 214 of 19.12.2018 amending and supplementing Order no. 72/2017 of the President of the National Energy Regulatory Authority approving the technical norm on the technical requirements to connect synchronous power-generating modules to public electrical grids
Download
Order no. 208 of 14.12.2018 approving the technical norm on the technical requirements to connect power-generating modules, power plants modules and offshore power park modules to public electrical grids
Download
Serbia
Slovakia

DCC

Web links to a national source of information
Download

RFG

Web links to a national source of information
Download

HVDC

Web links to a national source of information
Download

DCC

Propuesta OM Codigos de Red
Download

RFG

Propuesta OM Codigos de Red
Download

HVDC

Propuesta OM Codigos de Red
Download

DCC

EIFS 2019:6 - Secondary Legislation for DCC
Download

RFG

EIFS 2018:2 - Secondary Legislation for RfG
Download

HVDC

EIFS 2019:3 - Secondary Legislation for HVDC
Download
Switzerland
United Kingdom National docs

DCC

The Grid Code
Download

RFG

The Grid Code
Download

HVDC

The Grid Code
Download