Padang Bypass Capacity Expansion Project Bidding Documents Part 1 - Section I-V
Padang Bypass Capacity Expansion Project Bidding Documents Part 1 - Section I-V
Padang Bypass Capacity Expansion Project Bidding Documents Part 1 - Section I-V
BIDDING DOCUMENTS
PART - 1
BIDDING PROCEDURES
Section I.
Section II.
Section III.
Section IV.
Section V.
APRIL 2013
Abbreviations
BDS .....................Bid Data Sheet
CB ...................Competitive Bidding
EDCF.......Economic Development Cooperation Fund
ELI ..........Eligibility Form
EXP..........Experience Form
FIN...........Financial Data Form
GCC ........General Conditions of Contract
IFB ..........Invitation for Bids
ITB ..............Instructions to Bidders
JO/JV...................Joint Operation or Joint Venture
LIT.......................Pending Litigation Form
PCC .........Particular Conditions of Contract
SBD ....................Standard Bidding Document
ii
Glossary
The Bank
Borrower
The party to the Loan Agreement to which the Bank has agreed
to make the Loan
Contractor
EDCF
Employer
Joint Venture
Korean Won
Loan
Management
Contractor
Nominated
Subcontractor
Specialist
Subcontractors
iii
Prequalification
Postqualification
US Dollar
Works
Writing
iv
Table of Contents
1.
The Government of Indonesia has received a Loan from the Export-Import Bank of
Korea from the resources of the Economic Development Cooperation Fund (EDCF)
of the Republic of Korea in the amount of US Dollars 58 million toward the cost of
Padang Bypass Capacity Expansion Project and intends to apply a portion of the
proceeds of this loan to payments under the contract for Padang Bypass Capacity
Expansion Project.
2.
The Directorate General of Highways, The Ministry of Public Works as The Project
Executing Agency now invites sealed bids from eligible bidders for Construction of
Road and Bridges of Padang Bypass as follows:
Project
Name
Components
1. Road Capacity Expansion
2. Structures Construction
Padang
Bypass
Capacity
Expansion
Project
3.
Construction
Period
Scope of Works
Description
3. Intersections
Level crossing: 7 ea
730 days
vi
4.
Interested eligible Bidders may obtain further information from Kelompok Kerja
(Pokja) ULP Paket Padang Bypass Capacity Expansion Project (EDCF Loan No. INA17) and inspect the bidding documents at the address below from 08.00 a.m 05.00
pm.
5.
A complete set of bidding documents in the Hardcopy and Softcopy files (DVD)
may be obtained by any interested Bidders on the submission of a written
application to the address below and free of charge.
6.
Bids must be delivered to the address below at or before (June 10, 2013). All bids
must be accompanied by a bid security of at least 2 (two) percent of each currency
of bid price (Included Value Added Tax). Late bids shall be rejected. Bids will be
opened in the presence of the Bidders representatives who choose to attend at the
address below at 2.00 pm.
7.
Estimated Project Cost is Rp. 440,364,741,000.- (Four hundred forty billion three
hundred sixty four million seven hundred forty one thousand rupiah) equivalent to
USD 45,040,885.- (Forty five million forty thousand eight hundred eighty five US
Dolar) excluding VAT.
8.
Section I.
Instructions to Bidders
Table of Clauses
A. General ................................................................................................................................ 4
1.
Scope of Bid ...................................................................................................... 4
2.
Source of Funds ................................................................................................ 4
3.
Fraud and Corruption ........................................................................................ 5
4.
Eligible Bidders ................................................................................................ 6
5.
Eligible Materials, Equipment and Services ..................................................... 7
B. Contents of Bidding Document ...................................................................................... 8
6.
Sections of Bidding Document ......................................................................... 8
7.
Clarification of Bidding Document, Site Visit, Pre-Bid Meeting ..................... 9
8.
Amendment of Bidding Document ................................................................. 10
C. Preparation of Bids ....................................................................................................... 10
9.
Cost of Bidding ............................................................................................... 10
10.
Language of Bid .............................................................................................. 10
11.
Documents Comprising the Bid ...................................................................... 11
12.
Letter of Bid, and Schedules ........................................................................... 12
13.
Alternative Bids .............................................................................................. 12
14.
Bid Prices and Discounts ................................................................................ 12
15.
Currencies of Bid and Payment ...................................................................... 13
16.
Documents Comprising the Technical Proposal ............................................. 14
17.
Documents Establishing the Qualifications of the Bidder .............................. 14
18.
Period of Validity of Bids ............................................................................... 14
19.
Bid Security .................................................................................................... 15
20.
Format and Signing of Bid .............................................................................. 16
D. Submission and Opening of Bids ................................................................................. 17
21.
Sealing and Marking of Bids .......................................................................... 17
22.
Deadline for Submission of Bids .................................................................... 18
23.
Late Bids ......................................................................................................... 18
24.
Withdrawal, Substitution, and Modification of Bids ...................................... 18
25.
Bid Opening .................................................................................................... 19
E. Evaluation and Comparison of Bids ............................................................................ 21
26.
Confidentiality ................................................................................................ 21
27.
Clarification of Bids ........................................................................................ 22
28.
Deviations, Reservations, and Omissions ....................................................... 22
29.
Preliminary Examination of Technical Bids ................................................... 22
30.
31.
32.
33.
34.
35.
36.
37.
Section I.
Instructions to Bidders
Scope of Bid
1.1
2.1
2.2
3. Fraud and
Corruption
3.1
(ii)
Clause 30.
4. Eligible Bidders
3.3
4.1
4.3
4.5
5. Eligible
Materials,
Equipment, and
Services
4.6
4.7
5.1
6.1
Section VI.
Works Requirements
o A. Scope of Works
o B.1. General Specifications
o B.2. Special Specifications
o C. Drawings
PART 3 Conditions of Contract and Contract Forms
6.2
7. Clarification of
Bidding
Documents, Site
Visit, Pre-Bid
Meeting
6.3
6.4
7.1
7.2
7.3
7.4
10
8. Amendment of
Bidding
Document
7.5
7.6
7.7
8.1
8.2
8.3
C. Preparation of Bids
9. Cost of Bidding
9.1
10. Language of
Bid
11. Documents
Comprising the
Bid
11.1
11
(b)
(c)
(d)
(e)
(f)
(g)
Securing
Declaration,
in
12
12.1
13.2
13.3
13.4
14.2
The Bidder shall fill in rates and prices for all items of the
Works described in the Bill of Quantities. Items against
which no rate or price is entered by the Bidder will not be
paid for by the Employer when executed and shall be
deemed covered by the rates for other items and prices in
the Bill of Quantities.
