Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Design Checklist-6 Wmata Coordination

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Typical WMATA Design & Coordination Checklist (for Applicants Use)

PROJECT Control No. ______________________

Phase 1 - Application:

Project Number established for proposed project by WMATA (All documents shall
reference project number.)
Reviewed WMATAs Adjacent Construction Project Manual (ACPM)
Reviewed WMATAs Safety Manual
Submitted Document Request Form & Consumer Authorization for Release of
Personal Information Form
Received and reviewed any WMATA applicable reference material (as-builts, right-
of-way plans, etc)
Agreement executed
Payment of review and support fee

Phase 2 - Design / Drawings / Calculation Review:

Project Impact Statement completed


Bus Impacts
Sections showing foundations and WMATA structures
Site Plan (detailing impact to WMATA, easements provided)
Pertinent drawing/zone of influence diagram provided detailing level of impact on
WMATA facilities
Sheeting and shoring drawings
Drainage area map(s) with calculations
Architectural drawings
Civil drawings
Electrical drawings / photometric studies (as applicable)
Structural drawings / calculations
Column load tables
Geotechnical report
Finite element analysis
All drawings / calculations signed and sealed
Submit Real Estate Permit Application

Phase 3 - Pre-Construction Design Verification:

Structural monitoring and contingency plans


Construction schedule / sequence plan identifying specific WMATA impact
Construction layout of equipment relative to WMATAs right-of-way/roadway
Equipment certifications for equipment working in WMATAs Zone of Influence
Temporary safety plans and measures
Structural monitoring and contingency plans
Permanent easement / utility easement w/ plat and metes and bounds of
prospective property

Phase 4 - Pre-Construction Field Coordination & Verification:

Certification for Issuance of METRO SmarTrip Contractor Badge


Safety training course required
Site Specific Work Plan completed and submitted
Submit JDAC Support Request Form
JDAC Daily Support Tracking Form
Right-of-entry and/or utility permit applied for / executed
Indemnification /certification of insurance requirements
Other local jurisdictional approvals/permits and forwarded
Operational support arrangement(s)
Locate any WMATA monumentation. Coordinate relocation/replacement with
WMATA Survey Office.
Utility location / identification and protection
Pre-construction meeting with WMATAs Construction Inspection Facilitator
WMATA field contact(s) information and communication chain established
Pre-construction survey requirement met
Boundary survey tie-in to WMATA coordinate system

Phase 5 - Post Construction Coordination:

Post-construction survey requirement


Punch List / Out-processing

Phase 6 - Project Close Out:

As-Built requirement(s)
Other requirement(s) provided _____________________________

NOTE: This list is provided as a suggested reference for requirements which may be
imposed on a Owner/Developer/Contractor in coordinating and developing their
construction plans which may or may not impact WMATA facilities. Under no circumstance
is there a guarantee that construction plans will expedited for review and approval.
Planning, scheduling and coordination of the adjacent developer/contractors project is at
his/her sole expense and responsibility.

You might also like