RCPIER Tutorial Manual
RCPIER Tutorial Manual
RCPIER Tutorial Manual
00 Tutorials
LEAP RC-PIER
Tutorials
TRADEMARK NOTICE
Bentley, the "B" Bentley logo, and LEAP RC-PIER are registered or non-registered trademarks
of Bentley Systems, Inc. or Bentley Software, Inc. All other marks are the property of their
respective owners.
RESTRICTED RIGHTS LEGENDS
If this software is acquired for or on behalf of the United States of America, its agencies and/or
instrumentalities ("U.S. Government"), it is provided with restricted rights. This software and
accompanying documentation are "commercial computer software" and "commercial computer
software documentation," respectively, pursuant to 48 C.F.R. 12.212 and 227.7202, and
"restricted computer software" pursuant to 48 C.F.R. 52.227-19(a), as applicable. Use,
modification, reproduction, release, performance, display or disclosure of this software and
accompanying documentation by the U.S. Government are subject to restrictions as set forth in
this Agreement and pursuant to 48 C.F.R. 12.212, 52.227-19, 227.7202, and 1852.227-86, as
applicable. Contractor/Manufacturer is Bentley Systems, Incorporated, 685 Stockton Drive,
Exton, PA 19341-0678.
Unpublished - rights reserved under the Copyright Laws of the United States and International
treaties.
COPYRIGHT NOTICE
2011, Bentley Systems, Incorporated. All Rights Reserved. Including software, file formats,
and audiovisual displays; may only be used pursuant to applicable software license agreement;
contains confidential and proprietary information of Bentley Systems, Incorporated and/or third
parties which is protected by copyright and trade secret law and may not be provided or
otherwise made available without proper authorization.
DISCLAIMER
Although this program has been written and tested by Bentley Systems, Inc., no warranty,
expressed or implied, is made as to the accuracy or functioning of the program and related
program material. In no event will Bentley System, Inc. be liable for any damages, including,
without limitation, incidental and consequential damages and damages for lost data or profits,
arising out of the use of or inability to use the licensed program.
Version:
LEAP RC-PIERv10.00.01.00
Editor:
Robert Prancevic
Table of Contents
Chapter T1
Chapter T2
Chapter T3
Chapter T4
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
TOC-1
Chapter T5
Abutment Design
(AASHTO LRFD)
Abutment Design (AASHTO LRFD) . . . . . . . . . . . . . . . . . . . . . . . . . . . T5-1
Starting the Tutorial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T5-3
Index
TOC--2
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Chapter
T1
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -1
T1
Diagrams
27'-0"
9'-0"
4'-6"
1'-6"
9'-0"
3'-0"
1'-6"
4'-0"
6"
6"
4'-0"
A
4'-0"
3'-0"
8"
3'-0"
3'-0"
4'-6"
1'-6"
17'-0"
3'-0"
3'-0"
1'-6"
18'-0"
26'-0"
B
3'-0"
4'-0"
3'-0"
3'-0"
Section B-B
3'-0"
Section A-A
12'-0"
Figure T1-1 Elevation of Bridge Pier with Cross Section for Cap and Column
T1 -2
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
32 kips
T1
32 kips
8 kips
46'-0"
14'-0"
14'-0"
46'-0"
60'-0"
60'-0"
R
(a) Longitudinal View
27'-0"
4'-6"
1'-6"
2'-0"
9'-0"
6'-0"
2'-0"
9'-0"
4'-6"
7'-0"
3'-0"
6'-0"
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -3
T1
26 ft
0 = + 30
3 ft
= +30 deg
(a) Plan View of the Pier Cap where wind pressure acts on
26 sin
30 deg
3 cos
3 ft
30 deg
26 ft
(b) Calculation of projected area for wind pressure acts on a pier cap
Figure T1-3 Wind Load on the Substructure
T1 -4
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Problem Data
Table T1-1
Concrete Strength
Cap
fc = 4000 psi
Columns
fc = 4000 psi
Footings
fc = 4000 psi
Modulus of Elasticity
Ec = 3834 ksi
Concrete Density
Cap
= 150 pcf
Columns
= 150 pcf
Footings
= 150 pcf
fy = 60 ksi
Columns
fy = 60 ksi
Footings
fy = 60 ksi
Modulus of Elasticity
Es = 29000 ksi
Concrete Type
Cap
Normal
Columns
Normal
Footings
Normal
Other Parameters
z = 170 kips/in
Pier Configuration
Rectangular non-tapered multi-columns, with straight cap
Superstructure Parameters
Number of lanes
=2
(Note that in this tutorial, the pier is only designed for 1 lane loaded)
Beam Height
= 36 in
= 369 in2
= 50980 in4
= 5332.5 in4
Beam Ycg
=15.83 in
Barrier Height
= 36 in
Slab Depth
= 8.0 in
Span Information
Bridge Overall Width, ft
27 ft
24 ft
60 ft
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -5
T1
Table T1-1
60 ft
Substructure Parameters
Cap: Length Height Depth
= 26 ft 48 in 36 in
Skew Angle
= 0 degrees
Start Elevation
= 22 ft
End Elevation
= 22 ft
= 20 ft
Width Depth
= 36 in 36 in
Bearings
Loads
Dead Load
Self-weight
= 150 pcf
Slab
= 150 pcf
Girder Weight
= 150 pcf
Barrier Weight
= 20 psf
(20 27 = 540 plf)
Live Load
HS20 Truck
Wind on Structure
Direction of wind
= + 30
= 0 ft
= 41 psf
= 12 psf
= 40 psf
= 40 psf
= +30
= 82 plf
= 24 plf
= 60 ft
Footing Surcharge
Footing
= 0.200 ksf
T1 -6
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Step 1
The Project screen will be displayed, as shown in Figure T1-4. Fill in the general project information. Select the
AASHTO Standard option under Design Specifications and U.S. Units under Units.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -7
T1
Step 2
Click the Geometry tab to open the Geometry screen, as shown in Figure T1-5. Click and drag to rotate the model.
Step 3
Click Pier Configuration to open the Pier Configuration screen, as shown in Figure T1-6. Under Pier Type, select
Multi-columns, select Straight under Cap Shape, and Rect. Non-tapered from the Column Shape list. Set the Pier
View direction to Upstation. Click OK.
T1 -8
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Step 4
Click Superstr. to open the Superstructure Parameters screen. Input the values for the number of lanes, beam
height and area, barrier/railing height, slab depth, total number of spans, and total length and width of spans, as
shown in Figure T1-7, and then all add all span lengths. Click OK to the Geometry screen. Note that this screen is
optional; however, it is required for auto load generation, as illustrated later in this tutorial.
Step 5
Click Cap to open the Straight Cap Parameters screen, as shown in Figure T1-8. Enter 26 in the Cap Length field,
48 in the Cap Height field, 36 in the Cap Depth field, and 22 in the Start and End Elevation fields. Click OK.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -9
T1
Step 6
Click Column to open the Rectangular Non-Tapered Column screen, as shown in Figure T1-9. (This screen will be
specific to the type of column shape selected.) For this tutorial input two columns, as follows.
1. Enter 3 in the Loc from left of cap field, 0 in the Bot. Elev field, 36 in the Width and Depth fields, and 1 in
the Factor of Reduced MI field. Click Add. The column will appear in the list as shown.
2. Input the second column. Enter 23 in the Loc from left of cap field, 0 in the Bot. Elev field, 36 in the Width
and Depth fields, and 1 in the Factor of Reduced MI field. Click Add to add the column to the list.
3. Click OK and return to the Geometry screen.
To modify a column, highlight it in the list, make the necessary changes, and click Modify. To delete a column,
highlight it and click Delete.
Step 7
Click Strut to open the Intermediate Strut screen, as shown in Figure T1-10. This screen is used to add
intermediate struts to the pier structure; however, in this tutorial, modifications are not required. Click Cancel.
T1 -10
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Step 8
Click Brgs/Grdrs to open the Bearings/Girders screen, as shown in Figure T1-11. This screen is used to define the
configuration of the bearing line, eccentricity, and distance from left end of pier cap to individual bearings.
1. Select Single under Configuration. This specifies that there is only one bearing line on the pier.
2. Input the first bearing point by selecting the Cap Left End option and entering 4 in the text box under
Distance From. Click Add. A bearing line will appear in the list on the screen.
3. Enter the second bearing point. Select Cap Left End under Distance From and enter 13. Click Add to add
the second bearing line to the list.
4. Repeat the above steps to add the third bearing point, enter 22 under Distance From. Click Add. When
completed, your screen should resemble Figure T1-11. Click OK.
To modify a bearing line in the list, highlight it, make the appropriate changes, and click Modify. To delete a
bearing line, highlight it and click Delete.
Note:
The first bearing point must be measured from Cap Left End. For all other points, you can select the Last
Point option. This allows you to input the same value multiple times; each new bearing spaced evenly from
the previous bearing.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -11
T1
Step 9
Click Material to activate the Materials screen, as shown in Figure T1-12. This screen defines the strength,
density, concrete modulus of elasticity, and reinforcing steel strength as well as the concrete type. Notice that the
program defaults to certain values. You can override these values by typing over them. Input the values shown in
figure and click OK to return to the Geometry screen.
Step 10
Click Str. Model to open the Structure Model screen, as shown in Figure T1-13. Use this screen to keep track of all
nodes of the pier structure, add or remove nodes to the pier structure for use as reference points (checkpoints), and
define hinges at existing points. This screen is not used in this tutorial. Click Cancel to return to the Geometry
screen.
T1 -12
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Step 11
Hammer STM is only available for hammerhead structures (LRFD). This option is not used in Tutorial 1.
Step 12
Select Image from the Show menu to activate the Image screen (or the corresponding icon on the toolbar at the top
of the screen). A 3-D image of the structure will be displayed on the screen, as shown in Figure T1-14.
Use the buttons on the left of the screen to manipulate your view of the image (e.g., rotate, pan, zoom-in or out).
Experiment with the buttons to become more familiar with their functions. Once you have become familiar with
this screen, close or minimize the screen and return to the Geometry screen.
Step 13
Select Model from the Show menu to bring up the Model screen (or its corresponding icon on the toolbar at the top
of the screen), as shown in Figure T1-15. A 3-D model of the nodes, element number, etc will be displayed on the
screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -13
T1
The type of model displayed depends on which characteristics you select from the check boxes at the top of the
screen (Node Number, Member Number, and Checkpoints). Use the buttons on the left side of the screen to
manipulate your view of the model (e.g., rotate, pan, zoom-in or out). Experiment with these buttons to become
familiar with their functions. Once you have become familiar with this screen, close or minimize the screen and
return to the Geometry screen.
Step 14
Click the Loads tab to display the Loads screen, as shown in Figure T1-16. This is where you enter all load
information.
Notice there are two lists of loads: Load Types and Available Groups. Load Types are preset individual loads that
you can add to the pier structure for calculations. Available groups are preset load combinations that can be added
to the pier structure. First, add the load types (shown in Figure T1-16) to the Selected Load list:
T1 -14
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Step 15
Auto-generate loads for dead load, live load, wind load on structure, and wind load on live load.
1. Highlight D1 in the Selected Loads list and click Edit. The Loads: Load Data screen will display, as
shown in Figure T1-17.
2. Click Generate to bring up the Auto Load Generation: Structure DL screen, as shown in Figure T1-18.
(Note that the auto load generation screen will be specific to the load type selected).
3. Select the check boxes to include slab and girders.
4. Enter 150 in the Slab and Girder Unit Weight fields.
5. Select the option use simple span distribution for barrier and wearing surface.
6. Check the boxes for barriers and wearing surface.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -15
T1
7. Specify 1200 in the total load per foot field for barriers, and 540 in the Load per foot field for wearing
surface.
8. Click Generate. The program will automatically generate the loads and return to the Loads: Load Data
screen.
9. Click OK to return to the Loads screen.
T1 -16
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Step 16
Auto generate the live load:
1. Highlight (L+In)1 in the Selected Loads list and click Edit to bring up the Loads: Load Data screen.
2. Click Generate to activate the Auto Load Generation: Live Load screen, as shown in Figure T1-20.
Figure T1-19 Auto Load Generation: Live Load Screen - Prior to Auto Generation
3. In the longitudinal reaction area, select the option compute simple span longitudinal reaction using
following trucks.
4. Highlight HS20 Truck under Available and click Add to add it to the list under Selected.
5. In the Transverse Positioning area select 1 lane loaded from the Loaded Lanes list.
6. Select the Variable Spacing Method option and input 1.0 in the Minimum Spacing Between Locations
text box.
7. Click Generate. The program will automatically generate the loads and return to the Loads: Load Data
screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -17
T1
Figure T1-20 Auto Load Generation: Live Load Screen - Post to Auto Generation
8. If desired, input a name in the Name text box (e.g., llcase1) and a description in the Description text box.
9. Click OK and return to the Loads screen.
Note that when you return to the Loads screen after generating the live loads, RC-PIER adds (L+In)2, (L+In)3, and
(L+In)4 load cases to the list under Selected Loads. The Loads screen will look similar to Figure T1-21.
T1 -18
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Step 17
Now, auto generate the Wind Load on Structure:
1. Highlight W1 in the Selected Loads list and click Edit to bring up the Loads: Load Data screen.
2. Click Generate to open the Auto Load Generation: Wind on Structure screen, as shown in Figure T1-22.
3. Select 30 from the Wind Angle list and enter 0 in the Elevation Above Which Wind Load Acting field.
4. Select the Default Wind Pressure check box. (Note that when this option is selected, the remaining fields
are grayed out.)
5. Click Generate. The program automatically generates the loads and returns to the Loads: Load Data
screen.
6. Click OK and return to the Loads screen.
Step 18
Auto generate the Wind Load on Live Load:
1. Highlight WL1 in the Selected Loads list and click Edit to bring up the Loads: Load Data screen.
2. Click Generate to open the Auto Load Generation: Wind on Live Load screen, as shown in Figure T1-23.
3. Select 30 from the Wind Angle list and leave 60 in the Length of Live Load field.
4. Click Generate. The program automatically generates the loads.
5. Click OK and return to the Loads screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -19
T1
Step 19
Click the Analysis tab to activate the Analysis screen. This screen is used to perform an analysis and also specify
various factors relating to the analysis and design.
Click A/D Parameters to open the Analysis/Design Parameters (Standard) screen and input the values as shown in
Figure T1-24. Click OK and return to the Analysis screen.
Click Run Analysis to perform the analysis for the pier structure based on all the data entered up to this point. The
results will appear on the screen, as shown in Figure T1-25. If necessary, use the scroll bar on the right side of the
screen to view all the results. Specify the type of results to view by using the lists at the top of the screen.
Print the analysis results by right-clicking in the results area of the Analysis screen and selecting the Print.
T1 -20
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Step 20
Save your project. Select Save As from the File menu. The Save As screen, will open, as shown in Figure T1-26.
Enter a name for the file in the File Name field (e.g., Mytutor1). The default extension is *.rcp. Click Save.
Step 21
Click the Cap tab to open the Cap screen, as shown in Figure T1-27. Use this screen to have RC-PIER design the
cap. Clicking Auto Design or you can manually input the cap design. The following steps illustrate the auto design
feature.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -21
T1
3. Select #8 from the Main Bar Size list, #4 from the Stirrup Size list, 2 from the nlegs list and specify 6 inch
in the spacing increment box.
4. Click OK.
5. The Design Status - Cap screen will immediately display. Click Close (or the X in the top right corner of
the screen) to exit this screen and return to the Cap screen.
6. The generated cap design main reinforcement will appear on the screen, as shown in Figure T1-29.
T1 -22
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
7. To see the shear stirrups design, choose the option to view stirrups, as shown in Figure T1-30.
To see a design summary of the cap, click Design Status to display the cap summary, as shown in Figure T1-31.
Click Print to print the design summary.
Figure T1-31 Design Status - Cap Screen (In Enhanced Report Format)
The printout for shear/torsion design is given in terms of the sides of a section. For the section other than
the start or end of a span, it has two sides: left and right. The start and end of the span have only one side.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -23
T1
Step 22
Click the Column tab to open the Column screen, as shown in Figure T1-32. Either manually input the column
reinforcement or have the program automatically design it. For this tutorial, the Auto Design feature is used.
1. Select 1 from the Column# list and Ties from the Lateral Bar Type list.
2. Click Auto Design to bring up the Design Column screen, as shown in Figure T1-33.
3. Select #8 from the Bar Size list and #4 from the Stirrup Size list.
4. Click OK.
5. The Design Status - Column screen will immediately display. Click Close or the X in the top right corner of
the screen to exit this screen and return to the Column screen.
T1 -24
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
6. The column design will appear on the screen, as shown in Figure T1-34.
7. Repeat steps 1-6 for the second column. Select 2 from the Column# list and click Auto Design. Select #8
from the Bar Size list and 4 from the Stirrup Size list. Click OK.
To see a design summary of the selected component, click Design Status on the Column screen to activate the
Design Status - Column screen, as shown in Figure T1-35. Click Print to print the design summary or click Sketch
to see a graphical representation of the selected column.
Figure T1-35 Design Status - Column Screen (In Enhanced Report Format)
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -25
T1
Step 23
After the column is designed view the column interaction diagram by selecting Diagrams from the Show menu.
Then, select the column to view from the Objects list and the Design option. The column interaction diagram will
appear on the screen as shown in Figure T1-36. View different load combinations by selecting from the Load
Combination list.,
Step 24
There are two ways you can define footing sizes in RC-PIER. Rectangular footings size can be defined on footing
dialogs directly by choosing the user option and specifying the dimensions. Other way to define footing size is to
define and maintain an item in library. For this tutorial we will use the second approach. Select the Footing
Configuration item from the Libraries menu to activate the Footing Library screen, as shown in Figure T1-37.
Select Rectangular under Available Shape and input Spread 12 ft 12 ft in the Description text box. Under
Dimensions, input 12 in the A field and 12 in the B field. Click Add. It will appear in the list on the screen.
Click Save to save the footing library. Click OK to exit the Footing Library screen.
T1 -26
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Step 25
Select the Footing tab to activate the Footing screen, similar to the one shown in Figure T1-38. Notice that no
footings have been defined. The following illustrates how to define a spread footing and pile/cap footing.
1. Select 1@3 under Columns, input Spread in the Name field, and select Spread Footing under Type. Click
Add. The name Spread will appear in the list at the bottom of the screen.
2. Click Design to activate the Isolated Spread Footing screen, as shown in Figure T1-39.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -27
T1
3. Select Spread 12 ft 12 ft from the Description list. (This is the footing defined earlier.) Input -6 in the
From Column field, 0.2 in the Footing Surcharge field, 36 in the Spread/Cap Depth field, and 1 in the
Length and Width Multiplier fields.
4. Click Auto Design to activate the Design Footing screen, as shown in Figure T1-40. Select #8 from the
Bar Size list. Click OK and the program will automatically generate the footing reinforcement.
5. The Footing Design Results - Spread screen will immediately display. Click Close to exit this screen and
return to the Isolated Spread Footing screen.
6. Highlight the first line (X) under Reinforcement. Change the value in the Num Bar field to 10 and click
Modify. Repeat this for the second line, entering 10 in the Num Bar field.
7. Click the Design Status button to display a design summary of the selected component and verify the data.
Click Close to exit this screen.
8. Click OK and return to the Footing screen. Notice that a diagram of the spread footing will be displayed at
the bottom of the screen, as shown in Figure T1-41.
T1 -28
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
2. Click Design to activate the Footing: Isolated Pile/Shaft Cap Design screen, as shown in Figure T1-42.
3. Select user input and specify footage size of 12 ft 12 ft. Choose concentric under column 0.2 in the
Footing Surcharge field, 36 in the Spread/Cap Depth field and 1 in the Length and Width Multiplier fields.
4. Under Pile/Shaft configuration, select Circular from the Pile/Shaft Shape list and input 12 in the
Pile/Shaft Size field and 150 in the Max. Pile Capacity field.
5. In the Edit Mode, select From Library, to use the pile pattern defined in the library.
T1 -29
T1
6. In the Pile Pattern area, click on the Description drop down field and select the pattern N04P1. (Note: If
you do not see any pile pattern available in the list, this means that Pile Library is not correctly selected).
Please see how to use the pile pattern library in the General Operations section, Libraries | Pile Pattern
Configuration.
7. Select to keep the pattern origin to be concentric under the footing. For that, choose the option,
Concentric under footing.
8. Choose the Adjust Piles for end distance option and specify 24 in the text box.
9. When completed, there should be four pile locations, as shown in Figure T1-43. Click OK and return to the
Footing: Isolated Pile/Shaft Cap Design screen.
10. Now input the reinforcement. Select X from the Direction list, input 3.5 in the Bar Dist field, #8 from the
Bar Size list, 10 in the Num Bars field, and None from the Hook list.
11. Click Add. It will appear in the list under Footing Reinforcement.
12. Select Z from the Direction list and input 4.5 in the Bar dist field, #8 from the Bar Size list, 10 in the Num
Bars field, and None from the Hook list.
13. Click Add to add it to the list under Footing Reinforcement.
14. Click Design Status to display the design summary of the selected component. Click Close to exit this
screen.
15. Click OK and return to the Footing screen. The screen will resemble Figure T1-44.
T1 -30
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1
Step 26
In this step we will check to see if the isolated spread designed under column 1 works for column 2. On the Footing
tab, select column 2 in the columns list. Specify the footing name as Spread2 and click Add, as shown in Figure
T1-45.
Click the Design button. On the Isolated Spread Footing dialog click on the Copy From button, as shown in Figure
T1-42. The Copy Footing dialog will appear, as shown in Figure T1-46. Select Spread from in the list and click
Copy.
All the information about spread will be copied to the Spread2 footing. Click the Design Status button and review
the results to see if this footing will work. Click OK on this dialog to return to the Footing tab.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -31
T1
Step 27
Select Diagrams from the Show menu to activate the Diagram screen, as shown in Figure T1-47. Experiment with
the lists and buttons to become familiar with the options of this feature.
Step 28
This completes Tutorial 1. To print the output of the project, select Print from the File menu and the Print screen
will display. Select the appropriate options and click OK.
Following this tutorial is a printout of the output for selected items from Tutorial 1.
T1 -32
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1
T1 -33
UT
PROJECT DATA
============
Project
:
User Job No.:
State
:
Pier View
:
Code
:
Comments
:
Tutorial 1
Tutor1
FL
State Job No. : FL-001
Upstation.
AASHTO STANDARD (17th Edition 2002)
Auto Load Generation of DL, LL, WS, WL
Auto Design of Cap Beam
Design of Column, Spread footing and pile footing
PIER GEOMETRY
=============
Pier Type: Multi Column
Pier View
: Upstation.
Cap Shape: Straight
Top Elevations: start = 22.00 ft
end = 22.00 ft
Depth(Z) = 36.00 in
Skew angle = 0.00
Reduction of I = 1.000
Length(X) = 26.00 ft
Height(Y) = 48.00 in
Column Shape : Rectangular
Number of columns: 2
Column number 1:
Location from the left edge of the cap(X): 3.00 ft
Elevations: bottom = 0.00 ft
top = 20.00 ft
Reduction of I = 1.000
Column Bottom is Fixed
Column section dimensions:
Width(X) = 36.00 in
Depth(Z) = 36.00 in
Column number 2:
Location from the left edge of the cap(X): 23.00 ft
Elevations: bottom = 0.00 ft
top = 20.00 ft
Reduction of I = 1.000
Column Bottom is Fixed
Column section dimensions:
Width(X) = 36.00 in
Depth(Z) = 36.00 in
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -33
STRUCTURE MODEL
================
FRAME Model:
Member
Node
Hinge Check Pt Dist(ft) Memb length(ft)
------------------------------------------------------Column No. 1
1
1
2
0.00
20.00
20.00
3
4
0.00
20.00
20.00
5
2
2
6
6
7
7
8
8
4
4
9
0.00
3.00
3.00
4.00
4.00
13.00
13.00
22.00
22.00
23.00
23.00
26.00
Column No. 2
2
Cap
3
4
5
6
7
8
3.00
1.00
9.00
9.00
1.00
3.00
Node coordinates:
Number
X(ft)
Y(ft)
Node type
--------------------------------------------------------1
3.00
0.00
fixed at ground
2
3.00
20.00
column-cap
3
23.00
0.00
fixed at ground
4
23.00
20.00
column-cap
5
0.00
20.00
6
4.00
20.00
bearing
7
13.00
20.00
bearing
8
22.00
20.00
bearing
9
26.00
20.00
SUPERSTRUCTURE INFO
===================
Total number of spans: 2
Span number rear to current pier: 1
Number of traffic lanes: 2
Beam: height : 36.00 in
section area : 369.00 in^2
Beam Inertia (Ixx): 50980.00 in^4 Beam inertia (Iyy): 5332.50 in^4
Beam CG:15.83 in Barrier height : 36.00 in Depth of slab : 8.00 in
Bridge width:
27.00 ft
Curb to curb distance:
Span #
Span length
-----------------------------------------------1
60.000 ft
2
60.000 ft
24.000 ft
T1 -34
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
BEARING POINTS
==============
Number of bearing lines: 1
First bearing line
Eccentricity = 0.00 ft
Point
Distance ft
---------------------1
4.00
2
13.00
3
22.00
MATERIAL PROPERTIES
===================
Cap
Column
Footing
-----------------------------------------Concrete Type
normal
normal
normal
Concrete Strength (psi)
4000.00
4000.00
4000.00
Concrete Density (lb/ft3)
150.00
150.00
150.00
Concrete Modulus Ec (ksi)
3834.30
3834.30
3834.30
Steel Strength Fy (ksi)
60.00
60.00
60.00
DESIGN PARAMETERS
=================
AASHTO STANDARD Code
Strength Reduction factors for reinf. concrete:
Flexure and tension
0.90
Shear and torsion (normal)
0.85
(lightweight)
0.85
Axial compression (ties)
0.70
Axial compression (spiral)
0.75
R =
5.00
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -35
LOADS
=====
Pier View
: Upstation.
Load Cases: 7
Loadcase ID: D1
Name:
Multiplier = 1.000
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
-111.86
1
2
Y
-111.86
1
3
Y
-111.86
Auto generation details
Generated Dead Load
Slab weight
=
Wearing weight =
150.00
540.00
pcf
plf
Girder weight =
Barrier load =
150.00
1200.00
pcf
plf
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
0.00
1
2
Y
-13.93
1
3
Y
-48.74
Auto generation details
Generated Live Load
Longitudinal Reaction: Simple Span Distribution
Selected Vehicles:
HS20 truck
Transverse Positioning
Number of loaded lanes = 1
Live Load Positions = Variable Spacing
Minimum Spacing Between Positions = 1.00
ft
Name:
T1 -36
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
0.00
1
2
Y
-41.78
1
3
Y
-20.89
Auto generation details
Generated Live Load
Longitudinal Reaction: Simple Span Distribution
Selected Vehicles:
HS20 truck
Transverse Positioning
Number of loaded lanes = 1
Live Load Positions = Variable Spacing
Minimum Spacing Between Positions = 1.00
ft
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
-20.89
1
2
Y
-41.78
1
3
Y
0.00
Auto generation details
Generated Live Load
Longitudinal Reaction: Simple Span Distribution
Selected Vehicles:
HS20 truck
Transverse Positioning
Number of loaded lanes = 1
Live Load Positions = Variable Spacing
Minimum Spacing Between Positions = 1.00
ft
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -37
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
-48.74
1
2
Y
-13.93
1
3
Y
0.00
Auto generation details
Generated Live Load
Longitudinal Reaction: Simple Span Distribution
Selected Vehicles:
HS20 truck
Transverse Positioning
Number of loaded lanes = 1
Live Load Positions = Variable Spacing
Minimum Spacing Between Positions = 1.00
ft
Loadcase ID: W1
Name: Angle: 30
Multiplier = 1.000
Cap loads:
Type
Dir
Arm
Mag1
x1/L
Mag2
x2/L
ft
kips, klf,k-ft
kips, klf,k-ft
------------------------------------------------------------------------------Force
X
0.00
-2.16
0.50
------UDL
Z
---0.05
0.00
---1.00
Column loads:
Col #
Type
Dir
Mag1
y1/L
Mag2
y2/L
---------------------------------------------------------------------2
UDL
X
-0.142
klf 0.00
---0.90
2
UDL
Z
0.082
klf 0.00
---0.90
1
UDL
X
-0.142
klf 0.00
---0.90
1
UDL
Z
0.082
klf 0.00
---0.90
T1 -38
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
X
-5.47
1
1
Y
-3.04
1
1
Z
1.60
1
2
X
-5.47
1
2
Y
0.00
1
2
Z
1.60
1
3
X
-5.47
1
3
Y
3.04
1
3
Z
1.60
Auto generation details
Generated Wind Load on Structure
Angle of wind = 30.00 deg
Elevation above which wind load acts =
0.00 ft
Default wind pressure
Wind pressure for superstructure:
Wind pressure for substructure:
Transverse
41.000 psf
Cap
40.000 psf
Longitudinal
12.000 psf
Column
40.000 psf
Overturning
not considered
Name: Angle: 30
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
X
-1.64
1
1
Y
-2.64
1
1
Z
0.48
1
2
X
-1.64
1
2
Y
0.00
1
2
Z
0.48
1
3
X
-1.64
1
3
Y
2.64
1
3
Z
0.48
Auto generation details
Generated Wind Load on Live Load
Angle of wind = 30.00 deg
Live load length =
60.00 ft
I
IA
III
VI
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -39
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(SER
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
I
I
I
I
IA
IA
IA
IA
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
I
I
I
I
IA
IA
IA
IA
III
III
III
III
III
III
III
III
III
III
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.67
1.67
1.67
1.67
2.20
2.20
2.20
2.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
)
)
)
)
)
)
)
)
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
)
)
)
)
)
)
)
)
+
+
+
+
+
+
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
-
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
+
+
+
+
+
+
+
+
-
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
)
)
)
)
)
)
)
)
)
)
T1 -40
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
III
III
III
III
III
III
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.30
1.30
1.30
1.30
1.30
1.30
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
(L+In)1
(L+In)2
(L+In)3
(L+In)4
+
+
+
+
+
+
+
+
+
+
-
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
+
+
+
+
+
+
+
+
-
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
2.20
2.20
2.20
2.20
2.20
2.20
2.20
2.20
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
(L+In)1
(L+In)1
(L+In)2
(L+In)2
(L+In)3
(L+In)3
(L+In)4
(L+In)4
(L+In)1
(L+In)1
(L+In)2
(L+In)2
(L+In)3
(L+In)3
(L+In)4
(L+In)4
(L+In)1
(L+In)1
(L+In)2
(L+In)2
(L+In)3
(L+In)3
(L+In)4
(L+In)4
(L+In)1
(L+In)1
(L+In)2
(L+In)2
(L+In)3
(L+In)3
(L+In)4
(L+In)4
(L+In)1
(L+In)1
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
+
+
+
+
+
+
+
+
+
+
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
-
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
1C
2C
3C
4C
5C
6C
7C
8C
9C
10C
11C
12C
13C
14C
15C
16C
17C
18C
19C
20C
21C
22C
23C
24C
25C
26C
27C
28C
29C
30C
31C
32C
33C
34C
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
I
I
I
I
I
I
I
I
IA
IA
IA
IA
IA
IA
IA
IA
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
III
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -41
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
35C
36C
37C
38C
39C
40C
41C
42C
43C
44C
45C
46C
47C
48C
49C
50C
51C
52C
53C
54C
55C
56C
57C
58C
59C
60C
61C
62C
63C
64C
65C
66C
67C
68C
69C
70C
71C
72C
73C
74C
75C
76C
77C
78C
79C
80C
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
(LFR
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
III
III
III
III
III
III
III
III
III
III
III
III
III
III
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
VI
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
1.00
0.75
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
(L+In)2
(L+In)2
(L+In)3
(L+In)3
(L+In)4
(L+In)4
(L+In)1
(L+In)1
(L+In)2
(L+In)2
(L+In)3
(L+In)3
(L+In)4
(L+In)4
(L+In)1
(L+In)1
(L+In)2
(L+In)2
(L+In)3
(L+In)3
(L+In)4
(L+In)4
(L+In)1
(L+In)1
(L+In)2
(L+In)2
(L+In)3
(L+In)3
(L+In)4
(L+In)4
(L+In)1
(L+In)1
(L+In)2
(L+In)2
(L+In)3
(L+In)3
(L+In)4
(L+In)4
(L+In)1
(L+In)1
(L+In)2
(L+In)2
(L+In)3
(L+In)3
(L+In)4
(L+In)4
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
-
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
T1 -42
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
-
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
WL1
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
LEAP RC-PIERv10.00.01.00
CAP DESIGN
==========
Code: AASHTO STANDARD (17th Edition 2002) - Ultimate Strength Design
Units: US
Pier View
: Upstation.
