DISTANCE PROTECTION RELAY TEST – P442

GENERAL DATA AND INFORMATION:

Location Date 28/09/2010


Circuit Ref. 400KV LINE-1 Designation 21M1
Panel No. 401RA Sr. No. 131554450847005
Make AREVA Model No. P442316B6M0400K
Drg. & Sh. No. CPD KA01 SC04 SHT-12 Aux. Voltage 220V DC

Watch Dog Relay Check:

Contact State
Terminals
Relay De- Result Relay Energized Result
Energized
J11-J12 Closed Open
J13-J14 Open Closed

Measurement Checks:

PT Ratio: 400KV / 110V CT Ratio: 1000 / 1A


Phase Injected Injected Value Relay Metered Value
A- Ph Current (Ia) 1.0 Amps
B- Ph Current (Ib) 1.0 Amps
C- Ph Current (Ic) 1.0 Amps
A-B Voltage (Vab) 110 Volts
B-C Voltage (Vbc) 110 Volts
C-A Voltage (Vca) 110 Volts
Zone Timing Test :

Set Set Value Operating Time


Zone Impedance Timing (ms)
P-N Fault (ms) P-P Fault (ms)
Descript (Ω)
ion
ZONE 1 (FWD) 8.507 0.0
ZONE 2 (FWD) 13.33 300.0
ZONE 3 (FWD) 15.48 1000.0

Performed by Verified by Accepted by

Areva T & D EPIL EPGL

Name: Name: Name:

Date: Date: Date:


Area : 400 KV Switchyard
Project Name: 2x600 MW Power Plant
,Salaya

Customer Name: Essar Projects (India).Ltd, Location :


Client Name: Essar Power Gujarat Ltd, Contractor Name: Areva T & D

ZONE 4 (REV) 0.851 1000.0

Note: Annexure attached for reach test.

SOTF CHECK:

Operating Time
Zone Description P-N Fault (ms) P-P Fault (ms)
ZONE 1 (FWD)
Zone 2 (FWD)

AIDED TRIP CHECK:

Operating Time
Zone Description
P-N Fault (ms) P-P Fault (ms)
Zone 2 (FWD)

Fault Locator Check:

Line Length: 116.00 KM Line Impedance: 10.63 ohm @ 85°

Fault Location Theoretical Value Actual Value


50% 58.0 KM
80% 92.80 KM
100% 116.0 KM

OVER CURRENT CHECK: Set Current: 2.50 A @ DT Set Time: 1.2


Sec

Injected Current Injected Current


PHASE Optd Time (S) Optd Time (S)
(A) (A)
R 1.248 3.00
Y 3.00
B 3.00
EARTH FAULT CHECK: Set Current: 0.30 A @ IEC SI CURVE TMS: 0.35

PHASE Injected Current Optd Time (S) Injected Current Optd Time (S)
Performed by Verified by Accepted by

Areva T & D EPIL EPGL

Name: Name: Name:

Date: Date: Date:


Area : 400 KV Switchyard
Project Name: 2x600 MW Power Plant
,Salaya

Customer Name: Essar Projects (India).Ltd, Location :


Client Name: Essar Power Gujarat Ltd, Contractor Name: Areva T & D

(A) (A)
R 1.60 2.20
Y 1.60 2.20
B 1.60 2.20

LED CONFIGURATION:

LED Fn LED
LED DESCRIPTION LED DESCRIPTION
NO. No
1 R- PH OPTD 1 ZONE 2 AIDED TRIP
2 Y-PH OPTD 2 POWER SWING
3 B-PH OPTD 3 VT FUSE FAIL
4 ZONE 1 OPTD 4 BROKEN CONDUCTOR
5 ZONE 2 OPTD 5 OVER CURRENT TRIP
6 ZONE 3 OPTD 6 EARTH FAULT TRIP
7 ZONE 4 OPTD 7 TIE CB LBB OPTD
8 SOTF OPTD 8 MAIN CB A/R OPTD
9 TIE CB A/R OPTD
10 A/R NOT IN PROGRESS

FUNCTIONAL CHECK:
TEST TYPE RESULT
Reach Test (P-P & P-G) OK
Switch on to fault OK
Power Swing Blocking OK
Back-up Protection OK
Carrier Aided Tripping OK
Broken conductor Function –Alarm OK
Vt Fuse Failure OK
Auto Reclose Function (Through BCU) OK
Disturbance Recorder & Event Logger OK
Binary Input / Output Check OK
Correct Operation of LED / Aux. Relay OK
Fault Recorder OK
Front Port Communication OK

Note: The settings, PSL Logic of output Relays, Opto Inputs and LEDs are configured as per the
scheme and customer requirement.

