BUILDING SCHEDULED RATES FOR THE YEAR 2005

AT TRINCOMALEE

EXCAVATION

1 Removing top soil to a depth not


exceeding 6" depositing as directed
within site.

Data: Per Sqr

Materials Cost Unit Qty. Rate

Labour Cost
Consider an area of 10.00 Sqrs. i.e 5.00
Cubes of excavation
Unskilled Labour Day 10.00 650.00

Add Over head & Profit 20%


Rate per 10.00 Sqrs
Rate per Sqrs

Per Sqr
Per M2

2 Excavation over site to reduced level, in


any material except rock requiring
blasting including depositing and
levelling as directed upto a distance not
exceeding 30' 0"

Data: Per Cube

Materials Cost Unit Qty. Rate

Labour Cost
Unskilled Labour (1 5/8) Day 1.625 950.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

1
3 Excavation in trenches for walls column
pits in soft /loose soil from 0' 0" to 5' 0"
deep and depositing excavated material
to a distance not exceeding 30' 0" (Earth
work support to be paid seperately where
necessary)

Data: Per Cube

Materials Cost Unit Qty. Rate

Labour Cost
Unskilled Labour Day 1.00 950.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

4 Excavation in trenches for walls column


pits in ordinary soil from 0' 0" to 5' 0"
deep and depositing excavated material
to a distance not exceeding 30' 0"

Data: Per Cube

Materials Cost Unit Qty. Rate

Labour Cost
Unskilled Labour Day 2.25 950.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

5 Excavation in trenches for walls column


pits in Hard/Dense soil upto a depth of 5'
0" and depositing excavated material to a
distance not exceeding 30' 0"

Data: Per Cube

2
Materials Cost Unit Qty. Rate

Labour Cost
Unskilled Labour Day 3.50 650.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

6 Excavation in trenches for walls column


pits in Mud/Wet soil upto a depth of 5' 0"
and depositing excavated material to a
distance not exceeding 30' 0" (Earth work
and dewatering paid for seperately)

Data: Per Cube

Materials Cost Unit Qty. Rate

Labour Cost
Unskilled Labour Day 3.00 650.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

7 Excavation in trenches for walls column


pits in soft disintergrated rock (Not
requiring blasting) upto a depth of 5' 0"
and depositing excavated material to a
distance not exceeding 30' 0"

Data: Per Cube

Materials Cost Unit Qty. Rate

Labour Cost
Unskilled Labour Day 2.50 650.00

3
Add Over head & Profit 20%
Rate per Cube

Per Cube
Per M3

8 Excavation in trenches for walls column


pits in Hard rock requiring blasting upto a
depth of 5' 0" and depositing excavated
material to a distance not exceeding 30'
0"

Data: Per Cube

Materials Cost Unit Qty. Rate


Blasting powder Lbs. 0.75
Fuse L.ft 10.00
Jumper Steel Lbs. 1.00
Fuel & Forge - 20% of Material Cost

Labour Cost
Skilled Labour Day 1.00 1,200.00
Unskilled Labour Day 2.00 650.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

9 Benching rock in foundation in 3' 6"


steps.(Blasting prohibited)

Data: Per 10.0 Sq.ft

Materials Cost Unit Qty. Rate

Labour Cost
Drilling, Chipping & wedging:-
Skilled Labour Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00
Steel, Fuel & Forge - 25% of Labour Cost

Add Over head & Profit 20%


Rate per 10.0 Sq.ft

4
Rate per Sq.ft

Per Sq.ft

ANTI - TERMITE TREATMENT

10 Anti - Termite treatment on excavated


foundation and compacted soil under
floor.

Data: Per Sqr

Materials Cost Unit Qty. Rate


D.D.T Powder Lbs. 16.00 50.00
Water Gal 20.00 10.00

Labour Cost
Unskilled Labour Day 0.50 650.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

EARTH WORK

11 Earth work - Back filling and compacting

Back filling to trenches with selected earth


available at site.

Data: Per Cube

Materials Cost Unit Qty. Rate

Labour Cost
Unskilled Labour Day 1.00 950.00

Add Over head & Profit 20%


Rate per Cube

5
Per Cube
Per M3

12 Back filling to trenches with selected


imported material.

Data: Per Cube

Materials Cost Unit Qty. Rate


Earth delivered at site Cube 1.00 1,750.00
Allow 15% compaction

Labour Cost
Unskilled Labour (Filling & Compacting) Day 1.25 950.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

13 Filling under floors including levelling,


watering and compacting in 3" layers with
available and selected earth at site.

Data: Per Cube

Materials Cost Unit Qty. Rate

Labour Cost
Unskilled Labour Day 2.00 650.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

14 Filling under floors including levelling,


watering and compacting in 3" layers with
selected imported earth.

Data: Per Cube

6
Materials Cost Unit Qty. Rate
Earth delivered at site Cube 1.00 2,750.00
Allow 15% compaction

Labour Cost
Unskilled Labour Day 2.00 650.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

15 Cutting turf sods, loading to hand carts


and transporting upto 30 yards, laying
and watering for 30 days. (Royalty for
turf, pegging and transport beyond 30
years paid seperately)

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cutting turf sods, loading and transporting
to site and unloading.