DESIGN PARAMETERS:
==================
f'c = 4000.0 psi
Fy flex = 60000.0 psi Fy shear = 60000.0 psi
phi flex = 0.90
phi shear = 0.85
phi flex ( seismic ) = 0.90
phi shear ( seismic) = 0.85
Ec = 3834.3 ksi
Es = 29000.0 ksi
crack control factor z = 170.00 kips / in
Concrete Type : Normal Weight.
Design : centerline of column.
CAP GEOMETRY:
=============
Straight Cap :
Length(X) = 26.00
ft
Depth(Z) = 36.00
in
MAIN REINFORCEMENT:
===================
Bar size
Quantity
STIRRUPS:
==========
From
To
Stirrup Size
n legs
Spacing
Aprv/s
ft
ft
in
in^2 / ft
-----------------------------------------------------------------------------0.00
3.00
# 4
4
18.00
0.53
3.00
4.00
# 4
4
6.00
1.60
4.00
22.00
# 4
4
18.00
0.53
22.00
23.00
# 4
4
6.00
1.60
23.00
26.00
# 4
4
18.00
0.53
Clear Cover on Sides =
3.50
in
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -43
FLEXURE DESIGN:
===============
Span 1: From 0.00
Loc
AbsLoc
ft
To 3.00
ft
Mmax
pMn
Comb Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
Mmin
pMn
Comb Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
ft
ft
in kips-ft kips-ft
in^2
in^2
in^2
in^2
in^2
in^2
----------------------------------------------------------------------------------------0.0
0.0
48
0.0
0.0
0
0.00
1.58
0.00
0.00
3.16
0.00
0.0
0.0
0
0.00
1.58
0.00
0.00
3.16
0.00
3.0
3.0
48
0.0
337.2
0
0.00
1.58
1.58
0.00
3.16
3.16
-10.5 -630.0
41
0.00
1.58
1.58
0.07
3.16
3.16
AbsLoc
ft
To 23.00
ft
Mmax
pMn
Comb Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
Mmin
pMn
Comb Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
ft
ft
in kips-ft kips-ft
in^2
in^2
in^2
in^2
in^2
in^2
----------------------------------------------------------------------------------------0.0
3.0
48
0.0
337.2
0
0.00
1.58
1.58
0.00
3.16
3.16
-459.9 -630.0
46
0.00
1.58
1.58
3.11
3.16
3.16
1.0
4.0
48
76.7
337.2
64
0.51
1.58
1.58
0.00
3.16
3.16
-141.7 -630.0
50
0.00
1.58
1.58
0.95
3.16
3.16
10.0 13.0
48 1326.8 1513.6
46
6.89
7.90
7.90
0.00
1.58
1.58
0.0 -342.0
0
0.00
7.90
7.90
0.00
1.58
1.58
19.0 22.0
48
76.7
337.2
49
0.51
1.58
1.58
0.00
3.16
3.16
-141.7 -630.0
63
0.00
1.58
1.58
0.95
3.16
3.16
20.0 23.0
48
0.0
337.2
0
0.00
1.58
1.58
0.00
3.16
3.16
-459.9 -630.0
47
0.00
1.58
1.58
3.11
3.16
3.16
AbsLoc
ft
To 26.00
ft
Mmax
pMn
Comb Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
Mmin
pMn
Comb Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
ft
ft
in kips-ft kips-ft
in^2
in^2
in^2
in^2
in^2
in^2
----------------------------------------------------------------------------------------0.0 23.0
48
0.0
337.2
0
0.00
1.58
1.58
0.00
3.16
3.16
-10.5 -630.0
41
0.00
1.58
1.58
0.07
3.16
3.16
3.0 26.0
48
0.0
0.0
0
0.00
1.58
0.00
0.00
3.16
0.00
0.0
0.0
0
0.00
1.58
0.00
0.00
3.16
0.00
T1 -44
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
ft
To 3.00
ft
ft
To 23.00
ft
ft
To 26.00
ft
Note:
-
Pos is the design position. L suggests the calculation is done at immediate left
of "Loc" and R suggests at immediate right of it.
T-lim is the limiting value of torsion for the concrete section. If actual torsion
is higher than this value, torsional steel has to be provided.
Avs/s is the required area of steel per unit length for shear force.
2Ats/s is the required area of steel per unit length for two legs of torsional
reinforcement.
Av/s is the total required area of steel per unit length due to shear plus torsion.
Aprvs/s is the total provided area of steel per unit length due to shear (stirrups).
Alt is the total longitudinal steel required due to torsion in addition to the REQUIRED
flexural steel.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -45
CRACKING/FATIGUE CHECK:
=======================
Span 1: From 0.00
ft
To 3.00
ft
AbsLoc
ft
To 23.00
ft
AbsLoc
ft
To 26.00
ft
AbsLoc
Note:
* Cracking / fatigue checking failed.
COLUMN DESIGN
=============
COLUMN DESIGN - Column: 1
Column Type: Rectangular
36.00 x
36.00 in
T1 -46
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
DESIGN PARAMETERS:
==================
f'c = 4000.0 psi
fy = 60000.0 psi
phi flex = 0.90
phi axial = 0.70
Ec = 3834.3 ksi
Es = 29000 ksi
Concrete Type : Normal Weight.
Reinforcement:
==============
Rebar Pattern: Rectangular
Rebar Orientation: Face Parallel
Layer
Dir
Size
No. bars
Bar Dist. in
-----------------------------------------------------------------------1
X
8
6
3.00
1
Z
8
5
3.00
Main bars summary:
Ties
18 #
size: # 4
8 bars
Column Design
=============
Loc
Comb
Pu
Mux
Muz
pMn
Incl
pPn/Pu pMn/Mu
ft
kips
kips-ft
kips-ft
kips-ft
deg
-------------------------------------------------------------------------------------0.00
19C
328.3
51.2
251.6
1150.8
78.49
1.00
4.48
20.00
11C
328.3
46.0
449.3
1156.3
84.16
1.00
2.56
COLUMN DESIGN
=============
COLUMN DESIGN - Column: 2
Column Type: Rectangular
36.00 x
36.00 in
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -47
DESIGN PARAMETERS:
==================
f'c = 4000.0 psi
fy = 60000.0 psi
phi flex = 0.90
phi axial = 0.70
Ec = 3834.3 ksi
Es = 29000 ksi
Concrete Type : Normal Weight.
Reinforcement:
==============
Rebar Pattern: Rectangular
Rebar Orientation: Face Parallel
Layer
Dir
Size
No. bars
Bar Dist. in
-----------------------------------------------------------------------1
X
8
6
3.00
1
Z
8
5
3.00
Main bars summary:
Ties
18 #
size: # 4
8 bars
Column Design
=============
Loc
Comb
Pu
Mux
Muz
pMn
Incl
pPn/Pu pMn/Mu
ft
kips
kips-ft
kips-ft
kips-ft
deg
------------------------------------------------------------------------------------0.00
45C
328.3
51.2
251.6
1150.8
78.49
1.00
4.48
20.00
13C
328.3
46.0
449.3
1156.3
84.16
1.00
2.56
ISOLATED FOOTING DESIGN
Code: AASHTO STANDARD (17th Edition 2002) - Ultimate Strength Design
Units: US
Pier View
: Upstation.
T1 -48
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Geometry:
=========
Name : Spread
Shape : Rectangular, Type : Spread
Bf(X) = 12.00 ft, Hf(Z) = 12.00 ft, Thickness(Y) = 36.00 in
Footing concentric.
Columns located on the footing:
Column No. 1 at x =
0.00 ft,
Rectangular
36.00 in x
36.00 in
0.20 ksf
Design Parameters:
==================
X
Z
|---------------- Column Loads ----------------| Soil press.
ft
ft
comb
Ovs
P, kips
Mxx, kft
Mzz, kft
ksf
-----------------------------------------------------------------------------------1
6.00
-6.00
8
1.500
-321.99
0.00
125.81
2.45
9
1.250
-234.12
39.41
173.67
1.54
2
-6.00
-6.00
8
1.500
-321.99
0.00
125.81
3.32
21
1.250
-215.70
-39.41
50.68
2.46
3
-6.00
6.00
8
1.500
-321.99
0.00
125.81
3.32
21
1.250
-215.70
-39.41
50.68
2.19
4
6.00
6.00
8
1.500
-321.99
0.00
125.81
2.45
9
1.250
-234.12
39.41
173.67
1.81
X
Z
|---------------- Column Loads ----------------| Soil press.
ft
ft
comb
Ovs
P, kips
Mxx, kft
Mzz, kft
ksf
-----------------------------------------------------------------------------------1
6.00
-6.00
48
---432.44
0.00
167.01
3.27
65
---292.65
49.26
217.09
1.92
2
-6.00
-6.00
48
---432.44
0.00
167.01
4.43
77
---269.63
-49.26
63.35
3.08
3
-6.00
6.00
48
---432.44
0.00
167.01
4.43
77
---269.63
-49.26
63.35
2.73
4
6.00
6.00
48
---432.44
0.00
167.01
3.27
65
---292.65
49.26
217.09
2.26
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -49
X
Z
|---------------- Column Loads ----------------| Soil press.
ft
ft
comb
Ovs
P, kips
Mxx, kft
Mzz, kft
ksf
-----------------------------------------------------------------------------------1
6.00
-6.00
4
1.000
-268.74
0.00
112.51
2.13
25
1.400
-234.12
39.41
173.67
1.10
2
-6.00
-6.00
4
1.000
-268.74
0.00
112.51
2.91
37
1.400
-215.70
-39.41
50.68
1.76
3
-6.00
6.00
4
1.000
-268.74
0.00
112.51
2.91
37
1.400
-215.70
-39.41
50.68
1.56
4
6.00
6.00
4
1.000
-268.74
0.00
112.51
2.13
5
1.500
-234.33
0.00
125.14
1.23
Note:
Only max. positive pressure is considered for design.
3.62 ksf
2.89 ksf
0.42 ksf
Reinforcement Schedule:
=======================:
Dir
Quantity
Size
Flexure:
========
Dir
Loc
d
Mmax
Comb Asb_req Asb_prv
Asb_eff
Ast_req Ast_prv
Ast_eff
ft
in
kft
in^2
in^2
in^2
in^2
in^2
in^2
---------------------------------------------------------------------------------------X -1.50 32.50
439.3
48
4.03
7.90
7.90
0.00
0.00
0.00
X
1.50 32.50
439.3
48
4.03
7.90
7.90
0.00
0.00
0.00
Z -1.50 31.50
439.3
48
4.16
7.90
7.90
0.00
0.00
0.00
Z
1.50 31.50
439.3
48
4.16
7.90
7.90
0.00
0.00
0.00
T1 -50
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Cracking/Fatigue
================
<-------- Cracking ---------->
<---------- Fatigue --------->
Loc
d
Mmax
Comb
fs
ratio fs
Mmax
Comb
fs
ratio fs
ft
in
kft
ksi
kft
ksi
--------------------------------------------------------------------------------------X
-1.50
32.50
351.1
8
17.26
0.57
50.5
4
2.48
0.13
X
1.50
32.50
351.1
8
17.26
0.57
50.5
4
2.48
0.13
Z
-1.50
31.50
351.1
8
17.82
0.59
50.5
4
2.57
0.13
Z
1.50
31.50
351.1
8
17.82
0.59
50.5
4
2.57
0.13
Dir
Dir
Dist
Comb
d
Vu
phi*Vc
ft
in
kips
kips
---------------------------------------------------------------1
X
-4.21
48
32.50
77.7
503.2
X
4.21
48
32.50
77.7
503.2
Z
-4.13
48
31.50
81.3
487.7
Z
4.13
48
31.50
81.3
487.7
Bo
Ao
Comb
Avg. d
Vu
phi*Vc
ft
ft^2
in
kips
kips
---------------------------------------------------------------Columns:
1
22.67
32.11
48
32.00
404.5
1871.7
Note:
TWO WAY SHEAR IN FOOTING IS NOT DESIGNED AND STIRRUPS ARE NOT CONSIDERED.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -51
Geometry:
=========
Name : Pile Cap
Shape : Rectangular, Type : Pile/Shaft Cap
Bf(X) = 12.00 ft, Hf(Z) = 12.00 ft, Thickness(Y) = 36.00 in
Footing concentric.
Columns located on the footing:
Column No. 1 at x =
0.00 ft,
Rectangular
36.00 in x
36.00 in
0.20 ksf
Circular
Size: 12.00 in
1
1
Design Parameters:
==================
T1 -52
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Note:
Only max. force in piles is considered for design.
Pile coordinates X and Z are from the most left edge of the footing.
= 118.55 kips
88.36 kips
14.14 kips
Reinforcement Schedule:
=======================:
Dir
Quantity
Size
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -53
Flexure:
========
Dir
Loc
d
Mmax
Comb Asb_req Asb_prv
Asb_eff
Ast_req Ast_prv
Ast_eff
ft
in
kft
in^2
in^2
in^2
in^2
in^2
in^2
-----------------------------------------------------------------------------------------X -1.50 32.50
592.7
48
5.45
7.90
7.90
0.00
0.00
0.00
X
1.50 32.50
592.7
48
5.45
7.90
7.90
0.00
0.00
0.00
Z -1.50 31.50
592.7
48
5.62
7.90
7.90
0.00
0.00
0.00
Z
1.50 31.50
592.7
48
5.62
7.90
7.90
0.00
0.00
0.00
Cracking/Fatigue
================
<-------- Cracking ---------->
<---------- Fatigue --------->
Loc
d
Mmax
Comb
fs
ratio fs
Mmax
Comb
fs
ratio fs
ft
in
kft
ksi
kft
ksi
--------------------------------------------------------------------------------------X
-1.50
32.50
441.8
8
21.72
0.72
70.7
4
3.48
0.19
X
1.50
32.50
441.8
8
21.72
0.72
70.7
4
3.48
0.19
Z
-1.50
31.50
441.8
8
22.42
0.74
70.7
4
3.59
0.20
Z
1.50
31.50
441.8
8
22.42
0.74
70.7
4
3.59
0.20
Dir
Dir
Dist
Comb
d
Vu
phi*Vc
ft
in
kips
kips
---------------------------------------------------------------1
X
-4.21
48
32.50
62.8
503.2
X
4.21
48
32.50
62.8
503.2
Z
-4.13
48
31.50
85.1
487.7
Z
4.13
48
31.50
85.1
487.7
T1 -54
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Bo
Ao
Comb
Avg. d
Vu
phi*Vc
ft
ft^2
in
kips
kips
---------------------------------------------------------------Columns:
1
22.67
32.11
48
32.00
474.2
1871.7
Piles - max:
1
11.52
Piles - min:
1
11.52
10.56
48
32.00
118.5
951.2
10.56
48
32.00
118.5
951.2
Note:
TWO WAY SHEAR IN FOOTING IS NOT DESIGNED AND STIRRUPS ARE NOT CONSIDERED.
Geometry:
=========
Name : Spread2
Shape : Rectangular, Type : Spread
Bf(X) = 12.00 ft, Hf(Z) = 12.00 ft, Thickness(Y) = 36.00 in
Footing concentric.
Columns located on the footing:
Column No. 2 at x =
0.00 ft,
Rectangular
36.00 in x
36.00 in
0.20 ksf
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -55
Design Parameters:
==================
X
Z
|---------------- Column Loads ----------------| Soil press.
ft
ft
comb
Ovs
P, kips
Mxx, kft
Mzz, kft
ksf
-----------------------------------------------------------------------------------1
6.00
-6.00
5
1.500
-321.99
0.00
-125.81
3.32
12
1.250
-215.70
39.41
-50.68
2.19
2
-6.00
-6.00
5
1.500
-321.99
0.00
-125.81
2.45
24
1.250
-234.12
-39.41
-173.67
1.81
3
-6.00
6.00
5
1.500
-321.99
0.00
-125.81
2.45
24
1.250
-234.12
-39.41
-173.67
1.54
4
6.00
6.00
5
1.500
-321.99
0.00
-125.81
3.32
12
1.250
-215.70
39.41
-50.68
2.46 Max Soil
Pressures, Factored:
=============================
Corner
X
Z
|---------------- Column Loads ----------------| Soil press.
ft
ft
comb
Ovs
P, kips
Mxx, kft
Mzz, kft
ksf
-----------------------------------------------------------------------------------1
6.00
-6.00
45
---432.44
0.00
-167.01
4.43
68
---269.63
49.26
-63.35
2.73
2
-6.00
-6.00
45
---432.44
0.00
-167.01
3.27
80
---292.65
-49.26
-217.09
2.26
3
-6.00
6.00
45
---432.44
0.00
-167.01
3.27
80
---292.65
-49.26
-217.09
1.92
4
6.00
6.00
45
---432.44
0.00
-167.01
4.43
68
---269.63
49.26
-63.35
3.08
X
Z
|---------------- Column Loads ----------------| Soil press.
ft
ft
comb
Ovs
P, kips
Mxx, kft
Mzz, kft
ksf
-----------------------------------------------------------------------------------1
6.00
-6.00
1
1.000
-268.74
0.00
-112.51
2.91
28
1.400
-215.70
39.41
-50.68
1.56
2
-6.00
-6.00
1
1.000
-268.74
0.00
-112.51
2.13
8
1.500
-234.33
0.00
-125.14
1.23
3
-6.00
6.00
1
1.000
-268.74
0.00
-112.51
2.13
40
1.400
-234.12
-39.41
-173.67
1.10
4
6.00
6.00
1
1.000
-268.74
0.00
-112.51
2.91
28
1.400
-215.70
39.41
-50.68
1.76
Note:
Only max. positive pressure is considered for design.
T1 -56
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
3.62 ksf
2.89 ksf
0.42 ksf
Reinforcement Schedule:
=======================:
Dir
Quantity
Size
Flexure:
========
Dir
Loc
d
Mmax
Comb Asb_req Asb_prv
Asb_eff
Ast_req Ast_prv
Ast_eff
ft
in
kft
in^2
in^2
in^2
in^2
in^2
in^2
----------------------------------------------------------------------------------------X -1.50 32.50
439.3
45
4.03
7.90
7.90
0.00
0.00
0.00
X
1.50 32.50
439.3
45
4.03
7.90
7.90
0.00
0.00
0.00
Z -1.50 31.50
439.3
45
4.16
7.90
7.90
0.00
0.00
0.00
Z
1.50 31.50
439.3
45
4.16
7.90
7.90
0.00
0.00
0.00
Cracking/Fatigue
================
<-------- Cracking ---------->
<---------- Fatigue --------->
Loc
d
Mmax
Comb
fs
ratio fs
Mmax
Comb
fs
ratio fs
ft
in
kft
ksi
kft
ksi
--------------------------------------------------------------------------------------X
-1.50
32.50
351.1
5
17.26
0.57
50.5
1
2.48
0.13
X
1.50
32.50
351.1
5
17.26
0.57
50.5
1
2.48
0.13
Z
-1.50
31.50
351.1
5
17.82
0.59
50.5
1
2.57
0.13
Z
1.50
31.50
351.1
5
17.82
0.59
50.5
1
2.57
0.13
Dir
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1 -57
Dir
Dist
Comb
d
Vu
phi*Vc
ft
in
kips
kips
---------------------------------------------------------------1
X
-4.21
45
32.50
77.7
503.2
X
4.21
45
32.50
77.7
503.2
Z
-4.13
45
31.50
81.3
487.7
Z
4.13
45
31.50
81.3
487.7
Bo
Ao
Comb
Avg. d
Vu
phi*Vc
ft
ft^2
in
kips
kips
---------------------------------------------------------------Columns:
1
22.67
32.11
45
32.00
404.5
1871.7
Note:
TWO WAY SHEAR IN FOOTING IS NOT DESIGNED AND STIRRUPS ARE NOT CONSIDERED.
T1 -58
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1 -59
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Chapter
T1A
Problem Data
Table T1A-1 Two-Column Pier, Design for Plastic Hinging (AASHTO LFD)
EQ Load Case
Bearing Loads (EQ1)
Bearing 1 PX = 20 kips
PZ = 60 kips
Bearing 2 PX = 20 kips
PZ = 60 kips
PZ = 60 kips
1.3
Bending
1.3
Additional Factors:
1.2
Use column core area for plastic hinge calculations and seismic design of column.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1A -1
T1A
Step 1
Select Open from the File menu to activate the File/Open dialog. Browse to the examples sub-folder and select
Tutor1.rcp and click Open. After opening, save it with a new name. Select File: Save As and specify a name such
as MyTutor1a.rcp. Alternatively you can open Tutor1a.rcp from the examples folder. This will open the two
column pier file that we looked in Tutorial 1 earlier.
T1A -2
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1A
Step 2
Switch to Loads tab and add a load case of type EQ by selecting EQ in the Load Type list and clicking the -->
button. This will add as EQ1 in the selected Loads list as shown in Figure T1A-2.
Step 3
With EQ1 selected, click on the Edit button as shown in Figure T1A-3 and specify the bearings loads.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1A -3
T1A
Step 4
Select Load Group/Limit State Library from the Libraries Menu as shown in Figure T1A-4.
Select SEISMIC GROUP VII and click Modify/View to see details as shown in Figure T1A-5.
T1A -4
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1A
For RC-PIER to carry out the plastic hinging moments and design for that, a load group must be Seismic
type. This is a Seismic load group. Further review shows that this load group matches our desired load
group factors, so we will use this load group. In case you need to make changes to load factors, add a new
load group of type seismic and then specify your own values of load factors.
Since we are not making any changes to library at this time, click Cancel twice to close the library
dialogs and return to the Load Tab.
On the Loads tab, scroll to the bottom of the Available Groups list as shown in Figure T1A-6. Choose
SEISMIC GROUP VII and then click --> button to include the Seismic group for analysis.
Figure T1A-6 Loads Tab Screen with Seismic Load Group Screen
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1A -5
T1A
Step 5
Next specify the locations in columns where the plastic hinge moments need to be determined. Switch to
Geometry tab and click the Str. Model button. On the Structure Model Screen, check the option to specify
locations for plastic hinges as shown in Figure T1A-7 below. Click OK to return to the Geometry tab.
Click on Show:Model to see the graphical structural model as shown in Figure T1A-8.
T1A -6
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1A
Step 6
Click the Analysis tab to activate the Analysis screen. This screen is used to perform an analysis and also specify
various factors relating to the analysis and design.
Click A/D Parameters to open the Analysis/Design Parameters (Standard) screen and input the values as shown in
Figure T1A-9.
After updating the information as above, click the Seismic Design Parameters button to open the Seismic
Parameters screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1A -7
T1A
Step 7
On the Seismic Design Parameters Screen, (Figure T1A-10) first review the Phi values to be used for
design. Next check the Overstrength factors. Set those to be 1.3 for flexure as well as for axial
compression. Choose the option to use the maximum computed plastic hinge for each column in all
combinations. Choose the option to use column core area for plastic hinge calculations. Review the
response modification factor and the remaining items then click OK to accept all changes.
Return to the Analysis tab by clicking OK on the Analysis and Design Parameters Screen.
T1A -8
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1A
Step 8
Run the analysis and then review the EQ load as shown below in Figure T1A-11.
To view the load combinations generated for selected load groups, click combinations button on the loads tab.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1A -9
T1A
Step 9
When design of pier considering the plastic hinging of column is needed, (Figure T1A-12) columns need
to be designed first. Only then, can Cap and Footings may be designed.
Switch to Column tab, select Column #1 and click Design Status. Review the Design Status report for computed
Plastic Hinge moments at top and bottom of this column. After review, close that dialog.
Then select Column #2 and click Design Status. After review, close the Design Status dialog.
T1A -10
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T1A
Step 10
After the column plastic hinge moments are determined, cap can be designed. Switch to Cap Tab shown
below in Figure T1A-13. You can do Auto Design or Design Status of cap. When Auto Design is done,
program determines the reinforcement for flexure in strength design (non-seismic) combinations and
provides in the cap. It then checks the provided reinforcement for capacity requirements for seismic
demand. For more information about Seismic Design and Cap Demand, please refer to the Theory
chapter in User Manual. For this tutorial, we have already provided the reinforcement in cap. To check
for seismic combinations, click Design Status. Close that after review.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T1A -11
T1A
Step 11
To check the footings for seismic demand, switch to Footing tab. Select Footing Spread1 in the list of
footings and click Design. The Spread Footing Design Screen displays as shown below in Figure
T1A-14.
You can do Auto Design or Design Status of footings. When Auto Design is selected program determines
the reinforcement for flexure in strength design (non-seismic) combinations and provides in the footing.
It then checks for the seismic demand in footing that considers plastic hanging moment in column and
designs it. For this Tutorial, click the Design Status to check the already provided reinforcement for
seismic combinations. Review the report and close this dialog by clicking OK to return to the footing tab.
In the same way other footings may be checked as well. This completes this tutorial.
T1A -12
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Chapter
T2
Tutorial 2 demonstrates the basic features of RC-PIER according to LRFD. This tutorial will take you through a
RC-PIER design, step-by-step, illustrating the design of a cap beam, column, rectangular combined spread footing,
and rectangular combined pile footing.
The information for Tutorial 2 is contained in a RC-PIER input file called Tutor2.rcp. As an alternative to
inputting all information manually, as directed by this tutorial, you can load this file and work on only specific
sections. To load this file, select the Open item from the File menu (File | Open). Move to the RC-PIER/Examples
subdirectory, if it is not already showing and select the file Tutor2.rcp.
Diagrams
CL Pier
75'-0"
12'-0"
21
11
16'-0"
9'-6"
22
23
14
13
12
10'-6"
15
11'-0"
16'-0"
24
25
26
17
16
18
3'-6"
1'-6"
2 0'-6 "
36'-0"
2 9 '-0 "
54" (Typ.)