Performed by Verified by Accepted by

Areva T & D EPIL EPGL

Name: Name: Name:

Date: Date: Date:


Area : 400 KV Switchyard
Project Name: 2x600 MW Power Plant
,Salaya

Customer Name: Essar Projects (India).Ltd, Location :


Client Name: Essar Power Gujarat Ltd, Contractor Name: Areva T & D

DISTANCE PROTECTION RELAY TEST – P437

GENERAL DATA AND INFORMATION:

Location Date
Circuit Ref. Designation
Panel No. Sr. No.
Make Model No.
Drg. & Sh. No. Aux. Voltage

Watch Dog Relay Check:

Contact State
Terminals
Relay Out Of Result Relay Healthy Result
Service
1615-1616 Closed OK Open OK

Measurement Checks:

PT Ratio: 400KV / 110V CT Ratio: 100 / 1A


Phase Injected Injected Value Relay Metered Value
A- Ph Current (Ia) 1.0 Amps
B- Ph Current (Ib) 1.0 Amps
C- Ph Current (Ic) 1.0 Amps
A-B Voltage (Vab) 110 Volts
B-C Voltage (Vbc) 110 Volts
C-A Voltage (Vca) 110 Volts
Zone Timing Test :

Set Set Value Timing (ms) Operating Time


Zone Description Reactanc(Ω)
P-N Fault (ms) P-P Fault (ms)
ZONE 1 (FWD)
ZONE 2 (FWD)
ZONE 3 (FWD)
ZONE 4 (REV)

Performed by Verified by Accepted by

Areva T & D EPIL EPGL

Name: Name: Name:

Date: Date: Date:


Area : 400 KV Switchyard
Project Name: 2x600 MW Power Plant
,Salaya

Customer Name: Essar Projects (India).Ltd, Location :


Client Name: Essar Power Gujarat Ltd, Contractor Name: Areva T & D

Note: Annexure attached for reach test.

SOTF CHECK:

Operating Time
Zone Description P-N Fault (ms) P-P Fault (ms)
ZONE 1 (FWD)
Zone 2 (FWD)

AIDED TRIP CHECK:

Operating Time
Zone Description
P-N Fault (ms) P-P Fault (ms)
Zone 2 (FWD)

Fault Locator Check:

Line Length: Line Impedance:

Fault Location Theoretical Value Actual Value


50%
80%
100%

LED CONFIGURATION:

LED
LED DESCRIPTION LED No LED DESCRIPTION
NO.
1 7
2 8
3 9
4 10
5 11
6 12

Performed by Verified by Accepted by

Areva T & D EPIL EPGL

Name: Name: Name:

Date: Date: Date:


Area : 400 KV Switchyard
Project Name: 2x600 MW Power Plant
,Salaya

Customer Name: Essar Projects (India).Ltd, Location :


Client Name: Essar Power Gujarat Ltd, Contractor Name: Areva T & D

FUNCTIONAL CHECK:
TEST TYPE RESULT
Reach Test (P-P & P-G)
Switch on to fault
Power Swing Blocking
Broken conductor Function –Alarm
VT Fuse Failure
Carrier Aided Tripping
Auto Reclose Function (Through BCU)
Disturbance Recorder & Event Logger
Binary Input / Output Check
Correct Operation of LED / Aux. Relay
Fault Recorder
Front Port Communication

Note: The settings, PSL Logic of output Relays, Opto Inputs and LEDs are configured as per the
scheme and customer requirement.

