OH Gravel Pack
Copyright 2007,
Copyright 2007,
Copyright 2007,
Pre-Pack Screens
Copyright 2007,
Premium Screens
Halliburton Sinterpac
Pall Stratapac
Halliburton (Purolator) Poroplus
Baker Excluder
USF Superflo
USF Excel
Schlumberger (Secure) MeshRITE*
Copyright 2007,
Copyright 2007,
NSP Erosion
Formation particle flow velocity through the screen will cause
erosion.
Consequences are more severe in gas wells.
Increased formation particle flow velocity will occur due partial
screen plugging.
Copyright 2007,
Copyright 2007,
NSP Considerations
Uniformity of the sand
For uniform sand (C<3), consider WWS / SL, (Economic decision).
For non uniform sand (C>3), consider PP or Premium.
Hole collapse
If instantaneous and uniform hole collapse is expected, consider WWS
/ SL (Economic decision).
If initially stable hole, the decision will be dictated by production rate.
In high rate environment PP or Premium are recommended.
Even in low rate environment consider tolerance to fines production SPE
39437 SPE 31087
Copyright 2007,
Copyright 2007,
EX250
EX200
UNIFORM 120 TO 360 MICRON
EX100
UNIFORM 60 TO 180M
NON UNIFORM 27 TO
132 MICRON
EX60
UNIFORM 36 TO
108 MICRON
50
100
150
200
Fine Sand
(125 to 250M)
250
300
350
400
Medium Sand
250 to 500M
FORMATION SAND D50 SIZE
Copyright 2007,
450
500
550
1000
Coarse Sand
(500 to 1000M)
Copyright 2007,
Gravel Pack*
6
5
High Flow
WW
Premium
4
3
2
Prepack
WWS
25%
50%
100%
Gravel Pack*
6
5
4
Premium
High Flow
WW
3
2
Prepack
WWS
25%
50%
100%
Copyright 2007,
Gravel Pack*
6
5
4
3
2
Premium
High Flow
WW
25%
50%
100%
Copyright 2007,
Gravel Pack
Introduction in the middle 90
Water Pack
AllPAC
Copyright 2007,
Water Pack
Relies on circulation.
Circulation can be achieved by a combination of filter cake
efficiency, downhole string configuration, pump schedule and
reservoir condition.
Mechanical back up (Premium Screens) normally used.
Job can be simulated using SandCADE* software.
Copyright 2007,
Perm = 500 mD
Perm = 3000 mD
Copyright 2007,
Effect of Skin
Skin = 10
Skin = 100
Copyright 2007,
OD / ID = 0.8
OD / ID = 0.3
Copyright 2007,
AllPAC Technology
Does not rely on circulation. Gravel Pack is achieved even with
100% losses.
Comparable or reduced total system cost.
Continuos system support and development.
History
1st Design 1996
Manifold 1998
Eccentric Design 1999
Copyright 2007,
Copyright 2007,
Copyright 2007,
Copyright 2007,
Stab in Box
Stab in Pin
TUBE #4
"B" RING NOT
WELDED TO SCREEN
TUBE #1
TUBE #3
TUBE #2
SECTION A-A
Copyright 2007,
SECTION B-B
SECTION C-C
SECTION D-D
Copyright 2007,
Transport tube
Gravel
slurry
3/8 ID
nozzles
4 Base pipe
Packing tube
Top manifold
ring
Copyright 2007,
Bottom
manifold ring
Single wire
wrap screen
Bottom ring
Copyright 2007,
Copyright 2007,
3000
2000
Tubing Pressure
Pumping Rate (bpm)
1000
0
Copyright 2007,
60
Time (min)
120
180
Rate (bpm)
Pressures (psi)
4000
Final Screenout
33% Excess
Gravel Placed
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0
Reliability Considerations
How to Complete a Horizontal Well in the Gulf of Mexico:
Operators Shares Experiences
Harts Petroleum Engineer International, Nov 97
Schlumberger experience.
Copyright 2007,
Copyright 2007,
Schlumberger Experience
Screen Only Completion.
Total: 90
Failure: 12-15
Mean Time: 3 years
Water Pack
Total: 49 ( 14 packages, 35 pumping)
Failure: Not available
AllPAC
Total: 14
Failure: None in 4 years since its introduction
Copyright 2007,
Completion Installation
Rotation
Wash Down Feature