EDG Test
EDG Test
EDG Test
Page 1 of 7
HK-E-HV701
Document Class
For Commissioning
Revised as comment
Revised as comment
For approval
Sep. 08,
2015
Ayhu
Rev.
Description
Date
Tirda
Tirda
OWNER`S
DWG.NO
DWG. NO.
E07007-PR-TM-3007
DATE OF ISSUED
REVISION NO.
Sep.08, 2015
Yoga
REV 0
HK-E-HV701
Page 2 of 7
Commissioning Procedure
Table of Contents
1
2
3
4
5
6
7
8
9
COVER
SCOPE
OBJECTIVE
REFERENCE
TEST INSTRUMENT
RISK AND SAFETY PRECAUTION
BUSBAS PROTECTION TEST ITEM
BUSBAS PROTECTION PROCEDURE
ATTACHEMENT
1
2
3
3
3
3
3
3
3
REV 0
HK-E-HV701
Page 3 of 7
Commissioning Procedure
1.
Title
EDG Test Procedure
2.
Scope
EDG body, local panel of EDG, incoming switch 0.4Kv protection.
3.
Objective
This is to assure that the requirements of electrical individual test works c1re
meets the codes requirements and contract specifications. To make sure, the
works are carried out in acceptable workmanship and follow requirements
in the quality manual.
4. Reference
a) HK/SDMIEC Quality manual
b) Applicable manufacture manual/standard
c) Design drawing provided by Design Institute ZT-F201115S-D0201-03
(2/3)
5. Test Instrument
Fluke 17B
Secondary Phase Sequence Tester
DC Resistance Tester
Insulation Resistance Tester
Relay Tester.
REV 0
HK-E-HV701
Page 4 of 7
Commissioning Procedure
7.
Visual inspection
Individual Test of EDG.
Local Stop/Start EDG
Local Protection
8.
8.1.1
Visual Inspection.
Check name plate of each protection and write down.
8.1.2
8.1.3
REV 0
HK-E-HV701
Page 5 of 7
Commissioning Procedure
9.
.
Manually stop EDG locally.
Manually start and stop EDG local 3 times. Checked the battery capacity.
ATTACHEMENT
Test form
Calibration date of equipment test
Drawing Equipment