3 '-6 "
9'-0"
36'-0"
(Combined Pile Cap Footing)
Legend:
T2 -1
T2
4'-6"
3'-6"
29'-0"
4-54" Columns
10'-0"
10'-0"
20'-0"
T2 -2
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T2
CL Pier
24"
4.8"
Bearing Line #1
Bearing Line #2
42"
60"
18"
27"
27"
54"
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -3
T2
20'-0"
3
10'-0"
16'-0"
10'-0"
36'-0"
3'-6"
36'-0"
T2 -4
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
(Typical)
2
3
11
13
15
20' 0"
19
T2
17
21
2 (Typical)
x
20
22
10
16'
10'
12
14
16
18
10'
36' 0"
3' 6"
36' 0"
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -5
T2
Problem Data
Table T2-1
Concrete Strength
Cap
fc = 4 ksi
Columns
fc = 4 ksi
Footings
c = 4 ksi
Concrete Density
Cap
= 150 pcf
Columns
= 150 pcf
Footings
= 150 pcf
fy = 60 ksi
Columns
fy = 60 ksi
Footings
fy = 60 ksi
Concrete Type
Cap
Normal
Columns
Normal
Footings
Normal
Loads
Dead Load
Bearing Loads
Bearing Line 1
Bearing Line 2
P = -20 kips
Bearing 2
P = -7 kips
Line 2
Bearing 1
P = -45 kips
Bearing 2
P = 6 kips
P = -10 kips
Bearing 8
P = -29 kips
Line 2
T2 -6
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Table T2-1
T2
Bearing 5
P = 4 kips
Bearing 6
P = -30 kips
P = -43 kips
Bearing 3
P = -19 kips
P = -19 kips
Bearing 7
P = -43 kips
Wind on Structure
Bearing Loads
Line 1
Bearing 1
P = 35 kips
Bearing 8
P = -35 kips
Line 2
Bearing 1
P = 42 kips
Bearing 6
P = -42 kips
Cap Loads
X-dir
P = 40 kips
Z-dir
UDL
= 0.4667 klf
Creep
Creep Strain Load
cr = 0.0003
Shrinkage
Shrinkage Strain Load
sh = - 0.00027
Footing Surcharge
Footing
= 0.200 ksf
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -7
T2
Step 1
The Project screen will be displayed, as shown in Figure T2-6. The fields will be blank. Fill in the general project
information in the text boxes. Select the AASHTO LRFD option under Design Specifications and U.S. Units
under Units.
T2 -8
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T2
Step 2
Click the Geometry tab to activate the Geometry screen, as shown in Figure T2-7. Use the buttons on the left of the
screen to input the pier layout information as follows.
Step 3
Click Pier Configuration to open the Pier Configuration screen, as shown in Figure T2-8. Under Pier Type, select
Multi-Columns, under Cap Shape, select Tapered, and from the Column Shape list, select Round. Select Pier
View direction as Upstation. Click OK and return to the Geometry screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -9
T2
Step 4
Click Cap. The Tapered Cap Parameters screen will open, as shown in Figure T2-9. Enter 75 in the Cap Length
field, 57 in the Length of Non-tapered Segment field, 42 in the Cap Min. Height field, 60 in the Cap Max Height
field, 54 in the Cap Depth field, and 25.5 in the Start and End Elevation fields. Click OK.
Step 5
Click Column to bring up the Rounded Column screen, as shown in Figure T2-10.
1. To input the first column, enter 12 in the Loc from left cap field, 0 in the Bot. Elev field, 54 in the Diameter
field, and 1 in the Factor of Reduced MI field. Click Add. The column will appear in the list on the screen
(Figure T2-10).
2. Repeat the above step to input the remaining three columns, as shown in Figure T2-10.
3. Click OK and return to the Geometry screen.
To modify a column, highlight it in the list, make the necessary changes, and click Modify. To delete a column,
highlight it and click Delete.
T2 -10
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T2
Step 6
Click Brgs/Grdrs to bring up the Bearings/Girders screen. You will be entering two bearing lines, as shown in
Figure T2-11 and Figure T2-12, starting with the first bearing line:
1. Select the Double option under Configuration and input 2 in the First Line field and -0.4 in the Second
Line field (under Eccentricity from CL of Cap).
2. Input the bearing points for the first line. Select First under Line, and then select Cap Left End under
Distance From and input 3.06 in the text box.
3. Click Add. The first bearing point for the first line will appear in the list at the bottom of the screen.
4. For the remaining 7 points, repeat the above steps except under Distance From, select the Last Point
option and input 9.84 in the text box (for each point). When completed, there will be a total of 8 bearing
points for the first line (Figure T2-11).
5. To input the bearings for the second line, select Second under Line and then select Cap Left End and
input 7.5 in the text box under Distance From.
6. Click Add to add it to the list on the screen.
7. For the remaining 5 points, repeat #5-6 except select the Last Point option and input 12 in the text box (for
each point).
8. When completed, there will be a total of 6 bearing points on the second line (Figure T2-12).
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -11
T2
Bearing Line
Bearing Line #1
Bearing
Point
1
2
3
4
5
6
7
8
Bearing Line #2
Bearing
Point
1
2
3
4
5
6
T2 -12
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T2
Step 7
Click Material to open the Materials screen, as shown in Figure T2-13. This screen defines the strength, density,
type of elasticity of concrete, and reinforcing steel of the pier.
Notice that the program defaults to certain values. Override these values by typing over them. Input the values
shown in Figure T2-13 and click OK when completed and return to the Geometry screen.
Step 8
Select Image from the Show menu to open the Image screen. A 3-D image of the structure will be displayed on the
screen, as shown in Figure T2-14. Experiment with the buttons left of the pane to become more familiar with their
functions. Close or minimize the screen and return to the Geometry screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -13
T2
Step 9
Select Model from the Show menu to open the Model screen, as shown in Figure T2-15. A 3-D model of the nodes
and elements will be displayed on the screen.
The type of model displayed depends on which characteristics you select from the check boxes at the top of the
screen (Node Number, Member Number, and Check Points). Use the buttons on the left side of the screen to
manipulate the view of the model. Close or minimize the screen and return to the Geometry screen.
Step 10
Click the Loads tab to open the Loads screen. Add the load types to the Selected Load list, by highlighting the load
type in the list under Load Type and clicking the -> button. The load type will appear in the list under Selected
Loads. Repeat the above steps until you enter all the required loads as shown in Figure T2-16.
LEAP RC-PIERv10.00.01.00
T2
Next, add the load groups to the Selected Groups list in a similar manner as above. Highlight the load group in the
list under Available Groups and click the --> button. The load group will appear in the list under Selected Groups.
Repeat the above steps until you select all required load groups as shown in Figure T2-16.
To manually add Bearing Loads follow the steps below.
1. Select the Load Type and click the --> button to place the selected load in the Selected Loads list.
2. Select the Load in the Selected Loads list and click Edit. The Load Data screen will appear as shown in
Figure T2-17.
3. In the Bearing Loads section, select the Line, enter the Bearing Point number (Bear.Pt#), Direction (Dir),
and Loads (kips). The values used in the example are: Line: First, Bear.Pt#: 1, Dir: Y, Loads: -300.
4. Click Add to add the Bearing Loads list. Continue this process for all bearing points.
To remove a selected group from the Selected Groups list by clicking the <- button. To remove all groups from the
Selected Groups list, click the <== button. To define all groups, select the Load Groups/Limit States item from
the Libraries menu. (See the section Libraries | Load Groups/Limit States in the General Operations section of
the manual for more information on this command.) Click on each load case in the Selected Loads list and click
Edit. Then manually input the loads for each load case.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -15
T2
Step 11
Click the Analysis tab to activate the Analysis screen. Perform an analysis and, if desired, specify various factors
relating to the analysis and design.
Click A/D Parameters to bring up the Analysis/Design Parameters (LRFD) screen and input the values as shown
in Figure T2-18. Click OK to accept any changes and return to the Analysis screen. (Click Cancel to ignore any
changes.)
Step 12
Click Run Analysis to perform the analysis for the pier structure based on all the data entered up to this point. The
results will appear on the screen, as shown in Figure T2-19. If necessary, use the scroll bar on the right side of the
screen to view all the results. Specify the type of results to view by using the lists at the top of the screen.
LEAP RC-PIERv10.00.01.00
T2
Step 13
At this point, it is recommended to save your project. Select the Save As item from the File menu. This will display
the Save As screen. Enter a name for the file in the File Name field (e.g., Mytutor2). The default extension is
*.rcp. Click Save.
Step 14
Click the Cap tab to activate the Cap screen, as shown in Figure T2-20. First, select Cap from the Selection list
and then choose to edit main rebars.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -17
T2
Click Design Status on the Cap screen to see a design summary of the cap as shown in Figure T2-22.\
Figure T2-22 Design Status - Cap Screen (In Enhanced Report Format)
T2 -18
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T2
To view a graphical representation of the cap with multiple views, click Sketch on the Cap screen.
Note:
The printout for shear/torsion design is given in terms of the sides of a section. For the section other than
the start or end of a span, it has two sides: left and right. The start and end of the span have only one side.
Step 15
Click the Column tab to activate the Column screen. For this tutorial, manually input the column design, as
follows. First, select 1 from the Column# list, Spiral from the Lateral Bar Type list. Select Rebar Pattern as
Circular and Rebar Orientation as Face Parallel. Uncheck the Consider MM check box and the Braced Framed
option. Then, input the values for the column reinforcement. Select 1 from the Layer# list, #10 from the Bar Size
list and input 19 in the #Bars field and 3.135 in the Bar Dist field. Click Add. It will appear in the list on the screen,
as shown in Figure T2-23. A diagram of the column design will appear in the display window on the screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -19
T2
Click the Design Status on the Column screen to see a design summary of the selected column components, as
shown in Figure T2-24. To print the design summary, click Print.
Figure T2-24 Design Status - Column Screen (In Enhanced Report Format)
To view a graphical representation of the selected column, click Sketch on the Column screen.
Step 16
Select the Footing tab to activate the Footing screen, as shown in Figure T2-25. For this tutorial, you will define a
rectangular spread footing under the first two columns, and a combined rectangular pile footing under the last two
columns. Start with the rectangular spread footing design.
T2 -20
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T2
1. Select the first two columns, 1@12 and 2@28 under Columns for a combined footing. Input Spread in the
Name field, and select Spread Footing under Type. Click Add. The name Spread will appear in the list
at the bottom of the screen.
2. Click Design to activate the Combined Spread Footing Design screen, as shown in Figure T2-26.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -21
T2
11. Click Design Status to display a design summary of the selected footing, as shown in Figure T2-27. Click
Close to exit this screen and return to the Combined Spread Footing Design screen.
12. Click OK and return to the Footing screen. A graphical representation of the footing will appear in the
display window on the screen.
13. Now, define the Combined Rectangular Pile Footing Design. Select 3@48 and 4@64 under Columns,
input Pile cap in the Name field, and select Pile/Shaft Cap under Type. Click Add. The name Pile cap
will appear in the list at the bottom of the screen.
14. Click Design to activate the Combined Pile Footing Design screen, as shown in Figure T2-28.
T2 -22
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T2
Pile #
1
2
3
4
5
X (in)
24
24
72
72
120
Z (in)
-96
96
-96
96
-96
Pile #
12
13
14
15
16
X (in)
264
312
312
360
360
Z (in)
96
-96
96
-96
96
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -23
T2
6
7
8
9
10
11
120
168
168
216
216
264
96
-96
96
-96
96
-96
17
18
19
20
21
22
408
408
24
24
408
408
-96
96
-48
48
-48
48
Step 17
RC-PIER provides you with many diagrams for your project. Select Diagrams from the Show menu to activate the
Diagram screen, as shown in Figure T2-30. Experiment with the lists and buttons to become familiar with the
options of this feature.
Step 18
This completes RC-PIER Tutorial 2. To print the output of the project, select Print from the File menu. The Print
screen will display. Select the appropriate options and click OK.
Save your file by selecting Save from the File menu. Exit the program by selecting Exit from the File menu.
Following this tutorial, is a printout of the output for selected items from Tutorial 2.
T2 -24
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
PUT
PROJECT DATA
============
Project
:
User Job No.:
State
:
Pier View
:
Code
:
Comments
:
Tutorial 2 LRFD
Tutor2
FL
State Job No. : FL-002
Upstation.
AASHTO LRFD (3rd edition)
Tapered cap beam
Two bearing lines with eccentricity
Combined rectangular spread footing under the first two columns
Combined rectangular pile cap under the third and fourth columns
PIER GEOMETRY
=============
Pier Type: Multi Column
Pier View
: Upstation.
Cap Shape: Tapered
Top Elevations: start = 25.50 ft
end = 25.50 ft
Depth(Z) = 54.00 in
Skew angle = 0.00
Reduction of I = 1.000
Length(X) = 75.00 ft
Non tapered length = 57.00 ft
Height max(Y) = 60.00 in Height min(Y) = 42.00 in
Column Shape : Round
Number of columns: 4
Column number 1:
Location from the left edge of the cap(X): 12.00 ft
Elevations: bottom = 0.00 ft
top = 23.75 ft
Reduction of I = 1.000
Column Bottom is Fixed
Column section dimensions:
Diameter = 54.00 in
Column number 2:
Location from the left edge of the cap(X): 28.00 ft
Elevations: bottom = 0.00 ft
top = 23.75 ft
Reduction of I = 1.000
Column Bottom is Fixed
Column section dimensions:
Diameter = 54.00 in
Column number 3:
Location from the left edge of the cap(X): 48.00 ft
Elevations: bottom = 0.00 ft
top = 23.75 ft
Reduction of I = 1.000
Column Bottom is Fixed
Column section dimensions:
Diameter = 54.00 in
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -25
OUTPUT
Column number 4:
Location from the left edge of the cap(X): 64.00 ft
Elevations: bottom = 0.00 ft
top = 23.75 ft
Reduction of I = 1.000
Column Bottom is Fixed
Column section dimensions:
Diameter = 54.00 in
STRUCTURE MODEL
================
FRAME Model:
Member
Node
Hinge Check Pt Dist(ft) Memb length(ft)
------------------------------------------------------Column No. 1
1
1
2
0.00
23.75
23.75
3
4
0.00
23.75
23.75
5
6
0.00
23.75
23.75
7
8
0.00
23.75
23.75
9
10
10
11
11
12
12
2
2
13
13
14
14
15
15
4
4
16
16
17
17
18
18
19
19
6
6
20
20
0.00
3.06
3.06
7.50
7.50
9.00
9.00
12.00
12.00
12.90
12.90
19.50
19.50
22.74
22.74
28.00
28.00
31.50
31.50
32.58
32.58
42.42
42.42
43.50
43.50
48.00
48.00
52.26
52.26
Column No. 2
2
Column No. 3
3
Column No. 4
4
Cap
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
3.06
4.44
1.50
3.00
0.90
6.60
3.24
5.26
3.50
1.08
9.84
1.08
4.50
4.26
T2 -26
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
20
21
22
23
24
25
21
21
22
22
8
8
23
23
24
24
25
25
26
55.50
55.50
62.10
62.10
64.00
64.00
66.00
66.00
67.50
67.50
71.94
71.94
75.00
3.24
6.60
1.90
2.00
1.50
4.44
3.06
Node coordinates:
Number
X(ft)
Y(ft)
Node type
--------------------------------------------------------1
12.00
0.00
fixed at ground
2
12.00
23.75
column-cap
3
28.00
0.00
fixed at ground
4
28.00
23.75
column-cap
5
48.00
0.00
fixed at ground
6
48.00
23.75
column-cap
7
64.00
0.00
fixed at ground
8
64.00
23.75
column-cap
9
0.00
23.75
10
3.06
23.75
bearing
11
7.50
23.75
bearing
12
9.00
23.75
13
12.90
23.75
bearing
14
19.50
23.75
bearing
15
22.74
23.75
bearing
16
31.50
23.75
bearing
17
32.58
23.75
bearing
18
42.42
23.75
bearing
19
43.50
23.75
bearing
20
52.26
23.75
bearing
21
55.50
23.75
bearing
22
62.10
23.75
bearing
23
66.00
23.75
24
67.50
23.75
bearing
25
71.94
23.75
bearing
26
75.00
23.75
SUPERSTRUCTURE INFO
===================
No superstructure defined!
BEARING POINTS
==============
Number of bearing lines: 2
First bearing line
Eccentricity = 2.00 ft
Point
Distance ft
---------------------1
3.06
2
12.90
3
22.74
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -27
4
5
6
7
8
32.58
42.42
52.26
62.10
71.94
MATERIAL PROPERTIES
===================
Cap
Column
Footing
-----------------------------------------Concrete Type
normal
normal
normal
Concrete Strength (psi)
4000.00
4000.00
4000.00
Concrete Density (lb/ft3)
150.00
150.00
150.00
Concrete Modulus Ec (ksi)
3834.30
3834.30
3834.30
Steel Strength Fy (ksi)
60.00
60.00
60.00
DESIGN PARAMETERS
=================
AASHTO LRFD Code
Resistance factors for reinf. concrete:
Flexure and tension
0.90
Shear and torsion (normal)
0.90
(lightweight)
0.70
Axial compression (ties)
0.75
Axial compression (spiral)
0.75
Compression in STM
0.70
Eta factor:
Service Fatigue Strength Extreme event
---------------------------------------------------Cap
1.00
1.00
1.00
1.00
Column
1.00
1.00
1.00
1.00
Footing
1.00
1.00
1.00
1.00
Dynamic load allowance IM:
Truck
Lane
Fatigue
-------------------------------------Cap
0.33
0.00
0.15
Column
0.33
0.00
0.15
Footing
0.00
0.00
0.00
Crack control factor
Min clear cover
kip/ft
in
----------------------------------------------Cap
170.00
2.00
Column
170.00
2.00
T2 -28
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Footing
170.00
3.00
R =
5.00
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
-300.00
1
2
Y
-300.00
1
3
Y
-300.00
1
4
Y
-300.00
1
5
Y
-300.00
1
6
Y
-300.00
1
7
Y
-300.00
1
8
Y
-300.00
2
1
Y
-100.00
2
2
Y
-100.00
2
3
Y
-100.00
2
4
Y
-100.00
2
5
Y
-100.00
2
6
Y
-100.00
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
-----------------------------------------
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -29
1
1
1
1
1
1
1
1
2
2
2
2
2
2
1
1
1
1
1
1
1
1
2
2
2
2
2
2
1
2
3
4
5
6
7
8
1
2
3
4
5
6
1
2
3
4
5
6
7
8
1
2
3
4
5
6
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
-20.00
-7.00
0.00
0.00
0.00
0.00
0.00
0.00
-45.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
0.00
1
2
Y
0.00
1
3
Y
0.00
1
4
Y
0.00
1
5
Y
0.00
1
6
Y
0.00
1
7
Y
-10.00
1
8
Y
-29.00
2
1
Y
0.00
2
2
Y
0.00
2
3
Y
0.00
2
4
Y
0.00
2
5
Y
4.00
2
6
Y
-30.00
1
1
Y
0.00
1
2
Y
0.00
1
3
Y
0.00
1
4
Y
0.00
1
5
Y
0.00
1
6
Y
0.00
1
7
Y
0.00
1
8
Y
0.00
2
1
Y
0.00
2
2
Y
0.00
T2 -30
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
2
2
2
2
3
4
5
6
Y
Y
Y
Y
0.00
0.00
0.00
0.00
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
0.00
1
2
Y
-43.00
1
3
Y
-19.00
1
4
Y
0.00
1
5
Y
0.00
1
6
Y
0.00
1
7
Y
0.00
1
8
Y
0.00
2
1
Y
0.00
2
2
Y
0.00
2
3
Y
0.00
2
4
Y
0.00
2
5
Y
0.00
2
6
Y
0.00
1
1
Y
0.00
1
2
Y
0.00
1
3
Y
0.00
1
4
Y
0.00
1
5
Y
0.00
1
6
Y
0.00
1
7
Y
0.00
1
8
Y
0.00
2
1
Y
0.00
2
2
Y
0.00
2
3
Y
0.00
2
4
Y
0.00
2
5
Y
0.00
2
6
Y
0.00
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
0.00
1
2
Y
0.00
1
3
Y
0.00
1
4
Y
0.00
1
5
Y
0.00
1
6
Y
-19.00
1
7
Y
-43.00
1
8
Y
0.00
2
1
Y
0.00
2
2
Y
0.00
2
3
Y
0.00
2
4
Y
0.00
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -31
2
2
1
1
1
1
1
1
1
1
2
2
2
2
2
2
5
6
1
2
3
4
5
6
7
8
1
2
3
4
5
6
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Name:
Dir
Arm
Mag1
x1/L
Mag2
x2/L
ft
kips, klf,k-ft
kips, klf,k-ft
------------------------------------------------------------------------------Force
X
0.00
40.00
0.50
------UDL
Z
---0.47
0.00
---1.00
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
35.00
1
8
Y
-35.00
2
1
Y
42.00
2
6
Y
-42.00
-0.000270
Name:
Name:
0.000300
T2 -32
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
#
#
#
#
#
#
#
#
#
#
#
#
#
1
2
3
4
5
6
7
8
9
10
11
12
13
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(SER
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
1
1
1
1
1
1
1
1
3
3
3
3
1
Comb #
14
(SER GP 1
)
)
)
)
)
)
)
)
)
)
)
)
)
=
=
=
=
=
=
=
=
=
=
=
=
=
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
(
(
(
(
(
(
(
(
(
(
(
(
(
+
) = 1.00 (
+
Comb #
15
(SER GP 1
) = 1.00 (
+
Comb #
16
(SER GP 1
) = 1.00 (
+
Comb #
17
(SER GP 1
) = 1.00 (
+
Comb #
18
(SER GP 1
) = 1.00 (
+
Comb #
19
(SER GP 1
) = 1.00 (
+
Comb #
20
(SER GP 1
) = 1.00 (
+
Comb
Comb
Comb
Comb
Comb
Comb
Comb
Comb
#
#
#
#
#
#
#
#
21
22
23
24
25
26
27
28
(SER GP 3
(SER GP 3
(SER GP 3
(SER GP 3
(FATIGUE
(FATIGUE
(FATIGUE
(FATIGUE
)
)
)
)
)
)
)
)
=
=
=
=
=
=
=
=
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
(
(
(
(
(
(
(
(
1.25
1.25
1.25
1.25
0.90
0.90
0.90
0.90
1.25
1.25
0.90
0.90
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
0.75
0.75
0.75
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
SH1
DC1
SH1
DC1
SH1
DC1
SH1
DC1
SH1
DC1
SH1
DC1
SH1
DC1
SH1
DC1
DC1
DC1
DC1
LL1
LL2
LL3
LL4
+
+
+
+
+
+
+
+
+
+
+
)
+
)
+
)
+
)
+
)
+
)
+
)
+
)
+
+
+
+
)
)
)
)
1.75
1.75
1.75
1.75
1.75
1.75
1.75
1.75
1.40
1.40
1.40
1.40
1.00
LL1
LL2
LL3
LL4
LL1
LL2
LL3
LL4
WS1
WS1
WS1
WS1
LL1
+
+
+
+
+
+
+
+
+
+
+
+
+
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.30
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
CR1
WS1
+
+
+
+
+
+
+
+
+
+
+
+
+
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.00
SH1
SH1
SH1
SH1
SH1
SH1
SH1
SH1
SH1
SH1
SH1
SH1
CR1
)
)
)
)
)
)
)
)
)
)
)
)
LL1
LL2
LL3
LL4
+
+
+
+
1.00
1.00
1.00
1.00
CR1
CR1
CR1
CR1
+
+
+
+
1.00
1.00
1.00
1.00
SH1
SH1
SH1
SH1
)
)
)
)
CAP DESIGN
==========
Code: AASHTO LRFD (3rd Edition)
Units: US
Pier View
: Upstation.
DESIGN PARAMETERS:
==================
f'c = 4000.0 psi
Fy flex = 60000.0 psi Fy shear = 60000.0 psi
phi flex = 0.90
phi shear = 0.90
phi flex ( seismic ) = 0.90
phi shear ( seismic) = 0.90
Ec = 3834.3 ksi
Es = 29000.0 ksi
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -33
CAP GEOMETRY:
=============
Tapered Cap :
Length(X) = 75.00
kips / in
ft
Depth(Z) = 54.00
in
MAIN REINFORCEMENT:
===================
Bar size
Quantity
STIRRUPS:
==========
From
To
Stirrup Size
n legs
Spacing
Aprv/s
ft
ft
in
in^2 / ft
-----------------------------------------------------------------------------0.00
75.00
# 5
4
6.00
2.48
Clear Cover on Sides =
2.00
in
FLEXURE DESIGN:
===============
Span 1: From 0.00
Loc
AbsLoc
ft
To 12.00
ft
Mmax
Mr
Comb
Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
Mmin
Mr
Comb
Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
ft
ft
in kips-ft kips-ft
in^2
in^2
in^2
in^2
in^2
in^2
------------------------------------------------------------------------------------------0.0
0.0
42
0.0
0.0
0
2.08
9.36*
0.00*
2.08
9.36*
0.00*
0.0
0.0
0
2.08
9.36*
0.00*
2.08
9.36*
0.00*
3.1
3.1
48
0.0 1815.1
0
2.38
9.36
9.36
2.38
9.36
9.36
-14.8 -1815.1
1
2.38
9.36
9.36
2.38
9.36
9.36
7.5
7.5
57
0.0 2189.2
0
2.82
9.36
9.36
2.82
21.84
21.84
-1976.9 -3627.8
10
2.82
9.36
9.36
8.43
21.84
15.76
9.0
9.0
60
0.0 2315.5
0
2.97
9.36
9.36
2.97
21.84
21.84
-2986.7 -4488.4
1
2.97
9.36
9.36
12.18
21.84
18.50
12.0 12.0
60
0.0 2315.5
0
2.97
9.36
9.36
2.97
21.84
21.84
-5056.4 -5269.8
1
2.97
9.36
9.36
21.19
21.84
21.84
ft
To 28.00
ft
T2 -34
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Loc
AbsLoc
Mmax
Mr
Comb
Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
Mmin
Mr
Comb
Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
ft
ft
in kips-ft kips-ft
in^2
in^2
in^2
in^2
in^2
in^2
-----------------------------------------------------------------------------------------0.0 12.0
60
0.0 2315.5
0
2.97
9.36
9.36
2.97
21.84
21.84
-3956.5 -5269.8
10
2.97
9.36
9.36
16.33
21.84
21.84
0.9 12.9
60
0.0 2315.5
0
2.97
9.36
9.36
2.97
21.84
21.84
-3276.0 -5269.8
10
2.97
9.36
9.36
13.40
21.84
21.84
7.5 19.5
60
0.0 2315.5
0
2.97
9.36
9.36
2.97
21.84
21.84
-928.2 -4272.9
1
2.97
9.36
9.36
4.93
21.84
17.59
10.7 22.7
60
74.1 2315.5
7
2.97
9.36
9.36
2.97
21.84
16.44
-226.9 -2866.1
1
2.97
9.36
9.36
2.97
21.84
11.66
16.0 28.0
60
0.0 2831.7
0
2.97
18.72
11.52
2.97
9.36
9.36
-1414.4 -2315.5
9
2.97
18.72
17.79
6.15
9.36
9.36
AbsLoc
ft
To 48.00
ft
Mmax
Mr
Comb
Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
Mmin
Mr
Comb
Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
ft
ft
in kips-ft kips-ft
in^2
in^2
in^2
in^2
in^2
in^2
--------------------------------------------------------------------------------------------0.0 28.0
60
0.0 2831.7
0
2.97
18.72
11.52
2.97
9.36
9.36
-1676.1 -2315.5
10
2.97
18.72
17.79
6.72
9.36
9.36
3.5 31.5
60
439.5 2315.5
9
2.97
9.36
9.36
2.97
9.36
9.36
0.0 -2315.5
0
2.97
9.36
9.36
2.97
9.36
9.36
4.6 32.6
60
887.1 2315.5
9
4.70
9.36
9.36
2.97
9.36
9.36
0.0 -2315.5
0
2.97
9.36
9.36
2.97
9.36
9.36
14.4 42.4
60 1145.9 2315.5
10
6.10
9.36
9.36
2.97
9.36
9.36
0.0 -2315.5
0
2.97
9.36
9.36
2.97
9.36
9.36
15.5 43.5
60
755.6 2315.5
10
4.00
9.36
9.36
2.97
9.36
9.36
0.0 -2315.5
0
2.97
9.36
9.36
2.97
9.36
9.36
20.0 48.0
60
0.0 3289.4
0
2.97
18.72
13.44
2.97
9.36
9.36
-1696.2 -2315.5
9
2.97
18.72
18.72
6.81
9.36
9.36
AbsLoc
ft
To 64.00
ft
Mmax
Mr
Comb
Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
Mmin
Mr
Comb
Asb-req Asb-prv Asb-eff Ast-req Ast-prv Ast-eff
ft
ft
in kips-ft kips-ft
in^2
in^2
in^2
in^2
in^2
in^2
--------------------------------------------------------------------------------------------0.0 48.0
60
0.0 3289.4
0
2.97
18.72
13.44
2.97
9.36
9.36
-1514.6 -2315.5
10
2.97
18.72
18.72
6.15
9.36
9.36
4.3 52.3
60
89.2 2315.5
8
2.97
9.36
9.36
2.97
9.36
9.36
-125.1 -2315.5
2
2.97
9.36
9.36
2.97
9.36
9.36
7.5 55.5
60
11.7 2315.5
12
2.97
9.36
9.36
2.97
21.84
17.79
-502.1 -2970.8
2
2.97
9.36
9.36
2.97
21.84
12.10
14.1 62.1
60
0.0 2315.5
0
2.97
9.36
9.36
2.97
21.84
21.84
-2227.6 -5269.8
9
2.97
9.36
9.36
9.00
21.84
21.84
16.0 64.0
60
0.0 2315.5
0
2.97
9.36
9.36
2.97
21.84
21.84
-3485.1 -5269.8
9
2.97
9.36
9.36
14.30
21.84
21.84
AbsLoc
Mmax
Mmin
Mr
Mr
Comb
Comb
Asb-req
Asb-req
ft
To 75.00
Asb-prv
Asb-prv
ft
Asb-eff
Asb-eff
Ast-req
Ast-req
Ast-prv
Ast-prv
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
Ast-eff
Ast-eff
T2 -35
ft
ft
in kips-ft kips-ft
in^2
in^2
in^2
in^2
in^2
in^2
--------------------------------------------------------------------------------------------0.0 64.0
60
0.0 2315.5
0
2.97
9.36
9.36
2.97
21.84
21.84
-4406.4 -5269.8
2
2.97
9.36
9.36
18.30
21.84
21.84
2.0 66.0
60
0.0 2315.5
0
2.97
9.36
9.36
2.97
21.84
21.84
-3058.8 -4917.5
2
2.97
9.36
9.36
12.48
21.84
20.33
3.5 67.5
57
0.0 2189.2
0
2.82
9.36
9.36
2.82
21.84
21.84
-2059.0 -4035.5
2
2.82
9.36
9.36
8.79
21.84
17.59
7.9 71.9
48
0.0 1815.1
0
2.38
9.36
9.36
2.38
21.84
9.70
-14.8 -1835.5
1
2.38
9.36
9.36
2.38
21.84
9.47
11.0 75.0
42
0.0
0.0
0
2.08
9.36*
0.00*
2.08
9.36*
0.00*
0.0
0.0
0
2.08
9.36*
0.00*
2.08
9.36*
0.00*
Note:
* The provided reinforcement is not adequate, either less than required
or larger than maximum allowed.
ft
To 12.00
ft
ft
To 28.00
ft
AbsLoc Pos
Vu
Comb
Tu
Comb phi*Vc
ft
To 48.00
T-lim
ft
Avs/s 2Ats/s
Av/s
T2 -36
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
Aprv/s
Alx
LEAP RC-PIERv10.00.01.00
ft
ft
kips
kips-ft
kips
kips-ft <--------- in^2/ft -------->
in^2
-------------------------------------------------------------------------------------------0.00 28.00 R
576.7
10
791.9
4
335.8
215.8
0.98
0.91
1.89
2.48
6.58
3.50 31.50 L
561.9
10
791.9
4
337.9
215.8
0.91
0.91
1.82
2.48
0.93
R
436.9
10
841.9
4
337.9
215.8
0.40
0.97
1.37
2.48
0.00
4.58 32.58 L
432.4
10
841.9
4
337.9
215.8
0.38
0.97
1.35
2.48
1.83
R
57.4
10
91.9
4
337.9
215.8
0.00
0.00
0.00
2.48
0.00
14.42 42.42 L
15.8
10
91.9
4
337.9
215.8
0.00
0.00
0.00
2.48
0.00
R
379.3
9
801.7
3
337.9
215.8
0.17
0.93
1.09
2.48
2.37
15.50 43.50 L
383.9
9
801.7
3
337.9
215.8
0.19
0.93
1.11
2.48
0.74
R
508.9
9
751.7
3
337.9
215.8
0.69
0.87
1.56
2.48
1.70
20.00 48.00 L
527.9
9
751.7
3
333.8
215.8
0.79
0.87
1.66
2.48
6.20
ft
To 64.00
ft
ft
To 75.00
ft
Note:
** Provided stirrup area ( Aprv/s ) is not adequate.
-
Pos is the design position. L suggests the calculation is done at immediate left
of "Loc" and R suggests at immediate right of it.