14.3
14.
13
15. Currencies of
Bid and
Payment
14.4
14.5
14.6
14.7
15.1
15.2
15.3
14
16.1
17. Documents
Establishing the
Qualifications
of the Bidder
17.1
18. Period of
Validity of Bids
18.1
Bids shall remain valid for the period specified in the BDS
after the bid submission deadline date prescribed by the
Employer. A bid valid for a shorter period shall be
rejected by the Employer as non responsive.
18.2
18.3
15
19.1
19.2
19.3
or
19.5
19.6
19.7
16
19.9
20.1
17
20.2
The original and all copies of the bid shall be typed or written
in indelible ink and shall be signed by a person duly
authorized to sign on behalf of the Bidder. This authorization
shall consist of a written confirmation as specified in the
BDS and shall be attached to the bid. The name and position
held by each person signing the authorization must be typed
or printed below the signature. All pages of the Bid, except
for unamended printed literature, where entries or
amendments have been made shall be signed or initialed by
the person signing the bid.
20.3
20.4
18
21.3 The outer envelopes and the inner envelopes containing the
Technical Bid shall bear a warning not to open before the
time and date for the opening of Technical Bid, in accordance
with ITB 25.1.
21.4 The inner envelopes containing the Price Bid shall bear a
warning not to open until advised by the Employer in
accordance with ITB 25.7.
21.5
22.1
22.2
23.1
The Employer shall not consider any bid that arrives after
the deadline for submission of bids, in accordance with ITB
22. Any bid received by the Employer after the deadline
for submission of bids shall be declared late, rejected, and
returned unopened to the Bidder.
24.1
24. Withdrawal,
Substitution, and
Modification of
Bids
19
24.2
24.3
25.1
25.2
25.3
25.4
20
25.7
25.8
21
(c)
(d)
26.1
22
27. Clarification of
Bids
28. Deviations,
Reservations,
and Omissions
26.2
26.3
27.1
27.2
28.1
29. Preliminary
Examination of
Technical Bids
29.1
29.2
23
30.2
30.3
30.4
24
31.1
31. Nonmaterial
Nonconformities
31.2
31.3
32.1
32.2
32.3
33.1
32. Qualification of
Bidder
33. Correction of
Arithmetical
Errors
25
corrected;
(b) if there is an error in a total corresponding to the
addition or subtraction of subtotals, the subtotals shall
prevail and the total shall be corrected; and
(c) if there is a discrepancy between words and figures,
the amount in words shall prevail, unless the amount
expressed in words is related to an arithmetic error, in
which case the amount in figures shall prevail subject
to (a) and (b) above.
33.2
34.1
34. Conversion to
Single Currency
35.1
35.2
35. Evaluation of
Price Bids
discounts
offered in
26
35.4
35.5
36. Comparison of
Bids
36.1
37. Employers
Right to Accept
Any Bid, and to
Reject Any or
All Bids
37.1
27
F. Award of Contract
38. Award Criteria
38.1
39. Notification of
Award
39.1
40. Signing of
Contract
(a)
(b)
(c)
(d)
(e)
39.2
The Employer shall inform the bidders that any bidder who
wishes to ascertain the grounds, on which its bid was not
selected, shall request an explanation from the Employer
after the award of contract. The Employer shall promptly
provide an explanation of why such bid was not selected,
either in writing and/or in a debriefing meeting, at the
option of the Employer. The requesting bidder shall bear
all the costs of attending such a debriefing.
39.3
40.1
40.2
28
41.1
41.2
Failure of the successful Bidder to submit the abovementioned Performance Security or sign the Contract
Agreement shall constitute sufficient grounds for the
annulment of the award and forfeiture of the bid security.
In that event the Employer may award the Contract to the
next lowest evaluated Bidder whose offer is substantially
responsive and is determined by the Employer to be
qualified to perform the Contract satisfactorily.
29
Section II.
A. Introduction
ITB 1.1
The number of the Invitation for Bids is: [Insert number of the Invitation
for Bids]
ITB 1.1
ITB 1.1
ITB 2.1
ITB 2.1
The name of the Project is: Padang Bypass Capacity Expansion Project
ITB 3.2
The individuals or firms in a joint venture shall jointly and severally liable.
ITB 4.5
B. Bidding Documents
ITB 7.1
ITB 7.4
30
A Pre-Bid meeting will take place, at the following date, time and place:
Date: May 06, 2013
Time: 10.00 am
Place: Meeting Room of Kantor Balai Besar Pelaksanaan Jalan Nasional II
,
Jl.Jati No 109, Padang
A site visit conducted by the Employer will be organized
C. Preparation of Bids
ITB 11.2 (g)
ITB 13.1
Not applicable
ITB 13.2
Not applicable
ITB 13.4
Not applicable
ITB 14.5
The prices quoted by the bidder shall be subject to price adjustment with
the formulae specified in Sub-clause 13.8 of Section 7 General
Conditions of Contract.
The bid price for this project shall be stated in US Dollars for the foreign
currency portion and Indonesian Rupiah for the local currency portion in
addition the equivalent US$ amount for the local currency portion shall be
stated together applied the exchange (T/T selling) rate quoted by The
Bank, specified by the Project Executing Agency in the bidding documents in
each step of the bidding and contract, provided that such date shall be thirty
days prior to the deadline for submission of the Bids. The Korean Won
amount of the contract for the foreign currency portion and the local
currency portion stated together with equivalent US Dollar amount can be
calculated by applying the exchange rate (Average Rate) presented by the
Bank at the point of contract approval.
