Installation Instructions For Hydrant M-575
Installation Instructions For Hydrant M-575
Installation Instructions For Hydrant M-575
Prepare trench for water-supply line and waste line (if required). Below hydrant location, prepare hole to trench depth and large enough for a person to work. Lay watersupply line and waste line (if required) into trench. Run supply line to hydrant location, allowing extra line length to be trimmed during hookup. Flush supply line before installing hydrant. Depending on code and design requirements, drain may be open, French or sanitary connection. Make certain that drain line is plumb. Wrap bottom drain opening with filter fabric and place a minimum of three cubic feet (0.085 cubic meter) of large round rock under drain opening. Check local codes. Local soil conditions may require more rock for drainage. Position hydrant in hole. Adjust height of hydrant as necessary to ensure that top of hydrant will be flush with surrounding surface. Brace hydrant as necessary. Connect water-supply line and drain line (if required). Backfill trench and hole. Compact backfilled earth. Protect hydrant lid hinge as necessary from sod or pavement until installation is complete. If concrete is specified, prepare area surrounding hydrant site for concrete slab. Spread and compact gravel as necessary. Pour concrete to grade level. Finish concrete as necessary, ensuring that top surface of slab is flat and level.
Hydrant box Level
Concrete (optional) Gravel (optional) Earth 2" black pipe Frost line Minimum 3 cubic feet of large, round rock Tail assembly with 3/4" N.P.T. (male) supply connection Supply line with fitting (by others)
Valve body Seat washer Screw Cup washer Ring washer Packing ring
MURDOCK-SUPER SECUR A Member of Acorn Engineering's Family of Companies 15125 Proctor Avenue City of Industry, CA 91746 USA Phone 800-591-9880 or 626-333-2543 Fax 626-855-4860
Rev. A 8/10/07