SL Qty Description of Work Rate Per Amoun T 1. 10 Pts 7638.0 0
SL Qty Description of Work Rate Per Amoun T 1. 10 Pts 7638.0 0
SL Qty Description of Work Rate Per Amoun T 1. 10 Pts 7638.0 0
N.W: Providing AC facilities and power plugs to Insurance ward at District Head
Quarters Hospital at Ramanathapuram.
Sl Qty
Description of work
Rate
Per
1. 10
Pts
763.80
2. 7
Nos.
1590.4
0
Ea
11,132.
80
3. 2No
s.
1787.9
0
Ea
3575.8
4. 4
Nos.
5. 12
Nos.
6. 3
Nos.
7. 12
Nos.
8. 120
Mts.
Pt.
Amoun
t
7638.0
0
236.1
Ea
944.40
179.90
Ea
2158.8
0
680.00
Ea
2040.0
0
314.90
Ea
3778.8
0
98.00
Mt.
11760.
00
43,028.
2
6
Sl Qty
Description of work
Rate
Per
B/F
9. 120
Mts.
9. 120
Mts.
Amount
43,028.6
83.50
Mt.
10,020.00
129.50
Mt.
9065.00
3
1 6
0. Nos.
35055.0 Ea
0
210330.00
Qty
Description of work
B/F
272,443.6
Rate
Per
Amount
272,443.6
4
1 6
1. Nos
.
3200.00
Ea.
19200.00
1 3
2. Nos
.
4000.00
Ea
12,000.00
Total
Less cost for old materials
303,643.6
643.6
303000.00
LS
7000.00
Tota
l
Rupees Three Lakhs and ten thousand
only
310000.00