ITB 15.1
ITB 18.1
The bid validity period shall be 120 (one hundred and twenty) days
The bid price shall be adjusted by the following factor(s): Not applicable
The fixed portion of the bid price shall be adjusted by the following
factor(s):
The local currency portion of the fixed portion shall be calculated on the basis of
an annual increase for Indonesian Rupiah is the interest rate of Sertifikat Bank
Indonesia (SBI) at thirty (30) days prior to the deadline for submission of Bid
31
and the foreign currency portion of the fixed portion shall be calculated on the
basis of an annual increase for US Dollar is the interest rate of the Bank
Indonesia at thirty (30) days prior to the deadline for submission of Bid
ITB 19.1
A bid security, in the amount and currency shall be at least 2 (two) percent
of each currency of the bid price, shall be required
ITB 19.3.(a)
ITB 19.3.(b)
ITB 19.3.(c)
ITB
19.7.(b)(iii)
(iii) Add the new Sub-clause 19.7 (b) (iii) as follows: provide increased
Performance Security due to a seriously unbalance bid or front loaded bid
in accordance with ITB 35.5.
ITB
19.7.(b)(iv)
(iv) Add the new Sub-clause 19.7 (b) (iv )as follows: accept to carry out
the items against which have no rate or price in accordance with ITB 14.2.
ITB 20.1
ITB 20.2
3 (three)
For bid submission purposes only (Bidders shall not have the option of
submitting their bids electronically), the Employers address is:
Kelompok Kerja (Pokja) ULP Paket Padang Bypass Capacity
Expansion Project (EDCF Loan No. INA-17) Satuan Kerja
Pelaksanaan Jalan Nasional Wilayah II, Provinsi Sumatera Barat
Jl. S. Parman No. 129, Padang
Phone
Facsimile
Email
: (62-751) 443231
: ( 62-751) 443231
: pokja_wildua_sumbar@yahoo.com
32
ITB 25.1
: (62-751) 34334
Facsimile
: (62-751) 39764
ITB 25.5
ITB 34.1
The currency that shall be used for bid evaluation and comparison
purposes to convert all bid prices expressed in various currencies into a
single currency is: US Dollar
The source of exchange rate shall be: Bank Indonesia
The date for the exchange rate shall be: 30 days prior to the deadline for
submission of the Bids
The currency(ies) of the Bid shall be converted into a single currency in
accordance with the procedure under Alternative B that follows;
33
The Employer shall select the alternative which is the most suitable,
depending on the alternative selected in the BDS under ITB 15.1. The
Employer must keep only one of the following alternative texts;
Alternative B; Bidders quote in local and foreign currencies
The Employer will convert the amounts in various currencies in which the
Bid Price, corrected pursuant to ITB 31, is payable (excluding Provisional
Sums but including Day work where priced competitively) to the single
currency identified above at the selling rates established for similar
transactions by the authority specified and on the date stipulated above.
ITB 35.5
ITB 35.6
34
(Following Prequalification)
This Section contains all the criteria that the Employer shall use to evaluate bids and qualify
Bidders. In accordance with ITB 33 and ITB 35, no other factors, methods or criteria shall be
used. The Bidder shall provide all the information requested in the forms included in Section IV
(Bidding Forms).
Table of Forms
1. Evaluation ................................................................................................................................. 35
1.1 Stage 1: Preliminary Screening ........................................................................................... 35
1.1.1 Completeness of Information ..................................................................................... 35
1.1.2 Substantive Responsiveness of Bids .......................................................................... 37
1.2 Stage 2: Detailed Evaluation ............................................................................................... 38
1.2.1 Personnel Capability .................................................................................................. 38
1.2.2 Capability with Respect to Equipment and Pant........................................................ 39
1.2.3 Site Organization ....................................................................................................... 40
1.2.4 Method Statement / Construction Method ................................................................. 40
1.2.5 Mobilization Schedule ............................................................................................... 41
1.2.6 Construction Schedule ............................................................................................... 41
1.2.7 Subcontracting ........................................................................................................... 41
2. Qualification ............................................................................................................................. 42
2.1 Financial Resources ............................................................................................................ 42
2.2 Updating of Information ..................................................................................................... 42
35
1. Evaluation Criteria
Section III Evaluation Criteria (EC) contains all criteria and methods that the Employer will use
to evaluate bidders. The information to be provided in relation to each criterion and the definitions
of the corresponding terms are included in the respective Bidding Forms.
The criteria adopted must relate to characteristics that are essential to ensure satisfactory execution
of the contract, and must be stated in unambiguous terms. In essence, the criteria must be chosen
so that only Contractors who are well qualified to carry out the contract.
A Bidders capabilities to perform the contract/s satisfactorily are established in respect of
Information submitted by Bidders.
Bidding Procedures consists of mainly of two (2) stages:
Stage 1:
Stage 2:
Preliminary Screening
Detailed Evaluation
Completeness of Information
It is to assess the completeness of information for all documents submitted by the
Bidders including supporting data (Bidding Form, Section IV), in the event of no
submission or omission of required documents deemed as important (including
supporting data) the Bidding Documents is to be disqualified at this stage.
Description
Bid Documents
1.1
1.2
1.3
1.4
1.5
1.6
Bid Security
Bidder No.
1.7
Bill of Quantities
1.8
Technical Proposal:
Personnel
Equipment
Site Organization
Method Statement / Construction Method
Mobilization Schedule
Construction Time Schedule
Subcontracting
1.9
1.10
1.11
Y=Yes;
P=Partial;
2.1
2.2
Note:
36
Completeness of Bids
N=No;
NA=Not Applicable
Yes
Go to Next STEP
No
REJECT BIDDING
1.1.2
37
Requirements
Power of Attorney
Signature on Documents
Eligibility
(a) Bidder & Sub-Contractor
(b) Bidder Affiliated with Consultant
(c) Material & Equipment
Bid Security
(a) Amount and Validity
(b) Format and Terms
Bidding Doc.
Bidder No.
