01 Anti-Collision Workflow Poster 28-Sep-05
01 Anti-Collision Workflow Poster 28-Sep-05
01 Anti-Collision Workflow Poster 28-Sep-05
Schlumberger Private
Client / Schlumberger Anti-Collision Standard
Confirm with client their anti-collision Standard
NO
Is there a centralized survey Central Survey Database
database for the GeoMarket? Import all existing survey databases into
centralized GeoMarket database
YES
YES
Optimize Well Design YES Safe to continue Drilling?
Well Drilled to TD
YES
NO
A/C Exemption Granted?
Are all Oriented Separation Factors
(OSF) > 1.5? Audited by Sign-off Authority
NO
YES
Discuss with client changes required
Surface Hole Rules satisfied? NO to allow the well to be drilled
NO
Separation > 80% of ADP or 10M
Conform to Safety rules? Enter into Quest & Create Action Plan
YES
YES
YES
Finalize Well Design
Discuss well design with Client, Traveling Cylinders Any A/C Exemption? NO
with Tolerance lines and Spider Plots Any A/C Exemption?
End of A/C Process
NO YES
Sign Off
Final design and plots signed off by DEC, D&M line NO
Management and client
Conforms to A/C Exemption ?
YES
Anti-Collision Work Flow
Schlumberger Private
Client / Schlumberger Anti-Collision Standard
Confirm with client their anti-collision Standard
NO
Is there a centralized survey Central Survey Database
database for the GeoMarket? Import all existing survey databases into
centralized GeoMarket database
YES
YES
Optimize Well Design YES Safe to continue Drilling?
Well Drilled to TD
YES
NO
A/C Exemption Granted?
Are all Oriented Separation Factors
(OSF) > 1.5? Audited by Sign-off Authority
NO
YES
Discuss with client changes required
Surface Hole Rules satisfied? NO to allow the well to be drilled
NO
Separation > 80% of ADP or 10M
Conform to Safety rules? Enter into Quest & Create Action Plan
YES
YES
YES
Finalize Well Design
Discuss well design with Client, Traveling Cylinders Any A/C Exemption? NO
with Tolerance lines and Spider Plots Any A/C Exemption?
End of A/C Process
NO YES
Sign Off
Final design and plots signed off by DEC, D&M line NO
Management and client
Conforms to A/C Exemption ?
YES