Green School Project: Diablo Valley School's New Site
Green School Project: Diablo Valley School's New Site
Green School Project: Diablo Valley School's New Site
We are at an exciting point of growth in the life of Diablo Valley School. Our students are doing
more resourceful, interesting things than ever before. Plans are under way to purchase a larger,
permanent site with convenient access to BART, buses, and the community college.
You can be part of our vibrant future, ensuring that more children will be able to grow up with the
benefit of a Sudbury education by helping us build our new physical plant.
The Green School Project addresses both the problems of applying an outdated educational model to
today's children the fundamental educational problem that no mere 'reforms' can change and the
problems of a wasteful consumer culture. We are part of the wonderful, beautiful physical world. It
matters where we live, what we build, and how lightly we walk our path.
Diablo Valley School is working to build a new campus, which, in keeping with our role as the school
for the 21st century, will be as green as we can make it. Our goals include:
P H A S E I I : This is the key Green Phase. All new PHASE II Cost Estimates
construction and remodeling will incorporate as much Main Building $250,000
state-of-the-art green design as possible. Out Buildings $150,000
Construct a Main Building to house all basic Admin Building Conversion $15,000
school activities. Native Landscaping $10,000
Construct facilities for use as shops, rehearsal Architect, Permits, Misc. $65,000
space, labs, etc.
Convert space for the Administration Building. Total Phase II Estimated Costs: $500,000
Complete landscaping using native, low water
plants as much as possible.
I would like to donate construction trades expertise, labor, or materials. Contact me:
Name
__________________________________________________________________________________________
E-mail, phone, and/or mailing address