Reference
Section 1,
ITB 20
Section 1,
ITB 11 & 20
Section 1,
ITB 4 & 11
Section 1,
ITB 4 & 5
Section 1,
ITB 18
Section 1,
ITB 19
FINDINGS
Note:
C = Complied,
NA = Not Applicable,
R = Substantially Responsive
PC = Partially Complied
NC = Not Complied
Complied
Go to Next STEP
Not Complied
REJECT BIDDING
38
1.2.1
Criteria of Evaluation
Personnel
Equipment
Sufficiency of Organization
Method Statement / Construction Method
Mobilization Schedule
Construction Schedule
Subcontracting
TOTAL
Weighting
Minimum
Req. Score
20 points
25 points
3 points
40 points
4 points
5 points
3 points
16 points
20 points
2.4 points
32 points
3.2 points
4 points
2.4 points
100 points
80 points
Key Personnel
Employee
Status
General
Superintendent
(Korean)
Deputy General Superintendent
(Indonesian)
Quality
Control
Engineer
(Indonesian/Korean)
Bridge
Engineer
(Indonesian/Korean)
Highway
Engineer
(Indonesian/Korean)
Quality
Assurance
(Indonesian/Korean)
Total
Point Distribution
YSE
Base Score
Actual
Score
CW
SW C
SW
W
2
2.5
CW
(YSE)
SW
(YSE)
RNP
NP
PS
15
PS
12
PS/NPS
PS/NPS
PS/NPS
PS/NP S
1
2
1
2
1
2
1
0.5
0.5
0.5
0.5
0.5
0.5
1
1
1
1
1
1
1
1.5
12
NOTE:
ACTUAL SCORE OF YSE IS EVALUATED IN THE FOLLOWING MANNER:
Key Personnel
General
Superintendent
Deputy
General
Superintendent
Quality
Engineer
Control
CW
CW>15: 100%
15CW12: 80%
12>CW: 0%
CW>12: 100%
12CW10: 80%
10>CW: 0%
CW>5: 100%
5CW3: 80%
3>CW: 0%
SW
SW>5: 100%
5>SW3: 80%
3>SW: 0%
SW>5: 100%
5>SW3: 80%
3>SW: 0%
SW>3: 100%
3>SW2: 80%
2>SW: 0%
Total
Actual
Score
Bridge Engineer
CW>5: 100%
5CW3: 80%
3>CW: 0%
CW>5: 100%
5CW3: 80%
3>CW: 0%
CW>5: 100%
5CW3: 80%
3>CW: 0%
Highway Engineer
Quality Assurance
CW : CIVIL WORKS
SW : SIMILAR WORKS IN ROAD
YSE : YEARS OF SIMILAR EXPERIENCE
39
SW>3: 100%
3>SW2: 80%
2>SW: 0%
SW>3: 100%
3>SW2: 80%
2>SW: 0%
SW>3: 100%
3>SW2: 80%
2>SW: 0%
Specification
Required
Number
of Equipment
Eqmt
No.
Total
Base
Score
Ownership
Base
Score
Actual
Score
Condition
Base
Score
60 T/H
60 T/H
8 Tonnes
800 Ltr
1 Unit
1 Unit
1 Unit
1 Unit
1 unit
1 unit
1
1
1
1
1
1
2
2
1
1
1
1
0.80
0.80
0.40
0.40
0.40
0.40
1.20
1.20
0.60
0.60
0.60
0.60
10 Tonnes
2 Unit
8. Tandem Roller
8 Tonnes
2 Unit
9. Vibrator Roller
8 Tonnes
2 Unit
1
2
1
2
1
2
10. Excavator
200 HP
2 Unit
120 HP
2 Unit
0.30
0.30
0.30
0.30
0.30
0.30
0.60
0.60
0.30
0.30
1.2 Cu.M
1 Unit
2 Unit
1
2
1
2
1
1
2
0.20
0.20
0.20
0.20
0.20
0.20
0.40
0.40
0.20
0.20
1
1
0.40
0.60
0.20
0.20
0.30
0.30
8 Cu M
10 Unit
15.Pre-stressed
jacker/Hydraulic jack
16. Crawler Cranes
300 ton
1
2
3
4
5
6
7
8
9
10
1
0.16
0.16
0.16
0.16
0.16
0.16
0.16
0.16
0.16
0.16
0.40
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.60
1 Unit
0.40
0.60
17. Compressor
Up
to
20
Tonnes at 20
m radius
Min 200 CPM
2 Unit
0.20
0.20
0.30
0.30
5000 Liters
100-150 HP
1 Unit
1 Unit
1
2
1
1
1
1
25
0.40
0.40
10
0.60
0.60
15
TOTAL
1
1
Actual
Score
Total
Actual
Score
40
NOTE:
BASE SCORE SHALL BE ADJUSTED WITH THE FOLLOWING FACTORS; THE NOTARIZED LEASE CONTRACT AGREEMENT
FOR EQUIPMENT TO BE LEASED OR RENTED (INCLUDING THE LESSOR'S PROOF OF OWNERSHIP OF THE SAID
EQUIPMENT) MUST BE SUBMITTED WITH THE BID DOCUMENTS.
FAILURE TO THE ABOVE REQUIREMENT: NOT COUNT OF THE RELEVANT EQUIPMENT.
IN CASE OF J.O., ALL REQUIRED EQUIPMENT SHALL BE EVALUATED COLLECTIVELY.
AS TO CONDITION OF EQUIPMENT
CONDITION OF
EQUIPMENT
VERY GOOD
GOOD
FAIR
NORMAL
POOR
OWNERSHIP
OWNED
LEASE
RENT
CRITERIA
SCORE (%)
0 AGE 4
4 AGE 6
6 AGE 8
8 AGE 10
AGE > 10
100
90
80
70
0
SCORE (%)
100
80
60
NOTE : THE NOTARIZED LEAS E CONTRACT AGREEMENT FOR EQUIPMENT TO BE LEASED OR RENTED
PROOF OF OWNERSHIP OF THE SAID EQUIPMENT) MUST BE SUBMITTED WITH THE BIDDING DOCUMENTS
FAILURE TO THE ABOVE REQUIREMENTS: NOT TO BE COUNTED FOR
1.2.2
1.2.3
SCORE
3
2
1
No
Criteria
Base Score
(Points)
20
20
15
10
0
20
20
15
Actual
Score
1.2.4
10
0
1.2.5
SCORE
4
3
2
CONSTRUCTION SCHEDULE
Proposed Construction schedule, shorter than the time required
Proposed Construction schedule, same as the time required
Proposed Construction schedule, longer than the time required
1.2.6
No
41
Base Score
(Points)
5
5
4
0
SUBCONTRACTING (3 POINTS)
Criteria
List of Work
List of work to be subcontracted
No List of work to be subcontracted
Actual
Score
2.