T-lim is the limiting value of torsion for the concrete section. If actual torsion
is higher than this value, torsional steel has to be provided.
Avs/s is the required area of steel per unit length for shear force.
2Ats/s is the required area of steel per unit length for two legs of torsional
reinforcement.
Av/s is the total required area of steel per unit length due to shear plus torsion.
Aprvs/s is the total provided area of steel per unit length due to shear (stirrups).
Alx is the EFFECTIVE longitudinal steel required in addition to the PROVIDED EFFECTIVE
flexural steel.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -37
CRACKING/FATIGUE CHECK:
=======================
Cracking check as per AASHTO LRFD (3rd Edition)
Span 1: From 0.00
ft
To 12.00
ft
AbsLoc
ft
To 28.00
ft
AbsLoc
ft
To 48.00
ft
AbsLoc
T2 -38
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
20.00
48.0
60.0
32.1
0.0
0.96
0.00
16
0
0.7
0.3
ft
To 64.00
0.05
0.01
28
25
ft
AbsLoc
ft
To 75.00
ft
AbsLoc
Note:
* Cracking / fatigue checking failed.
COLUMN DESIGN
=============
COLUMN DESIGN - Column: 1
Column Type: Round
D =
54.00 in
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -39
DESIGN PARAMETERS:
==================
f'c = 4000.0 psi
fy = 60000.0 psi
phi flex = 0.90
phi axial = 0.75
Ec = 3834.3 ksi
Es = 29000 ksi
Concrete Type : Normal Weight.
Reinforcement:
==============
Rebar Pattern: Circular
Rebar Orientation: Face Parallel
Layer
Dir
Size
No. bars
Bar Dist. in
-----------------------------------------------------------------------1
X
10
19
3.13
Main bars summary:
Spiral size: # 4
19 # 10 bars
Column Design
=============
Loc
Comb
Pu
Mux
Muz
pMn
Incl
pPn/Pu pMn/Mu
ft
kips
kips-ft
kips-ft
kips-ft
deg
-------------------------------------------------------------------------------------0.00
9
1149.4
1705.8
525.7
3252.7
17.13
1.00
1.82
23.75
1
1453.4
1547.5
1150.2
3458.7
36.62
1.00
1.79
COLUMN DESIGN
=============
COLUMN DESIGN - Column: 2
Column Type: Round
D =
54.00 in
T2 -40
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
DESIGN PARAMETERS:
==================
f'c = 4000.0 psi
fy = 60000.0 psi
phi flex = 0.90
phi axial = 0.75
Ec = 3834.3 ksi
Es = 29000 ksi
Concrete Type : Normal Weight.
Reinforcement:
==============
Rebar Pattern: Circular
Rebar Orientation: Face Parallel
Layer
Dir
Size
No. bars
Bar Dist. in
-----------------------------------------------------------------------1
X
10
19
3.13
Main bars summary:
Spiral size: # 4
19 # 10 bars
Column Design
=============
Loc
Comb
Pu
Mux
Muz
pMn
Incl
pPn/Pu pMn/Mu
ft
kips
kips-ft
kips-ft
kips-ft
deg
------------------------------------------------------------------------------------0.00
9
909.0
1722.2
168.2
3022.2
5.58
1.00
1.75
23.75
10
761.1
1371.1
611.5
2886.1
24.04
1.00
1.92
COLUMN DESIGN
=============
COLUMN DESIGN - Column: 3
Column Type: Round
D =
54.00 in
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -41
DESIGN PARAMETERS:
==================
f'c = 4000.0 psi
fy = 60000.0 psi
phi flex = 0.90
phi axial = 0.75
Ec = 3834.3 ksi
Es = 29000 ksi
Concrete Type : Normal Weight.
Reinforcement:
==============
Rebar Pattern: Circular
Rebar Orientation: Face Parallel
Layer
Dir
Size
No. bars
Bar Dist. in
-----------------------------------------------------------------------1
X
10
19
3.13
Main bars summary:
Spiral size: # 4
19 # 10 bars
Column Design
=============
Loc
Comb
Pu
Mux
Muz
pMn
Incl
pPn/Pu pMn/Mu
ft
kips
kips-ft
kips-ft
kips-ft
deg
-------------------------------------------------------------------------------------0.00
9
865.6
1724.8
380.5
2988.4
12.44
1.00
1.69
23.75
9
804.5
1382.7
502.8
2920.6
19.98
1.00
1.99
COLUMN DESIGN
=============
COLUMN DESIGN - Column: 4
Column Type: Round
D =
54.00 in
T2 -42
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
DESIGN PARAMETERS:
==================
f'c = 4000.0 psi
fy = 60000.0 psi
phi flex = 0.90
phi axial = 0.75
Ec = 3834.3 ksi
Es = 29000 ksi
Concrete Type : Normal Weight.
Reinforcement:
==============
Rebar Pattern: Circular
Rebar Orientation: Face Parallel
Layer
Dir
Size
No. bars
Bar Dist. in
-----------------------------------------------------------------------1
X
10
19
3.13
Main bars summary:
Spiral size: # 4
19 # 10 bars
Column Design
=============
Loc
Comb
Pu
Mux
Muz
pMn
Incl
pPn/Pu pMn/Mu
ft
kips
kips-ft
kips-ft
kips-ft
deg
-------------------------------------------------------------------------------------0.00
9
1375.5
1711.0
254.5
3407.2
8.46
1.00
1.97
23.75
2
1351.1
1546.2
964.6
3405.8
31.96
1.00
1.87
Geometry:
=========
Name : Spread
Shape : Rectangular, Type : Spread
Bf(X) = 36.00 ft, Hf(Z) = 20.00 ft, Thickness(Y) = 42.00 in
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -43
Footing concentric.
Columns located on the footing:
Column No. 1 at x =
0.00 ft,
Column No. 2 at x = 16.00 ft,
Round
Round
D =
D =
54.00 in
54.00 in
0.20 ksf
Design Parameters:
==================
X
Z
|------------------ Column Loads ------------------| Soil press.
ft
ft
col# comb
Ovs
P, kips
Mxx, kft
Mzz, kft
ksf
--------------------------------------------------------------------------------------1
26.00 -10.00
1
15
1.000
-1062.31
1237.96
-293.89
1.56
2
15
1.000
-716.94
1254.54
112.34
1
17
1.000
-1174.30
1084.81
-288.53
1.41
2
17
1.000
-658.60
1112.56
266.65
2
-10.00 -10.00
1
17
1.000
-1174.30
1084.81
-288.53
3.31
2
17
1.000
-658.60
1112.56
266.65
1
14
1.000
-1016.03
1203.31
-318.91
2.63
2
14
1.000
-698.98
1231.81
98.66
3
-10.00
10.00
1
17
1.000
-1174.30
1084.81
-288.53
5.14
2
17
1.000
-658.60
1112.56
266.65
1
14
1.000
-1016.03
1203.31
-318.91
4.66
2
14
1.000
-698.98
1231.81
98.66
4
26.00
10.00
1
15
1.000
-1062.31
1237.96
-293.89
3.64
2
15
1.000
-716.94
1254.54
112.34
1
17
1.000
-1174.30
1084.81
-288.53
3.24
2
17
1.000
-658.60
1112.56
266.65
X
Z
|------------------ Column Loads ------------------| Soil press.
ft
ft
col# comb
Ovs
P, kips
Mxx, kft
Mzz, kft
ksf
--------------------------------------------------------------------------------------1
26.00 -10.00
1
9
---1149.37
1705.85
-525.71
2.05
2
9
---909.02
1722.20
-74.59
1
5
---1097.84
1043.05
-350.91
1.47
2
5
---585.66
1064.98
199.72
2
-10.00 -10.00
1
10
---1471.95
1128.40
-275.45
4.40
2
10
---822.22
1174.14
469.80
1
11
---783.22
1309.05
-402.56
1.94
2
11
---665.81
1316.71
-125.23
3
-10.00
10.00
1
1
---1463.98
1439.85
-474.07
6.45
T2 -44
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
26.00
10.00
2
1
2
1
2
1
2
1
11
11
9
9
12
12
---------------
-828.87
-783.22
-665.81
-1149.37
-909.02
-1105.80
-579.01
1470.47
1309.05
1316.71
1705.85
1722.20
731.60
768.66
250.36
-402.56
-125.23
-525.71
-74.59
-152.30
419.16
4.13
4.91
2.85
Note:
Only max. positive pressure is considered for design.
5.52 ksf
4.41 ksf
0.23 ksf
Reinforcement Schedule:
=======================:
Dir
Quantity
Size
Flexure:
========
X direction
Loc
Mmax
Comb
Asb_req
Asb_prv
Asb_eff
Ast_req
Ast_prv
Ast_eff
Mmin
Comb
Asb_req
Asb_prv
Asb_eff
Ast_req
Ast_prv
Ast_eff
ft
kft
in^2
in^2
in^2
in^2
in^2
in^2
-------------------------------------------------------------------------------------10.00
0.0
1
7.56
30.81 *
0.00 *
7.56
0.00 *
0.00 *
0.0
1
7.56
30.81 *
0.00 *
7.56
0.00 *
0.00 *
-9.11
43.7
1
7.56
30.81
17.31
7.56
0.00 *
0.00 *
0.0
1
7.56
30.81
17.40
7.56
0.00 *
0.00 *
-8.22
174.8
1
7.56
30.81
30.81
7.56
0.00 *
0.00 *
0.0
1
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-7.33
393.2
1
7.56
30.81
30.81
7.56
0.00 *
0.00 *
0.0
1
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-6.44
699.1
1
7.56
30.81
30.81
7.56
0.00 *
0.00 *
0.0
1
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-5.11
1321.4
1
10.24
30.81
30.81
7.56
0.00 *
0.00 *
0.0
1
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-4.66
1572.9
1
12.22
30.81
30.81
7.56
0.00 *
0.00 *
0.0
1
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-3.77
2140.9
1
16.70
30.81
30.81
7.56
0.00 *
0.00 *
0.0
1
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-2.88
2796.3
1
19.69
30.81
30.81
7.56
0.00 *
0.00 *
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -45
-1.99
0.00
1.99
3.50
5.11
6.50
8.00
9.50
10.89
12.50
14.01
16.00
17.99
18.88
19.77
20.66
21.11
22.44
23.33
24.22
25.11
26.00
0.0
3539.1
0.0
0.0
0.0
3979.4
0.0
3108.1
0.0
2449.6
0.0
2112.2
0.0
1987.7
0.0
2112.2
0.0
2449.6
0.0
3108.1
0.0
3979.4
0.0
0.0
0.0
3539.1
0.0
2796.3
0.0
2140.9
0.0
1572.9
0.0
1321.4
0.0
699.1
0.0
393.2
0.0
174.8
0.0
43.7
0.0
0.0
0.0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
7.56
20.84
7.56
7.56
7.56
23.50
7.56
19.69
7.56
19.16
7.56
16.47
7.56
15.49
7.56
16.47
7.56
19.16
7.56
19.69
7.56
23.50
7.56
7.56
7.56
20.84
7.56
19.69
7.56
16.70
7.56
12.22
7.56
10.24
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81 *
30.81 *
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
17.31
17.40
0.00 *
0.00 *
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
Z direction
Loc
Mmax
Comb
Asb_req
Asb_prv
Asb_eff
Ast_req
Ast_prv
Ast_eff
ft
kft
in^2
in^2
in^2
in^2
in^2
in^2
-------------------------------------------------------------------------------------1.99
6370.3
1
38.56
63.20
63.20
13.61
0.00 *
0.00 *
1.99
6370.3
1
38.56
63.20
63.20
13.61
0.00 *
0.00 *
Note:
* The provided reinforcement is not adequate, either less than required
or larger than maximum allowed.
T2 -46
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Cracking/Fatigue
================
Cracking check as per AASHTO LRFD 3rd Edition (2004)
X direction
<----------- Cracking ----------->
<----------- Fatigue ----------->
Loc
Mmax
Comb
fs-t
ratio fs-t
Mmax
Comb
fs-t
ratio fs-t
Loc
Mmin
Comb
fs-b
ratio fs-b
Mmin
Comb
fs-b
ratio fs-b
ft
kft
ksi
kft
ksi
------------------------------------------------------------------------------------10.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
-9.11
0.0
0
0.00
0.00
0.00
0
0.00
0.00
34.9
17
0.66
0.02
1.79
25
0.03
0.00
-8.22
0.0
0
0.00
0.00
0.00
0
0.00
0.00
139.6
17
1.51
0.04
7.16
25
0.08
0.00
-7.33
0.0
0
0.00
0.00
0.00
0
0.00
0.00
314.2
17
3.41
0.09
16.11
25
0.17
0.01
-6.44
0.0
0
0.00
0.00
0.00
0
0.00
0.00
558.5
17
6.06
0.17
28.64
25
0.31
0.01
-5.11
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1055.7
17
11.45
0.32
54.14
25
0.59
0.03
-4.66
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1256.6
17
13.62
0.38
64.45
25
0.70
0.04
-3.77
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1710.4
17
18.54
0.52
87.72
25
0.95
0.05
-2.88
0.0
0
0.00
0.00
0.00
0
0.00
0.00
2234.0
17
24.22
0.67
114.57
25
1.24
0.08
-1.99
0.0
0
0.00
0.00
0.00
0
0.00
0.00
2827.4
17
30.65
0.85
145.00
25
1.57
0.11
0.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1.99
0.0
0
0.00
0.00
0.00
0
0.00
0.00
3179.2
17
34.47
0.96
163.05
25
1.77
0.14
3.50
0.0
0
0.00
0.00
0.00
0
0.00
0.00
2483.1
17
26.92
0.75
127.34
25
1.38
0.09
5.11
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1957.0
17
21.22
0.59
100.36
25
1.09
0.06
6.50
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1687.5
17
18.30
0.51
86.54
25
0.94
0.05
8.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1588.0
17
17.22
0.48
81.44
25
0.88
0.05
9.50
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1687.5
17
18.30
0.51
86.54
25
0.94
0.05
10.89
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1957.0
17
21.22
0.59
100.36
25
1.09
0.06
12.50
0.0
0
0.00
0.00
0.00
0
0.00
0.00
2483.1
17
26.92
0.75
127.34
25
1.38
0.09
14.01
0.0
0
0.00
0.00
0.00
0
0.00
0.00
3179.2
17
34.47
0.96
163.05
25
1.77
0.14
16.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
17.99
0.0
0
0.00
0.00
0.00
0
0.00
0.00
2827.4
17
30.65
0.85
145.00
25
1.57
0.11
18.88
0.0
0
0.00
0.00
0.00
0
0.00
0.00
2234.0
17
24.22
0.67
114.57
25
1.24
0.08
19.77
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1710.4
17
18.54
0.52
87.72
25
0.95
0.05
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -47
20.66
21.11
22.44
23.33
24.22
25.11
26.00
0.0
1256.6
0.0
1055.7
0.0
558.5
0.0
314.2
0.0
139.6
0.0
34.9
0.0
0.0
0
17
0
17
0
17
0
17
0
17
0
17
0
0
0.00
13.62
0.00
11.45
0.00
6.06
0.00
3.41
0.00
1.51
0.00
0.66
0.00
0.00
0.00
0.38
0.00
0.32
0.00
0.17
0.00
0.09
0.00
0.04
0.00
0.02
0.00
0.00
0.00
64.45
0.00
54.14
0.00
28.64
0.00
16.11
0.00
7.16
0.00
1.79
0.00
0.00
0
25
0
25
0
25
0
25
0
25
0
25
0
0
0.00
0.70
0.00
0.59
0.00
0.31
0.00
0.17
0.00
0.08
0.00
0.03
0.00
0.00
0.00
0.04
0.00
0.03
0.00
0.01
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
5089.3
5089.3
17
17
27.76
27.76
0.77
0.77
261.00
261.00
25
25
1.42
1.42
0.06
0.06
Z direction
-1.99
1.99
Dist
Comb
dv
Vu
Mu
theta
beta
phi*Vc
ft
in
kips
kft
deg
kips
--------------------------------------------------------------------------------------X direction
1
2
-5.11
5.11
10.89
21.11
1
1
1
1
37.37
37.37
37.37
37.37
540.2
319.4
319.4
540.2
1321.4
2449.6
2449.6
1321.4
52.18
55.36
55.36
52.18
1.76
1.47
1.47
1.76
899.8
751.7
751.7
899.8
1
1
36.21
36.21
991.6
991.6
2473.3
2473.3
51.14
51.14
1.84
1.84
1642.7
1642.7
Z direction
-5.01
5.01
Two Way Shear:
==============
#
Bo
Ao
Comb
Avg. dv
Vu
phi*Vc
ft
ft^2
in
kips
kips
---------------------------------------------------------------Columns:
1
23.77
44.96
1
36.79
1739.5
2379.7
2
23.77
44.96
1
36.79
1739.5
2379.7
Note:
TWO WAY SHEAR IN FOOTING IS NOT DESIGNED AND STIRRUPS ARE NOT CONSIDERED.
T2 -48
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Geometry:
=========
Name : Pile Cap
Shape : Rectangular, Type : Pile/Shaft Cap
Bf(X) = 36.00 ft, Hf(Z) = 20.00 ft, Thickness(Y) = 42.00 in
Footing concentric.
Columns located on the footing:
Column No. 3 at x =
0.00 ft,
Column No. 4 at x = 16.00 ft,
Round
Round
D =
D =
54.00 in
54.00 in
0.20 ksf
Circular
Design Parameters:
==================
Size: 12.00 in
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -49
10
11
12
13
14
15
16
17
18
19
20
0.00
4.00
4.00
8.00
8.00
12.00
12.00
16.00
16.00
20.00
20.00
24.00
24.00
-8.00
-8.00
120.0
168.0
168.0
216.0
216.0
264.0
264.0
312.0
312.0
360.0
360.0
408.0
408.0
24.0
24.0
96.0
-96.0
96.0
-96.0
96.0
-96.0
96.0
-96.0
96.0
-96.0
96.0
-96.0
96.0
-48.0
48.0
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
16
16
19
19
20
20
15
15
16
16
17
17
14
14
19
19
16
16
17
17
14
14
19
19
14
14
17
17
14
14
19
19
14
14
17
17
14
14
17
17
14
14
17
17
14
14
17
17
14
14
17
17
20
20
14
14
20
20
14
14
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
-733.27
-1054.05
-725.69
-946.17
-749.40
-987.39
-709.55
-1012.83
-733.27
-1054.05
-728.25
-944.49
-694.13
-1095.50
-725.69
-946.17
-733.27
-1054.05
-728.25
-944.49
-694.13
-1095.50
-725.69
-946.17
-694.13
-1095.50
-728.25
-944.49
-694.13
-1095.50
-725.69
-946.17
-694.13
-1095.50
-728.25
-944.49
-694.13
-1095.50
-728.25
-944.49
-694.13
-1095.50
-728.25
-944.49
-694.13
-1095.50
-728.25
-944.49
-694.13
-1095.50
-728.25
-944.49
-749.40
-987.39
-694.13
-1095.50
-749.40
-987.39
-694.13
-1095.50
1246.04
1229.10
1113.75
1069.54
1121.76
1095.78
1238.04
1202.85
1246.04
1229.10
1093.98
1057.65
1232.46
1209.42
1113.75
1069.54
1246.04
1229.10
1093.98
1057.65
1232.46
1209.42
1113.75
1069.54
1232.46
1209.42
1093.98
1057.65
1232.46
1209.42
1113.75
1069.54
1232.46
1209.42
1093.98
1057.65
1232.46
1209.42
1093.98
1057.65
1232.46
1209.42
1093.98
1057.65
1232.46
1209.42
1093.98
1057.65
1232.46
1209.42
1093.98
1057.65
1121.76
1095.78
1232.46
1209.42
1121.76
1095.78
1232.46
1209.42
-157.42
202.87
-50.06
273.33
-42.19
262.81
-165.29
213.39
-157.42
202.87
-27.74
293.34
-192.37
247.80
-50.06
273.33
-157.42
202.87
-27.74
293.34
-192.37
247.80
-50.06
273.33
-192.37
247.80
-27.74
293.34
-192.37
247.80
-50.06
273.33
-192.37
247.80
-27.74
293.34
-192.37
247.80
-27.74
293.34
-192.37
247.80
-27.74
293.34
-192.37
247.80
-27.74
293.34
-192.37
247.80
-27.74
293.34
-42.19
262.81
-192.37
247.80
-42.19
262.81
-192.37
247.80
T2 -50
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
114.40
109.90
85.80
82.73
117.83
111.93
89.01
85.36
121.25
113.92
93.30
87.45
125.43
115.91
97.58
89.54
129.71
117.90
101.87
91.57
134.00
119.89
106.16
93.56
138.29
121.87
86.23
79.89
100.82
95.96
LEAP RC-PIERv10.00.01.00
21
22
24.00
24.00
408.0
408.0
-48.0
48.0
1
2
1
2
1
2
1
2
14
14
17
17
14
14
17
17
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
-694.13
-1095.50
-728.25
-944.49
-694.13
-1095.50
-728.25
-944.49
1232.46
1209.42
1093.98
1057.65
1232.46
1209.42
1093.98
1057.65
-192.37
247.80
-27.74
293.34
-192.37
247.80
-27.74
293.34
114.19
100.64
130.26
114.80
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -51
12
12.00
13
16.00
14
16.00
15
20.00
16
20.00
17
24.00
18
24.00
19
-8.00
20
-8.00
21
24.00
22
24.00
264.0
312.0
312.0
360.0
360.0
408.0
408.0
24.0
24.0
408.0
408.0
96.0
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
-96.0
96.0
-96.0
96.0
-96.0
96.0
-48.0
48.0
-48.0
48.0
9
9
12
12
2
2
12
12
9
9
12
12
2
2
12
12
9
9
12
12
2
2
12
12
9
9
12
12
10
10
11
11
4
4
11
11
9
9
12
12
9
9
12
12
-----------------------------------------------------------------------------------------
-865.62
-1375.53
-687.17
-723.69
-873.83
-1364.51
-687.17
-723.69
-865.62
-1375.53
-687.17
-723.69
-873.83
-1364.51
-687.17
-723.69
-865.62
-1375.53
-687.17
-723.69
-873.83
-1364.51
-687.17
-723.69
-865.62
-1375.53
-687.17
-723.69
-940.92
-1064.45
-611.86
-1034.78
-942.32
-1291.96
-611.86
-1034.78
-865.62
-1375.53
-687.17
-723.69
-865.62
-1375.53
-687.17
-723.69
1724.83
1710.96
743.07
696.84
1474.12
1439.88
743.07
696.84
1724.83
1710.96
743.07
696.84
1474.12
1439.88
743.07
696.84
1724.83
1710.96
743.07
696.84
1474.12
1439.88
743.07
696.84
1724.83
1710.96
743.07
696.84
1144.82
1088.80
1323.08
1318.99
1497.89
1474.33
1323.08
1318.99
1724.83
1710.96
743.07
696.84
1724.83
1710.96
743.07
696.84
-380.55
221.50
183.77
389.03
-155.97
424.00
183.77
389.03
-380.55
221.50
183.77
389.03
-155.97
424.00
183.77
389.03
-380.55
221.50
183.77
389.03
-155.97
424.00
183.77
389.03
-380.55
221.50
183.77
389.03
157.19
501.20
-353.97
109.33
-94.82
345.38
-353.97
109.33
-380.55
221.50
183.77
389.03
-380.55
221.50
183.77
389.03
160.55
103.54
122.82
84.21
166.31
103.15
127.79
83.83
172.06
102.77
132.76
83.45
177.82
102.39
112.33
76.75
127.81
94.13
143.92
88.18
166.52
97.66
Note:
Only max. force in piles is considered for design.
Pile coordinates X and Z are from the most left edge of the footing.
= 147.51 kips
= 114.56 kips
5.66 kips
T2 -52
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Reinforcement Schedule:
=======================:
Dir
Quantity
Size
Flexure:
========
X direction
Loc
Mmax
Comb
Asb_req
Asb_prv
Asb_eff
Ast_req
Ast_prv
Ast_eff
Mmin
Comb
Asb_req
Asb_prv
Asb_eff
Ast_req
Ast_prv
Ast_eff
ft
kft
in^2
in^2
in^2
in^2
in^2
in^2
-------------------------------------------------------------------------------------10.00
0.0
9
7.56
30.81 *
0.00 *
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81 *
0.00 *
7.56
0.00 *
0.00 *
-9.11
0.0
9
7.56
30.81
17.31
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
17.40
7.56
0.00 *
0.00 *
-8.22
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-7.33
394.5
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-6.44
919.4
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-5.11
1706.4
9
13.27
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-4.66
1969.1
9
15.34
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-3.77
2560.9
9
19.69
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-2.88
3348.3
9
19.70
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
-1.99
4135.6
9
24.44
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
0.00
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
1.99
5018.0
9
29.81
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
3.50
4353.5
9
25.76
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
5.11
3966.8
9
23.42
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
6.50
3761.7
9
22.18
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
8.00
3540.2
9
20.85
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
9.50
3761.7
9
22.18
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
10.89
3966.8
9
23.42
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
12.50
4353.5
9
25.76
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
14.01
5018.0
9
29.81
30.81
30.81
7.56
0.00 *
0.00 *
0.0
9
7.56
30.81
30.81
7.56
0.00 *
0.00 *
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -53
16.00
17.99
18.88
19.77
20.66
21.11
22.44
23.33
24.22
25.11
26.00
0.0
0.0
4135.6
0.0
3348.3
0.0
2560.9
0.0
1969.1
0.0
1706.4
0.0
919.4
0.0
394.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
7.56
7.56
24.44
7.56
19.70
7.56
19.69
7.56
15.34
7.56
13.27
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81 *
30.81 *
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
30.81
17.31
17.40
0.00 *
0.00 *
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
7.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
Z direction
Loc
Mmax
Comb
Asb_req
Asb_prv
Asb_eff
Ast_req
Ast_prv
Ast_eff
ft
kft
in^2
in^2
in^2
in^2
in^2
in^2
-------------------------------------------------------------------------------------1.99
8565.2
9
52.24
63.20
63.20
13.61
0.00 *
0.00 *
1.99
8565.2
9
52.24
63.20
63.20
13.61
0.00 *
0.00 *
Note:
* The provided reinforcement is not adequate, either less than required
or larger than maximum allowed.
