System:: 220 KV Switchyard Menouf I Over Head Transmission Line

This document contains settings for protection equipment monitoring a 220kV overhead transmission line, including: 1) Distance relay settings for zones 1-3 and zone 4/OR for the main protection, with time delays for each zone. 2) Settings for an additional distance relay for the line, also with zone and time settings. 3) Details of voltage and current transformers monitoring the line, and their ratings. 4) Information on the relays' additional functions like power swing blocking, overcurrent backup, autoreclosure and synchrocheck.

Uploaded by

Mouhemed Mouha
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

System:: 220 KV Switchyard Menouf I Over Head Transmission Line

This document contains settings for protection equipment monitoring a 220kV overhead transmission line, including: 1) Distance relay settings for zones 1-3 and zone 4/OR for the main protection, with time delays for each zone. 2) Settings for an additional distance relay for the line, also with zone and time settings. 3) Details of voltage and current transformers monitoring the line, and their ratings. 4) Information on the relays' additional functions like power swing blocking, overcurrent backup, autoreclosure and synchrocheck.

Uploaded by

Mouhemed Mouha
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

SYSTEM: 220 kV Switchyard Menouf I Over Head Transmission line

Equip. Name
Distance Relay Main I [ REL 531 ]

Description / Function
Distance zone settings

Manu.
ABB Z1 = 80 %

Setting Values Time

First Comm. date


12/2004

First Service date

Test /Check Period

Test Type
Secondary injection

Test Equip.
ISA

Main./ Test Steps

Remarks

Z2 = 120 %
Z3 = 200 % Z4 = 30 % Z1 (forward) X1pp = 9.8 ohm/phase R1 pp = 1.3 ohm/phase RF1 pp = 7.3 ohm/phase X1 pE= 9.8 ohm/phase R1 pE = 1.3 ohm/phase X0 pE = 32 ohm/phase R0 pE = 8.4 ohm/phase RF pE = 35.3 ohm/phase Z2 (forward) X1pp = 18.9 ohm/phase R1 pp = 2.33 ohm/phase RF1 pp = 8.33 ohm/phase X1 PE= 18.9 ohm/phase R1 pE = 2.33 ohm/phase X0 pE= 56 ohm/phase R0 PE = 14.7 ohm/phase RF PE = 36.33 ohm/phase Z3 (forward) X1pp = 33.8 ohm/phase R1 pp = 5.6 ohm/phase RF1 pp = 11.6 ohm/phase X1 pE= 33.8 ohm/phase R1 pE = 5.6 ohm/phase X0 pE = 85.5 ohm/phase R0 pE = 22.5 ohm/phase RF pE = 39.6 ohm/phase Z4 (backward) X1pp = 20 ohm/phase T4 pp= 2.5 sec T3 pE= 2.5 sec T3 pp= 0.9 sec T3 pE= 0.9 sec T2 pp= 0.45 sec T2 PE= 0.45 sec T1 pp= 0.0 sec T1 pE = 0.0 sec

SYSTEM: 220 kV Switchyard Menouf I Over Head Transmission line


1

Equip. Name
Continuo Distance Relay Main I [ REL 531 ]

Description / Function

Manu.

Setting Values Time

First Comm. date

First Service date

Test /Check Period

Test Type

Test Equip.

Main./ Test Steps

Remarks

R1 pp = 1.56 ohm/phase

RF1 pp = 7.6 ohm/phase X1 pE= 20 ohm/phase R1 pE = 1.56 ohm/phase X0 pE = 13 ohm/phase R0 pE = 3.5 ohm/phase RF pE = 36 ohm/phase Earth fault protection I = 0.3 IN 2.5 sec IN = nominal C.T secondary current

Equip. Name
Voltage transformer V.T.

Description / Function

Setting Manu.
220 / 0.1 3 3 200 VA

Values
KV

Time

First Comm. date

First Service date

Test /Check Period

Test Type

Test Equip.

Main./ Test Steps

Remarks

ABB

Current transformer C.T.

ABB

2000/1 A 30 VA 5P20

SYSTEM: 220 kV Switchyard Menouf I Over Head Transmission line


2

Equip. Name

Description / Function

Manu.

Setting Values Time

First Comm. date

First Service date

Test /Check Period

Test Type

Test Equip.

Main./ Test Steps

Remarks

Distance Relay Main II [ REl 316*4 ]

Distance zone settings

ABB

HV distance starting

12/2004

Secondary injection

ISA IN = nominal C.T secondary current

I starting = 0.6 IN Imin = 0.08 IN Xa = 51 ohm/phase Xb = -25.5 ohm/phase Ra =44.2 ohm/phase Rb = - 44.2 ohm/phase Rload = 28.9 ohm/phase Angle load = 45 Z1 (forward) X1 = 9.21 ohm/phase R1 = 1.23 ohm/phase RR1 = 6.68 ohm/phase RRE1= 32.1 ohm/phase Z2 (forward) X2= 17 ohm/phase R2 = 2.1 ohm/phase RR2 = 8.36 ohm/phase RRE2= 33.8 ohm/phase Z3 (forward) X3= 30.5 ohm/phase R3 = 5.32 ohm/phase RR3 = 10.8 ohm/phase RRE3= 36.2 ohm/phase Z(4 / OR) X(4 / OR) = 17 ohm/phase R(4 / OR) = 2.9 ohm/phase RR(4 / OR) = 8.36 ohm/phase RRE(4 / OR) = 33.8 ohm/phase Z (back) X(back) = - 2.88 ohm/phase R(back) = - 0.38 ohm/phase RR(back) = - 5.84 ohm/phase Delay= Def 2.5 sec 0.4 sec 0.90 sec 0.45 sec 0 sec

RRE(back)

= - 31.3 ohm/phase

SYSTEM: 220 kV Switchyard Menouf I Over Head Transmission line

Equip. Name

Description / Function

Setting Manu. Values Time

First Comm. date

First Service date

Test /Check Period

Test Type

Test Equip.

Main./ Test Steps

Remarks

Continue
Distance Relay Main II [ REl 316*4

Power swing blocking

OK

2 sec

12/2004

Secondar y injection

ISA IN = nominal C.T secondary current

Over current back-up protection Autoreclosure Synchro check

I oc = 0.6 IN OK Ok

2.5 sec