42
Qualification
2.1 Financial Resource
Using the relevant Forms in Section IV (Bidding Forms) the Bidder must demonstrate
access to, or availability of, financial resources such as liquid assets, unencumbered
real assets, lines of credit, and other financial means, other than any contractual
advance payments to meet:
(i) the following cash-flow requirement:.. and
(i) the overall cash flow requirements for this contract and its current Works
commitment.
<<Note>>
Indicate under (i) above the construction cash flow requirement for a number of
months (to the nearest half-month), determined as the total time needed by the
Employer to pay a contractors invoice, allowing for (a) the actual time consumed for
construction, from the beginning of the month invoiced, (b) the time needed by the
Engineer to issue the monthly payment certificate, (c) the time needed by the
Employer to pay the amount certified, and (d) a contingency period of one month to
allow for unforeseen delays. The total period should not exceed six months. The
assessment of the monthly amount should be based on a straight-line projection of the
estimated cash flow requirement over the particular contract period, neglecting the
effect of any advance payment and retention monies, but including contingency
allowances in the estimated contract cost.
2.2 Updating Information
The Bidder shall continue to meet the criteria used at the time of prequalification.
Updating and reassessment of the following information which was previously
considered during prequalification will be required;
(a) Eligibility
(b) Pending Litigation
(c) Financial Situation
The Bidder shall provide updated details for the above by using the relevant forms
included in Section IV (Bidding Forms).
43
To: _______________________________________________________________________
Our firm, including any subcontractors or suppliers for any part of the Contract, have
nationalities from eligible countries [Insert the nationality of the Bidder, including that
of all parties that comprise the Bidder if the Bidder is a consortium or association, and
the nationality of each Subcontractor and Supplier];
(e)
We, including any subcontractors or suppliers for any part of the contract, do not have
any conflict of interest in accordance with ITB 4.3;
(f)
We are not participating, as a Bidder or as a subcontractor, in more than one bid in this
bidding process in accordance with ITB 4.3, other than alternative offers submitted in
accordance with ITB 13;
(g)
Our firm, its affiliates or subsidiaries, including any Subcontractors or Suppliers for any
part of the contract, has not been declared ineligible by the Bank, under the Employers
country laws or official regulations.
(h)
We are not a government owned entity / We are a government owned entity but meet
the requirements of ITB4.5; *
Name
44
In the capacity of
Signed
45
To: ...............................................................................................................................................
(a) We have examined and have no reservations to the Bidding Documents, including
Addenda issued in accordance with Instructions to Bidders (ITB) 8;
(b) We offer to execute in conformity with the Bidding Documents and the Technical Bid
submitted for the following Works:
(c) The total price of our Bid, excluding any discounts offered in item (d) below is:
(d) The discounts offered and the methodology for their application are:
(e) Our Bid shall be valid for a period of . . . . . days from the date fixed for the bid
submission deadline in accordance with the Bidding Documents, and it shall remain
binding upon us and may be accepted at any time before the expiration of that period;
(f) If our Bid is accepted, we commit to obtain a performance security in accordance with
the Bidding Documents;
(g) We have paid, or will pay the following commissions, gratuities, or fees with respect to
the bidding process or execution of the Contract: **
**
Name of Recipient
46
Address
Reason
Amount
(h) We understand that this bid, together with your written acceptance thereof included in
your notification of award, shall constitute a binding contract between us, until a formal
contract is prepared and executed; and
(i) We understand that you are not bound to accept the lowest evaluated bid or any other bid
that you may receive.
Name
In the capacity of
Signed
47
Appendix to Bid
Schedule of Payment Currencies
For ...........................insert name of Section of the Works ...............
Separate tables may be required if the various sections of the Works (or of the Bill of Quantities) will
have substantially different foreign and local currency requirements. The Employer should insert the
names of each Section of the Works.
Name
of
Currency
Payment
Amount of
Currency
Rate of
Exchange
to Local
Currency
Local Currency
Equivalent
C=AxB
Percentage of
Net Bid Price (NBP)
100xC
NBP
Local currency
1.00
Foreign Currency #1
Foreign Currency #2
Foreign Currency #3
Provisional
Expressed
Currency
100.00
in
Sums
Local
1.00
BID PRICE
<<Note>>
The rates of exchange shall be applied the calculation of the amount of the Loan under the
provisions of the Loan Agreement.
48
Index
Description
Source of Index
Base Value
and Date
Bidders
Local Currency
Amount
Nonadjustable
Bidders
Proposed
Weighting
A:
B:
C:
D:
E:
Total
1.00
If the Bidder wishes to quote in more than one foreign currency, this table should be
repeated for each foreign currency.
Index
Code
Index Description
Nonadjusta
b
l
e
Source of
Index
Base Value
and Date
Bidders
Currency in
Type/Amount
Bidders
Proposed
Weighting
Equivalent in
FC1
A:
B:
C:
D:
E:
Total
1.00
<<Note>>
As per GC 1.1.3.1, Base Date means that the date 28 days prior to the latest date for
submission and Completion of the Tender.
__________________________
Beneficiary:
Date:
__________________________
has withdrawn its Bid during the period of bid validity specified by the Bidder in the Form of
Bid; or
does not accept the correction of errors in accordance with the Instructions to Bidders
(hereinafter the ITB); or
has been notified of the acceptance of its Bid by the Employer during the period of bid
validity, (i) fails or refuses to execute the Contract Agreement or (ii) fails or refuses to
furnish the performance security, in accordance with the ITB.
This guarantee will expire: (a) if the Bidder is the successful Bidder, upon our receipt of copies of the contract
Agreement signed by the Bidder and the performance security issued to you upon the instruction of the Bidder;
and (b) if the Bidder is not the successful Bidder, upon the earlier of (i) our receipt of a copy your notification
to the Bidder of the name of the successful Bidder; or (ii) twenty-eight days after the expiration of the Bidders
bid.
Consequently, any demand for payment under this guarantee must be received by us at the office on or before
that date.
This guarantee is subject to the Uniform Rules for Demand Guarantees, ICC Publication No. 458.
