Autoclave Maintenance Schedule

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3
At a glance
Powered by AI
The document outlines the inspection and preventive maintenance procedures for an autoclave. It details the various components that should be inspected and the recommended time intervals for inspection.

The main components that are inspected include the door system, door mechanism, pressure vessel, fan and drive system, gas fired vessels, vacuum system, pneumatic systems, autoclave interior, cooling system, motor control centre and part monitoring sensors.

The door system is inspected weekly to monthly, the pressure vessel is inspected every 6 months, annually and every 5 years. The fan and drive system is inspected annually. Gas fired vessels, vacuum system and pneumatic systems are inspected annually. The autoclave interior is inspected weekly to annually. The cooling system is inspected every 6 months to annually.

Inspection/Preventive Maintenance / Calibration

Report of Autoclave

Department: _____________________________ Equipment Name:


__________________________

Supplier: ________________________________ Make________________ Model


No_____________

Serial No/ ID No.__________________________ Date of


installation__________________________

Marked
to:_____________________________Signature:____________________________________

Details Time Yes/No Remarks


interva
l
Door System
Clean lower 1/3 of locking ring 1 week
Inspect door seal for fit in groove of the door 1 week
Inspect door seal for nicks, gouges or 1 week
embedded debris
Inspect sliding surfaces & wedges for 1 week
excessive wear & alignment
Inspect for operation, clean and lube lock ring 1
& shell flange (SS30) month
Check hydraulic pump reservoir fluid level 2
month
Lubricate door wedges surfaces with SS303 6
month Inspect heat seal & repair if required month
Clean and apply protectant to door seal 6
month
Strip wedges & flanges of lubricant and re- 1 year
lube with SS30
Inspect hydraulic lines, fittings and cylinder 1 year
packing for leaks
Check wear plates for gouging: indicates door 1 year
out of alignment
Door Mechanism Operation
Inspect cam roll assembly 1 year
Inspect door interlock cylinder & micro-switch 1
for proper operation month
Attain a magnetic partial exam of lugs, 1 year
wedges & closure
Pressure Vessel Safety
Check and verify all pressure safety interlocks 6
month
Back flush pressure sense line 6
month
Activate Man-In-Vessel Alarm & confirm 6
operation month
Calibrate or replace relief valves 1 year
Replace rupture disks 1 year
Check and calibrate pressure in autoclave 1 year
switch & interlocks
Vessel Inspection
Inspect vessel and nozzles for cracking, 6
surface pitting month
Inspect vessel for high surface operating 6
temperature month
Attain a magnetic partial examination of 3 year
vessel and nozzles
Inspect vessel for minimum thickness 5 year
Fan and Drive System
Remove housing, check all bolts, piping & 1 year
electrical connections
Inspect and grease fan shaft, seal & drive 1 year
bearing
Inspect and drain bell housing 1 week
Inspect connection of fan wheel & motor 1 year
shaft, tighten as required
Inspect sheave guards, belt guards and motor 1 year
seal linkage
Electrically Heated Vessels
Check functionality and operation of 1 year
contactors and SCR
Check functionality and operation over- 1 year
temperature controller
Inspect all wires in MCC and clave leading to 1 year
and from the heater
Check all contactors, starters, & circuit 1 year
breakers proper operation
Check all connections for tightness, including 1 year
power source line
Gas Fired Vessels
Check combustion chamber over-temperature 1 year
controller
Replace spark plug and adjust pilot 1 year
Adjust low & high fire 1 year
Check the high & low gas pressure switches 1 year
Check gas supply, double block, proof of 1 year
closure switches, and bleed valves
Check the low combustion air pressure switch 1 year
Check the UV flame scanner, simulate alarms 1 year
and flame indicators
Inspect operating condition and cleanliness of 1 year
blowers
Inspect condition and cleanliness of gas train 1 year
and internals
Inspect combustion heating coil for leakage 1 year
Oxygen Analyzer
Calibrate analyzer & check operation
Vacuum System
Inspect pump packing 6
month
Vent receiver tank and drain condensation 1
month
Pneumatic Systems
Clean debris from inside of vessel 1 week
Check the sheet metal screws for tightness 3
and clean sheet metal month
Check bolts for tightness 1 year
Autoclave Interior
Clean debris from inside of vessel 1 week
Check the sheet metal screws for tightness 3
and clean sheet metal month
Check bolts for tightness 1 year
Cooling System
Inspect and replace worn fan belts 6
month
Inspect cooling valve for leakage Drain tank 6
and refill 1 year month
Motor Control Centre
Check contactors, starters, & circuit breakers 1 year
Verify that all contactors are tight, including 1 year
the incoming power
Part Monitoring
Sensors Calibrate all vacuum transducers 1 year
Check vacuum system fittings for tightness 6
and leaks month
Check system PID tuning and adjust if 6
required month

Biomedical Technician:
_______________________________________________________________
User Name: ________________User Remarks: ________________________ Signature:
__________