Cracking/Fatigue
================
Cracking check as per AASHTO LRFD 3rd Edition (2004)
X direction
<----------- Cracking ----------->
<----------- Fatigue ----------->
Loc
Mmax
Comb
fs-t
ratio fs-t
Mmax
Comb
fs-t
ratio fs-t
Loc
Mmin
Comb
fs-b
ratio fs-b
Mmin
Comb
fs-b
ratio fs-b
ft
kft
ksi
kft
ksi
------------------------------------------------------------------------------------10.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
-9.11
0.0
0
0.00
0.00
0.00
0
0.00
0.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
-8.22
0.0
0
0.00
0.00
0.00
0
0.00
0.00
0.0
0
0.00
0.00
0.00
0
0.00
0.00
-7.33
0.0
0
0.00
0.00
0.00
0
0.00
0.00
306.4
14
3.32
0.09
15.15
26
0.16
0.01
-6.44
0.0
0
0.00
0.00
0.00
0
0.00
0.00
714.0
14
7.74
0.22
35.30
26
0.38
0.02
-5.11
0.0
0
0.00
0.00
0.00
0
0.00
0.00
1325.3
14
14.37
0.40
65.52
26
0.71
0.04
T2 -54
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
-4.66
-3.77
-2.88
-1.99
0.00
1.99
3.50
5.11
6.50
8.00
9.50
10.89
12.50
14.01
16.00
17.99
18.88
19.77
20.66
21.11
22.44
23.33
24.22
25.11
26.00
0.0
1529.3
0.0
1988.9
0.0
2600.4
0.0
3211.8
0.0
0.0
0.0
3897.1
0.0
3381.1
0.0
3080.8
0.0
2921.5
0.0
2749.5
0.0
2921.5
0.0
3080.8
0.0
3381.1
0.0
3897.1
0.0
0.0
0.0
3211.8
0.0
2600.4
0.0
1988.9
0.0
1529.3
0.0
1325.3
0.0
714.0
0.0
306.4
0.0
0.0
0.0
0.0
0.0
0.0
0
14
0
14
0
14
0
14
0
0
0
14
0
14
0
14
0
14
0
14
0
14
0
14
0
14
0
14
0
0
0
14
0
14
0
14
0
14
0
14
0
14
0
14
0
0
0
0
0
0
0.00
16.58
0.00
21.56
0.00
28.19
0.00
34.82
0.00
0.00
0.00
42.25
0.00
36.66
0.00
33.40
0.00
31.67
0.00
29.81
0.00
31.67
0.00
33.40
0.00
36.66
0.00
42.25
0.00
0.00
0.00
34.82
0.00
28.19
0.00
21.56
0.00
16.58
0.00
14.37
0.00
7.74
0.00
3.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.46
0.00
0.60
0.00
0.78
0.00
0.97
0.00
0.00
0.00
1.17
0.00
1.02
0.00
0.93
0.00
0.88
0.00
0.83
0.00
0.88
0.00
0.93
0.00
1.02
0.00
1.17
0.00
0.00
0.00
0.97
0.00
0.78
0.00
0.60
0.00
0.46
0.00
0.40
0.00
0.22
0.00
0.09
0.00
0.00
0.00
0.00
0.00
0.00
6652.1
6652.1
14
14
36.28
36.28
1.01 *
1.01 *
*
*
*
*
0.00
75.61
0.00
98.33
0.00
128.56
0.00
158.79
0.00
0.00
0.00
192.67
0.00
167.16
0.00
152.31
0.00
144.44
0.00
135.93
0.00
144.44
0.00
152.31
0.00
167.16
0.00
192.67
0.00
0.00
0.00
158.79
0.00
128.56
0.00
98.33
0.00
75.61
0.00
65.52
0.00
35.30
0.00
15.15
0.00
0.00
0.00
0.00
0.00
0.00
0
26
0
26
0
26
0
26
0
0
0
26
0
26
0
26
0
26
0
26
0
26
0
26
0
26
0
26
0
0
0
26
0
26
0
26
0
26
0
26
0
26
0
26
0
0
0
0
0
0
0.00
0.82
0.00
1.07
0.00
1.39
0.00
1.72
0.00
0.00
0.00
2.09
0.00
1.81
0.00
1.65
0.00
1.57
0.00
1.47
0.00
1.57
0.00
1.65
0.00
1.81
0.00
2.09
0.00
0.00
0.00
1.72
0.00
1.39
0.00
1.07
0.00
0.82
0.00
0.71
0.00
0.38
0.00
0.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.04
0.00
0.06
0.00
0.09
0.00
0.13
0.00
0.00
0.00
0.19
0.00
0.14
0.00
0.12
0.00
0.11
0.00
0.10
0.00
0.11
0.00
0.12
0.00
0.14
0.00
0.19
0.00
0.00
0.00
0.13
0.00
0.09
0.00
0.06
0.00
0.04
0.00
0.04
0.00
0.02
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
328.88
328.88
26
26
1.79
1.79
0.14
0.14
Z direction
-1.99
1.99
Note:
* Cracking / fatigue ratio exceeds allowable.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T2 -55
Dist
Comb
dv
Vu
Mu
theta
beta
phi*Vc
ft
in
kips
kft
deg
kips
-------------------------------------------------------------------------------------X direction
1
2
-5.11
5.11
10.89
21.11
9
9
9
9
37.37
37.37
37.37
37.37
590.0
147.5
147.5
590.0
1706.4
3966.8
3966.8
1706.4
53.83
58.98
58.98
53.83
1.61
1.20
1.20
1.61
821.8
610.8
610.8
821.8
9
9
36.21
36.21
1327.6
1327.6
3967.6
3967.6
54.64
54.64
1.52
1.52
1351.9
1351.9
Z direction
-5.01
5.01
Bo
Ao
Comb
Avg. dv
Vu
phi*Vc
ft
ft^2
in
kips
kips
---------------------------------------------------------------Columns:
1
23.77
44.96
9
36.79
1622.6
2379.7
2
23.77
44.96
9
36.79
1622.6
2379.7
Piles - max:
3
7.19
Piles - min:
1
5.60
9.75
36.79
147.5
720.2
12.94
36.79
147.5
560.3
Note:
TWO WAY SHEAR IN FOOTING IS NOT DESIGNED AND STIRRUPS ARE NOT CONSIDERED.
T2 -56
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Chapter
T3
This tutorial will take you through a strut and tie model design, step-by-step, illustrating the design of a
hammerhead pier using the strut and tie model for pier cap and pile cap. Tutorial 3 does not cover column design;
however, you can refer to the previous tutorials for an example of column design.
The information for Tutorial 3 is contained in an RC-PIER input file called Tutor3.rcp. As an alternative to
inputting all information manually, as directed by this tutorial, you can load this file and work on only specific
sections. To load this file, select the Open item from the File menu (File | Open). Move to the RC-PIER/Examples
subdirectory, if it is not already showing and select the file Tutor3.rcp.
DIAGRAMS
35'-0"
4'-0"
6'-9"
6'-9"
6'-9"
6'-9"
4'-0"
2'-6"
A
3'-0"
3'-0" 8"
3'-0"
1'-6" 2'-6"
5'-0"
8'-0"
3'-0"
12'-0"
4'-0"
4'-0"
B
Section B-B
Section A-A
12'-0"
8'-0"
12'-0"
32'-0"
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -1
T3
Problem Data
Table T3-1
Concrete Strength
Cap
fc = 4 ksi
Columns
fc = 4 ksi
Footings
fc = 4 ksi
Modulus of Elasticity
Ec = 3834.3 ksi
Concrete Density
Cap
Columns
Footings
= 150 pcf
= 150 pcf
= 150 pcf
fy = 60 ksi
Columns
fy = 60 ksi
Footings
fy = 60 ksi
Modulus of Elasticity
Es = 29000 ksi
Other Parameters
Crack Control Factor
z = 170 kips/in
Superstructure Parameters
Number of Lanes
=2
Beam Height
= 36 in
= 369 in2
= 50980 in4
=5332.5 in4
Beam Ycg
= 15.83 in
Barrier Height
= 36 in
Slab Depth
= 8.0 in
=2
Span Information
Bridge Overall Width
= 35 ft
= 32 ft
= 60 ft
= 60 ft
Loads
Dead Load
Self Load
= 150 pcf
Barrier Load
Live Loads
Design Truck + Design Lane Load (only one lane loaded)
T3 -2
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T3
Step 1
The Project screen, shown in Figure T3-2, will open when the program is started. Fill in the general project
information in the text boxes. Select the AASHTO LRFD option under Design Specifications and U.S. Units
under Units.
Step 2
Click the Geometry tab to open the Geometry screen. Click Pier Configuration to bring up the Pier
Configuration screen, as shown in Figure T3-3. Under Pier Type, select Hammerhead. Notice that when you
select Hammerhead, the options under Cap Shape and Column Shape are grayed out; however, both STM options
become enabled. Select both options under Strut and Tie Model for LRFD. Choose to view the pier in upstation
view. Click OK.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -3
T3
Step 3
Click Superstr. to activate the Superstructure Parameters screen, as shown in Figure T3-4. Input the values for
number of lanes, beam height and area, barrier/railing height, slab depth, total number of spans, bridge width and
then add all span lengths. Note this screen is optional; however input is required for auto generating loads. Once
you entered all the data, click OK and return to the Geometry screen.
Step 4
Click Cap to open the Hammer Head Cap Parameters screen, as shown in Figure T3-5. Input 32 in the W field, 8
in the W1 and W2 fields, 12 in the H field, 3 in the H1 field, 8 in the H2 field, 4 in the Depth field, 20 in the Top
Elevation field, and 0 in the Skew Angle field. Click OK and return to the Geometry screen.
T3 -4
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T3
Step 5
Click Brgs/Grdrs to bring up the Bearings/Girders screen. For this tutorial, entering one bearing line, as shown in
Figure T3-6:
1. Select the Single option under Configuration and the First option under Line.
2. Select the Cap Left End option and input 2.5 in the text box under Distance From.
3. Click Add. The first bearing point for the first line will appear in the list at the bottom of the screen.
4. Enter the second point. Select the Single option under Configuration, the First option under Line, and then
select the Cap Left End option and input 9.25 in the text box under Distance From.
5. Click Add to add it to the list on the screen.
6. Repeat the above steps to enter the remaining points, entering the following values in the text box under
Distance From: 16 for the third point, 22.75 for the fourth point, and 29.5 for the fifth point.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -5
T3
7. When completed, there will be a total of 5 bearing points on the first line (Figure T3-6).
8. Click OK and return to the Geometry screen.
Step 6
Click Material to open the Materials screen, as shown in Figure T3-7. Use this screen to define the strength,
density, type of elasticity of concrete, and reinforced steel of the pier. Notice that the program defaults to certain
values. These values can be overwritten by typing over them. Input the values shown in Figure T3-7 and click OK.
Step 7
Click Hammer STM to open the Strut and Tie Model Edit screen, as shown in Figure T3-8. The following steps
will illustrate how to define a strut and tie model.
T3 -6
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T3
Yft
Support
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
1.17
2.3
3.5
4.7
5.3
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
5.3
4.7
3.5
2.3
1.17
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
2
6.75
10.13
13.5
15.25
15.25
13.5
10.13
6.75
2
0
-2
-6.75
-10.12
-13.5
-15.25
-15.25
-13.5
-10.12
-6.75
-2
6. Define the members that will form the STM. You can add the members in one of two ways: (a) using the
lists under Members, or (b) using the mouse to draw the members in the diagram at the top of the screen.
7. For the first member, use the boxes. Select 1 from the Start column and 2 from the End column. Click Add.
The member will be added to the strut and tie model and will appear in the list under Members and in the
diagram in the display area.
8. For the second member, try drawing the member in the diagram. Move the cursor over to Node #2 and
left-click. Notice that one end (Node #2) is marked with a square and the other end is free. From Node #2,
move the mouse over to Node #3 and left-click. This is the second member and it will appear in the list
under Members.
9. Using either of these methods, add the remaining members listed in Table T3-3 on page T3-8. When
completed, click OK and return to the Geometry screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -7
T3
Table T3-3
Element#
From
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
From
To
21
15
14
13
12
10
9
8
7
16
15
14
13
11
11
9
8
7
6
1
18
19
20
21
1
2
3
4
18
19
20
21
21
1
1
2
3
4
Step 8
Select Image from the Show menu to open the Image screen (or the corresponding icon on the toolbar). A 3-D
image of the structure will be displayed on the screen, as shown in Figure T3-9.
Use the buttons on the left of the screen to manipulate your view of the image. When finished, close or minimize
the screen and return to the Geometry screen.
T3 -8
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T3
Step 9
Select Model from the Show menu to open the Model screen, as shown in Figure T3-10. A 3-D model of the nodes,
element number, etc. will be displayed on the screen. To see the model shown in the figure, select Show STM.
The type of model displayed depends on which characteristics you select from the check boxes at the top of the
screen (Node Number, Member Number, Checkpoints, and STM). Use the buttons on the left side of the screen to
manipulate your view of the model (e.g., rotate, pan, zoom-in or out).When finished, close or minimize the screen
and return to the Geometry screen.
Step 10
Click the Loads tab to open the Loads screen, as shown in Figure T3-11. Add the load types to the Selected Load
list by highlighting DC: Component and Attachments in the list under Load Type and clicking the -> button. The
load DC1 will move to the list under Selected Loads. Repeat the above steps until all the required loads are entered.
T3 -9
T3
Add the load groups to the Selected Groups list in a similar manner as above. Highlight Strength Group I in the
list under Available Groups. Click the -> button. It will move to the Selected Groups list. Repeat the above steps to
add Strength Group III to the Selected Groups list.
Remove a selected group from the Selected Groups list by clicking the <- button. To remove all groups from the
Selected Groups list, click the <== button. To define all groups, select the Load Groups/Limit States item from
the Libraries menu.
Step 11
1. Auto generate the loads, beginning with the dead load. Highlight DC1 in the Selected Loads list and click
Edit. The Loads: Load Data screen will display. Click Generate to activate the Auto Load Generation:
Structure DC screen, as shown in Figure T3-12.
2. Select the check boxes for Include Slab and Include Girders. Input 150 in the Unit Weight field.
3. Select the option Use simple span load distribution for barrier and wearing surface.
4. Select Include Barrier and specify 1200 in the total load per foot field.
5. Click Generate. The program will automatically generate the loads and return to the Loads: Load Data
screen. Click OK to return to the Loads screen.
6. Highlight DW1 in the Selected Loads list and click Edit. The Loads: Load Data screen will display. Click
Generate to activate the Auto Load Generation: Structure DW screen, as shown in Figure T3-13.
T3 -10
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T3
7. Select the option Use simple span load distribution for barrier and wearing surface.
8. Select Include Wearing Surface and input 700 in the Load per foot text box. (Note that all other options
are grayed out because, in LRFD, dead load due to component and dead load due to wearing surface are
separate load cases.)
9. Click Generate. The program will automatically generate the loads. Click OK to return to the Loads
screen.
10. Highlight LL1 on the Selected Loads list and click Edit. The Loads: Load Data screen will display. Click
Generate to activate the Auto Load Generation: Live Load screen, as shown in Figure T3-14.
11. In the longitudinal reaction area, select Compute simple span longitudinal reaction using following
trucks.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -11
T3
12. Select Design Truck + Lane Load under Available and click Add. It will appear in the list under Selected.
13. In Transverse Positioning, select 1 lane loaded from the Loaded Lanes list. Select the Variable Spacing
option and input 0.5 in the Minimum Spacing Between Positions text box.
14. Click the Generate. The program will automatically generate the loads and return to the Loads: Load Data
screen. Click OK and return to the Loads screen.
T3 -12
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T3
15. Highlight WS1 on the Selected Loads list and click Edit. The Loads: Load Data screen displays. Click
Generate to activate the Auto Load Generation: Wind on Structure screen, as shown in Figure T3-15.
16. Select 0 from the Wind Angle list, City under Bridge Location, and the Default Wind Pressure check box
is unchecked. Then specify Transverse Longitudinal cap and column pressures as shown in the figure.
Make sure the Generate for Multiple Angles and Generate Wind on Live at same time check boxes are
not checked.
17. Click Generate. The program will automatically generate the loads and return to the Loads: Load Data
screen. Click OK and return to the Loads screen.
Step 12
Click the Analysis tab to open the Analysis screen. This screen is used to perform an analysis and specify various
factors relating to the analysis and design by clicking A/D Parameters. This will activate the Analysis/Design
Parameters (LRFD) screen, as shown in Figure T3-16. Adjust all the values, and click OK to return to the Analysis
screen, or click Cancel to close the screen without making any changes.
T3 -13
T3
Step 13
Click Run Analysis to perform the analysis for the pier structure based on all the data entered up to this point. The
results will appear on the screen, as shown in Figure T3-17.
If necessary, use the scroll bar on the right side of the screen to view all the results. To view the results for strut and
tie model, select the Strut and Tie option under Type of Analysis.
Step 14
At this point, it would be a good idea to save your project. Select the Save As item from the File menu. This will
activate the Save As screen. Enter a name for the file in the File Name field (e.g., Mytutor3). The default extension
is *.rcp. Click Save.
Step 15
Click the Cap tab to activate the Cap screen, as shown in Figure T3-18. Select Cap from the Selection list, and
then click Auto Design. The Design Cap screen displays. Select 8 from the Bar Size list and 4 from the Stirrup Size
list. Click OK. The program will automatically generate the cap design and immediately displays the Design Status
- Cap screen (Figure T3-19). Click Close to exit this screen and return to the Cap screen. A diagram of the cap will
appear in the display area at the top of the screen.
T3 -14
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T3
Click Design Status on the Cap screen to display a design summary of the selected component, as shown in Figure
T3-19. To see a graphical representation of the selected structure, click Sketch on the Cap screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -15
T3
Step 16
Select the Footing tab to activate the Footing screen, as shown in Figure T3-20.
1. To begin, select 1@16 under Columns, input STM Pile Cap in the Name field, and select Pile/Shaft Cap
under Type. Click Add. The name STM Pile Cap will appear in the list, as shown in Figure T3-20.
2. Highlight STM Pile Cap and click Design to activate the Footing: Isolated Pile/Shaft Cap Design screen,
as shown in Figure T3-21.
LEAP RC-PIERv10.00.01.00
T3
3. Select Spread 10 ft x 20 ft from the Description list and input -10 in the From Column field, 1 in the
Footing Surcharge field, 72 in the Spread/Cap Depth field, and 1 in the Length and Width Multiplier fields
4. Under Pile/Shaft Configuration, select Circular from the Pile/Shaft Shape list, input 14 in the Pile/Shaft
Size field, 250 in the Max. Pile Capacity field.
5. Then, click Edit Pile to activate the Edit: Pile Locations screen. For the first pile location, input 36 in the
X field and 36 in the Z field. Click Add. It will appear in the list on the screen. Repeat this for the
remaining pile locations, as listed in the following table.
Pile Locations
Pile #
X (in)
Z (in)
1
2
3
4
5
6
7
8
9
36
120
204
36
120
204
36
120
204
36
36
36
0
0
0
-36
-36
-36
6. When completed, there will be nine pile locations. Click OK and return to Footing: Isolated Pile/Shaft
Cap Design screen.
7. Click STM X-Dir to activate the Strut and Tie Model Edit screen, as shown in Figure T3-22.
8. Input 0.4 in the Width of all Compressive Struts field. Under Nodes, input 0 in the X field and 0.5 in the Y
field. Click Add to add the first node to the list under Nodes.
9. Using the above procedure, add the remaining nodes shown in Figure T3-22.
10. Highlight Node #4 in the list and click Set Sup. An asterisk will appear next to the node. Repeat this for
Node #5.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -17
T3
11. Add the members to design the strut and ties. Select 4 from the Start column and 5 from the End column.
Click Add. This is the first member and it will appear in the list under Members.
12. Repeat the above step to add the remaining members as shown in Figure T3-22.
13. When completed, click OK and return to the Footing: Isolated Pile/Shaft Cap Design screen.
14. Click STM Z-Dir to activate the Strut and Tie Model Edit screen, as shown in Figure T3-23. Repeat steps
8-13 above to add the nodes and members shown in Figure T3-23.
15. Click Auto Design to activate the Design Footing screen, as shown in Figure T3-24. Select #8 from the
Bar Size list. Click OK.
16. The program will design the footing and immediately displays the Design Status screen. Close this screen
to return to the Footing: Isolated Pile/Shaft Cap Design screen.
17. Click OK to return to the Footing screen. The diagram at the top of the screen shows the selected footing
design.
Step 17
This completes RC-PIER Tutorial 3. To print the output of the project, select Print from the File menu. Save your
file by selecting Save from the File menu. Exit the program by selecting Exit from the File menu.
Following this tutorial is a printout of the output for selected items from Tutorial 3.
T3 -18
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
OUTPUT
PROJECT DATA
============
Project
:
User Job No.:
State
:
Pier View
:
Code
:
Comments
:
Tutorial 3
Tutor3
FL
State Job No. : FL-003
Upstation.
AASHTO LRFD (3rd edition)
Hammer Head Pier
Designed using Stut and Tie Method
PIER GEOMETRY
=============
Pier Type: Hammer Head
Pier View
: Upstation.
Length(X) = 32.00 ft
Height max(Y) = 8.00 ft
Bottom length(X) = 8.00 ft
Depth(Z) = 4.00 ft
Column Shape: Rectangular Non Tapered
Bottom width(X) = 8.00 ft Top width(X) = 8.00 ft
Column Bottom is Fixed
Depth(Z) = 4.00 ft
Height(Y) = 12.00 ft
STRUCTURE MODEL
================
FRAME Model:
Member
Node
Hinge Check Pt Dist(ft) Memb length(ft)
------------------------------------------------------Column No. 1
1
1
2
0.00
18.50
3
4
4
5
5
6
6
2
2
7
7
8
8
9
9
10
0.00
2.50
2.50
9.25
9.25
12.00
12.00
16.00
16.00
20.00
20.00
22.75
22.75
29.50
29.50
32.00
18.50
Cap
2
3
4
5
6
7
8
9
2.50
6.75
2.75
4.00
4.00
2.75
6.75
2.50
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -19
Node coordinates:
Number
X(ft)
Y(ft)
Node type
--------------------------------------------------------1
16.00
0.00
fixed at ground
2
16.00
18.50
column-cap bearing
3
0.00
18.50
4
2.50
18.50
bearing
5
9.25
18.50
bearing
6
12.00
18.50
7
20.00
18.50
8
22.75
18.50
bearing
9
29.50
18.50
bearing
10
32.00
18.50
Strut and Tie Model Configuration for Hammer Head Cap:
Strut Width =
0.40 ft
Node Coordinates:
Number
X ft
Z ft
---------------------------1
18.00
1.17
2
22.75
2.30
3
26.13
3.50
4
29.50
4.70
5
31.25
5.30
6
31.25
7.20
7
29.50
7.20
8
26.13
7.20
9
22.75
7.20
10
18.00
7.20
11
16.00
7.20
12
14.00
7.20
13
9.25
7.20
14
5.88
7.20
15
2.50
7.20
16
0.75
7.20
17
0.75
5.30
18
2.50
4.70
19
5.88
3.50
20
9.25
2.30
21
14.00
1.17
support
support
Members:
Number Start Node
End Node
----------------------------1
1
2
2
2
3
3
3
4
4
4
5
5
5
6
6
6
7
7
7
8
8
8
9
9
9
10
10
10
11
11
11
12
T3 -20
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
12
13
14
15
16
17
18
19
20
21
15
14
13
12
10
9
8
7
16
15
14
13
11
11
9
8
7
6
13
14
15
16
17
18
19
20
21
1
18
19
20
21
1
2
3
4
18
19
20
21
21
1
1
2
3
4
SUPERSTRUCTURE INFO
===================
Total number of spans: 2
Span number rear to current pier: 1
Number of traffic lanes: 2
Beam: height : 36.00 in
section area : 369.00 in^2
Beam Inertia (Ixx): 50980.00 in^4 Beam inertia (Iyy): 5332.50 in^4
Beam CG:15.83 in Barrier height : 36.00 in Depth of slab : 8.00 in
Bridge width:
35.00 ft
Curb to curb distance:
Span #
Span length
-----------------------------------------------1
60.000 ft
2
60.000 ft
32.000 ft
BEARING POINTS
==============
Number of bearing lines: 1
First bearing line
Eccentricity = 0.00 ft
Point
Distance ft
---------------------1
2.50
2
9.25
3
16.00
4
22.75
5
29.50
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -21
MATERIAL PROPERTIES
===================
Cap
Column
Footing
-----------------------------------------Concrete Type
normal
normal
normal
Concrete Strength (psi)
4000.00
4000.00
4000.00
Concrete Density (lb/ft3)
150.00
150.00
150.00
Concrete Modulus Ec (ksi)
3834.30
3834.30
3834.30
Steel Strength Fy (ksi)
60.00
60.00
60.00
DESIGN PARAMETERS
=================
AASHTO LRFD Code
Resistance factors for reinf. concrete:
Flexure and tension
0.90
Shear and torsion (normal)
0.90
(lightweight)
0.70
Axial compression (ties)
0.75
Axial compression (spiral)
0.75
Compression in STM
0.70
Eta factor:
Service Fatigue Strength Extreme event
---------------------------------------------------Cap
1.00
1.00
1.00
1.00
Column
1.00
1.00
1.00
1.00
Footing
1.00
1.00
1.00
1.00
Dynamic load allowance IM:
Truck
Lane
Fatigue
-------------------------------------Cap
0.33
0.00
0.15
Column
0.33
0.00
0.15
Footing
0.00
0.00
0.00
Crack control factor
Min clear cover
kip/ft
in
----------------------------------------------Cap
170.00
2.00
Column
170.00
2.00
Footing
170.00
3.00
Degree of fixity in foundations for Moment Magnify Method:
R =
5.00
T3 -22
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
-82.48
1
2
Y
-77.45
1
3
Y
-77.45
1
4
Y
-77.45
1
5
Y
-82.48
Auto generation details
Generated Dead Load
Slab weight
=
Wearing weight =
150.00
pcf
Not included
Girder weight =
Barrier load =
150.00
1200.00
pcf
plf
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
-8.85
1
2
Y
-8.10
1
3
Y
-8.10
1
4
Y
-8.10
1
5
Y
-8.85
Auto generation details
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -23
150.00
700.00
pcf
plf
Girder weight =
Barrier load =
150.00
418.00
pcf
plf
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
0.00
1
2
Y
0.00
1
3
Y
0.00
1
4
Y
-27.85
1
5
Y
-47.35
1
1
Y
0.00
1
2
Y
0.00
1
3
Y
-0.19
1
4
Y
-16.68
1
5
Y
-29.21
Auto generation details
Generated Live Load
Longitudinal Reaction: Simple Span Distribution
Selected Vehicles:
Design Truck + Lane Load
Transverse Positioning
Number of loaded lanes = 1
Live Load Positions = Variable Spacing
Minimum Spacing Between Positions = 1.00
ft
Name:
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
Y
-47.35
1
2
Y
-27.85
1
3
Y
0.00
1
4
Y
0.00
1
5
Y
0.00
1
1
Y
-29.21
1
2
Y
-16.68
1
3
Y
-0.19
1
4
Y
0.00
1
5
Y
0.00
T3 -24
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
ft
Name: Angle: 0
Dir
Arm
Mag1
x1/L
Mag2
x2/L
ft
kips, klf,k-ft
kips, klf,k-ft
------------------------------------------------------------------------------Force
X
0.00
-1.28
0.50
-------
Column loads:
Col #
Type
Dir
Mag1
y1/L
Mag2
y2/L
---------------------------------------------------------------------1
UDL
X
-0.160
klf 0.00
---0.65
Bearing loads:
Line #
Bearing #
Dir.
Load, kips
----------------------------------------1
1
X
-4.00
1
1
Y
-2.47
1
1
Z
0.00
1
2
X
-4.00
1
2
Y
0.00
1
2
Z
0.00
1
3
X
-4.00
1
3
Y
0.00
1
3
Z
0.00
1
4
X
-4.00
1
4
Y
0.00
1
4
Z
0.00
1
5
X
-4.00
1
5
Y
2.47
1
5
Z
0.00
Auto generation details
Generated Wind Load on Structure
Angle of wind = 0.00 deg
Elevation above which wind load acts =
0.00 ft
User defined wind pressure
Wind pressure for superstructure:
Wind pressure for substructure:
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -25
Transverse
Longitudinal
Overturning
50.000 psf
0.000 psf
not considered
Cap
Column
40.000 psf
40.000 psf
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
(STR
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
GP
1
1
1
1
1
1
1
1
3
3
3
3
3
3
3
3
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
1.25
1.25
1.25
1.25
0.90
0.90
0.90
0.90
1.25
1.25
1.25
1.25
0.90
0.90
0.90
0.90
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
DC1
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
1.50
1.50
0.65
0.65
1.50
1.50
0.65
0.65
1.50
1.50
0.65
0.65
1.50
1.50
0.65
0.65
DW1
DW1
DW1
DW1
DW1
DW1
DW1
DW1
DW1
DW1
DW1
DW1
DW1
DW1
DW1
DW1
+
+
+
+
+
+
+
+
+
+
+
+
-
1.75
1.75
1.75
1.75
1.75
1.75
1.75
1.75
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
LL1
LL2
LL1
LL2
LL1
LL2
LL1
LL2
WS1
WS1
WS1
WS1
WS1
WS1
WS1
WS1
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
CAP DESIGN
==========
CAP DESIGN
Code: AASHTO LRFD (3rd Edition)
Units: US
Pier View
: Upstation.
