The passage discusses estimates provided by different users for the typical daily output of a carpenter for shuttering work, with estimates ranging from around 2-4 square meters to as high as 10 square meters depending on factors like type of structure, availability of labor, etc.

Most answers suggest that the typical output of a carpenter for shuttering work ranges from around 2.5 to 4 square meters per day, depending on factors like type of structure, height, shape, availability of skilled labor, etc.

The output of a carpenter for shuttering work depends on several factors like the type of structure, height of structure, slab to slab height, shape of structure, type of shuttering used, and availability of skilled labor.

10/17/2017 how much quantity a carpenter do shuttering per day

Sign Up (/mypanel.php?register) Login (/mypanel.php)

Categories (/interview-questions/all.html) >> Engineering (/interview-questions/79/engineering.html) >> Civil Engineering / Suggest New Category

how much quantity a carpenter do shuttering per day

Question Posted / Touseef_hussain

16 Answers

50295 Views

Nexus Technologies (/company/1575/nexus-technologies.html), Tata Projects (/company/8533/tata-projects.html), I also Faced

E-Mail Answers

Answers Were Sorted Based On User's Feedback

Answer (/Viewpost/267080/A-Carpenter-Can-Do-3-To-4-Sq-M-Shuttering-Per-Day.Html) / Sachin

a carpenter can do 3 to 4 sq m shuttering per day

Is This Answer Correct ? 127 Yes 25 No submit

Answer (/Viewpost/434984/Actually-Shuttering-Output-Depend-Upon-Type-Structure-Height-Slab-Shape-Most-Imp.Html) / Nitin Adate

Actually Shuttering output is depend upon type of


structure,height of structure, slab to slab height,shape of
structure, type of shuttering & most important availability
of skilled labour.But for planning purpose 2.5 to 3.00
sqmt /per day ( 1Skilled Carpenter + 2 helper ) is
reasonable value.

Is This Answer Correct ? 50 Yes 11 No submit

Answer (/Viewpost/375217/The-Out-Turn-Of-A-Shuttering-Carpenter-Per-Day-Is-Between-2-5-Sq-M-To-3-Sq-M.Html) / Aijaz Hussain, Modi Builders

The Out-turn of a Shuttering carpenter per day is between


2.5 sq.m. to 3 sq.m.

Is This Answer Correct ? 32 Yes 11 No submit

https://www.allinterview.com/showanswers/115709/how-much-quantity-a-carpenter-do-shuttering-per-day.html 1/4
10/17/2017 how much quantity a carpenter do shuttering per day

Answer (/Viewpost/447427/4-Sq-M-In-One-Day.Html) / Ghulam Raza

4 sq.m in one day

Is This Answer Correct ? 20 Yes 7 No submit

Answer (/Viewpost/414647/1carpenter-2-Helper-Shall-Give-Output-Of-11-Square-Meters-In-08-Hours-Of-Work.Html) / Uday Gandhi

1CARPENTER + 2 HELPER SHALL GIVE OUTPUT OF 11 SQUARE METERS IN 08 HOURS OF WORK.

Is This Answer Correct ? 34 Yes 23 No submit

Answer (/Viewpost/438208/4-5-Sqm-Which-Is-Vey-Good-Output.Html) / Arvind Rai (/Users/103866)

4-5 sqm .. which is vey good output.

Is This Answer Correct ? 13 Yes 7 No submit

Answer (/Viewpost/283301/10-Sq-M-Per-Day-Inclusive-Slab-Beam.Html) / Vickey

10 sq.m. per day inclusive slab & beam

Is This Answer Correct ? 29 Yes 26 No submit

Answer (/Viewpost/468794/4-45-Sqm-Per-Day.Html) / Shaikh Shahrukh

4.45 sqm per day.

Is This Answer Correct ? 5 Yes 2 No submit

Answer (/Viewpost/479029/4-Sq-M-With-1-Mason-1-Labour-Per-Day.Html) / Vishal Thakur

4 sq.m with 1 mason , 1 labour per day

Is This Answer Correct ? 3 Yes 0 No submit

Answer (/Viewpost/479410/4-5-Sq-M-Work-Per-Day.Html) / Visha Patil

4.5 sq/m work per day

Is This Answer Correct ? 3 Yes 2 No submit

https://www.allinterview.com/showanswers/115709/how-much-quantity-a-carpenter-do-shuttering-per-day.html 2/4
10/17/2017 how much quantity a carpenter do shuttering per day

1 (/showanswers/115709/how-much-quantity-a-carpenter-do-shuttering-per-day.html)

2 (/showanswers/115709-2/how-much-quantity-a-carpenter-do-shuttering-per-day.html)

Post New Answer

Ads by Google

Online Job Application Brick Making Machine

Building and Construction 304 Stainless Steel

More Civil Engineering Interview Questions

how much binding wire is required for one tone steel

20 Answers (/showanswers/135868/how-much-binding-wire-is-required-for-one-tone-steel.html) Gammon (/company/834/gammon.html), Jindal


(/company/1210/jindal.html), Hinduja (/company/950/hinduja.html),

how much steel provide in 1m cube r.c.c

3 Answers (/showanswers/191425/how-much-steel-provide-in-1m-cube-r-c-c.html)

how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......

