Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Producing CO2, Other Gas, and Chemical EOR in US

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Producing CO2, other gas, and chemical EOR in US

As published in Oil & Gas Journal, April 7, 2014

No. No.
Type and Start Area, wells wells
operator Field State County date acres prod. inj. Pay zoneFormatio
_____________________________________________ ________________________________________
CO2 miscible
AnadarkoSalt Creek Ph 7Wyo. Natrona 1/10 600 40 27 Wall Creek
SS
AnadarkoSussex Wyo. Johnson 12/04 25 4 1 Tensleep S

Apache Adair Tex. Gaines 1997 5,338 90 61 San Andr Dolo.


Apache Adair Tex. Gaines 2004 2,550 11 11 WolfcampDolo.
Apache Roberts Tex. 2012 13,600 222 186 San Andr Dolo.
Apache Slaughter Tex. Hockley & 5/85 569 43 21 San Andr Dolo.
Apache Slaughter Tex. Hockley & 6/89 8,559 259 164 San Andr Dolo.

Breitburn Postle - PUMU Okla. 11/1/95 4,032 43 36 Morrow SS


Breitburn Postle - HMAU Okla. 11/1/95 3,396 38 29 Morrow SS
Breitburn Poslte - WHMU Okla. 1/1/98 7,724 96 74 Morrow SS
Table C

Porosity,
Permeability,Depth, Gravity, Oil, Oil, Prev. Satur. Satur. Proj.
% md ft API cp F prod. % start % end matur.
________________________ ________________________ _______________________________

17 30 1,600 35 0.6 99 Prim, WF 32 24 C


10 16 9,000 30 2.0 200 WF C

14.1 4 4,789 34 104 WF HF


12.4 28 8,500 42 126 WF JS
8.5
12.5 6 4,900 32 1 110 WF HF
10 3 5,000 32 2 107 WF 45 8 JS

16 10-40 6,200 40 1.3 145 WF 75 25


16 10-40 6,200 40 1.3 145 WF 75 25
16 10-40 6,200 40 1.3 145 WF 75 25
Tot. Enh.
prod., prod., Proj. Project
b/d b/d eval. Profit scope
____________________________________________

1,200 1,200 Succ. Yes RW, Exp L


Prom. P

2,350 Succ. 0
420 Prom. Exp. L
2,300
600 580 Succ. Yes TETT
5,800 4,000 Succ. Yes LW

912 912 Succ.


619 619 Succ.
2,429 2,429 Succ.

You might also like