Baru
Baru
Baru
Personal Details
Name
Age: 43
NR Identity Card
691126-02-5269
Nationality
Malaysian
Race
Malay
Marital Status
Home Address
Telephone No.
E Mail
akmalp2d@yahoo.com
Command of Language :
Mac
Feb
1999
Safety
Induction
Course
issue
by
CIDB
2001
Aug
2004
July
2007
2007
by
CONSIST
Lumpur.
Oct
2008
regulatory standards
- supervising Rigger Foreman and participating in various maintenance
work about the entire offshore unit material/equipment movement,
repair, and maintenance
Type of Crane: FAVCO CRANE 15/10K, 7.5/10k, 6/10k Crane, Sea Crane T35
- Involve in Shutdown Project ( Cakerawala) , Demolition (Cakerawala-CKR), Hock-up
& Commissioning ( Bumi, Bulan & Suriya Satelite Platform )
- Coordinate with Marine Coordinator, Marine Logistic, Radio Room, Supply boats, etc to
ensure safe lifting operations when diving ship is nearby.
- utilized in the lifting and movement of all operations equipment, personal , systems,
2003-2005:
- The Beris Dam in Sik, Kedah is the newest dam in Malaysia. Built at the cost
of RM355mil in 2000 and completed in 2005, the dam was formed when it
was built across the Beris River. Some 535 families from seven kampungs
were relocated for the project.
- rig the machine up by pinning the boom and pendant cables and pull the
hoist
- Use safe working procedure and safe working loads at site. (SWL & WLL)
- Regular inspection, maintenance of Mobile Crane equipment and rigging.
2001-2003:
Tower Crane Operator
BLAZE CONSTRUCTION SDN BHD.
POTAIN F3/29B Hammerhead Tower Crane.
-
Operates cranes to lift and move loads such as steel, concrete, wood or
bulk materials
1999-2001
Tower Crane Operator
PUTRA PERDANA CONSTRUCTION Sdn Bhd.
POTAIN MC 265 HAMMERHEAD TOWER CRANE
-
Operates cranes to lift and move loads such as steel, concrete, wood or
bulk materials
Use safe working procedure and safe working loads at site. (SWL & WLL )
1997-1999
Tower Crane Operator
PAREMBA CONSTRUCTION SDN BHD
( Potain FO/23A Hammerhead Tower Crane )
- Build & Construct 22 Storey Condominium at Sri Petaling
- Operates cranes to lift and move loads such as steel, concrete, wood or
bulk materials
- Use safe working procedure and safe working loads.
- regular inspection, maintenance of crane equipment and rigging
1997-1997
Tower Crane Operator
KEDAH SATO (KHTP)
POTAIN MC 120 HAMMERHEAD TOWER CRANE
-
Build & Construct Business Center at Kulim Hi-Tech Industrial Park, Kedah.
Operates cranes to lift and move loads such as steel, concrete, wood or
bulk materials
Use safe working procedure and safe working loads at site. (SWL & WLL )
1995-1996
Tower Crane Operator
IJM Construction Sdn Bhd under Flexiworld (M) Sdn Bhd
Operates cranes to lift and move loads such as steel, concrete, wood or
bulk materials
Use safe working procedure and safe working loads at site. (SWL & WLL )
1993-1995
Signalman /Rigger
PINA AUTO (M) Sdn Bhd Tower Crane Supplier
( Potain F2/23 Hammerhead Tower Crane )
- Build & Construct 18 Storey Condominium at Jelutong, Penang.
- Learn, responds and practice using two way communication by hand signal
or walkie-talkie with Tower Crane Operator.
- Learn and practice how to respons and practice safe working procedure and
safe working loads.
-
- Operates cranes to lift and move loads such as steel, concrete, wood or
bulk materials with supervision qualified Tower crane Operator.
References
1-MOHD LATIFF AHMAD
SENIOR EXECUTIVE HSE
DEVELOPMENT DIVISION
PETRONAS CARIGALI
H/P: +6012-2871174
2-Mohd Shahrul Akmal
Newfield Crane Operator,