Strut and Tie Method Used for Analysis.
DESIGN PARAMETERS:
==================
f'c = 4000.0 psi
Fy flex = 60000.0 psi Fy shear = 60000.0 psi
phi flex = 0.90
phi shear = 0.90
phi flex ( seismic ) = 0.90
phi shear ( seismic) = 0.90
Ec = 3834.3 ksi
Es = 29000.0 ksi
crack control factor z = 170.00 kips / in
Concrete Type : Normal Weight.
Design : face of column.
T3 -26
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
CAP GEOMETRY:
=============
Hammer Head Cap :
Length(X) = 32.00
ft
Depth(Z) = 48.00
in
MAIN REINFORCEMENT:
===================
Bar size
Quantity
2.00
in
0.40
ft
Force
Comb
As-req
As-prv
kips
in^2
in^2
---------------------------------------------------------ST
6
9.9
10
0.18
15.01
ST
7
285.0
1
5.28
15.01
ST
8
435.8
1
8.07
15.01
ST
9
776.9
1
14.39
15.01
ST
10
776.9
1
14.39
15.01
ST
11
776.8
2
14.39
15.01
ST
12
776.8
2
14.39
15.01
ST
13
435.7
2
8.07
15.01
ST
14
285.9
2
5.29
15.01
ST
15
9.9
9
0.18
15.01
Force
Comb
As-req
As-prv
Comp_c
Comp_allow
kips
in^2
in^2
ksi
ksi
-----------------------------------------------------------------------ST
1
-447.9
1
0.00
0.00
2.78
3.36
ST
2
-302.5
1
0.00
0.00
1.88
3.23
ST
3
-10.6
9
0.00
0.00
0.07
3.23
ST
4
-0.1
9
0.00
0.00
0.00
3.24
ST
17
-0.1
10
0.00
0.00
0.00
3.24
ST
18
-10.6
10
0.00
0.00
0.07
3.23
ST
19
-303.5
2
0.00
0.00
1.88
3.23
ST
20
-447.9
2
0.00
0.00
2.78
3.36
ST
21
-566.7
1
0.98 *
0.00
3.51 *
3.26
Force
Comb
Comp_c
Comp_allow
kips
ksi
ksi
-----------------------------------------------------------ST
25
-7.0
1
0.04
0.54
ST
26
-7.0
1
0.04
0.54
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -27
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
30
31
32
33
34
35
36
37
38
39
-17.1
-409.3
-264.5
-551.2
-667.5
-667.5
-551.2
-265.4
-408.8
-17.1
9
2
2
2
2
1
1
1
1
10
0.11
2.54
1.64
3.42
4.14
4.14
3.42
1.65
2.53
0.11
*
*
*
*
*
*
*
*
1.56
2.02
1.53
1.76
1.67
1.67
1.76
1.54
2.01
1.56
Force
Comb
Av-req
S max
kips
in^2
in
-------------------------------------------------------ST
5
7.0
10
0.13
12.00
ST
16
7.0
9
0.13
12.00
ST
22
17.6
9
0.33
12.00
ST
23
210.9
2
3.91
12.00
ST
24
223.0
2
4.13
12.00
ST
27
223.0
1
4.13
12.00
ST
28
211.5
1
3.92
12.00
ST
29
17.6
10
0.33
12.00
ST
34
563.9
7
10.44
12.00
ST
35
563.9
8
10.44
12.00
Geometry:
=========
Name : Stm Pile Cap
Shape : Rectangular, Type : Pile/Shaft Cap
Bf(X) = 20.00 ft, Hf(Z) = 10.00 ft, Thickness(Y) = 72.00 in
Footing eccentric: Start at X = -10.00 ft from centerline of column.
Columns located on the footing:
Column No. 1 at x =
0.00 ft, Rectangular 96.00 in x 48.00 in
Ag = 200.00 ft^2, Ix = 54.00 ft^2, Iz = 294.00 ft^2
Surcharge =
Piles:
1.00 ksf
Circular
Size: 14.00 in
T3 -28
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Design Parameters:
==================
Note:
Only max. force in piles is considered for design.
Pile coordinates X and Z are from the most left edge of the footing.
= 165.68 kips
Reinforcement Schedule:
=======================:
Dir
Quantity
Size
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T3 -29
fCrack
Crack
Comb fFatigue
Fatigue Comb
ksi
ksi
------------------------------------------------------------
fCrack
Crack
Comb fFatigue
Fatigue Comb
ksi
ksi
------------------------------------------------------------
T3 -30
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Chapter
T4
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -1
T4
T4 -2
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
Problem Data
Table T4-1
Concrete Strength
Cap
fc = 5000 psi
Columns
fc = 5000 psi
Footings
fc = 5000 psi
Modulus of Elasticity
Ec = 4286.83ksi
Concrete Density
Cap
= 150 pcf
Columns
= 150 pcf
Footings
= 150 pcf
fy = 60 ksi
Columns
fy = 60 ksi
Footings
fy = 60 ksi
Modulus of Elasticity
Es = 29000 ksi
Concrete Type
Cap
Normal
Columns
Normal
Footings
Normal
Other Parameters
Exposure factor
1.0
Pier Configuration
Integral Pier supporting multiple cell box
Superstructure Parameters
Number of lanes
=2
(Note that in this tutorial, the pier is only designed for 1 lane loaded)
Superstructure Height
= 78 in
= 1073 in2
= 8.08x106 in4
= 8.08x106 in4
Superstructure Ycg
=45 in
Barrier Height
= 36 in
Slab Depth
= 8.0 in
Span Information
Bridge Overall Width, ft
36 ft
32 ft
100 ft
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -3
T4
Table T4-1
120 ft
100 ft
Substructure Parameters
Cap: Width
= 78 in
Skew Angle
= 0 degrees
Start Elevation
= 32 ft
End Elevation
= 32 ft
= 0 ft
Diameter
= 48 in
Bearings
Loads
Dead Load
DC Reaction on Pier
1386.47
DC Moment on Pier
-297.05
DW Reaction on Pier
78.16 kft
DW Moment on Pier
- 9.6 kft
Live Load
LL Truck Max vertical load reaction on pier
= 102.84 k
= 35.18 kft
= 82.54 k
= 50.91 kft
= -191.51 kft
= 41.13 k
= -127.38 kft
= 35.72 k
Wind on Structure
Direction of wind
= + 30
= 0 ft
= +30
= 110 ft
Footing Surcharge
Footing
= 0.200 ksf
T4 -4
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
Step 1
The Project screen will be displayed, as shown in Figure T4-2. Fill in the general project information. Select the
AASHTO LRFD option under Design Specifications and U.S. Units under Units.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -5
T4
Step 2
Click the Geometry tab to open the Geometry screen, as shown in Figure T4-3. Click and drag to rotate the model.
Step 3
Click Pier Configuration to open the Pier Configuration screen, as shown in Figure T4-4. Under Pier Type, select
Integral, select Integral under Cap Shape, and Circular from the Column Shape list. Choose to view the pier in
downstation view. Click OK.
Step 4
Click Superstr. to open the Superstructure Parameters screen. Input the values for the number of lanes,
superstructure height and area, barrier/railing height, slab depth, total number of spans, and total length and width
of bridge, as shown in Figure T4-5, and then all add all span lengths. Click OK to return to the Geometry screen.
Note that this screen is optional; however, it is required for auto load generation, as illustrated later in this tutorial.
T4 -6
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
Step 5
Click Cap to open the Integral Cap Parameters screen, as shown in Figure T4-6. specify the data as shown in the
fields. Note that X dimensions are along length of cap, Y dimensions are vertical and Z dimensions are
perpendicular to X. Click OK and return to the Geometry screen.
T4 -7
T4
Step 6
Click Column to open the Round Column screen, as shown in Figure T4-7. (This screen will be specific to the type
of column shape selected.) For this tutorial input two columns, as follows.
1. Enter 8 in the Loc from left of cap field, 0 in the Bot. Elev field, 48 in the diameter field, and 1 in the
Factor of Reduced MI field. Click Add. The column will appear in the list as shown.
2. Input the second column. Enter 28 in the Loc from left of cap field, 0 in the Bot. Elev field, 48 in the
diameter field, and 1 in the Factor of Reduced MI field. Click Add to add the column to the list.
3. Click OK and return to the Geometry screen.
T4 -8
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
Step 7
Click Brgs/Grdrs to open the Bearings/Girders screen, as shown in Figure T4-8. This screen is used to define the
configuration of the girder from left end of pier cap.
1. Input the first girder location by selecting the Cap Left End option and entering 6.75 in the text box under
Distance From. Click Add. A girder location will appear in the list on the screen.
2. Enter the second girder location. Select Last Point under Distance From and enter 7.25. Click Add to add
the second girder location to the list.
3. Repeat the above steps to add the third and forth girder positions at distances of 7.25 ft. and 6.75 ft. When
completed, your screen should resemble Figure T4-8. Click OK to return to Geometry screen.
Step 8
Click Material to activate the Materials screen, as shown in Figure T4-9. This screen defines the strength, density,
concrete modulus of elasticity, and reinforcing steel strength as well as the concrete type. Notice that the program
defaults to certain values. You can override these values by typing over them. Input the values shown in figure and
click OK to return to the Geometry screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -9
T4
Step 9
Click Str. Model to open the Structure Model screen, as shown in Figure T4-10. Use this screen to keep track of all
nodes of the pier structure, add or remove nodes to the pier structure for use as reference points (checkpoints), and
define hinges at existing points. Choose to do cap design at centerline of column. Click OK to return to the
Geometry screen.
Step 10
Click the Loads tab to display the Loads screen, as shown in Figure T4-11. This is where you enter all load
information.
LEAP RC-PIERv10.00.01.00
T4
1. Highlight DC: Components and Attachments in the list under Load Type.
2. Click the right-arrow button (>). The load type will appear in the list under Selected Loads.
3. Repeat the above steps until all the required loads have been entered, as shown in Figure T4-11.
Next, add the load groups to the Selected Groups list:
1. Highlight Strength Group I in the list under Available Groups.
2. Click the right-arrow button (>). The load group will appear in the list under Selected Groups.
3. Repeat the above steps until all required load groups are entered, as shown in Figure T4-11.
You can remove a selected group from the Selected Groups list by clicking the left-arrow button (<-). To remove all
groups from the Selected Groups list, click the <== button. To define groups, select the Load Groups/Limit States
item from the Libraries menu.
Step 11
Auto-generate dead loads. For integral piers, the generation of dead loads can be based on an already completed
superstructure run. The overall dead load reactions from the superstructure can be specified as input for this
generation. For this bridge already computed dead load reactions for the pier are available and will be used for
generation.
1. Highlight DC1 in the Selected Loads list and click Edit. The Loads: Load Data screen will display, as
shown in Figure T4-12.
2. Click Generate to bring up the Auto Load Generation: Structure DC screen, as shown in Figure T4-13.
3. Select to input the composite dead load reaction.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -11
T4
4. Enter the vertical reaction and the moment as shown in Figure T4-13.
5. Click Generate. The program will generate the loads and return to the Loads: Load Data screen.
6. Click OK to return to the Loads screen.
7. Next highlight DW1 and click Edit.
8. Click Generate to generate loads.
T4 -12
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
1. Click Generate. The program will generate the loads and return to the Loads: Load Data screen.
2. Click OK to return to the Loads screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -13
T4
Step 12
Auto generate the live load. For this generation, we will use:
1. Highlight (L+In)1 in the Selected Loads list and click Edit to bring up the Loads: Load Data screen.
2. Click Generate to activate the Auto Load Generation: Live Load screen, as shown in Figure T4-15.
Figure T4-15 Auto Load Generation: Live Load Screen - Prior to Auto Generation
3. In the longitudinal reaction area, select the option Input Already Computed Reaction.
4. Specify the vertical and moment reactions for truck and lane as shown.
5. In the Transverse Positioning area select All combinations from the Loaded Lanes list.
6. Select the Variable Spacing Method option and input 1.0 in the Minimum Spacing Between Locations
text box.
7. Click Generate. The program will generate the loads and return to the Loads: Load Data screen.
T4 -14
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
Figure T4-16 Auto Load Generation: Live Load Screen - Post to Auto Generation
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -15
T4
3. The LL reactions used to generate live loading on the pier was for HL 93 Load. Therefore select the truck,
number of lanes and the contributing length as specified in the figure.
4. Click Generate. The program will generate the loads and return to Loads: Load Data screen.
5. Click OK and return to the Loads screen.
T4 -16
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
Step 13
Now, auto generate the Wind Load on Structure:
1. Highlight WS1 in the Selected Loads list and click Edit to bring up the Loads: Load Data screen.
2. Click Generate to open the Auto Load Generation: Wind on Structure screen, as shown in Figure T4-18.
3. Select the Wind Angle and the Elevation Above Which Wind Load Acting field as shown above.
4. Select the Default Wind Pressure check box. (Note that when this option is selected, the remaining fields
are grayed out.)
5. Click Generate. The program automatically generates the loads and returns to the Loads: Load Data
screen.
6. Click OK and return to the Loads screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -17
T4
Step 14
Auto generate the Wind Load on Live Load:
1. Highlight WL1 in the Selected Loads list and click Edit to bring up the Loads: Load Data screen.
2. Click Generate to open the Auto Load Generation: Wind on Live Load screen, as shown in Figure T4-19.
3. Select the Wind Angle and the Length of Live Load field as shown in Figure T4-19
4. Click Generate. The program automatically generates the loads.
5. Click OK and return to the Loads screen.
T4 -18
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
Step 15
Click the Analysis tab to activate the Analysis screen. This screen is used to perform an analysis and also specify
various factors relating to the analysis and design.
Click A/D Parameters to open the Analysis/Design Parameters (LRFD) screen and input the values as shown in
Figure T4-20.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -19
T4
Then click Dependency Table button to open the Load Dependency Table screen as shown in Figure T4-21 below.
On the Load Dependency Table screen, click the row corresponding to Load Case BR: Braking Force. Then at
top of right column, select None Depends on. Click OK to close this dialog and return to the Analysis/Design
Parameters screen. Click OK and return to the Analysis screen.
Click Run Analysis to perform the analysis for the pier structure based on all the data entered up to this point. The
results will appear on the screen, as shown in Figure T4-22. If necessary, use the scroll bar on the right side of the
screen to view all the results. Specify the type of results to view by using the lists at the top of the screen.
Print the analysis results by right-clicking in the results area of the Analysis screen and selecting the Print.
T4 -20
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
Step 16
Save your project. Select Save As from the File menu. The Save As screen, will open, as shown in Figure T4-23.
Enter a name for the file in the File Name field (e.g., Mytutor4). The default extension is *.rcp. Click Save.
Step 17
Click the Cap tab to open the Cap screen, as shown in Figure T4-24. Use this screen to have RC-PIER design the
cap. Clicking Auto Design or you can manually input the cap design. The following steps illustrate the manual
input design feature.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -21
T4
LEAP RC-PIERv10.00.01.00
T4
Click Design Status to display the cap summary, as shown in Figure T4-27. Click Print to print the design
summary.
Figure T4-27 Design Status - Cap Screen (In Enhanced Report Format)
Step 18
Click the Column tab to open the Column screen, as shown in Figure T4-28. You can either manually input the
column reinforcement or have the program automatically design it. For this tutorial, the Auto Design feature is
used.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -23
T4
1. Select 1 from the Column# list and Spirals from the Lateral Bar Type list.
2. Check the box to consider Moment Magnification and select Braced Frame.
3. Click Auto Design to bring up the Design Column screen, as shown in Figure T4-29.
4. Select the Bar Size and the Tie/Spiral size as shown above and Click OK.
5. The Design Status - Column screen will immediately display. Click Close or the X in the top right corner of
the screen to exit this screen and return to the Column screen.
6. The column design will appear on the screen, as shown in Figure T4-30.
7. Select 2 from the Column# list and then repeat steps 1-6 for the second column.
To see a design summary of the selected component, click Design Status on the Column screen to activate the
Design Status - Column screen, as shown in Figure T4-31. Click Print to print the design summary or click Sketch
to see a graphical representation of the selected column.
T4 -24
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
Figure T4-31 Design Status - Column Screen (In Enhanced Report Format)
Step 19
After the column is designed view the column interaction diagram by selecting Diagrams from the Show menu.
Then, select the column to view from the Objects list and the Design option. The column interaction diagram will
appear on the screen as shown in Figure T4-32. View different load combinations by selecting from the Load
Combination list.,
Click Save to save the footing library. Click OK to exit the Footing Library screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -25
T4
Step 20
Select the Footing tab to activate the Footing screen, similar to the one shown in Figure T4-33. Notice that no
footings have been defined. The following illustrates how to define a spread footing and pile/cap footing.
LEAP RC-PIERv10.00.01.00
T4
6. In the Pile Pattern area, click on the Description drop down field and select the pattern N08P1. (Note: If
you do not see any pile pattern available in the list, this means that Pile Library is not correctly selected).
Please see how to use the pile pattern library in the General Operations section, Libraries | Pile Pattern
Configuration.
7. Select to keep the pattern origin to be concentric under the footing. For that, choose the option,
Concentric under footing.
8. Choose the Adjust Piles for end distance option and specify 24 in the text box. Then press the
Adjust button.
9. When completed, pile locations will look as shown in Figure T4-35. Click OK and return to the Footing:
Isolated Pile/Shaft Cap Design screen.
10. Click Auto Design to activate the Design Footing screen, as shown in Figure T4-36. Select #8 from the
Bar Size list. Click OK and the program will automatically generate the footing reinforcement.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -27
T4
11. The Footing Design Results - Pile Cap screen will immediately display.
12. Click OK and return to the Footing screen. The screen will resemble Figure T4-37.
Step 21
In this step we will check to see if the pile cap designed under column 1 works for column 2. On the Footing tab,
select column 2 in the columns list. Specify the footing name as F2 and choose the option for pile cap and click
Add, as shown in Figure T4-38.
Click the Design button. On the Isolate Pile Cap dialog click on the Copy From button, as shown in Figure T4-38.
The Copy Footing dialog will appear, as shown in Figure T4-39. Select F1 from in the list and click Copy.
T4 -28
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T4
All the information about pile cap will be copied to the second footing. Click the Design Status button and review
the results to see if this footing will work. Click OK on this dialog to return to the Footing tab.
Step 22
This completes Tutorial 4. To print the output of the project, select Print from the File menu and the Print screen
will display. Select the appropriate options and click OK.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T4 -29
T4
T4 -30
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Chapter
Abutment Design
(AASHTO LRFD)
T5
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-1
T5
Problem Data
Table T5-1
Abutment configuration
Stem Wall
20
84
Stem Height
180
Stem Width
42
Footing/Pile Configuration
Pile Size
18
12
Superstructure Parameters
Number of Lanes
Beam Height
76
967
12
36
Barrier Height
42
Slab Depth
Span Information
Bridge Overall Width, ft
46.875
42
T5-2
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Table T5-1
T5
120
120
Substruture Parameter
Start Elevation
22
End Elevation
22
Material Properties
Cap
4000
Stem
4000
Footing
4000
Loads
Live Load
HL93
Wind on Structure
0 to 60
0 to 60
Footing Surcharge
0.24
Step 1
The Project screen displays, as shown in Figure T5-3. Indicate the general project information. Select the
AASHTO LRFD option under Design Specifications and U.S. Units under Units.
T5-3
T5
Step 2
Select the Geometry tab to open the Geometry screen, as shown in Figure T5-4. Click and drag to rotate the model.
Step 3
Select Abutment Configuration to open the Abutment Configuration screen, as shown in Figure T5-5. Define the
Abutment configuration data such as back wall and stem dimensions. Select the view direction as down station.
Click OK.
LEAP RC-PIERv10.00.01.00
T5
Step 4
Select Superstr. to open the Superstructure Parameters screen. Input the values for the number of lanes, beam,
height and area, barrier/railing height, slab depth, total number of spans, and total length and width of spans, as
shown in Figure T5-6, and then add all span lengths. Note that span number rear to current pier should be 0 for this
example. Click OK to advance to the Superstructure screen.
Note that this screen is optional, however, it is required for auto load generation, as illustrated later in this tutorial.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-5
T5
Step 5
Select the Footing/Pile button to open the screen shown as shown in Figure T5-7.
1. For this tutorial, define the footing dimensions of spread cap footing as 46.875 by 10.25
2. Enter the pile dimensions as pile size 18, length 12 and click Edit pile button to define 2 rows of the piles.
Define the eqispaced battered piles for the front row and normal piles for the back row as shown in Figure
T5-8.
T5-6
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T5
Step 6
Select the bearing/girder screen and enter bearing/girder locations as shown below Figure T5-9. This screen is
used to define the configuration of the bearing line, eccentricity, and distance from center line of stem to individual
bearings.
Note: For abutment, there is only one bearing line.
1. Input the first bearing point by selecting the Cap Left End option and entering 3.9375 in the text box
under Distance From. Click Add. A bearing line will appear in the list on the screen.
2. Enter the second bearing point. Select Cap Left End under Distance From and enter 9.75. Click Add to
add the second bearing line to the list.
3. Repeat the above steps to add the remaining bearing locations under Distance From. Click Add. When
Completed, your screen will resemble Figure T5-9. Click OK.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-7
T5
Step 7
Select Material to activate the Materials screen, as shown in Figure T5-10. This screen defines the strength,
density, concrete modulus of elasticity, and reinforcing steel strength as well as the concrete type. Notice that the
program defaults to certain values. You can override these values by typing over them. Input the values shown in
the figure and click OK to return to the Geometry screen.
LEAP RC-PIERv10.00.01.00
T5
Step 8
Select Str. Model to open the Structure Model screen, as shown in Figure T5-11. Use this screen to keep track of all
nodes of the abutment structure, add or remove nodes to the pier structure for use as reference points (checkpoints),
and define hinges at existing points. Note this screen is not used in this tutorial. Click Cancel to return to the
Geometry Screen.
Note: program assumes thin cap internally for the model and shows the nodes for the same in the structural model.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-9
T5
Step 9
Select Image from the Show menu to activate the Image screen (or the corresponding icon on the toolbar at the top
of the screen). which displays a 3-D image of the structure on the screen, as shown in Figure T5-12.
Use buttons on the left of the screen to manipulate your view of the image (e.g., rotate, pan, zoom-in or out).
Experiment with the buttons to become more familiar with their functions. Once you have become familiar with
this screen, close or minimize the screen and return to the Geometry screen.
T5-10
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T5
Step 10
Select Model from the Show menu to display the Model screen (or its corresponding icon on the toolbar at the top
of the screen), as shown in Figure T5-13. A 3-D model of the nodes, element number, etc will be displayed on the
screen. The type of model displayed depends on which characteristics you select from the check boxes at the top of
the screen (Node Number, Member Number, and Checkpoints).
Select the Loads tab to display the Loads screen, as shown in Figure T5-14. This is where you enter all load
information.
Use the buttons on the left side of the screen to manipulate your view of the model (e.g., rotate, pan, zoom-in or
out). Experiment with these buttons to become familiar with their functions. Once you have become familiar with
this screen, close or minimize the screen and return to the Geometry screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-11
T5
Step 11
Select the Loads tab to display the Loads screen, as shown in Figure T5-14. This is where you enter all load
information.
T5-12
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T5
3. Select the Generate button to display the following screen as shown in Figure T5-16.
T5-13
T5
Program calculates the self weight due to stem, footing. Back wall configuration is used to generate the dead load
due to back wall. You must select this option to generate the dead load due to back wall in the auto generation
dialog if you want to consider this into dead load.
4. Specify the slab and girder density as 150 pcf.
5. Select back wall dead generation and define the density as 150 pcf.
6. Use simple span distribution for barrier and wearing surface load. Specify 1200 in the total load per foot
field for barriers.
7. Click Generate. Program automatically generates the dead load.
8. Click OK to accept and return to load case dialog.
Live Load Case:
1. Select LL live load case. Highlight the load and click Edit to open the live load screen.
2. Click Generate to activate auto live load generate dialog as shown in Fig T5-15.Figure T5-17.
3. For this tutorial, we want to consider HL-93 live load. Highlight Design Truck, Design +lane and Design
Tandem+lane load and click on Add.
4. For longitudinal reaction, well consider simple span reaction option.
5. For Transverse Positioning, select all combinations option.
T5-14
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T5
6. Click Generate button to generate multiple live positions and cases to return to the load generation screen
dialog as shown below in Fig Figure T5-18.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-15
T5
T5-16
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T5
3. Select Generate for multiple angle box and enter the values as 0 to 60 as Wind Angle. Enter 0 in the
Elevation above Which Wind Load Acting field.
4. Select the Default Wind Pressure check box. (Note when this option is selected, the remaining fields are
grayed out.)
5. If you want to generate wind on live load simultaneously, select Wind on Live load at the same time and
define span length as required.
6. Click Generate. The program automatically generates the loads and returns to the Loads: Load Data
screen.
7. Click OK and return to the Loads screen.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-17
T5
8. Click OK to accept and return to the load screen, which shows the list of wind load generated as follows.
T5-18
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T5
Click Generate to open the auto load generation screen as shown below in Figure T5-23
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-19
T5
Note that program generates the pressure at the bottom of the stem and uses total height of the abutment in the
computation of earth pressure load. Program applies this load as trapezoidal load.
T5-20
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T5
Temperature Load:
Select the temperature load and click Edit. Click Generate to display Figure T5-24:
1. Use the expansion bearing with Area=120 in^2, Shear modulus=0.095 ksi.
2. Contributing length is 50% from either side.
3. Define the change in temperature as 52 degrees F. Click Generate. The temperature loads are defined as
bearing loads as shown in Figure T5-25.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-21
T5
T5-22
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T5
Step 12
Once all load cases are defined, select the load combinations required for analysis and design. For this tutorial,
well select Strength I, Strength III, Strength V and Service I as shown below in Figure T5-26.
Figure T5-26 Load screen showing all the loads and load combinations
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-23
T5
Step 13
Select the Analysis tab to activate the Analysis screen. This screen is used to perform an analysis and also specify
various factors relating to the analysis and design. Click A/D Parameters to open the Analysis/Design Parameters
(Standard) screen and input the values as shown in Figure T5-27. Click OK and return to the Analysis screen.
T5-24
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
T5
Step 14
Run the analysis and proceed to the Stem design tab.
Stem Design:
Select the Stem tab to open the Stem screen, as shown in Figure T5-28. Either manually input the stem
reinforcement or have the program automatically design it. For this tutorial, the Auto Design feature is used. Select
#8 from the Bar Size list and #4 from the Stirrup Size list. Click OK.
The Design Status stem screen will immediately display. Click Close to exit this screen and return to the Stem
screen.
Footing Design:
Switch to Footing tab to design footing. Click Design to open the footing dialog. Note that footing geometry is
already defined.
You can do Auto Design or click Design Status of footings. When Auto Design is selected program determines the
reinforcement for flexure in strength design combinations.
For this Tutorial, click the Design Status to check the already provided reinforcement. Review the report and close
this dialog by clicking OK to return to the Footing tab.
This completes Tutorial 5. To print the output, select Print from the File menu and the Print screen will display.
