WTP Notes
WTP Notes
WTP Notes
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a
subscription. Go to Recruitment Products >>
Education: 2
Experience: 15 years
Relocation: Yes - Internationally
Industry Experience
15 years
Engineering
Career Objective
My objective is to assume employment in Water and/or Wastewater Treatment Plant Operations
and Maintenance
Professional Experience
EXPERIENCE:
09/07-Present PAE Government Services
Water and Wastewater Treatment Plant Supervisor
Kabul, Afghanistan
Corodex Reverse Osmosis Water Treatment Plant and
Ashbrook Wastewater Treatment Plant
1. 60 KGD Reverse Osmosis Water Treatment Plant
2. 40 KGD Wastewater Treatment Plant
3. Process Control, Responsible for Lab tests,
4. Chemical Preparations and Dosageing, Record Keeping
5. Reporting, and Distribution.
6. Multimedia Filters, Operations and Maintenance
7. Responsible for Maintenance of both units and pumps
8. Coordinate work assignments for subordinates
03/07 - 08/07 Harlingen Water Works System
Senior Water Treatment Plant Operator Harlingen Texas
Conventional Surface Water Treatment Plant
1. 20.4 MGD Surface Water Treatment Plant
2. Process Control, Lab Testing.
Commissioning
Petrochemical
PLC
DCS
Valves
Objectives:
position as a Reverse Osmosis, Boiler, Multi Effect Distillate (MED),Sea water Intake, STP &
Pumping Station Operation & Maintenance, In Power / Water Industry, having 10+ years
experience in Operation & Maintenance, and to deliver the best out of my Potential and play an
active role in the growth of the organization.
Hard working & Fast leaner.
plant operator
GASCO
Privately Held; 1001-5000 employees; Oil & Energy industry
April 2012 Present (2 years 2 months) Habshan
Working as utility operator at HABSHAN-5 plant
Gas turbine, HRSG with Duct Burner, Chillers, Air Compressors, HP Boilers, Demineralizer,
Plant Operator
Fauji Kabirala Power Complex, Pakistan
June 2009 April 2012 (2 years 11 months) Kabirwala, Pakistan
I have Worked in 157MW Combined Cycle Power Plant.
Ability and operational experience of start up, shutdown, base load and partial
load operation of Gas Turbines & Steam Turbines in combined cycle mode. And operational
experience of HRSG with Duct burner, EDG. Instrument Air Compressors, Switchyard and
switchgear operation, Demineralizer.
Plant Operator
Chashma Power Plant,Pakistan
May 2002 May 2009 (7 years 1 month)
325 MW Reaction Steam Turbine and its Auxiliary systems operation.
Operational experience of turbine normal and emergency test.
Utility Operator:
Operational experience of switchgears, Transformers, Generators & auxiliaries.
Raw Water Purification system operation.
Demineralized Water treatment system operation.
HVAC System. (Dampers, cleaning units, Supply units) operation.
LiBr Absorption & Compression Type Chillers operation.
21.
Summary
25.
26.Utility operator
27. Equate
28. Privately Held; 201-500 employees; Outsourcing/Offshoring industry
29. September 2011 Present (2 years 9 months) Kuwait
30.Process Technician
31. PT Kaltim NItrate Indonesia (Orica Australia)
32. November 2010 September 2011 (11 months) Bontang, East Kalimantan, Indonesia
33.Utility Operator
34. PT Kaltim Parna Industri
35. Privately Held; 201-500 employees; Chemicals industry
36. November 2006 November 2010 (4 years 1 month)
37. Start up, shut down and keep the plant in normal operation with the trouble shooting to
keep the target production per year.
Responsible for smooth operating of Ammonia and Utility Plant by DCS day to day
activities such as recording, monitoring and conditioning the operation system as well as
possible.
Maintain high standard, reliable and efficient operating variables in line with (HSE)
Health, Safety and Environment policy. Ensure shift activities are in line with HSE
requirements including ISO 9001, ISO 14001, OHSAS 18001 and Risk Management by
no spillages of chemical incident or unnecessary chemical waste.
Assist junior operators in performing their duties effectively by giving on shift training.
Responsible for the preparation of works for m
38. aintenance, follow up and monitor the maintenance work, sign off upon completion and
recording information in the system.
Take effective action to control emergencies and contain hazards within area of
responsibility.
Adherence to plant operating procedure guidelines and instructions.
Responsible to understand the company policy, obey the code of conduct and discipline.