Pre-Commissioning Test Report

Client AVAADA GREEN H.N PROJECT PVT.LTD 


Project 50 MW MITHI SURERA(SIRSA) SOLAR POWER PROJECT AT HARYANA 
Contractor TECHNO 
Testing
Team  EUREKA ENTERPRISES

Date: 01-10-2021

TEST REPORT FOR FEEDER PROTECTION RELAY


Location : 50MW AVAADA SIRSA
Switchgear Name : 33 KV SS
Feeder Name : AUX TRAFO -1
Designation : Feeder Protection Relay

1.Relay Details:
Make ABB Type REF615
Model HBFFAEAGNBA1BNA11 Sr 1VYV91362904
G
CTR 25/1 A PTR 33000/110 V

2. GENERAL INSPECTION & TESTING:-


SL.NO General Inspection & Testing REMARKS
1 Installation & Wiring Correct To Relevant Drawings OK
2 Relay Case Connected To Local Earth Bar OK
3 Relay Output Checked OK
4 Visual Inspection Of Unit OK

3. Measured Value Test:-


Inject current in the relay as per the table below. Observe the reading on the relay display,
in primary values.

Ct ratio – 25/1 A, Pt ratio – 33000/110 V


Primary Current Displayed on Relay (A)
Phase Current Injected (A)
IL1 IL2 IL3 IN
R-N 1 25 0A 0A 25
Y-N 1 0A 25 0A 25
B-N 1 0A 0A 25 25
RYB 1 25 25 25 0A

Primary Voltage Displayed on Relay (kV)


Phase Voltage Injected (V)
L1-L2 L2-L3 L3-L1
R-Y 110 32.974 0 0
Y-B 110 0 32.968 0
B-R 110 0 0 32.981

Details Tested By: Witnessed By: Witnessed By:


NAME Hariharan J M.Manik  Pankaj Mandal 
SIGNATURE      
DATE 01-10-2021    
(Testing) AVAADA (Testing) AVAADA (Quality)
Pre-Commissioning Test Report
Client AVAADA GREEN H.N PROJECT PVT.LTD 
Project 50 MW MITHI SURERA(SIRSA) SOLAR POWER PROJECT AT HARYANA 
Contractor TECHNO 
Testing
Team  EUREKA ENTERPRISES

Date: 01-10-2021

4. Overcurrent Protection 51/50 :-

DPHLPDOC1:1
Ip> 0.78 A, IEC Normal Inverse, TMS – 0.07

Operating Time in (sec)


Pick up in (Amps)
2 times 5 times 10 times
Phase
Expected Actual Expected Actual Expected Actual Expected Actual
(A) (A) (sec) (sec) (sec) (sec) (sec) (sec)

R 0.78 0.79 0.713 0.306 0.226


Y 0.78 0.79 0.713 0.304 0.228
0.702 0.300 0.208
B 0.78 0.79 0.712 0.308 0.226
RYB 0.78 0.79 0.713 0.307 0.221

PHIPTOC1:1
I> 2.5 A, Time Delay – 0.150 Sec.
Phase I Pickup (A) Expected Trip Time (sec) Actual Trip Time (sec)
R 2.51 0.150 0.157
Y 2.51 0.150 0.155
B 2.51 0.150 0.161
RYB 2.51 0.150 0.154

5. Earthfault Protection 51N/50N :-

DEFLPDEF1:1
Ie>- 0.2 In, IEC Normal Inverse, TMS – 0.10
Operating Time in (sec)
Pick up in (Amps)
2 times 5 times 10 times
Reference
Expected Actual Expected Actual Expected Actual Expected Actual
(A) (A) (sec) (sec) (sec) (sec) (sec) (sec)

N 0.2 0.22 1.003 1.018 0.428 0.435 0.297 0.312

EFHPTOC1:1
Details Tested By: Witnessed By: Witnessed By:
NAME Hariharan J M.Manik  Pankaj Mandal 
SIGNATURE      
DATE 01-10-2021    
(Testing) AVAADA (Testing) AVAADA (Quality)
Pre-Commissioning Test Report
Client AVAADA GREEN H.N PROJECT PVT.LTD 
Project 50 MW MITHI SURERA(SIRSA) SOLAR POWER PROJECT AT HARYANA 
Contractor TECHNO 
Testing
Team  EUREKA ENTERPRISES

Date: 01-10-2021

Ie>> 0.4 A, Time Delay – 0.160 Sec.


Reference I Pickup (A) Expected Trip Time (sec) Actual Trip Time (sec)
Neutral 0.41 0.160 0.180

6. Undervoltage Protection (27) :-

U<27.5 V, Time Delay – 3.00 Sec.


Phase U Pickup (V) Expected Trip Time (sec) Actual Trip Time (sec)
RY 27.4 3.000 3.024
YB 27.4 3.000 3.021
BR 27.4 3.000 3.019
RYB 27.4 3.000 3.015

7. Remarks : Above test results were found normal.

Note: Reference standard for field testing of Electrical Relays & Current transformer : IS9124 -1979.

Details Tested By: Witnessed By: Witnessed By:


NAME Hariharan J M.Manik  Pankaj Mandal 
SIGNATURE      
DATE 01-10-2021    
(Testing) AVAADA (Testing) AVAADA (Quality)