___________________________________
[Bankers seal and authorized signature(s)]
Note:
All italicized text is for use in preparing this form and shall be deleted from the final product.
49
Bill of Quantities
1.
The Bill of Quantities shall be read in conjunction with the Instructions to Bidders,
Conditions of Contract, Technical Specifications, and Drawings.
2.
The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and
verified by the Engineer and valued at the rates and prices tendered in the priced Bill
of Quantities, where applicable, and otherwise t such rates and prices as the Engineer
may fix within the terms of the Contract.
3.
The rates and prices tendered in the priced Bill of Quantities shall, except insofar as it
is otherwise provided under the Contract, include all constructional plant, labor,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
Contract.
4.
A rate or price shall be entered against each item in the Bill of Quantities, whether
quantities are stated or not. The cost of Items against which the Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices entered
in the Bill of Quantities.
5.
The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related Items of Work.
6.
General directions and descriptions of work and materials are not necessarily
repeated or summarized in the bill of Quantities. References to the relevant sections
of the contract documentation shall be made before entering rates or prices against
each item in the Bill of Quantities.
7.
8.
(b)
where there is a discrepancy between the unit rate and the total amount
derived from the multiplication of the unit price and the quantity, the unit rate
as quoted will govern, unless in the opinion of the Employer, there is an
obviously gross misplacement of the decimal point in the unit price, in which
event the total amount as quoted will govern and the unit
rate will be
corrected.
50
51
Division
No.
:
:
:
:
:
1
2
3
4
5
6
7
8
9
10
LC
(Rp)
General
Drainage
Earthworks
Pavement Widening and Shoulders
Granular Pavement
Asphalt Pavement
Structures
Reinstatement and Minor Works
Day work
Routine Maintenance Works
52
SUMMARY
BILL OF QUANTITY
Project
Contract
No.
Package Name
Province
: West Sumatera
Work Item
Pay Item
Description
Unit
Estimated
Unit Price
Unit Price
Quantity
(USD)
(IDR)
(USD)
(IDR)
g = (d x e)
h = (d x f)
DIVISION 1. GENERAL
1.2
Mobilization
LS
1.00
1.8
LS
1.00
DIVISION 2. DRAINAGE
2.1
Cu.M
29,025.59
2.3.3
Ln.M
1,288.00
2.3.4
Ln.M
610.00
2.3.10
U Ditch Type DS 2
Ln.M
15,701.50
2.3.11a
Ln.M
21.00
2.3.11b
Ln.M
23.00
2.3.11c
Ln.M
70 to 100 cm
Total Price
Total Price
53
169.00
2.3.11d
Ln.M
21.00
2.3.11e
Ln.M
100.00
2.3.11f
Box Culvert BC 3 x 2
Ln.M
14.00
2.3.11g
Box Culvert BC 2 x 2
Ln.M
106.00
2.3.11h
Box Culvert BC 3 x 3
Ln.M
37.00
DIVISION 3. EARTHWORKS
3.1.1
Common Excavation
Cu.M
27,375.21
3.1.3
Cu.M
5,779.26
3.1.4
Cu.M
2,060.18
3.2.1
Common Embankment
Cu.M
523,615.78
3.2.2
Selected Embankment
Cu.M
46,469.39
3.4.1
Sq. M
286,961.00
3.4.2
Each
169.00
Geotextile
Sq. M
26,000.00
Cu.M
19,877.40
3.5
54
Cu.M
32,909.88
5.1.2
Cu.M
62,396.85
5.3.1
Cu.M
22,858.50
5.3.3
Cu.M
8,163.75
Prime Coat
Liter
160,536.00
6.1 (2)(a)
Tack coat
Liter
325,922.40
6.3(5c)
Tonne
30,600.38
6.3(6a)
Tonne
44,162.21
6.3(7a)
Tonne
29,538.62
6.3.8.a
Asphalt Cement
6.3.10
6.4 (6)
( AC -Base ) ( fine/coarse )
Tonne
Kg
Liter
5,253.42
1,712,895.01
312,297.31
55
DIVISION 7. STRUCTURES
7.1 (5)
Cu.M
3
7,126.51
7.1 (7)
664.58
7.1 (9)
Cyclops Concrete
M3
146.38
7.1 (10)
Cu.M
86.65
7.2 (1)b
Each
32.00
7.2 (1)d
Each
15.00
7.2(1)e
Each
12.00
7.2(1)f
Each
18.00
7.2(1)g
Each
18.00
7.2(1)i
Each
7.00
7.2 (6)b
Each
78.00
7.2 (6)d
Each
60.00
7.2(6)e
Each
70.00
7.2(6)f
Each
105.00
7.2(6)g
Each
105.00
7.2(6)i
Each
28.00
7.2 (6)k
Each
520.00
7.2 (6)m
Each
360.00
7.2(6)n
Each
350.00
7.2(6)o
Each
530.00
7.2(6)p
Each
600.00
56
7.2(6)r
Each
7.2(6)s
unit
7.2(6)t
unit
Kg
7.3 (4)
7.6 (11)a
300.00
6.00
958,206.51
Ln.M
312.00
Ln.M
2,450.00
800 mm
Ln.M
448.00
600 mm
Ln.M
216.00
7.6 (11)a
7.6 (11)c
7.6 (11)d
7.6 (11)e
Ln.M
Ln.M
32.00
Ln.M
32.00
Ln.M
16.00
Ln.M
16.00
Ln.M
16.00
Ln.M
16.00
Ln.M
417.19
Each
64.00
Each
30.00
Each
24.00
Each
36.00
Each
36.00
Each
14.00
Railing
Ln.M
1,197.60
7.7 (1)
7.7 (2)
7.7 (1)
7.7 (2)
7.7 (1)
7.7 (2)
7.11 (3)
7.12 (4)d
7.12 (4)d
7.12 (4)f
7.12 (4)g
7.12 (4)c
7.12 (4)c
7.13.
