By Knut F. Garshol
6. CONCLUSION
Massive
Rock
Jointed Rock
Effects of GW Ingress
Surface Settlement
Underground Safety
and Working Conditions
Environmental Impact
1 ton
Back to normal
14 km Gardermoen Tunnel,
Oslo, Norway
HATS Stage 1
9
10
HATS Stage 2A
Probe hole hitting 15 bar water channel
11
Benefits of GW-Control:
12
Purposes of Grouting
Ground water control
Ground stability improvement
Sometimes: A combination of the above
Requirements for success:
14
15
Selection of Grout-Mix
16
17
18
19
20
Mud Balance
21
Water-Cement Ratio
22
Pressure Stability
23
24
Pre-Excavation Grouting
Execution Steps
Probe Ahead
Pre-Excavation
Grouting
Scaling, Mucking
and Geological Mapping
Blasting
26
Execution Steps
VERY important
27
Tunnel CrossSection
Advance
approx. 4 m
29
29
Rod Magazine
30
Packer
High-Pressure
Grout Pump
Colloidal
Mixer
31
Agitator
Contract 24
AMV / Hny
Contract 23
Unigrout Atlas Copco
32
Grouting Materials
Microfine Cement
Colloidal Silica
Microfine Cement
Pressure: 60-80 bar
Volume 2000 L
Colloidal Silica
Pressure: 40 bar
Volume 750 L
0.1
mm
MC
0.03 mm
CS
0.016 m
Colloidal Silica
Microfine Cement
33
Colloidal Silica
OPC
0.1mm
Hydraulic
working
basket
Packers
secured by
chain
Disposable Packer
designed for 100 bar
35
36
37
38
Stonecutters
Island
North Point
Aberdeen
LEGEND
Outfall Tunnels (Completed)
HATS Stage 1 Sewage Tunnels (Completed)
HATS Stage 2A Sewage Tunnels
40
HATS 2A Overview
North Point
Contract 24
Sai Ying Pun
Contract 23
Victoria
Habour
Stonecutters
Island
41
Vertical shafts:
13
Total Tunnel Length: 20 km
North Point
Sai Ying Pun
Aberdeen
LEGEND
Coastline of Year 2005
HATS 2A Tunnels
42
Aberdeen
Cyberport
Central
Wah Fu
Sandy Bay
Appx. 70 msl
To Stonecutters Island
Victoria Habour
LEGEND
Sea
Soil
Rock
43
Granitic Rock
66% of tunnel length
Medium Grained Granite
50-percentile UCS = 180 MPa
Granite 66%
Granite/Tuff
Contact Zone
Granite
Tuff
Tuff 34%
G
T
45
In tuff
50.0
45.0
40.0
35.0
30.0
25.0
20.0
15.0
10.0
5.0
0.0
5
15
30
L/min/100 m tunnel
46
50
Grouting Results
Granite
Tuff
Avg L/min/100 m
Avg L/min/100 m
30.2
16.9
6.5
7.5
4.5
6.0
45.3
21.6
48
49
50
51
20 MPa UCS
52
13 September 2013
53
Summing Up HATS2A
Summing Up HATS2A
Micro Fine Cement ONLY, supplemented by Colloidal Silica
Verification of result by Control Holes before further excavation
Tight face bulkhead is a Must especially in soft ground
27% of tunnel length required < 5 L/min/100 m tunnel
92% of excavated tunnels well below ingress limits
The Tuff required 78% more drilling ahead
AND 3.7 X more Colloidal Silica than in Granite
55
D&B excavation
Modern PEG technology
+ Re-measurable quantities for payment
CONCLUSION
CONCLUSION
57