Select the appropriate options and click OK.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
T5-25
T5
T5-26
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Chapter
HC
4'-6"
1'-6"
9'-0"
3'-0"
1'-6"
4'-0"
6"
6"
4'-0"
A
4'-0"
3'-0"
8"
3'-0"
3'-0"
4'-6"
1'-6"
17'-0"
3'-0"
3'-0"
1'-6"
18'-0"
26'-0"
B
3'-0"
4'-0"
3'-0"
3'-0"
Section B-B
3'-0"
Section A-A
12'-0"
Figure HC-1 Elevation of Bridge Pier with Cross-Sections for Cap and Column (Tutorial 1)
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-1
HC
32 kips
32 kips
8 kips
46'-0"
14'-0"
14'-0"
46'-0"
60'-0"
60'-0"
R
(a) Longitudinal View
27'-0"
4'-6"
1'-6"
2'-0"
9'-0"
6'-0"
2'-0"
9'-0"
4'-6"
7'-0"
3'-0"
6'-0"
HC-2
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
26 ft
3 ft
= +30 deg
z
Wind Pressure = 40 psf
(a) Plan View of the Pier Cap where wind pressure acts on
26 sin
30 deg
3 cos
3 ft
30 deg
26 ft
(b) Calculation of projected area for wind pressure acts on a pier cap
Figure HC-3 Wind Load on Substructure (Tutorial 1)
Problem Data
Concrete Strength
Cap
Columns
Footings
Modulus of Elasticity
fc = 4000 psi
fc = 4000 psi
fc = 4000 psi
Ec = 3834 ksi
Concrete Density
Cap
Columns
Footings
= 150 pcf
= 150 pcf
= 150 pcf
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-3
HC
fy = 60 ksi
fy = 60 ksi
fy = 60 ksi
Es = 29000 ksi
Concrete Type
Cap
Columns
Footings
Normal
Normal
Normal
Other Parameters
Crack Control Factor,
z = 170 kips/in
Pier Configuration
Rectangular non-tapered multi-columns, with straight cap
Superstructure Parameters
Number of lanes
=2
(Note that, in this tutorial, the pier is only designed for 1 lane loaded)
Beam Height
= 36 in
Beam Section Area
= 369 in2
Barrier Height
= 36 in
Slab Depth
= 8.0 in
Total number of spans
=2
Span Information
Bridge Overall Width, ft
Curb to Curb Distance, ft
Span Length, ft
Forward = 27 ft
Forward = 24 ft
Forward = 60 ft
Rear = 27 ft
Rear = 24 ft
Rear = 60 ft
Substructure Parameters
Cap: Length Height Depth = 26 ft 48 in 36 in
Skew Angle
= 0 degrees
Start Elevation
= 22 ft
End Elevation
= 22 ft
Factor of Reduced Moment of Inertia = 1.0 (non-cracked section)
Columns: Fixed at base
Column Height
= 20 ft
Width Depth
= 36 in 36 in
Factor of Reduced Moment of Inertia = 1.0 (non-cracked section)
Bearings = one line with no eccentricity
Loads
Dead Load
Self-weight
Slab Girder
Girder Weight
Barrier Weight
Total Barrier Weight
Future Wearing Surface Load
= 150 pcf
= 150 pcf
= 150 pcf
= 600 plf each side
= 2 600 = 1200 plf
= 20 psf
= 20 27 = 540 plf
HC-4
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Live Load
HS20 Truck
Wind on Structure
Direction of wind
Elevation above which wind acts
Trans. wind pressure on superstructure
Longitudinal pressure on superstructure
Wind pressure on cap
Wind pressure on column
= + 30
= 0 ft
= 41 psf
= 12 psf
= 40 psf
= 40 psf
= + 30
= 82 plf
= 24 plf
= 60 ft
Footing Surcharge
Footing
= 0.200 ksf
Load Combinations
Service Group I
Q = 1.00 (1.00 DL + 1.00 (LL + I)1 or 2 or 3 or 4)
Service Group IA
Q = 1.00 (1.00 DL + 2.00 (LL + I)1 or 2 or 3 or 4)
Service Group VI
Q = 1.00 (1.00 DL + 1.00 (LL + I)1 or 2 or 3 or 4 0.30Wl 1.00WL1)
Load Factor Group III. Q = 1.30 (1.00 DL + 1.00 (LL + I)1 or 2 or 3 or 4 0.30Wl
1.00WLl)
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-5
HC
Load Generation
Dead Load from Superstructure
The tributary width of deck to each beam is 9 ft. The tributary span length to the pier is 30 ft rear and 30 ft
forward (for simple span distribution). Thus, the total length is 60 ft.
Load Type
Exterior Bearing
Points (kips)
Interior Bearing
Points (kips)
(8/12)(0.150)(9)(60) = 54.00
(8/12)(0.150)(9)(60) = 54.00
(369/144)(0.150)(60) = 23.06
(369/144)(0.150)(60) = 23.06
(1.2)(9/27)(60) = 24.00
(1.2)(9/27)(60) = 24.00
(0.54)(9/27)(60) = 10.80
(0.54)(9/27)(60) = 10.80
Total
111.86
111.86
Dead Load
Bearing 1
Bearing 2
Bearing 3
P = -111.86 kips
P = -111.86 kips
P = -111.86 kips
P = -48.74 kips
P = -13.93 kips
P = 0 kips
Bearing 1
Bearing 2
Bearing 3
P = 0 kips
P = -13.93 kips
P = -48.74 kips
LL4:
HC-6
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
P = -20.89 kips
P = -41.78 kips
P = 0 kips
Bearing 1
Bearing 2
Bearing 3
P = 0 kips
P = -41.78 kips
P = -20.89 kips
LL3:
Wind Load
Assume wind load at an angle of +30 degrees, as shown in Figure TH-3a.
Transverse Wind Loads:
The transverse pressure is 41 psf, acting on the height of superstructure at the center of this area.
The total height of the superstructure is:
36 barrier + 8 deck slab + 36 beam = 80 in
Total transverse load is:
(41/1000) (80/12) (60) = 16.4 kips
Distribute the total load equally between the bearing points, and the transverse load is:
Fx = 16.4/3 = +5.47 kips/bearing
Since this load is applied at the center of the height of superstructure, it creates an overturning moment =
(16.4)(80/12)/2 = 54.67 kips-ft at the bearing elevation.
This moment will be distributed to the two exterior girders, where
One exterior girder (at bearing point #3) applies a downward force, that is, -Fy, on the pier cap, and
Exterior girder on other side (at bearing point #1) applies upward force, +Fy.
HC-7
HC
The bearings are considered to act as a hinge about the X-axis of the pier and do not transmit any Mx moment
to the substructure due to longitudinal loads. Therefore, the longitudinal wind load results only in Fz force
acting at the bearing elevation, which is the top surface of pier cap.
Loads from Superstructure:
For wind load with skew angle of 30 degrees, transverse pressure = 41 psf and longitudinal pressure = 12 psf
(AASHTO Std. 3.15.2.1).
Bearing Loads:
Bearing 1
X
Y
Z
P = 5.47 kips
P = 3.04 kips
P = -1.6 kips
Bearing 2
X
Z
P = 5.47 kips
P = -1.6 kips
Bearing 3
X
Y
Z
P = 5.47 kips
P = -3.04 kips
P = -1.6 kips
Loads on Substructure:
According to AASHTO Std. 3.15.2.2, a 40 psf wind pressure acting on an angle of = +30 degrees, should be
applied. Since the wind load is not normal to the exposed surface area, the wind force should be calculated
based on the projected area of exposed surface.
Loads on Pier Cap:
Total projected length of pier cap (normal to the wind direction) is
= 26 sin(30) + 3 cos(30) = 15.598 ft
Total wind force = 0.04 4 (depth) 15.598 = 2.496 kips
Therefore,
Transverse Load, Fx, is
= 2.496 cos(30) = +2.162 kips
Longitudinal Force, Fz, is
= 2.496 sin(30) = -1.248 kips = -1.248/26 = -0.048 kip/ft
Cap Loads
X-dir:P = 2.162 kips
Z-dir: = - 0.048 klf
Loads on the Column:
Total projected length of the column (normal to wind direction) is
= 3 sin(30) + 3 cos(30) = 4.098 ft
HC-8
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
y1 0.0ft
=
= 0.0
L 20.0ft
y 2 18.0ft
=
= 0 .9
L 20.0ft
Column Loads
Column 1
x-dir:
z-dir:
Column 2
x-dir:
z-dir:
= 0.142 klf
= -0.082 klf
= 0.142 klf
= -0.082 klf
y1
= 0 .0
L
and ending at
y2
= 0.9
L
The transverse load, Fx, acting 6ft above the deck, creates an overturning moment in longitudinal direction =
4.920(6 + 8/12 + 36/12) = 47.560 kip-ft.
Distributing this force between the exterior girders, creates an upward force on the left exterior girder and
downward force on right exterior girder.
Fy
= 47.560/18
= +2.642 kips at bearing 1
= -2.642 kips at bearing 3
= -24(60)/1000
= -1.440 kips total
= -1.440/3
= -0.480 kips/bearing
Bearing Loads:
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-9
HC
Bearing 1
X
Y
Z
P = 1.64 kips
P = 2.642 kips
P = -0.48 kips
Bearing 2
X
Z
P = 1.64 kips
P = -0.48 kips
Bearing 3
X
Y
Z
P = 1.64 kips
P = -2.642 kips
P = -0.48 kips
Impact Factor
Span Length = 60 ft
50
50
Impact = ------------------- = --------------------- = 0.27
60 + 125
L + 125
Fx
b
h
=
=
=
=
=
=
=
=
36 in
48 in
2.5 in
#8 bars
#4 bars
48 - 2.5 - .5 - .5(1) = 44.5 in
0.9 for flexure
0.85 for shear
HC-10
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Mu =
Flexure Design
Mu Mn
Mu = 1326.8 kft
Mu
1326.8 12 1000
Required Ru = ------------- = ----------------------------------------------- = 248.15 psi
2
2
0.9 36 ( 44.5 )
bd
0.85f c
2R u
0.85 4000
2 248.15
= --------------- 1 1 --------------- = ---------------------------- 1 1 ----------------------------
60000
0.85 4000
fy
0.85f c
= 0.0043
0.851f c 87000
87000 + f y
fy
60000
87000 + 60000
= 0.0285
0.75b= 0.75 0.0285 = 0.021
< 0.75b
OK
36 2 2.5 1
Spacing of reinforcement = ------------------------------------- = 3.33 in > 1.5db
9
OK
OK
10 0.79
= ---------------------- = 0.00493
36 44.5
Mr = Mn
0.00493 60
1
12
HC-11
HC
St
Mn-min
Mcr
= 7.5 f c S
= section modulus for the extreme top fiber of non-composite concrete section
=
I
----gyt
where:
Ig
3
1
= ------ 36 48 = 331776 in4
12
yt
= 48
------ = 24 in
2
St
3
= 331776
------------------ = 13824 in
24
1
Mcr =( 7.5 4000 13824 ) --------------- = 546.4 kft
12000
1.2Mcr = 1.2 546.4 = 655.7 kft controls
1.33Mu = 1.33 1326.8 = 1765 kft
Mn-min = 655.7k-ft Mn = 1511.78 kft
Shear Design
Vu Vn
Vn
= Vc + Vs
Vc
LEAP RC-PIERv10.00.01.00
Vs
Vu Vc
435 172.2
0.85
HC
= 309.2 kips
Av
309.2
Vs
=
=
= 0.116 in2/in = 1.39 in2/ft
s
60 44.5
fy d
Tlim
Acp 2
f
c
=
Pcp
Acp = bh = 36 48 = 1728in2
Pcp = 2(b + h) = 2(36 + 48) = 168 in
17282
1
168 12000
= 79.62 kft > 3.7 kft (Therefore, no torsional steel is needed.)
Check for minimum transverse reinforcement:
50b w 50 36
Av
=
=
fy
60000
s min
= 0.03 12 in2/ft
= 0.36 in2/ft < 1.39 in2/ft
Maximum Spacing:
44.5
(i) d
--- = ---------- = 22.25 in
2
(ii) 24 in
Ms
Self Moment
Mself
Dead Moment
Md
MLmax
MLmin
z
fs = ------------------------- 0.6f y
13
( dc A )
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-13
HC
nA s
7.56 7.9
= ---------- = -----------------------bd
36 44.5
2
= m + 2m m
=
= 0.0372
2
( 0.0372 ) + 2 0.0372 0.0372
= 0.24
j
= + 48 k
--- = 1 0.24
---------- = 0.9
3
3
fs
Ms
978.1 12
= ------------ = ----------------------------------------- = 36.29ksi
A s jd
7.9 0.92 44.5
dc
1
= 2 + --- = 2.5 in
2
2.5 36
=2
----------------------------10
fs
170
=---------------------------------1 3 = 47.8 ksi > 36 ksi, use 36 ksi
( 2.5 18 )
= 18 in2
LEAP RC-PIERv10.00.01.00
HC
Column Design
Section Properties
Square Column:
Width of column
Depth of column
Height of column
=
=
=
36 in.
36 in.
20 ft. (bottom of the column to the
centerline of the cap)
Reinforcement
12 # 8 in X-direction
10 # 8 in Z-direction
Bar dist = 3.0 in.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-15
HC
Design Loads
At base of the column:
Pu
Muz
Mux
= 328.3 kips
= 251.6 kft
= 51.2 kft
Pu
Muz
Mux
= 328.3 kips
= 449.3 kft
= 46.0 kft
M
46
34 12 1 34 12
= 23.2
51.2
M2
k x l x 1.0(2.0 12 )
=
= 22.2 < 23.2
rx
10.8
Therefore, neglect slenderness in the X-direction.
Slenderness About the Z-Axis
M
251.6
34 12 1 = 34 12
= 27.3
449.3
M2
k z l z 1.0(240)
=
= 22.2 < 27.3
rz
10.8
Therefore, neglect slenderness in the Z-direction.
HC-16
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Interaction Diagram
The moment interaction diagram in RC-PIER as shown in Figure TH-5, is compared to that from PCACOL, as
shown in Figure TH-4. The results for the bottom of the leftmost column is illustrated in Figure TH-5.
Figure HC-5 Moment Interaction Diagram Column Component No. 1 at Bottom Location
2
2
Mux + Muz =
2
2
57.2 + 251.6 = 256.8 kft
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-17
HC
The intersection point (point a) is well within the boundary of the interaction diagram; therefore, the capacity
of the column is adequate. Next, locate point b, as shown in Figure TH-4. Point b is the intersection of the
horizontal line passing the factored load (Pu = 331.9 kips) with the moment interaction diagram. The
corresponding load and moment values for point b are:
Pn = 328.3 kips
Mn = 1150 kft
Therefore,
P n
---------Pu
= 1.0
M n
1150
------------ = ------------- = 4.48
Mu
256.8
OK
Footing Design
Spread Footing
12'
6'
6'
6'
x
12'
6'
4
3' 0"
12' 0"
HC-18
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Section Properties
= (12)(12) = 144 ft2
= Area of footing
Iz
= Moment of inertia
Ix
= Moment of inertia
1
12
1
12
= 432.44 kips
Pu M uz x
+
A
Iz
432.44 167.0(6)
+
144
172.8
= 3.58 ksf
Flexure Design
X-Dir
2
2
wl
3.58x12 ( 6 1.5 )
Mu = --------- = --------------------------------------------- = 435 kft
2
2
Determine the Required Area of Steel
Rn
Mu
435 ( 12000 )
= ------------- = ---------------------------------------2
2
bd s
0.9 ( 144 ) ( 32.5 )
= 38.1 psi
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-19
HC
0.85f c
2R n
0.85 ( 4 )
2 ( 38.1 )
= --------------- 1 1 --------------- = ------------------ 1 1 ---------------------------
fy
60
0.85 ( 4000 )
0.85f c
= 0.0006386
10 0.79
= ----------------------------------- = 0.001688
12 12 32.5
Mr = Mn
0.001688 60
1
12
Mn Mn-min
where Mn-min = smaller of 1.2 Mcr and 1.33 Mu
Mcr = 7.5 f c St
St
= section modulus for the extreme top fiber of the non-composite concrete section
Ig
= ----yt
where:
1
12 12 363
12
Ig
yt
= 18 in
St
559872
18
= 559872 in4
= 31104 in3
1
)12000
= 1229.5 kft
HC-20
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
OK
Crack Control
X-Dir:
fsa
z
--------------- 0.6f
y
3d A
c
where:
z
= 170 k/in
dc
fsa
170
= ---------------------------= 30 ksi < 0.6(60) = 36 ksi
3 ( 2.5 ) ( 72 )
M s 12
A s jd
E s 29000
=
E c 3834.3
nA s
7.56(7.9)
=
bd (144 )(32.5)
= 1
= 7.56
= 0.0128
k
0.148
=1
3
3
= 0.95
q
M
fs
328.05 ( 12 )
= -------------------------------------- = 16.14 ksi
7.9 ( 0.95 ) ( 32.5 )
fs
16.14
Ratio= ------------- = 0.53 < 1.0
30.1
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
OK
HC-21
HC
Fatigue Check
ff
r
= 21 0.33f min + 8.0
h
= 21 - 0.33fmin + 8.0(0.3)
= 23.4 - 0.33fmin
Maximum Soil Pressure Due to Live Load:
13.29 ( 6 )
= 53.25
------------- + --------------------- = 0.416 ksf
144
1728
Mr
2
2
l
( 0.416 12 ) ( 6 1.5 )
------------------------------------------------------------- = 50.5 kft
=
=
2
2
9.417 12.97 ( 6 )
= ------------- --------------------- = 0.020 ksf
144
1728
2
2
l
( 0.020 12 ) ( 6 1.5 )
Mr = --------- = ------------------------------------------------------- = 2.43 kft
2
2
Minimum Permanent Load Moment:
99.21 ( 6 )
= 215.5
------------- + --------------------- = 1.84 ksf
144
1728
2
2
l
( 1.84 12 ) ( 6 1.5 )
Mdl = --------- = ---------------------------------------------------- = 223.7 kft
2
2
X-Dir:
M s 12
50.5 ( 12 )
= -------------------- = -------------------------------------- = 2.48 ksi (tension)
A s jd
7.9 ( 0.95 ) ( 32.5 )
LEAP RC-PIERv10.00.01.00
fs
2.43 ( 12 )
= -------------------------------------7.9 ( 0.95 ) ( 32.5 )
HC
223.7 ( 12 )
= -------------------------------------7.9 ( 0.95 ) ( 32.5 )
ff
OK
Vu Vn
Vc = 2 f bd
c
d1 + d2
31.5 + 32.5
davg = ------------------ = --------------------------- = 32.0
2
2
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-23
HC
bo
( 36 + 32 -) = 22.67 ft
= 4------------------------12
Ao
Vu
Vc = 4 f c bd
0.85 ( 4 ) 4000 ( 22.67 12 ) ( 32 )
Vc = ----------------------------------------------------------------------------- = 1871.9 kips
3
10
Vc = 1871.9 kips > Vu = 401.4 kips
Footing Design
Pile Cap Forces
12'
6'
2'
6'
4'
2'
6'
4'
x
12'
3
6'
3' 0"
12' 0"
Figure HC-7 Plan and Elevation of Isolated Pile Cap Footing Design
Pile Reactions
For symmetric pile pattern with pile group c.g. concentric with column,
Pp
P Mz Xi Mx Zi
= --- -------------- -------------n
2
2
X i Z i
HC-24
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Mx = 0 kft
Mz = 125.81 kft
415.59 125.81 4
P1,3 = ---------------- + ------------------------4
2
4( 4)
=111.76 kips
415.59 125.81 4
P2,4 = ---------------- ------------------------- = 96.03 kips
4
2
4(4)
Mx = 0 kft
Mz = 167.01 kft
554.12 167.01 4
P1,3 = ---------------- + ------------------------- = 148.97 kips
2
4
4(4)
554.12 167.01 4
P2,4 = ---------------- ------------------------4
2
4(4)
= 128.09 kips
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-25
HC
16'-0"
9'-6"
22
23
14
13
12
10'-6"
15
11'-0"
16'-0"
24
25
26
17
16
18
3'-6"
1'-6"
20'-6"
3'-6"
29'-0"
9'-0"
54" (Typ.)
36'-0"
(Combined Spread Footing)
36'-0"
(Combined Pile Cap Footing)
Legend:
HC-26
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
4'-6"
3'-6"
29'-0"
4-54" Columns
10'-0"
10'-0"
20'-0"
24"
4.8"
Bearing Line #1
Bearing Line #2
42"
60"
18"
27"
27"
54"
HC-27
HC
Materials
Concrete Strength
Cap
Columns
Footings
fc = 4 ksi
fc = 4 ksi
fc = 4 ksi
Concrete Density
Cap
Columns
Footings
= 150 pcf
= 150 pcf
= 150 pcf
fy
fy
fy
= 60 ksi
= 60 ksi
= 60 ksi
Concrete Type
Cap
Columns
Footings
Normal
Normal
Normal
Bearing Location
Bearing Line #1
Distance from left
Bearing Point
edge of pier cap (ft)
1
2
3
4
5
6
7
8
3.06
12.90
22.74
32.58
42.42
52.26
62.10
71.94
Bearing Line #2
Distance from left
Bearing Point
edge of pier cap (ft)
1
2
3
4
5
6
7.50
19.50
31.50
43.50
55.50
67.50
Loads
Dead Load
Bearing Loads
Bearing Line 1
Bearing Line 2
P = -20 kips
HC-28
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Bearing 2
HC
P = -7 kips
Line 2
Bearing 1
Bearing 2
P = -45 kips
P = 6 kips
P = -10 kips
P = -29 kips
Line 2
Bearing 5
Bearing 6
P = 4 kips
P = -30 kips
P = -43 kips
P = -19 kips
P = -19 kips
P = -43 kips
Wind on Structure
Bearing Loads
Line 1
Bearing 1
Bearing 8
P = 35 kips
P = -35 kips
Line 2
Bearing 1
Bearing 6
P = 42 kips
P = -42 kips
Cap Loads
X dir:
P = 40 kips
Z dir:
UDL
= 0.4667 klf
Creep
Creep in the Cap Beam
sh = 0.0003
Shrinkage
Shrinkage in the Cap Beam
sh = -0.00027
Footing Surcharge
Footing
= 0.200 ksf
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-29
HC
Load Combinations
Strength Group I
Q = 1.00 (1.25 max./0.90 min. DC + 1.35 EV + 1.75 (LL+I)
+ 0.50/1.20 (CR/SH))
Strength Group III
Q = 1.00 (1.25 max./0.90 min. DC + 1.35 EV + 1.40 WS
+ 0.50/1.20 (CR/SH))
Service Group I
Q = 1.00 (1.00 DC + 1.00 EV + 1.00 (LL+I) + 0.30 WS
+ 1.00/1.20 (CR/SH))
Service Group III
Q = 1.00 (1.00 DC + 1.00 EV + 0.80 (LL+I) + 1.00/1.20 (CR/SH))
Fatigue
Q= 1.00(0.75(LL+I))
Ms
899.84 kft
Factored Moment
Mu
1145.5 kft
Self Moment
Mself
43.37 kft
Dead Moment
Md
835.71 kft
Shrinkage Moment
Msh
27.89
Creep Moment
MCR
-30.99
Mftgmax
8.72 kft
Mftgmin
-17.39 kft
54 in
Overall depth
60 in
3.5 in
Longitudinal reinforcement
#11 bars
#4 bars
Effective Depth
60 3.5 = 56.5 in
HC-30
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Flexure Design
Mu Mn
Mu = 1145.5 kft
Mu
1145.5 12 1000
Required Ru = ------------- = ----------------------------------------------- = 88.60 psi
2
2
0.9 54 ( 56.5 )
bd
0.85f c
2R
2 88.60
0.85 4
0.85 4000
60
fy
0.85f c
= 0.0015
As
= 8.31 in
9.36 60
= -----------------------------------------------= 3.6 in
0.85 0.85 4 54
3.06
1
Mr = M = 0.9 9.36 60 56.5 ---------- -----n
2
12
= 2315 kft > 1145.5 kft
St
Mn-min
Mcr
= 0.24 f c S
= section modulus for the extreme top fiber of non-composite concrete section
=
Ig
----yt
where:
Ig
3
1
= ------ 54 60 = 972,000 in4
12
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-31
HC
yt
60- = 30 in
= ----2
St
Mcr =
972000
-----------------30
= 32400 in3
1
( 0.24 4 32400 ) -----12
= 1296 kft
(d c A )1/ 3
0.6f y
= 7.56
nA s 7.56 9.36
=
= 0.0232
bd
54 56.5
= 1
fs
Ms
899.8 12
= ------------ = ----------------------------------------------- = 21.81 ksi
A s jd
9.36 0.936 56.5
dc
= 2+
fs
m 2 + 2m m =
k
0.193
=1
= 0.936
3
3
1.41
= 2.705 in.
2
2 2.705 54
= 48.69 in 2
6
170
(2.705 48.69)1/ 3
21.81
Cracking Ratio = ------------- = 0.65
33.4
HC-32
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
r
= 21 0.33f min + 8 ---
h
where:
--r- = 0.3
h
ff
8.72 12
= ---------------------------------------------- = 0.21 ksi (tension)
9.36 0.936 56.5
0.32
Fatigue Ratio = ------------- = 0.020
16.32
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-33
HC
Vu
Section Properties
bv
= width of beam
= depth of beam
= 60 in.
= 56.5in
c
0.125 f c
Tcr
where:
fc
= 0.9
fpc
pc
Tcr =
2
3240
0
0.125 4 --------------- 1 + --------------------228
0.125 4----------------------------------------------------------------------12
= 959.2 kft
HC-34
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
2A A t f y
= ---------------------- cot
s
Ao
= 0.85Aoh
Aoh = [(60 2(3.5 0.5 (1.41) 0.5 (0.625))) (54 2 (2 + 0.5 (0.625)))]
= 2718 in2
Ao
At
Tu
774 .5(12000 )
=
=
s
2 Ao f y cot
2 (0 .9 )(2310 )(60000 )(1 .0 )
= 0.037 in2/in/leg
= 0.45 in2/ft/leg
2
2At
---------- = 0.89 in /ft
S
0.0316 f c b v d v
where:
a
d v = d e --2
where:
a
As fy
21.84 ( 60 )
- = ----------------------------- = 7.14 in.
= -----------------
0.85 ( 4 ) ( 54 )
0.85f c b
dv
7.14
= 56.5 ---------- = 52.93 in
2
HC-35
HC
Vu
696.2 325.2
Vs, = ------- Vc = -------------- ------------- = 412.2 kips
req
0.9
0.9
Av
Vs
412.2
------- = ----------= ------------------------ = 0.13 in2/in=1.55 in2/ft
S
fy dv
60 ( 52.93 )
bv S
= 0.0316 f c --------fy
Av
54
------- = 0.0316 4 ------ = 0.05688 12 = 0.68 in2/ft < 2.44 in2/ft
S
60
Therefore, S 0.8d v 24 in
S 0.8(52.93) = 42.34 in 24 in
Therefore, Smax = 24 in
Av
= -------- fy dv
S
HC-36
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
= (1.59/12) 60 52.93
= 420.79 kips
M u 0 .5 N u
+
+ cot
d v
Vu
0.45p h Tu
0.5Vs Vp +
2A o
5056.37(12)
696.2
0.45(208.84)(774.5 12)
Asf y + 0
+ 0 +1
0.5(420.79) 0 +
0.9(52.93)
2(2310)(0.9)
0.9
= 54 in.
= height of column
= 23.75 ft
Reinforcement
19 #10
Bar dist = 3.13 in
Loads
0 ft.(Bottom):
Pu
Muz
Mux
= 1149.4 kips
= 525.7 kft
= 1705.8 kft
= 1453.4 kips
= 1150.2 kft
= 1547.5 kft
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-37
HC
= kz
= 1.0
rx
= rz
= 0.25(54)= 13.5 in
lx
= lz
X-Dir:
M 1
1547.5
34 12 -------- = 34 12 ---------------- = 23.1
M
1705.8
2
kx lx
1.0 ( 285 )
----------- = --------------------- = 21.1 < 23.1
rx
13.5
Therefore, neglect slenderness in the X-direction.
Z-Dir:
M 1
525.7
34 12 -------- = 34 12 ------------------ = 28.522
1150.2
M 2
kx lx
1.0 ( 285 )
----------- = --------------------- = 21.1 < 28.52
rx
13.5
Therefore, neglect slenderness in the Z-direction.
Interaction Diagram
Moment interaction diagram from RC-PIER is compared to that from PCACOL, as
shown in Figure TH-11. The result for the bottom of the leftmost column from RC-PIER
is shown in Figure TH-12.
HC-38
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
1149
1781
3250
Now, draw a horizontal line passing Pu = 1149.4 kips and a vertical line passing M = 1785.7 kft, as shown in
Figure TH-11. The intersection point (point a) is shown to be within the boundary of the interaction diagram;
therefore, the capacity of the column is adequate. Next, locate point b, as shown in Figure TH-11. Point b is the
intersection of the horizontal line passing the factored load (P = 1149.4 kips) with the moment interaction
diagram. The corresponding load and moment values for point b are:
Pn = 1149.4 kips
Mn = 3250 kft
Therefore,
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-39
HC
P n
---------- = 1.0
Pu
M n
3250
------------ = ------------ = 1.82 > 1.0
Mu
1785
OK
Ag fc
As fy
19 ( 1.27 ) ( 60 )
-------------- = -------------------------------------- = 0.158 > 0.135
2
Ag fc
( 27 ) ( 3.14 ) ( 4 )
OK
20'-0"
3
10'-0"
16'-0"
10'-0"
36'-0"
3'-6"
36'-0"
HC-40
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Section Properties
A
= Area of footing
= (20)(36)
= 720 ft2
Iz
= Moment of inertia
3
1
= ------ ( 20 ) ( 36 )
12
= 77760 ft4
Ix
= Moment of inertia
3
1= ----( 36 ) ( 20 )
12
= 24000 ft4
Sz
= Section modulus
77760
--------------18
= 4320 ft3
Sx
= Section modulus
24000
--------------10
= 2400 ft3
Loads
Self-weight = 0.15 kcf 3.5 ft = 0.525 ksf
Surcharge = 0.20 ksf
= 1174.30 kips
= -288.53 kft
= 1084.81 kft
= 658.6 kips
= 266.65 kft
= 1112.56 kft
Column #2:
P
Mz
Mx
Mz
Mx
P Mz Mx
= ---- + -------- + -------A Sz Sx
1832.9
720
4103.72
4320
2197.37
2400
q3
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-41
HC
= 1463.98 kips
= -474.07 kft
= 1439.85 kft
= 828.87 kips
= 250.36 kft
= 1470.47 kft
Column #2:
Pu
Muz
Mux
Pu
Muz
Mux
P u M uz M ux
------ + ----------- + ----------A
Sz
Sx
2292.85
4857.17
720
4320
2910.32
2400
Flexure Design
X-Dir:
q3,fac (used for design) = 5.52 ksf
Area of equivalent square = 0.25(54)2 = 2290 in2
Side of square = 2290 = 47.85 in/12 = 3.99 ft
From two dimensional frame analysis maximum, Mu = 3979.4 kft
Rn
Mu
= ------------2
bd s
HC-42
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
3979.4 ( 12000 )
= ----------------------------------------
= 149.15 psi
0.85f c
2R n
--------------
-------------=
1 1
fy
0.85f c
0.85 ( 4 )
60
= ------------------ 1
2 ( 149.15 )
1 ---------------------------
0.85 ( 4000 )
= 0.00254
f c x St
St = Ig/Yt
3
20 12 ( 42 )
Ig = bh3 /12 = -------------------------------------- = 1481760 in4
12
Yt = 21 in.