OVER VOLTAGE PROTECTION RELAY TEST

General Data and Information:

Circuit Ref. Designation


Panel No. Sr. No.
Make Model No.
Drg. & Sh. No. Aux. Voltage

Watch Dog Relay Check:

Contact State
Terminals
Relay De- Result Relay Energized Result
Energized
F11-F12 Closed OK Open OK
F13-F14 Open OK Closed OK

Measurement Checks:
PT Ratio: 400KV / 110V
Performed by Verified by Accepted by

Areva T & D EPIL EPGL

Name: Name: Name:

Date: Date: Date:


Area : 400 KV Switchyard
Project Name: 2x600 MW Power Plant
,Salaya

Customer Name: Essar Projects (India).Ltd, Location :


Client Name: Essar Power Gujarat Ltd, Contractor Name: Areva T & D

Phase Injected Injected Value Relay Metered Value


A-B Voltage (Vab) 110 Volts
B-C Voltage (Vbc) 110 Volts
C-A Voltage (Vca) 110 Volts

Over Voltage Check:

(Stage-1) Set Volt: 70.0 V Set Time: 3.0 Secs

PHASE Applied Optd. Applied Voltage Optd. Time(Sec)


Voltage(V) Time(Sec)
R
Y
B

(Stage-2) Set Volt: 89.0 V Set Time: 0.0 Secs

PHASE Applied Optd. Time(ms) Applied Voltage Optd. Time(ms)


Voltage(V)
R
Y
B

LED Configuration:

LED
LED DESCRIPTION LED No LED DESCRIPTION
NO.
1 5
2 6
3 7
4 8

FUNCTION CHECKS:

TEST-TYPE RESULT

Performed by Verified by Accepted by

Areva T & D EPIL EPGL

Name: Name: Name:

Date: Date: Date:


Area : 400 KV Switchyard
Project Name: 2x600 MW Power Plant
,Salaya

Customer Name: Essar Projects (India).Ltd, Location :


Client Name: Essar Power Gujarat Ltd, Contractor Name: Areva T & D

Over Voltage Function


Disturbance Recorder & Event Logger
Binary Input / Output Checks
Correct Operation of LED / Aux. Relay
Fault Recorder
Front Port Communication

Note: The settings, PSL Logic of output Relays, Input Optos and LEDs are configured as per the
scheme and customer requirement.

MiCOM P122 STUB Protection Relay

GENERAL DATA AND INFORMATION:

Circuit Ref. 400KV LINE-1 Designation


Panel No. Serial No.
Make AREVA Model No.
Dwg & Sh No. Aux. Voltage 220V DC

Watch Dog Relay Check:

Terminals Contact State


Relay De-Energized Result Relay Energized Result
J11 – J12 Closed Open
J13 – J14 Open Closed

Measurement Checks:
CT Ratio: 2000 / 1A

Phase Injected Injected Value Relay Metered Value


A PHASE 1.0 Amps
B PHASE 1.0 Amps
C PHASE 1.0 Amps

stub FUNCTION TEST:

Performed by Verified by Accepted by

Areva T & D EPIL EPGL

Name: Name: Name:

Date: Date: Date:


Area : 400 KV Switchyard
Project Name: 2x600 MW Power Plant
,Salaya

Customer Name: Essar Projects (India).Ltd, Location :


Client Name: Essar Power Gujarat Ltd, Contractor Name: Areva T & D

Applied Optd Time Applied Current Optd


Current Time

LED CONFIGURATION:

LED LED
NO
1
2
3
4

TIME DELAY LBB PROTECTION RELAY TEST

General Data And Information:

Circuit Ref. Designation


Panel No. Sr. No.
Make Model No.
Drg. & Sh. No. Aux. Voltage

Timing Check at Rated Current:


PHASE SETTING Injected Optd SETTING Injected Optd
Current(A) Time(s) Current(A) Time(s)
R PHASE Current= Current=
Y PHASE
B PHASE Time= Time=
R PHASE Current= Current=
Y PHASE
B PHASE Time= Time=
R PHASE Current= Current=
Y PHASE
B PHASE Time= Time=
FUNCTION CHECKS:

TEST-TYPE RESULT

Performed by Verified by Accepted by

Areva T & D EPIL EPGL

Name: Name: Name:

Date: Date: Date:


Area : 400 KV Switchyard
Project Name: 2x600 MW Power Plant
,Salaya

Customer Name: Essar Projects (India).Ltd, Location :


Client Name: Essar Power Gujarat Ltd, Contractor Name: Areva T & D

Correct Operation of Contacts


Correct Operation of Aux. Relay
Binary Input / Output Checks

Note: The settings are configured as per the scheme and customer requirement.