Ra 8749
Ra 8749
Eruption of Volcano
Forest Fire
Sand Storm
Pollen Grains
2. Man-Made Sources
Mobile Source
Stationary Source
Area Source
9/23/2015
9/23/2015
10
9/23/2015
11
Metro Manila
Monitoring Stations
managed by EMB
Central & NCR
9/23/2015
13
Health
Environment
Particulates
(TSP, PM10, PM2.5)
Visibility reduction
Environmental Damage
Aesthetic Damage
Sulfur Oxides
(Sox)
Colorless gas with strong
suffocating odor
Nitrogen Oxides
(NOx)
Reddish brown gas with
irritating odor, by product of
incomplete combustion from
vehicles.
Major source of
photochemical smog
Contributes global warming
Hampers plants growth
Carbon Monoxide
(CO)
Colorless, odorless gas , by
product of incomplete
combustion
Lead (Pb)
Affects Ecosystem
Pollutants
LongTerm
ug/Ncm
Averaging
Time
ug/Ncm
Averaging
Time
230
150
24 hours
24 hours
90
60
1 yeare
1 yeare
Sulfur
Dioxidec
180
24 hours
80
1 year
Nitrogen Dioxide
150
24 hours
Ozone
140
60
1 hour
8 hours
35 mg/Ncm
10 mg/Ncm
1 hour
8 hours
1.5
3 monthsg
1.0
1 year
Suspended Particulate
Matterc
TSP
PM 10
Carbon Monoxide
Lead
DENR ADMINISTRATIVE
ORDER NO. 2013-13
Establishing the Provisional National Guideline
Values for PM2.5
PM 2.5 National Air Quality Guideline Values, ug/NCM
Short Term (24 Hr)
Implementation Period
75
35
50
25
January 1,2016
PERMITTING REQUIREMENTS
Permit to Operate
refers to the legal authorization granted by
the Environmental Management Bureau to
operate or maintain any installation for a
specified period of time
Supporting Documents
Engineers Report prepared by the Pollution Control Officer and approved by
Drawing Requirements
Plan/Elevation Drawing with the following:
Vicinity Map
Plant & Machinery Layout showing the
connection of the APSI to APCF
Plan & Elevation Drawings of each APSI &
APCF
Sectional Drawing of APCF
Must be drawn in 50 cm by 90 cm signed by
the President/General Manager and duly
signed by PME/CHE or any from the two.
Supporting Documents
Copy of the Certificate of Accreditation of the Pollution Control
Office, or appointment/designation as such by the Managing
Head.
Environmental Compliance Certificate (ECC) or Certificate of
Non-Coverage (CNC) copy.
Source Emission Test Requirement (if required).
Copy of Recent Permit to Operate issued by the Office.
Copy of Discharge Permit , if applicable.
Copy of Hazardous Waste Generator Registration ID, if
applicable.
Copy of SEC Registration Certificate & Articles of Incorporation
Copy of DTI Registration Certificate
11 Proof of compliance to permit conditions (if required).
INSTRUCTIONS
Fully accomplish the form and complete all the
supporting documents. Submit all documents in
duplicate copies to Permitting Section for
screening and assessment of fees.
Application shall be acted upon within thirty (30)
working days and you shall be informed of our
action accordingly.
Releasing of Permit
APPROVED PERMIT
ISSUANCE OF
ORDER OF PAYMENT
from Accounting Section
CASHIER SECTION
Issuance of O. R.
RECORDS SECTION
RECEIVED THE
APPLICATION
RECORDS SECTION
APPROVED PERMIT RELEASED TO
PCO OR AUTHORIZED PERSON
E = A x EF x (1-ER/100)
E= emissions
A= Activity
EF = emission factor
ER = overall emission reduction efficiency
PM
CO
NOx
SO2
SO3
VOC
A. Bunker Oil
< 100 million BTU/hr
or 293.3 MW
10
55
157 (S) at 3%
S = 471
2 (S)
1.28
9.19 (S)
+ 3.22
47
157 (S) at 3%
S = 471
5.7(S)
B. Diesel
< 100 million BTU/hr
or 293.3 MW
20
112 (S)
0.252
24
157 (S)
0.252
PM
CO
NOx
SOx
VOC
<600 Hp or
588.24 KW
41.49
127.1
590.2
38.31
48.18
> 600 Hp or
588.24 KW
13.38
133.8
428.3
133.835 (S)
12.045
E = A x EF x (1-ER/100)
A = Activity (Fuel Consumption/yr)
EF = Emission Factor
No APCD: (1-0) = 1
PERMIT CONDITIONS
FOR NEW INSTALLATIONS
Permit Conditions
By _________submit the following:
Updated Certificate of Accreditation of
appointed PCO;
Reduction/Mitigation Plan on the activities
that potentially may contribute greenhouse
gases or global warming, including its
timetable of implementation; and
Source Emission Test (SET) report for
NOx/PM on the ________________.
Date of
Memorandum
30 Oct 2014
Installation of
CCTV camera on
stacks of Fuel
Burning
Equipment as per
DAO 2008-81
Location
Mixer
Process bldg.
100
Shaded Area
2208
Location
Fuel Used
# of hrs of operation
Quantity
Consumed
# of hrs of
operations
150 Hp Boiler
Bunker oil
4,000
300
200 Hp Boiler
Bunker oil
6,000
350
Location
# of hrs of operation
Tapped to 2 boilers
350
Cost of Treatment
Month 1
Month 2
Month 3
P 12,000
P 12,000
P 12,000
30
32
28
100
120
80
Small Source
Boiler rated at less than 50 Hp to 100 HP
Generator set rated at less than 300 KW to 599 KW (regardless of
frequency of operation)
Source that has the potential to emit 10 to < 30 tons per year
Emission testing required once every two years
Large Source
Boiler with rated capacity of 251 Hp or greater
Source that has the potential to emit 100 tons or
more per year
-Testing is twice (2x) per year
Particulates
150
200
150
3. Smelting Furnaces
150
200
NOx
Maximum Permissible
Limits (mg/Ncm)
Pollutant
NOx
2. New Sources
a) Manufacture of Sulfuric Acid
and Sulf(on)ation Process
b) Fuel Burning Equipment
c) Other Stationary Sources
Maximum Permissible
Limits (mg/Ncm)
2,000 as NO2
1,000 as NO2
500 as NO2
2,000 as SO3
1,500 as SO2
1,000 as SO3
1,500 as SO3
700 as SO2
200 as SO3
Pollutant
Maximum Permissible
Limits (mg/Ncm)
500 as CO
Lead
10 as Pb
Mercury
Any Source
5 as elemental Hg
Any Source
20 as Ni
Any Source
100 as Cu
Any Source
10 as Cd
Any Source
10 as AS
FACT:
Tobacco Smoke
KILLS
EXISTING
EXISTING
PROPOSED
PROPOSED