CE-2105
DESIGN OF CONCRETE STRUCTURE-I
DESIGN OF BEAM
(AS PER ACI CODE)
Course TeacherPresented ByDr. Md. Rezaul Karim Md. Jahidur Rahman
Associate Professor
S.ID- 121041
Content
USD(Ultimate Strength Design)
Classification of beam with respect to design system
Assumptions
Evolution of design parameters
Calculating
Jahidur Rahman
Jahidur Rahman
compression zone)
T section beam (both beam and slab are designed
together)
ASSUMPTIONS
Plane sections before bending remain plane and
c=0.003
c
h
0.85fc
a
a/2
C
d
d-a/2
s = fy / Es
5
Jahidur Rahman
Actual
fy
Idealized
Es
1
Jahidur Rahman
T = As fy
C=T
0.85fc ba = As fy
a = As fy / (0.85fc b)
= d fy / (0.85 fc) [ = As / bd]
Moment of Resistance/Nominal MomentMn = 0.85fc ba (d a/2)
or,
Mn = As fy (d a/2)
= bd fy [ d (dfyb / 1.7fc) ]
= fc [ 1 0.59 ] bd2
= fy / fc
Mn = Kn bd2 Kn = fc [ 1 0.59 ]
Ultimate Moment- Mu = Mn
= Kn bd2
Jahidur Rahman
; fc 4000 psi
1= 0.65
b = Asb / bd
= 0.85fc ab / (fy. d)
= 1 ( 0.85 fc / fy) [ 87,000 / (87,000+fy)]
8
Jahidur Rahman
For beams the ACI code limits the max. amount of steel to 75% of
that required for balanced section.
0.75 b
Jahidur Rahman
Calculating
Yes
No
No
Yes
Calculating
12
Jahidur Rahman
face
9. Calculate , Kn
OK
Note Below:
14
Jahidur Rahman
Over
reinforced
beam
Yes
Ultimate moment
15
No
Under
reinforced
beam
16
Jahidur Rahman
DESIGN
PROCEDURE
FOR
DOUBLY
REINFORCED
BEAM
Concrete
section, Area
of steel are
known
Compression bar
does not reach in
yielding
rectangular
beam
No
Yes
No
Yes
Doubly
reinforced
beam
Compression and
tension bar reach in
yielding
DESIGN
PROCEDURE
FOR
DOUBLY
REINFORCED
BEAM
Reinforcement
required in comp.
zone too
Load or
ultimate
moment is
given
Doubly
reinforced
beam
Yes
No
rectangular
beam
T- REINFORCED BEAM
A part of slab acts as the upper part of
Resulting cross section is T shaped.
The
beam.
19
Jahidur Rahman
DESIGN
PROCEDURE
FOR
T-REINFORCED
BEAM
calculation
Yes
Are of concrete
section, Area of
steel are known
No
T - beam
analysis
Rectangular
beam analysis
modification
Nominal moment
Additional moment
Total moment
DESIGN
PROCEDURE
FOR
TREINFORCED
BEAM
T - beam
analysis
Moment or loading is
given
calculation
T section:
L section:
No
Yes
Rectangular
beam analysis
Isolated beam:
Nominal moment
Additional moment
Check for
Total area of steel
APPENDIX
22
Jahidur Rahman
L / 18.5
L / 21
L/8
23
Jahidur Rahman
CLEAR COVER
RULE OF THUMB
d/b = 1.5 to 2.0 for beam spans of 15 to 25 ft.
d/b = 3.0 to 4.0 for beam spans > 25 ft.
`b` is taken as an even number
Larger the d/b, the more efficient is the section due to less
deflection
24
Jahidur Rahman
BAR SIZE
#n = n/8 in. diameter for n 8.
Ex. #1 = 1/8 in.
.
#8 = 8/8 i.e., I in.
25
Bar
No
Wt.per
Foot (lb)
3
4
5
6
7
8
9
10
11
14
18
0.376
0.668
1.043
1.502
2.044
2.670
3.400
4.303
5.313
7.650
13.600
Jahidur Rahman
26
Jahidur Rahman