Process Automation Practical Connection Diagram
Process Automation Practical Connection Diagram
CONNECTION DETAILS
PLC
MOTOR
I01
Q5
I02
Q6
Q7
Q8
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list ,then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.
If you press the SW-1(I01) push button then the motor will be start to rotate
continuously.
If you press the SW-2(I02) push button then the motor will be stop the rotation.
CONNECTION DETAILS
Output motor connection:
Input connection:
PLC
MOTOR
I01
----------------
switch (SW-1)
Q5
I02
----------------
switch (SW-2)
Q6
Q7
Q8
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list, then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.
TRUTH TABLE
I01
0
0
1
1
I02
0
1
0
1
OUT
0
0
0
1
CONNECTION DETAILS
Output motor connection:
PLC
Input connection:
MOTOR
Q5
I01
Q6
I02
Q7
Q8
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list, then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.
I02
0
1
0
1
OUT
0
1
1
1
In this program work the OR Gate operation. OR gate logic truth table is
attaching the above tabulation.
If you press the SW-1 or SW-2 push buttons then the motor will be start.
Similarly if you press the both SW-1 and SW-2 push buttons also the
motor will be start to rotate continuously.
CONNECTION DETAILS
Output motor connection:
PLC
Input connection:
I01
I02
MOTOR
Q5
Q6
Q7
Q8
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list ,then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.
CONNECTION DETAILS
Output motor connection:
PLC
Input connection:
I01
I02
MOTOR
Q5
Q6
Q7
Q8
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list ,then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.
CONNECTION DETAILS
Output motor connection:
Input connection:
I01
I05
PLC
D.S.VALVE
Q1
Q2
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list ,then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.
7. Automatic operation of a Double acting cylinder-single cycle - forward, time Delay, return.
Input connection:
I01
I05
D.S.VALVE
Q1
Q2
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list ,then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.
time is running at a particular user defined time. When the delay time is
end PLC output Q2 is enable cylinder is automatically return.
Input connection:
I01
I02
D.S.VALVE
Q1
Q2
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list ,then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.
9. Automatic operation of Double acting cylinder-N cycles (using counter function Block)
Input connection:
I01
I02
D.S.VALVE
Q1
Q2
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list ,then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.
PLC
D.S.VALVE
Q1
Q2
Q5
Q6
Q7
Q8
I01
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list ,then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.
11. Sequential operation of two Double Acting Cylinders for the sequence A+,B+, B-, A-.
Input connection:
I01
I03
D.S.VALVE
Q1
Q2
Q3
Q4
PROCEDURE:
1. Connect the Computer and PLC using RS232 serial cable
2. Open the SG2client software and open the New ladder document. Now view the
program Window like LAD VERSION 3.2 then File MENU ---> Open and browse the
respective folder in your saved location and double click or open the required program
(ex:pgm.gen) and view the ladder program page.
3. Then click the Operation Menu ---> it shows the Link com port in the menu list ,then
click the link com port, one window open it shows selecting com you select the default
com port in your computer, and mode is single mode selection only. then ensure after
selecting the com port and mode selection correctly click the link button in your
window. if your process is correct means it shows connect successfully, if it is wrong
means communication error.(check the communication serial cable if it connected or
not)
4. Then click the Operation Menu --->select the Write it shows the pop-up message like
this Old data will be lost, continue? YES or NO button. You click Yes button allow to
write the current data to the PLC.
5. Then click the Operation Menu --->select the RUN it shows the pop-up message Like
this Do you want to read program from module? YES or NO button. You click NO it
means avoid to read the current program again. Then the PLC Ready to the RUN mode.
6. Now the PLC is act as the working mode. Connections are connecting as per the
connection diagram.