57
Sq. M
20,239.32
each
27,849.00
Sq. M
59,406.50
8.6(1)
Concrete Barrier
Ln.M
47,848.00
8.7(2)
Each
626.00
8.4.(10)(d)
8.4.(12)
DIVISION 9. DAYWORK
9.1
Foreman
Hour
315.00
9.2
Labour
Hour
1,260.00
9.3
Hour
420.00
9.4
Hour
1,050.00
9.6
Hour
126.00
9.8
Hour
126.00
9.9
Hour
126.00
9.11
Excavator 80 - 140 PK
Hour
147.00
9.14
Hour
84.00
9.17
58
Hour
210.00
Hour
126.00
9.19
Hour
42.00
9.20
Jack Hammer
Hour
210.00
(B)
42.00
9.18
(A)
Hour
59
Description
Unit
Quantity
Rate
Foreign Local
Amount
Foreign Local
60
Description
Unit
Quantity
Rate
Foreign Local
Amount
Foreign Local
61
Description
Unit
Quantity
Rate
Foreign Local
Amount
Foreign Local
62
Description
Unit
Quantity
Rate
Foreign Local
Amount
Foreign Local
63
Description
Unit
Quantity
Rate
Foreign Local
Amount
Foreign Local
64
Description
Unit
Quantity
Rate
Foreign Local
Amount
Foreign Local
65
Description
Unit
Quantity
Rate
Foreign Local
Amount
Foreign Local
66
Description
Unit
Quantity
Rate
Foreign Local
Amount
Foreign Local
67
Description
Unit
Nominal
quantity
Rate
Foreign Local
Subtotal
D122
Allow
percenta of Subtotal for
Contractors overhead, profit, etc., in
accordance with paragraph 3 (b) above.
Total for Daywork: Labor
(carried forward to Daywork Summary, p.
)
Extended amount
Foreign
Local
68
Description
Unit
Nominal
quantity
Rate
Foreign Local
Subtotal
D122
Allow
percent of Subtotal for
Contractors overhead, profit, etc., in
accordance with paragraph 3 (b) above.
Total for Daywork: Materials
(carried forward to Daywork Summary, p.
)
Extended amount
Foreign Local
69
Item
no.
Description
Nominal
quantity
(hours)
Basic hourly
rental rate
Foreign Local
Extended amount
Foreign
Local
70
Daywork Summary
Amount
Foreign
Local
1. Total for Daywork:
2. Total for Daywork:
3. Total for Daywork:
Labour
Materials
Contractors Equipment
Total for Daywork
(carried forward to Bid Summary, p.
)
71
Description
Unit
Quantity
Rate
Foreign Local
Amount
Foreign Local
Technical Proposal
Technical Proposal - Personnel
Form PER -1: Proposed Personnel
Bidders should provide the names of suitably qualified personnel to meet the specified
requirements stated in Section III (Evaluation and Qualification Criteria). The data on their
experience should be supplied using the Form below for each candidate.
1.
Title of position*
Name
2.
Title of position*
Name
3.
Title of position*
Name
4.
Title of position*
Name
72
73
Personnel
information
Name
Date of birth
Professional qualifications
Present
employment
Name of employer
Address of employer
Telephone
Fax
Job title
Summarize professional experience over the last 20 years, in reverse chronological order.
Indicate particular technical and managerial experience relevant to the project.
From
To
74
Current
status
Name of manufacturer
Capacity
Year of manufacture
Current location
Details of current commitments
Source
Rented
Leased
Specially manufactured
Name of owner
Address of owner
Agreements
Telephone
Fax
Telex
75
76
Description
Unit
Quantity
Rate
Foreign Local
Total
Amount
Foreign Local
Bidder Information
Bidders
country
constitution
of
Bidders
year
constitution
of
Bidders authorized
representative
(name,
address,
telephone numbers, fax
numbers, e-mail address)
Attached are copies of the following original documents.
1. In case of single entity, articles of incorporation or constitution of the legal entity named above, in accordance with ITB
4.1 and 4.2.
2.
Authorization to represent the firm or JO/JV named in above, in accordance with ITB 20.2.
3.
In case of JO/JV, letter of intent to form JV or JV agreement, in accordance with ITB 4.1.
4.
In case of a government-owned entity, any additional documents not covered under 1 above required to comply with
ITB 4.5.
77
JO/JV
Partners
or
Subcontractors
legal
name
JO/JV
Partners
or
Subcontractors country
of constitution
JO/JV
Partners
or
Subcontractors year of
constitution
JO/JV
Partners
or
Subcontractors
legal
address in country of
constitution
JO/JV
Partners
or
Subcontractors
authorized representative
information
(name, address, telephone
numbers, fax numbers, email address)
Attached are copies of the following original documents.
1.
Articles of incorporation or constitution of the legal entity named above, in accordance with ITB 4.1 and 4.2.
2.
Authorization to represent the firm named above, in accordance with ITB 20.2.
3.
In the case of government-owned entity, documents establishing legal and financial autonomy and compliance with
commercial law, in accordance with ITB 4.5.
78
79
Pending Litigation
No pending litigation in accordance with Criteria 2.2 of Section 3 (Evaluation and Qualification Criteria)
Pending litigation in accordance with Criteria 2.2 of Section 3 (Evaluation and Qualification Criteria)
Year
Matter in Dispute
Value
of
Pending
Claim
in
US$
Equivalent
Value of
Pending
Claim as a
Percentage of
Net Worth
80
Year 2:
Year 3:
Attached are copies of financial statements (balance sheets including all related notes, and income statements) for the
last three years, as indicated above, complying with the following conditions.
All such documents reflect the financial situation of the Bidder or partner to a JO/JV, and not sister or parent
companies.
Historic financial statements must be complete, including all notes to the financial statements.
Historic financial statements must correspond to accounting periods already completed and audited (no
statements for partial periods shall be requested or accepted).
81
Amount
Currency
Exchange
Rate
US$
Equivalent
The information supplied should be the Annual Turnover of the Bidder or each member of a
JO/JV in terms of the amounts billed to clients for each year for work in progress or
completed, converted to US Dollars at the rate of exchange at the end of the period reported.
* , .
The English text in this declaration is not an official translation. In case of discrepancy, the
Korean one shall prevail.
Anti-Corruption and Anti-Malpractice Declaration
To The Export-Import Bank of Korea (the Bank)
:
Name of the Project (the Project):
(EDCF)( )
.
We hereby confirm the following with regard to participation in the Project stated above financed by
the Economic Development Cooperation Fund (EDCF):
- -
1.
