BCA Unit Rates
BCA Unit Rates
BCA Unit Rates
I EXCAVATION
1 GENERAL EXCAVATION
2 FILLING
2.1 Backfilling
Page 1/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
3 DISPOSAL
Page 2/34
Unit Rates - Concrete Work
Last Updated on 12/8/09
[The data will be updated on a quarterly basis]
II CONCRETE WORK
1 IN-SITU CONCRETE
2 REINFORCEMENT
Page 3/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
3 FORMWORK
4 PRECAST CONCRETE
5 EXPANSION JOINTS
Page 4/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
6 WATERPROOF MEMBRANE
7 INTEGRATED FINISH
Page 5/34
Unit Rates - Brickwork and Blockwork
Last Updated on 12/8/09
[The data will be updated on a quarterly basis]
1 CLAY BRICKS
2 CONCRETE BLOCKS
Page 6/34
Unit Rates - Roofing
Last Updated on 12/8/09
[The data will be updated on a quarterly basis]
IV ROOFING
1 TILE ROOFING
Page 7/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
2 BUILT-UP ROOFING
Page 8/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
B 0.48mm thick BlueScope Lysaght `Trimdek Hi- 2 35.83 35.83 35.83 35.83 35.83
m
Ten' sheet
C 0.53mm thick Stramit `Speed Deck Hi-Ten' m2 38.33 38.33 38.33 38.33 38.33
sheet
D 0.53mm thick BlueScope Lysaght Colorbond m2 42.00 42.00 42.00 42.00 42.00
XRW Kliplok Hi-Ten roofing sheet
4 RAINWATER GOODS
4.1 Flashings/Cappings
Page 9/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
4.1 Flashings/Cappings
4.2 Gutters
5 SUNDRIES
5.1 Insulation
5.3 Purlin
Page 10/34
Unit Rates - Carpentry and Joinery
Last Updated on 12/8/09
[The data will be updated on a quarterly basis]
1 CARCASSING
2 FRAMING
2.1 Mouldings
2.3 Handrails
Page 11/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
3 LININGS
3.4 Plywoods
Page 12/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
4 WALL INSULATION
4.1 Fibreglass
5 PANELLING
6 FLOORING
Page 13/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
7 DOORS
Page 14/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
8 PARTITIONS
Page 15/34
Unit Rates - Structural Steelwork & Metal Work
Last Updated on 12/8/09
[The data will be updated on a quarterly basis]
1 STRUCTURAL STEELWORK
2 METAL WORK
A hollow section, flat, rod, angle and channel kg 6.57 6.50 5.40 5.23 5.13
complying with BS 4360 Grade 43C
B 50mm diameter tubular rail complying with m 57.33 56.83 54.17 52.50 52.50
SS17; light duty
C 38mm diameter tubular baluster/balustrade m 46.67 45.83 44.33 43.33 43.33
complying with SS 17; light duty
A 50mm diameter, 1.5mm thick natural anodised m 47.33 47.00 45.67 45.00 45.00
tubular rail
B 38mm diameter, 1.5mm thick natural anodised m 38.67 38.17 36.83 35.83 35.83
tubular baluster/balustrade
Page 16/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
4 WINDOWS
Page 17/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
4.3 Shopfront
4.4 Cladding
5 DOORS
Page 18/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
Page 19/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
Page 20/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
Page 21/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
8 SUNDRY
Page 22/34
Unit Rates - Wall and Ceiling Finishes
Last Updated on 12/8/09
[The data will be updated on a quarterly basis]
1 IN-SITU FINISHES
2 TILE FINISHES
2.1 Labour
3 STONE FINISHES
3.1 Labour
Page 23/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
4 SHEET FINISHES
4.1 Labour
5 SUSPENDED CEILINGS
Page 24/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
C 101x0.6mm thick `Luxalon Type V100' m2 82.71 82.71 82.71 82.71 82.71
aluminium screen ceiling
D 0.6mm Dampa 200 type perforated aluminium m2 82.49 82.49 82.49 82.49 82.49
strip ceiling
Page 25/34
Unit Rates - Floor Finishes
Last Updated on 12/8/09
[The data will be updated on a quarterly basis]
1 IN-SITU FINISHES
Page 26/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
2 STONE FINISHES
2.1 Labour
3 BRICK FINISHES
4 TILE FINISHES
Page 27/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
5 GLASS BLOCKS
5.1 Floors
5.2 Walls
6 VINYL FINISHES
7 CARPET FINISHES
Page 28/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
8 SUNDRIES
Page 29/34
Unit Rates - Glazing
Last Updated on 12/8/09
[The data will be updated on a quarterly basis]
IX GLAZING
1 STANDARD GLASS
1.1 In Panes
Tempered glass
V 12mm thick m2 213.26 213.26 211.02 211.02 211.02
1.2 In Louvres
Page 30/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
1.2 In Louvres
1.3 In Panels/Doors
2 SPECIAL GLASS
2.1 Mirrors
Page 31/34
Unit Rates - Painting
Last Updated on 12/8/09
[The data will be updated on a quarterly basis]
X PAINTING
1 PAINT APPLICATION
E one coat of oil based anti-alkali sealer, one m2 4.63 4.63 4.63 4.63 4.63
undercoat and one finishing coat of acrylic
emulsion paint
F one coat of epoxy primer and one coat of m2 9.93 9.93 9.93 9.93 9.93
polyurethane paint
G one coat of latex primer and two finishing m2 7.78 7.78 7.78 7.78 7.78
coats of alkyd semi-gloss enamel paint
H one coat of metal primer and 2 coats of 2 8.48 8.48 8.48 8.48 8.48
m
enamel paint
I one undercoat and two finishing coats of gloss m2 3.68 3.68 3.68 3.68 3.68
oil paint
J one coat of primer sealer and three finishing m2 5.83 5.83 5.83 5.83 5.83
coats of PVA based emulsion paint
K one undercoat two finishing coats synthetic 2 3.32 3.32 3.32 3.32 3.32
m
emulsion paint
L two finishing coats of epoxy paint m2 12.40 12.40 12.40 12.40 12.40
M one coat of primer sealer and two finishing m2 3.25 3.25 3.25 3.25 3.25
coats of emulsion paint
N spray applied two coats of `Flakeline 251' flake m2 96.13 96.13 96.13 96.13 96.13
reinforced Bisphenol polyyester resin based
lining
O two coats of `Sandtex Matt' m2 12.71 12.71 12.71 12.71 12.71
P one coat of primer sealer, one body texture m2 10.82 10.82 10.82 10.82 10.82
coat and one finishing coat of polyurethane
finish
Q one undercoat and two finishing coats of 2 5.92 5.92 5.92 5.92 5.92
m
weathershield emulsion
R Lenaluck acrylic texture spray coating finishes m2 18.05 18.05 18.05 18.05 18.05
S one undercoat and two finishing coats of gloss m2 42.98 42.98 42.98 42.98 42.98
enamel three coats of `Methalack-C' coating
system
Page 32/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
T one coat of plaster sealer, one undercoat and 2 4.03 4.06 3.98 3.93 3.91
m
two coats of solvent based acrylic coating
U one undercoat and one finishing coat with m2 3.36 3.36 3.36 3.36 3.36
transparent clear coating of `Cemetex' glazed
coating
Page 33/34
ITEM DESCRIPTION UNIT 2008Q2 2008Q3 2008Q4 2009Q1 2009Q2
MEAN MEAN MEAN MEAN MEAN
2.0 Labour
Page 34/34