Stockpile Calculation

This document calculates the volume of a stockpile that is 435m long, 50m wide, and 8m high with a 35 degree repose angle and 0.8 tonnes/m^3 density. It finds the length and width at the base to be 27.15m and 412.15m. It then calculates the volumes of the triangular, trapezoidal, and conical sections, finding the total volume to be 1,307,636.85m^3 and total weight as 1,046,111.08 tonnes.

Uploaded by

brock
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Stockpile Calculation

This document calculates the volume of a stockpile that is 435m long, 50m wide, and 8m high with a 35 degree repose angle and 0.8 tonnes/m^3 density. It finds the length and width at the base to be 27.15m and 412.15m. It then calculates the volumes of the triangular, trapezoidal, and conical sections, finding the total volume to be 1,307,636.85m^3 and total weight as 1,046,111.08 tonnes.

Uploaded by

brock
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

STOCK PILE CALCULATION

Total Length of Stockpile L= 435 m


Total width of pile B= 50 m
Height of Stockpile h= 8 m
Repose angle of coal u = 35 deg.
Density of material u = 0.8 T/m3

Calculation:

Length a= height / tan u

a= 11.43 m

Length b= Base Width - 2*a


b= 27.15 m

Length c= Length - 2*a

c= 412.15 m

1) Calculation for Vol. of Portion A

Where A= A1 + A2 + A3 + A4

Since total vol. is cone

Vol. V1 = u *a2*h / 3

V1 = 1093.57 m3
2) Calculation for Vol. of Portion B

Where B= B1 + B2

Vol. V2 = (1/2 * base * ht)*length

V2 = (1/2*a*h)*b

V2 = 1240.76

Since it is a 2 nos. of Triangular

V2 = 2481.52 m3

3) Calculation for Vol. of Portion C

Since it is a Trapazodial section

Vol. V3 = [(B + b)/2]*h*c

V3 = 127188.77 m3

So, Total Volume of Stockpile

V= V1 + V2 + V3

V= 130763.85 m3

Total Capacity (for one stockpile only)

W= Volume x density

W= 104611.08 T

BMCR = 653.3 TPH


No of Units 2
coal stock for 15 days 376300.8 Tonnes witth 80 % PLF
No of stockpile 3.597
Length of stockpile (L) meter 80
Width of stockpile (B) meter 32
Angle of repose () degree 35 35-37 degree for coal / limestone
Density of material () kg/m3 800

Storage quantity Ton 5802


Height of stockpile (H) meter 7 Should not be in excess of 10 m, adjust width
Width of stockpile (W1) meter 435
Length of stockpile (L1) meter 50
Angle of repose () degree 35 35-37 degree for coal / limestone
Density of material () kg/m3 800
Height of stockpile (H) meter 8 should not be more than 8m when dozers are u

Top width of stockpile (W2) meter 401.2315


Top length of stockpile (L2) meter 16.23153

, adjust width
han 8m when dozers are used