3
St = 1481760
---------------------- = 70560 in
21
Mcr = 0.24
1
4 x 70560 x ------ = 2822.4 k-ft
12
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-43
HC
Mu
------------2
bd
Rn =
3386.9
--------------------------------------------2
0.9x20x12 ( 38.5 )
126.942 psi
[P-T.O]
0.85f c'
2R n
= ---------------- 1 1 ---------------
fy
0.85f c
0.85 ( 4 )
60
= ------------------ 1
1 ----------------------------
0.85 x 4000
2x126.942
= 0.00216
0.11Ag
-------------------fy
[LRFD 5.10.8.2-1]
Ag
0.11
---------- -------- =
2 fy
10080x0.11
----------------------------- x
2
[LRFD 5.10.8.2-2]
0.0015Ag
0.0015 ( 10080 )
-------------------------- = ---------------------------------------- = 7.56in2
2
2
Therefore temperature and shrinkage steel = 7.56in2
As prov > temperature and shrinkage steel.
OK
Z-Dir :
q3,fac (used for design) = q3,fac 1.35(0.20) 1.25(0.525) = 5.52 ksf
Area of equivalent square = 0.25(54)2 = 2290 in2
Side of square = 2290 = 47.85 in/12 = 3.99 ft
Distance from centerline column to face of equivalent square = 3.99/2 = 1.99 ft
HC-44
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
2
2
wl
( 5.52 36 ) ( 10 1.99 )
Mu at 1.99 = --------- = ---------------------------------------------------------- = 6374.94 kft
2
2
= 42 3 1 0.5(1.0) = 37.5 in
Rn
Mu
6374.94 ( 12000 )
------------ = ----------------------------------------- = 139.91 psi
=
2
2
0.9 ( 432 ) ( 37.5 )
bd e
0.85f c
2R n
= --------------- 1 1 ---------------
fy
0.85f c
2x139.91
0.85
( 4 )-
----------------1 1 --------------------------
60
0.85 x 4000
= 0.002381
As required = bd
= 0.002381(432)(37.5)
= 38.586 in2
[LRFD 5.7.3.3.2]
Ig =
36
( 12 ) ( 42 )
--------------------------------------12
= 2667168 in4
yt = 21 inch
st = 127008 in3
1
Mcr = 0.24 ( 4 ) 127008x ------ = 5080.32 kft
12
1.2 Mcr = 6096.38 kft
1.33 Mu =8478.67 kft
Mn min = 6096.38 kft
Rn =
6096.38x12000
----------------------------------------------- = 133.80
2
0.9 ( 36x12 ) ( 37.5 )
psi
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-45
HC
2 x133.8
0.85x4
= ------------------ 1 1 ---------------------------
60
0.85 x4000
= 0.00228
As = 0.00228 (36x12) (37.5) = 36.94 in2
As (provided) >As (min)
OK
LRFD 5.7.3.3.2 requires to check temperature and shrinkage steel as per 5.10.8. As per
LRFD 5.10.8.2
0.11Ag
As prov -----------------fy
[LRFD 5.10.8.2-1]
Ag = 36x12x42=18144 in2
RC-PIER
0.11
Ag
----------- -------- = 8.136 in2
2 fy
Also for footings
Ab = 0.0015Ag
0.0015
---------------- = 13.608 in2
2
As (temp) = 8.136 in2
As prov As (temp)
Crack Control
X-Dir (At inside face of first column):
fsa
z
3
dcA
0.6f y
where:
z
= 170 k/in
dc
fsa
170
= --------------------------------- = 39.96 ksi > 0.6(60) = 36 ksi
3 ( 2.5 ) ( 30.8 )
HC-46
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
M s x12
A s jd
E s 29000
=
= 7.56
E c 3834.3
nA s 7.56(30.81)
=
= 0.025
(240)(38.5)
bd
= 1
From two dimensional frame analysis, Mservice at the face of the equivalent square =
3179.2 kft
fs
3179.2 ( 12 )
= ----------------------------------------------- = 34.47 ksi
30.81 ( 0.933 ) ( 38.5 )
fs
34.47
ratio = ------------- = 0.96
36
z
3
dcA
0.6f y
where:
z
= 170 k/in
dc
fsa
170
= --------------------------------- = 41.75 ksi > 0.6(60) = 36 ksi
3 ( 2.5 ) ( 27.0 )
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-47
HC
fs
M s x12
A s jd
E s 29000
=
= 7.56
E c 3834.3
nA s 7.56(63.2 )
=
= 0.0295
bd (432 )(37.5)
= 1
2
( 4.42 36 ) ( 10 1.99 )
Ms = ---------------------------------------------------------- = 5104.57 kft
2
fs
5104.57 ( 12 )
= -------------------------------------------63.2 ( 0.930 ) ( 37.5 )
fs
= 27.79 ksi
ratio = 27.79
------------- = 0.77
36
Fatigue Check
X-Dir:
The range between a maximum tensile stress and minimum stress in straight reinforcement caused by fatigue
combination should not exceed.
ff
r
= 21.0 33fmm + 8 ---
n
r
where --- = 0.3
n
Maximum soil pressure due to fatigue combination occurs for combination #17.
Column #1
P
= 65.71 kip
Mz = -31.49 kft
Mx = 9.74 kft
HC-48
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Column #2
P
= -15.75 kip
Mz = 22.61 kft
Mx = 9.56 kft
Determine the Maximum Fatigue Soil Pressure
Determine the Soil Pressure due to Permanent Loads, Creep, and Shrinkage Loads
Column #1
P
= 1052.12 kip
Mz
= -273.36 kft
Mx
= 1133.7 kft
= 688.9 kip
Mz
= 178.2 kft
Mx
= 1158.54 kft
Column #2
q3
2809.64 2292.2
=1740.9
---------------- + --------------------- + ---------------- = 4.02 ksf
4320
2400
720
= 0.23 ksf
= 163.00 kft
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-49
HC
fs
163.00 ( 12 )
= ----------------------------------------------= 1.77 ksi
30.81 ( 0.933 ) ( 38.5 )
= 4.02 ksf
= 2900.00 kft
fs
2900.00 ( 12 )
= ----------------------------------------------30.81 ( 0.933 ) ( 38.5 ) = 31.44 ksi
= 23.4 0.33(fmin)
= 23.4 0.33(31.44)
= 13.02 ksi
1.77- = 0.14
Ratio = -----------13.02
20' 0"
11
13
15
17
19
21
20
22
10
12
14
16'
10'
16
18
10'
36' 0"
3' 6"
36' 0"
HC-50
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Geometry
n
= number of piles = 22
Pp
P Mz Xz Mx Xx
= --- --------------- ---------------n
2
2
X z
X x
Pile Reactions
2
d z = 4(4)2 + 4(8)2 + 4(12)2 + 8(16)2 = 2944 ft2
2
d x = 4(4)2 + 18(8)2 = 1216 ft2
Maximum Service Pile Reaction
= 694.13 kips
= -192.37 kft
= 1232.46 kft
= 1095.50 kips
= 247.80 kft
= 1209.42 kft
Column #2:
P
Mz
Mx
42
P = 694.13 + 1095.50 + 0.15 20 36 ------ ( 1.0 ) + 0.2 20 36 ( 1.0 )
12
= 2311.63 kips
= 865.62 kips
= -380.55 kft
= 1724.83 kft
= 1375.53 kips
= +221.50 kft
= 1710.96 kft
Column #2:
Pu
Muz
Mux
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-51
HC
dv
= de
a
2
where:
de
= 38.5
= ------------------- = --------------------------------
dv
= 38.5 -----------2
As fy
0.85f c b
30.81 ( 60 )
0.85 ( 4 ) ( 240 )
2.265
= 2.265 in
= 37.37 in
The distance from column centerline to distance dv from the face of the equivalent square is
= 1.99 + 37.37
------------- = 5.10 ft.
12
HC-52
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
1706.4
12
------------------------------- + 0.5 590 731
37.367
= 0.0008456
29000 x 30.81
Sxe = 37.367
= 53.83
= 1.61
Vc = ( 0.0316 ) f c b v d v
dv
= de
a
2
where:
de
= 37.5
As fy
63.2 ( 60 )
- = -------------------------------- = 2.58 in
= -----------------0.85 ( 4 ) ( 432 )
0.85f c b
dv
2.580
= 37.5 ------------- = 36.21 in
2
The distance from column centerline to a distance dv from the face of the equivalent square is
= 1.99 + 36.21/12 = 5.01 ft
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-53
HC
_____________________________________________________________
EsAs + EpAp
3967.6 12
---------------------------- + 0.5 1327.6 0.7096
36.21
=
= 0.0009743
29000 x 63.2
= 54.64
= 1.518
Vc = (0.0316) f c b v d v
0.9(0.0316)(1.518) 4( 432)(36.21)
= 1350.65 kips
bo
Ao
= 1622.6 kips
Vc = ( 0.0632 ) f c b o d v
= V c + V s 0.192 f c b o d v
Vn
2387.6
= ---------------- = 2653kips 0.192 4 ( 23.77 12 ) ( 36.79 )
0.9
= 4029.7 kips
HC-54
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
6'-9"
6'-9"
6'-9"
6'-9"
4'-0"
2'-6"
A
3'-0"
3'-0" 8"
3'-0"
1'-6" 2'-6"
5'-0"
8'-0"
3'-0"
12'-0"
4'-0"
4'-0"
B
B
Section B-B
Section A-A
12'-0"
8'-0"
12'-0"
32'-0"
Materials
Concrete Strength
Cap
f c = 4.0 ksi
Columns
f c = 4.0 ksi
Footings
Modulus of Elasticity
f c = 4.0 ksi
Ec = 3834.3 ksi
Concrete Density
Cap
Columns
Footings
= 150 pcf
= 150 pcf
= 150 pcf
fy = 60 ksi
fy = 60 ksi
fy = 60 ksi
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-55
HC
Modulus of Elasticity
Es = 29000 ksi
Other Parameters
Crack control factor
z = 170 kips/in
Superstructure Parameters
Number of lanes
Beam height
Beam section area
Barrier height
Slab depth
Total number of spans
Wearing surface load
Barrier load
=2
= 36 in
= 369 in2
= 36 in
= 8.0 in
=2
= 20 psf
= 600 plf each side
Span Information
Bridge overall width
Curb to curb distance
Span Length
Forward = 35 ft
Forward = 32 ft
Forward = 60 ft
Rear = 35 ft
Rear = 32 ft
Rear = 60 ft
Substructure Parameters
Dimensions
Skew Angle
Top elevation
Factor of reduced moment of inertia
Five bearing points, spaced at 6.75 ft, on one line with no eccentricity
Loads
Dead Loads
Self load
Slab Weight
Girder Weight
Barrier Weight
Wearing Surface
= 150 pcf
= 150 pcf
= 150 pcf
= 600 plf each side 2 = 1200 plf
= 200 psf 35 ft = 700 plf
Live Load
= city
= 0o
= 0 ft
= 50 psf
= 0 psf
= 40 psf
= 40 psf
HC-56
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Load Generation
Dead Loads, DC
1.
2.
Load Type
Exterior Bearing
Points (kips)
Tributary width
Interior Bearing
Points (kips)
Tributary width
= 4 + 0.5 6.75
= 6.75 ft
Slab Weight
= 7.375 ft
(8/12)(0.150)(7.375)(60)
(8/12)(0.150)(6.75)(60)
Girder Weight
= 44.250
(369/144)(0.150)(60)
= 40.500
(369/144)(0.150)(60)
Barrier Weight
= 23.063
1.2(7.375/35)(60)
= 23.063
1.2[6.75/35](60)
Total DL
= 15.171
82.484
= 13.886
77.449
NOTE: In RC-PIER, all loads have negative signs, if they are downwards.
Wearing Surface Loads, DW:
Wearing Surface, DW
700 7.375
----------- ------------- 60
1000 35
700 6.75
----------- ---------- 60
1000 35
= 8.850
= 8.100
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-57
HC
32 kips 32 kips
0.64 kLF
46'-0"
14'-0"
8 kips
14'-0"
60'-0"
46'-0"
60'-0"
5'-6"
2'-6" 4'-3"
6'-9"
6'-9"
2'-1 1/2" 4'-7 1/2" 4 1/2" 6'-4 1/2"
3.84(2.5+6.75)
3.84 kLF
3.84(0.75)
10'-0"
To get maximum reaction at exterior girders, position the truck such that the distance between the inner face of
the barrier and the nearest wheel of the truck = 2 ft, as shown in Figure TH-16b. Therefore,
Bearing load from the exterior girder = 62.7(4.25/6.75) = 39.5 kips
Bearing load from the first interior girder = 62.7(2.5/6.75) = 23.2 kips
To get reaction from the lane load, position the 10 ft wide lane such that it starts from the inner face of the
barrier, as shown in Figure TH-16c. Distributing the total reaction of the lane load (38.4 kips) over the 10 ft
wide lane results in 3.84 kip/ft.
Bearing load from the exterior girder
= (3.84)(2.5+6.75)(4.625/6.75)
= 24.3 kips
Bearing load from the first interior girder
= (3.84)(2.5 + 6.75)(2.125/6.75) + (3.84)(0.75)(6.375/6.75)
= 13.9 kips
Bearing load from the second interior girder
= (3.84)(0.75)(0.375/6.75)
= 0.16 kips
HC-58
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Taking into consideration, a multi presence factor of 1.2 for one loaded lane, bearing loads are:
Bearing
1
2
3
4
5
Truck Load
1.2 39.5 = 47.4
1.2 23.2 = 27.84
0
0
0
Lane Load
1.2 24.3 = 29.16
1.2 13.9 = 16.69
1.2 0.16 = 0.19
0
0
Impact factor, IM = 33% (applied to Truck only). Note the impact factor is only applied to the analysis results
(moments and forces) of the load combinations and envelopes.
The transverse pressure is acting on the height of the superstructure at the center of this area.
The superstructure has a total height = 36 barrier + 8 deck slab + 36 beam = 80 in.
50
80
Total transverse load = ------------ ------ 60 = 20 kips
1000 12
Distribute the total load equally at the five bearing points, thus,
20
Transverse load, Fx = ------ = +4.0 kips/bearing
5
Since this load is applied at the center of the height of the superstructure, it creates an overturning moment
where
80
20 ------
12
------------------ = 66.7 kips-ft at the bearing elevation.
2
This moment will be distributed to the two exterior girders. Thus, one exterior girder (at bearing point #5)
applies a downward force, i.e. -Fy, on the pier cap and the exterior girder on the other side (at bearing point #1)
applies upward force, i.e. +Fy. This force, Fy is
66.7
------------------- = +2.47 kips at bearing 1 = 2.47 kips at bearing 5
4 6.75
NOTE: 4 6.75 = 27 ft is the distance between bearing point #1 and bearing point #5.
Loads on the Substructure
Total projected area of the pier cap (normal to the wind direction) is = 8 4 = 32 sq ft
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-59
HC
32 50
Total wind force = ------------------ = 1.6 kips
1000
Distribute this force equally between all of the nodes of the STM, and each node will have an applied X-force
= 1.6 kips / 21 nodes = 0.076 kips
Loads on the Column
Assume that the column is subject to wind load from its bottom upwards.
40
Total wind force = ------------ 4 = 0.16 kip/ft of the column length
1000
3.38'
4.75'
2'
2'
3.38'
4.75'
3.37' 1.75'
#12
1.9'
6.03'
0.6' 17
1.2'
1.2'
1.13'
15 14
16
13
12
11
10
#27
#38
18
6
5
4
19
#1
20
21
3
2
Load Combination
Two limit states should be considered, Strength I and Strength III.
Strength I = 1.0[(1.25 or 0.9) DC + (1.5 or 0.65) DW + (1.75)LL]
Strength III = 1.0[(1.25 or 0.9) DC + (1.5 or 0.65) DW (1.4)WS]
fc
4
min = 0.03 ----- = 0.03 ------ = 0.002
60
fy
Asmin = 0.002 8 4 144 = 9.22 in2 < 15.01
HC-60
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
OK
LEAP RC-PIERv10.00.01.00
HC
Try member #1 where the compression force in this member is 447.9 kips. The angle is the one between
member #1 and member #27.
Therefore,
tan ------------------------ + 90
2.3 1.17
6.75 2.0
= 103.4
1 = s + (s + 0.002) cot2
s
60
29000
Therefore, 1 = 0.00230 and the limiting compressive stress, fcu (per LRFD Eq. 5.6.3.3.3-1) is:
fcu
fc
4.0
= ----------------------------- = -----------------------------------------------0.8 + 170 1
0.8 + 170 0.00230
= 0.84(4.0)
= 3.360 ksi < 0.85(4.0) = 3.4
OK
OK
Try Member #38 where the force in this member is 408.8 kips.
7.2 3.5
13.5 10.13
cot
= s + (s + 0.002) cot2
60 - = 0.00207
= fy/Es = -------------29000
fc
4.0
= ----------------------------- = -----------------------------------------------0.8 + 170 1
0.8 + 170 0.00698
= 0.503 (4.0)
= 2.01 ksi < 0.85(4.0) = 3.4 ksi
NG
Since actual stress in strut exceeds the allowable stress, additional steel (may be in terms of shear stirrups) is
required.
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-61
HC
3'-0"
7'-0"
2'-0"
3'-0"
109.9 kip
-38.2 kip
258 kip
109.9 kip
-38.2 kip
258 kip
109.9 kip
-38.2 kip
4'-0"
2'-0"
3'-0"
10'-0"
3'-0"
258 kip
8'-0"
Z
Figure HC-18Strut and Tie Model of Pile Cap - Plan View (Tutorial 3)
5
4
4
7
y
510
1 x
510
510
HC-62
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
510
510
510
Vertical force = 990.88 kips, and moment about the Z-axis = 2334.6 kip-ft
Maximum reaction on piles on the left-hand side
z2 = 3(72 + 02 + 72) = 294 ft2
P
Reaction on piles applied in a strut and tie model are those without the self-weight of the pile cap and
surcharge.
Mx Z
990.88 ------------------------P
7
--- + ----------- = ------------------ + 2334.6
= 165.68 kips
n
2
9
294
Z
Since there are three rows of pile, 3 165.68 = 497.05 kips will be applied at pile
location.
T = 298.23 kips
298.23
Required area of mild steel = T/(fy) = --------------------------- = 5.52 in2
0.9 60ksi
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-63
HC
fc
4
min
= 0.03 ----- = 0.03 ------ = 0.002
60
fy
Asmin
T = 99.41 kips
99.41 kips
Required area of mild steel = T/(fy) = --------------------------- = 1.84 in2
0.9 60ksi
Check minimum reinforcement
Compression Struts
X-Dir:
= 0.6
= s + (s + 0.002) cot2
60
= fy/Es = --------------- = 0.00207
29000
fc
40
= ----------------------------- = --------------------------------------------0.8 + 170 1
0.8 + 170 0.0035
= 0.71(4.0)
= 2.88 ksi < 0.85(4.0) = 3.4 ksi
OK
Z-Dir:
= s + (s + 0.002) cot2
HC-64
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
60
= fy/Es = -------------- = 0.00207
29000
Therefore,
1
= 0.00223
fcu
fc
40
= ----------------------------- = -----------------------------------------------0.8 + 170 1
0.8 + 170 0.00223
= 0.848(4.0)
= 3.39 < 0.85(4.0) = 3.4 ksi
OK
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-65
HC
C
L Abutment
C
L Abutment
60'
60'
Materials
Concrete Strength
fc
= 4000 psi
Modulus of Elasticity
E
= 3834 ksi
Concrete Density
= 150 pcf
= 60 ksi
Concrete Type
Normal
Seismic Parameters
Acceleration Coeff
Soil Profile
Response Modification Factor
= 0.4
= Type III
=1
= 369 in2
= 50980 in4
Iy
= 5332.5 in4
= 15.83 in
Barrier
HC-66
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Height
Avg. Width
Area
= 3 ft
= 1-4 = 1.33 ft
= 4 ft2
= 1.5 ft
Ix
= ------------------------ = 3 ft4
Iy
1.333 ( 3 )
12
3 ( 1.333 )
12
HC
369
8
= Area = 3 --------- + 27 ------ + 2 4 = 33.7 ft2 (4853 in2)
144
12
Iy
= Moment of inertia
1
12
Ix
= Moment of inertia
1
12
Iz
3
1
= Moment of Inertia = 2 ------ ( 3 ) ( 3 ) = 13.5 ft4 (279936 in4)
12
Ix
3
1
= Moment of Inertia = 2 ------ ( 3 ) ( 3 ) = 13.5 ft4 (279936 in4)
12
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-67
HC
Figure HC-22Structural Idealization and Application of Assumed Uniform Loading for Longitudinal Mode of
Vibration
The bridge is idealized so that the abutments do not contribute to the longitudinal
stiffness. Applying an assumed uniform longitudinal loading of 1 kip/ft yields a
constant displacement along the bridge. Assuming that the columns alone resist the
longitudinal motion, the displacement is obtained by using a column stiffness of 12 EI/
H3 in the longitudinal direction.
Using the column properties included in the section preceding this one, the stiffness for
the pier is calculated as:
k
3 EI 3 ( 3834 ) ( 279936 )
= --------- = ------------------------------------------- 12
3
3
H
( 20 12 )
vs
po 1
1.0 ( 120 )
= --------- = --------------------- = 0.04293 ft
k
2795
= 2795 k/ft
Calculate , ,
LEAP RC-PIERv10.00.01.00
HC
Abut1 w( x )v ( x ) dx = wvs 1
Abut2
1.2498
- = 2 ------------------------------------------ = 0.5453 sec
= 2 -----------p o g
1.0 ( 32.2 ) ( 5.152 )
Cs
1.2AS
T2/3
where:
A
= 0.4
= 1.5
Cs
Therefore, Cs = 0.8
Calculate the Equivalent Static Earthquake Loading, Pe(x)
C s w ( x )v s ( x )
Pe(x)=------------------------------------
= 4.52 kft
4.52 120
Force per bearing = ---------------------------- = 180.8 kips
3 bearings
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-69
HC
Figure HC-23Plan View of Two Span Bridge Subjected to Assumed Transverse Loading
Wt = 5.65 k/ft
=
Abut1
Abut2
Abut2
Abut2
= 0.1055 ft2
= 0.5961 kft
2
w ( x )v 3 ( x ) dx = 0.00066 kft2
0.00066
= 2 ------------- = 2 -------------------------------------------- = 0.088 sec
p o g
1.0 ( 32.2 ) ( 0.1055 )
Cs
1.2AS
T2/3
where:
A
= 0.4
= 1.5
Cs
Therefore, Cs = 0.8
HC-70
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
Pe(x)=
C s w (x )v s (x ) 0.5961(0.8)(5.65)v s (x )
=
0.00066
Displacements due to
Uniform Transverse
Loading Vs(x), (ft)
Seismic Loading
Intensity Pe(x),
(kips/ft)
Seismic Loads at
Quarter Points,
kips
Abutment 1
Span 1 1/4
Span 1 1/2
Span 1 3/4
Pier 1
Span 2 1/4
Span 2 1/2
Span 2 3/4
Abutment 2
0
0.000545
0.000995
0.001285
0.001384
0.001285
0.000995
0.000545
0
0
2.22
4.06
5.24
5.65
5.24
4.06
2.22
0
0
33.36
60.90
78.65
84.71
78.65
60.90
33.36
0
From frame analysis, the transverse force on the pier = 66.2 kips
66.2 kips
Force at each bearing = ---------------------------- = 22.07 kips/bearing
3 bearings
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-71
HC
LF
26
1.88 K
1.88 K
18
1.88 K
1
HC-72
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
HC
CF
1
Z
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
HC-73
HC
2
2
6.68S
6.68 ( 35 )
----------------- = -----------------------R
1500
= 5.455% of LL
4.2185 K
4.2185
Y
Z
18
CF = 0.05455 x 72 * 2 x 1
= 7.855 Kip
Forces / bearing = 7.855/3 = 2.6184
CF is applied 6 above the deck
Arm = 6 + 36/12 + 8/12 = 9.667
CF generates moment about Z = axis, RC-PIER applies this moment as couple force in
& direction.
Mz = 7.855 x 9.667 = 75.934
75.934
Coupling force = ---------------- = 4.2185 K
18
HC-74
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Index
IX
B
Bearing Loads
manually add T2-15
Bridge Pier Diagram T4-2
Design Loads
Interaction diagram HC-17
Slenderness About The X-Axis HC-16
Slenderness About the Z-Axis HC-16
Design of Positive Moment Section At Center of Cap
Check Moment of Resistance (AASHTO 8.16.3.2)
HC-11
Design of Shear Section at Inside Face of Column 1
Shear Design HC-12
Design of the Pile Cap
Analysis HC-62
Design of the STM Members
Bottom Tension Ties HC-63
Compression Struts HC-64
F
Fatigue Check
Allowable Fatigue Stress Range HC-23
Minimum Permanent Load Moment HC-22
Minimum Soil Pressure Due to Live Load HC-22
Minimum Stress Level HC-23
X-Dir HC-22
Flexure Design
Check Minimum Steel HC-43, HC-45
Crack Control HC-46
Determine the Required Area of Steel HC-42, HC-45
X-Dir
HC-42
Z-Dir
HC-44
Z-Dir (At face of column) HC-47
Footing
Isolated Pile/Shaft Cap Design screen T1-29
Footing Design
Pile Reactions HC-24
Pile Reactions, Factored HC-25
Pile Reactions, Service HC-25
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
Index-1
IX
Index
Footing design
Pile cap HC-24
Spread HC-18
Footing Design Pile Cap
Geometry HC-51
One Way Shear Design HC-52
Pile Reactions HC-51
Footing Design - Spread
Determine the Maximum Factored Soil Pressure
HC-42
Determine the Maximum Service Soil Pressure
HC-41
Loads HC-41
Section Properties HC-41
H
Hammerhead Pier, Strut and Tie Model Design
(AASHTO LRFD)
Analysis screen T3-13
Bearings/Girders screen T3-5
Footing screen T3-16
Geometry screen T3-3
Hammer Head Cap Parameters screen T3-4
Loads screen T3-9
Materials screen T3-6
Model screen T3-9
Project screen T3-3
Strut and Tie Model Edit screen T3-6, T3-17
Superstructure Parameters screen T3-4
Hand calculations for selected items HC-1
Hand Calculations for Selected ItemsProblem data
HC-3
M
Materials
Concrete Strength HC-28
Maximum tensile stress HC-33
Minimum stress HC-33
Multiple Column Pier (AASHTO LRFD)
Analysis/Design Parameters (LRFD) screen T2-16
Bearings/Girders screen T2-11
Cap screen T2-17
Column screen T2-19
Footing screen T2-20
Geometry screen T2-9
Image screen T2-13
Loads screen T2-14
Materials screen T2-13
Model screen T2-14
Pier Configuration screen T2-9
Project screen T2-8
Tapered Cap Parameters screen T2-10
O
One Way Shear Design
X-Dir HC-23
P
L
Load Combination (Global Axis System)
Analysis results HC-10
Load combinations HC-10, HC-30
Load Factor Group I HC-5
service group I HC-5
Problem Data
Hammerhead Pier, Strut and Tie Model Design
(AASHTO LRFD) T3-2
Multiple Column Pier (AASHTO LRFD) T2-6
Two-Column Integral Pier (AASHTO LRFD) T4-3
Two-Column Pier, Auto Load Generation (AASHYO
LFD) T1-5
Two-Column Pier, Design for Plastic Hinging T1A-1
Index-2
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00
Index
S
Section & Design Parameters HC-10
Seismic Auto Load Generation (AASHTO LFD)
Longitudinal Earthquake Loading HC-68
Seismic Load Generation HC-67
Seismic load generation HC-67
Single mode spectral method HC-66
Starting the Tutorial
Hammerhead Pier, Strut and Tie Model Design
(AASHTO LRFD) T3-3
Two-Column Integral Pier (AASHTO LRFD) T4-5
Two-Column Pier, Design for Plastic Handling
(AASHTO LFD) T1A-2
T
Transverse earthquake loading HC-69
Tutorial 3
Hammerhead Pier, Strut-and-Tie Model Design
(AASHTO LRFD) HC-55
Tutorial Sessions
Hammerhead Pier, Strut and Tie Model Design
(AASHTO LRFD) T3-1
Tutorial sessions
Hammerhead Pier, Strut and Tie Model Design T3-1
Multiple Column Pier T2-1
Two-Column Integral Pier (AASHTO LRFD) T4-1
Two-Column Pier, Auto Load Generation T1-1, T1A-1,
T4-1
Two-Column Pier, Design for Plastic Hinging
(AASHTO LFD) T1A-1
Two Way Shear Design HC-23
IX
LEAP RC-PIERv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
Index-3
IX
Index
W
Wind Load
Impact Factor HC-10
Loads from Superstructure HC-8
Loads on Pier Cap HC-8
Loads on Substructure HC-8
Loads on the Column HC-8
Longitudinal Wind Loads HC-7
Transverse Wind Loads HC-7
Wind Load on Moving Live Load HC-9
Index-4
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.
LEAP RC-PIERv10.00.01.00