0 Answers (/showanswers/194479/calculate-load-bungalow-1column-carry-much-if-size-column-9-15-total-structure.html) Vishwakarma


(/company/9731/vishwakarma.html),

if column length is 12'(feet) then how to take ring bar on it?

2 Answers (/showanswers/193076/if-column-length-is-12-feet-then-how-to-take-ring-bar-on-it.html) AGI Infra (/company/9217/agi-infra.html), SIPL


(/company/9270/sipl.html),

How to calculate the quantity of cement in Cement Mortar M10 Concrete using 40mm metal

1 Answers (/showanswers/179069/to-calculate-quantity-of-cement-in-cement-mortar-m10-concrete-using-40mm-metal.html) bscpl (/company/327/bscpl.html),

usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will
give if you use machine crushed stone in place?

0 Answers (/showanswers/157980/usually-hand-broken-stones-used-cement-concrete-1-4-8-foundation-single-two-stor.html)

How we can calculate the quantity of sand, & cement, & also aggregate for a slab. Length 25'/3.28 = 7.62 Mtr width 20'/3.28 = 6.09 Mtr depth 6" /3.28 = 0.152 Mtr

2 Answers (/showanswers/181540/calculate-quantity-sand-cement-aggregate-slab-length-25-3-28-7-62-mtr-width-20-6.html)

WHAT IS THE DIFFERENCE BETWEEN FACTOR OF SAFETY AND PARTIAL SAFETY FACTOR?

1 Answers (/showanswers/178370/what-is-the-difference-between-factor-of-safety-and-partial-safety-factor.html)

for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

0 Answers (/showanswers/191669/for-200-kg-of-cement-how-is-the-mix-proportion-in-kg-for-m25-grade-of-concrete.html) Indlands


(/company/4326/indlands.html),

What is construction mitigation management?

0 Answers (/showanswers/110293/what-is-construction-mitigation-management.html)

HOW MUCH SNOWCEM REQUIRED PER SQ. METER AREA

2 Answers (/showanswers/177144/how-much-snowcem-required-per-sq-meter-area.html) Bhushan Power Steel (/company/268/bhushan-power-steel.html),

what is shear force

https://www.allinterview.com/showanswers/115709/how-much-quantity-a-carpenter-do-shuttering-per-day.html 3/4
10/17/2017 how much quantity a carpenter do shuttering per day

2 Answers (/showanswers/186657/what-is-shear-force.html) NLC Neyveli Lignite Corporation Limited (/company/3725/nlc-neyveli-lignite-corporation-


limited.html),

For more Civil Engineering Interview Questions Click Here (/interview-questions/80/civil-engineering.html)

Ads by Google

Online Job Application Brick Making Machine

Building and Construction 304 Stainless Steel

Categories

Civil Engineering (4570) (/interview-questions/80/civil-engineering.html)


Mechanical Engineering (3670) (/interview-questions/81/mechanical-engineering.html)
Electrical Engineering (15608) (/interview-questions/82/electrical-engineering.html)
Electronics Communications (2623) (/interview-questions/83/electronics-communications.html)
Chemical Engineering (718) (/interview-questions/84/chemical-engineering.html)
Aeronautical Engineering (78) (/interview-questions/85/aeronautical-engineering.html)
Bio Engineering (30) (/interview-questions/86/bio-engineering.html)
Metallurgy (95) (/interview-questions/87/metallurgy.html)
Industrial Engineering (197) (/interview-questions/88/industrial-engineering.html)
Instrumentation (2847) (/interview-questions/366/instrumentation.html)
Automobile Engineering (135) (/interview-questions/580/automobile-engineering.html)
Mechatronics Engineering (41) (/interview-questions/587/mechatronics-engineering.html)
Marine Engineering (60) (/interview-questions/595/marine-engineering.html)
Power Plant Engineering (162) (/interview-questions/599/power-plant-engineering.html)
Engineering AllOther (1323) (/interview-questions/117/engineering-allother.html)

https://www.allinterview.com/showanswers/115709/how-much-quantity-a-carpenter-do-shuttering-per-day.html 4/4

You might also like