P 220 Testing Procedure
P 220 Testing Procedure
P 220 Testing Procedure
CONFIDENTIAL
SUMMARY:
This report is intended to explain procedures for demonstrating /testing
the main functions of the P220 relay using an Omicron test set or
similar.
TABLE OF CONTENTS
1.
INTRODUCTION
2.
EQUIPMENT REQUIRED
3.
INITIAL CONFIGURATION
4.
PRODUCT CHECKS
5.
6.
ON-LOAD TESTS
1.
Page 2 of
INTRODUCTION
EQUIPMENTS REQUIRED
3.0
INITIAL CONFIGURATION
3.1
P220 CONNECTIONS
Terminal no.
1 A CT
Current A
Current B
Current C
49,50
51,52
53,54
Page 3 of
Current N
5 A CT
Current
Current
Current
Current
55,56
Short 50-52-54-56
A
B
C
N
41,42
43,44
45,46
47,48
Short 42-44-46-48
Power supply
Opto input-1 (52-A )
Opto input-2 Speed
Opto input-3
Opto input-4
Opto input-5
Output relay- ( RL1)
Output relay- (RL2)
Output relay- (RL3)
Output relay- (RL4)
Output relay- (RL5)
3.2
33(+),34(-)
22(+),24(-)
26(+),28(-)
13,15
17,19
21,23
(2-4 NC )( 2-6 NO)
(8-10 NC)(,8-12 NO)
(14-16-NC)(14-18 NO)
(1-3-NC)(1-5 -NO)
(7-9 NC ) (7-11-NO)
Load default settings into relay from either MiCOM S1 .By default; the
frequency is set to 50 Hz. Change this to 60 Hz, if required. From 50
Hz or 60 Hz)
4.0
PRODUCT CHECKS
4.1
POWER UP TESTS
After auxiliary voltage is applied, check that LED indicators for Healthy
light up. After approx. 2-10 seconds the P220 is ready for operation.
4.2
INPUT OPTO-ISOLATORS
Page 4 of
Check all the Opto inputs by applying the required field voltage and
see the status of all the inputs in the menu Op Parameter.
During testing please make the Opto input 1 high. Opto input 1 is
dedicated for 52 A contacts in this relay.
5.1
+ Ke (I -ve) 2
Injected current
in 3 phase
Thermal time
Theoretical time
Const. set
Of operation in
sec
2.7 A
1.8 A
22.2 sec
2.7 A
1.8 A
111 sec
Page 5 of
3.9 A
2.6 A
9.6 sec
3.9 A
2.6 A
48 sec
Similarly we can check for the times in other thermal time constant
setting s.
5.2 E/F PROTECTION Set the Pick up value & time value then
inject the required current in E/F terminal ( 55,56 for 1A & 47,48 for
5 A ) and check the operation of the relay after the set time delay .
E/F Protection
E/F Set
0.1 A
Pick
Time
up
delay set
curren in m-Sec
t
0.1 A
Actual
Time of
operation
In Sec
Indicati
on
Check
Relay
Front
Display
I2 > Set
(1st
stage)
0.1 A
Page 6 of
Pick
Time
up
delay set
curren in m-Sec
t
( I2 )
0.1 A
Actual
Time of
operation
In m-Sec
Indicati
on
Check
Relay
Front
Display
Indicati
on
Check
Relay
Front
Display
msec
I2 >>
Set
(2nd
stage)
0.2 A
Pick
up
curren
t
( I2 )
0.2 A
Theoretica
l Time of
operation
In Sec
Actual
Time of
operation
In Sec
5.4 Phase Over Current : This feature will follow DMT curve .
Set the O/C threshold & time delay. Now inject the current in each
phase and check the operation .
Testing format will be like this
Phase Over Current Protection:
Relay
Inject Time set
Actual
set
ed
in Sec
Time of
1.5 Ith
curren
operation
t
In Sec
Indicati
on
Check
Relay
Front
Display
1.5 A
OK
OK
2 A
Actual Time of
operation
In Sec
Indication
Check
Relay Front
Display
1.5 A
Page 7 of
2 A
OK
OK
5.6 Excess long start : Set the excess long start current value &
excess long start time delay. Now inject current slightly more than the
excess long start threshold in each phase and check the operation of
the relay. Relay should operate after the set time delay.
Testing format will be like this
OK
OK
Page 8 of
ON LOAD TESTS