,
,
.
1. We undertake full understanding and compliance with the "Act on Preventing Bribery of Foreign
Public Officials in International Business Transactions," and declare that neither we nor any other
party acting on our behalf with regard to the Project has engaged or will engage in corrupt or
fraudulent practices.
2.
.
2. If the Bank determines that we have engaged in corrupt or fraudulent practices with regard to
the Project, we will not raise any objections to the following actions taken by the Bank:
.
2-1. Refusal of approval or no-objection with regard to our participation in the Project;
82
83
. 3
2-2. Declaration of our ineligibility for not more than 3 years to be awarded a contract financed by
EDCF loans, and disclosure of our ineligibility on the Banks official website; and
.
2-3. Disclosure to law enforcement authorities of our verified acts of bribery.
3.
7 6( ) () 3
.
3. We will not raise any objections to the Banks declaration that we are ineligible for not more
than 3 years to be awarded a contract financed by EDCF loans if we fall under the Ineligibility
Criteria on Malpractice (attached hereto) of the Article 7-6 of the Regulations on EDCF Operation
and Management, for defective design and/or construction with regard to the Project.
Date/Month/Year
:
Name of the Company:
()
* : ( 7 6)
Attached: Ineligibility Criteria on Malpractice under Article 7-6 of the Regulations on EDCF Operation and
Management
84
()
(Attachment)
( 7 6)
Ineligibility Criteria on Malpractice
(Article 7-6 of the Regulations on EDCF Operation and Management)
1.
1. Where the borrower raises an issue in writing on the defect of goods and services provided by
the company in question, and the Bank determines it reasonable; and
2. 76 1 1 , 2 ,
4 15 , 17
2. Where the company in question falls under Article 76 (1)-1, 2, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14,
15, and 17 of the Enforcement Decree of the Act on Contracts to Which the State Is a Party.
<> 76 1
Reference: Article 76 (1) of the Enforcement Decree of the Act on Contracts to Which the State Is
a Party
1.
1. A person who has, in the execution of contractual obligations, performed deficiently, crudely or
unreasonably, or committed a malpractice;
2.
( )
2. A person who has concluded a subcontract, in violation of the provisions concerning the
limitation of the subcontract (excluding the case of violating the liability for notification of the
subcontract) under the Framework Act on the Construction Industry, the Electrical Construction
Business Act, the Information and Communication Work Business Act, or other Acts and
subordinate statutes, and a person who has concluded a subcontract without the approval of the
government agency which has placed the order or has changed the conditions of the subcontract
approved by the said government agency;
4.
4. A person who has, in the contract of survey and design services or of cost accounting
services, failed to appropriately calculate the amount of survey and design or cost accounting by
either intention or gross negligence;
4 2. 2
4-2. A person who has, in a service contract for a feasibility study under Article 2 of the
Construction Technology Management Act, inflicted damage on the ordering agency by
improperly carrying out feasibility studies such as demand forecast by either intention or gross
negligence;
5.
5. A person who has inflicted injury on the general public by neglecting safety measures while
fulfilling any contract or a person who has inflicted a serious injury, including death, on
employees, etc. through the neglect of safety and health measures of the Industrial Safety and
Health Act at the workplace;
6. ( 19 ,
42 5 ,
72 72 2
)
6. A person who has, without any just cause, failed to conclude or perform a contract (including
the performance of matters concerning an incidental tender under Article 19, matters concerning
the subcontract management plan and the performance plan for outsourcing workers' working
conditions submitted for the review of the contract performance capability under Article 42 (5)
and matters concerning a joint contract under Articles 72 and 72-2);
7.
7. A person who has agreed upon the bidding price in advance by having discussed it between
bidders or has colluded for the purpose of successful tender by a specific person in the
competitive tender;
8. ( 39
2 8
)
8. A person who has forged or altered documents concerning tender or contract (including any
written public certification provided for in subparagraph 8 of Article 2 of the Digital Signature Act
in the case where the documents for the tender are submitted in use of the designated
information processing unit) or used them unjustly, or a person who has produced a false
document;
9.
9. A person who has executed an invalid tender by intent;
85
10. ( 29 1
, 42 7 ,
43 8 , 94 1 ,
)
10. A person who has, in relation to a bid, successful bid, or conclusion of a contract and
execution thereof, offered a bribe to a relevant public official (including members of the
International Contract Dispute Conciliation Committee under Article 29 (1) of the Act, the
Committee for Examining the Adequacy of Tender Prices under Article 42 (7) of this Decree, the
Committee for Evaluating Written Proposals under Article 43 (8) of this Decree, the Contract
Council under Article 94 (1) of this Decree, the Central Construction Technology Deliberation
Committee, the Special Construction Technology Deliberation Committee, and the Design
Advisory Committee under the Construction Technology Management Act);
11.
3 ( 39 2
)
11. A person who has failed to participate in the bidding (excluding any bidding for which a
written bidding is submitted by means of the designated information processing unit provided for
in the provisions of Article 39 (2)) three or more times during the corresponding fiscal year
without justifiable reasons even after having submitted a written application for participation in the
tender or a written consent to participation in the tender;
12.
12. A person who has interfered with participation in the tender or hinders a successful bidder
from concluding the contract and executing it;
13.
13. A person who has interfered with the performance of duties in the course of supervision or
inspection;
14. 42 1
14. A person who has, without any justifiable grounds, failed to submit the full or part of the
documents which are required for an examination of capabilities to perform the contract pursuant
to Article 42 (1) or a person who has abandoned the examination after submitting the required
documents before a successful bidder is finalized;
14 2. 42 4
86
14-2. A person who has, without any justifiable grounds, failed to submit the full or part of the
documents which are required for an examination after he/she was chosen as a participant in the
examination of the adequacy of bidding prices pursuant to Article 42 (4) or a person who has
abandoned the examination after submitting the required documents before a successful bidder
is determined;
15. 87
15. Where a successful bidder is determined for the package deal bid under Article 87, a person
who has failed to submit a written execution design within the time limit without any justifiable
reasons after being selected as a person suitable for the execution design; and
17. ,
17. A person who has caused damage to the State in a bid or a successful bid or during the
process of the conclusion or performance of the contract by deceit or other fraudulent means.
87
88