Operation and Troubleshooting - 5 Days: Gas-Insulated Switchgear, Type ELK-04
Operation and Troubleshooting - 5 Days: Gas-Insulated Switchgear, Type ELK-04
Operation and Troubleshooting - 5 Days: Gas-Insulated Switchgear, Type ELK-04
AB B T RAI N IN G C EN T ER HI G H VO LT AG E P RO D U C TS
ABB AG
Service High Voltage Products
Brown-Boveri-Straße 30
63457 Hanau-Großauheim, Germany
— —
ABB AG We reserve the right to make technical We reserve all rights in this document and in
High Voltage Products changes or modify the contents of this the subject matter and illustrations
Brown-Boveri-Straße 30 document without prior notice. With contained therein. Any reproduction,
63457 Hanau-Grossauheim , regard to purchase orders, the agreed disclosure to third parties or utilization of its
Germany particulars shall prevail. ABB AG does not contents – in whole or in parts – is forbidden
accept any responsibility whatsoever for without prior written consent of ABB AG.
potential errors or possible lack of
abb.com/highvoltage information in this document. Copyright©2017 ABB
All rights reserved