Labour Cost
Unskilled Labour (Laying turf rids at site) Day 2.50 650.00
Unskilled Labour (Watering for 30 days) Day 0.50 650.00
Unskilled Labour Day 1.50 650.00
Water Gal 60.00 10.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

16 Earth work support (Open planking) in


trenches upto a depth of 5' 0"

Consider trench 15' 0" long 3' 0" wide and 5'
0" depth open planking to both faces.

Total Area - 2/15' 0" x 5' 0" = 150 Sq.ft

7
Data: Per 150.0 Sq.ft

Materials Cost Unit Qty. Rate


Class II Timber (4 uses) Cu.ft 17.50 650.00
Add 5% on above for wedges

Labour Cost
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 3.00 650.00

Add Over head & Profit 20%


Rate per 150.0 Sq.ft
Rate per Sq.ft

Per Sq.ft

17 Earth work support (Close planking) in


trenches upto a depth of 5' 0"

Consider trench 15' 0" long 3' 0" wide and 5'
0" depth open planking to both faces.

Total Area - 2/15' 0" x 5' 0" = 150 Sq.ft

Data: Per 150.0 Sq.ft

Materials Cost Unit Qty. Rate


Class II Timber (4 uses) Cu.ft 30.00 650.00
Add 5% on above for wedges

Labour Cost
Carpenter Day 2.00 1,200.00
Unskilled Labour Day 6.00 650.00

Add Over head & Profit 20%


Rate per 150.0 Sq.ft
Rate per Sq.ft

Per Sq.ft

18 Earth support (Close planking) in deep


excavation in trenches upto a depth of
15' 0"

8
Consider trench of length 15' 0" width 5' 6"
at top, 3' 6" bottom

Total Area - 2/15' 0" x 15' 0" = 450 Sq.ft

Data: Per 450.0 Sq.ft

Materials Cost Unit Qty. Rate


Class II Timber (4 uses) Cu.ft 100.00 650.00
Add 5% on above for wedges

Labour Cost
Carpenter Day 8.00 1,200.00
Unskilled Labour Day 20.00 650.00

Add Over head & Profit 20%


Rate per 450.0 Sq.ft
Rate per Sq.ft

Per Sq.ft

CONCRETE

1 Cement concrete 1:3:6 ( 2" ). (Shuttering


paid for seperately)

Data: Per Cube

Materials Cost Unit Qty. Rate


Cement Cwts 11.25 800.00
Sand Cube 0.56 7,000.00
2" Metal Cube 1.00 11,750.00

Labour Cost
Mason Day 1.00 1,350.00
Labour Day 8.00 950.00
Basket 0.66 75.00
Water Allow

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

9
2 Cement concrete 1:3:6 ( 2" ). (Shuttering
paid for seperately)

Data: Per Cube

As in Item 1

Add 25% of cost of Labour

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

3 Cement concrete 1:2 1/2:5 ( 1" ).


(Shuttering paid for seperately)

Data: Per Cube

Materials Cost Unit Qty. Rate


Cement Cwts 13.60 800.00
Sand Cube 0.60 7,500.00
1" Metal Cube 1.00 11,666.00

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 8.00 800.00
Basket 0.66 75.00
Water Allow

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

4 Cement concrete 1:2 1/2:5 ( 1" ).


(Shuttering paid for seperately)

Data: Per Cube

As in Item 3

Add 25% of cost of Labour

10
Add Over head & Profit 20%
Rate per Cube

Per Cube
Per M3

5 Cement concrete 1:2:4 ( 3/4" ).


(Shuttering paid for seperately)

Data: Per Cube (above 1.0 Cube)

Materials Cost Unit Qty. Rate


Cement Cwts 18.00 800.00
Sand Cube 0.60 7,000.00
3/4" Metal Cube 1.00 11,666.00

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 8.00 900.00
Basket 0.66 300.00
Water Allow

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

6 Cement concrete 1:2:4 ( 3/4" ).


(Shuttering paid for seperately)

Data: Per Cube

As in Item 5

Add 25% of cost of Labour

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

11
7 Channels 2" semi - circular, formed in
cement concrete floors and 1/2" cement
rendered 1:2 (Extra over concrete floor)

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


Cement & Sand Allow

Labour Cost
Mason Day 0.25 1,200.00
Labour Day 0.125 650.00

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

8 Channels 4" semi - circular, formed in


cement concrete floors and 1/2" cement
rendered 1:2 (Extra over concrete floor)

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


Cement & Sand Allow

Labour Cost
Mason Day 0.25 1,200.00
Labour Day 0.125 650.00

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

9 Corbel stones in cement concrete 1:2:4


(3/4" ) reinforced with 4 nos. 3/8" rods
upto 1 Cu.ft in volume. Per corbel stone
6' x 9" x 15"

Data: Per Cu.ft

12
Materials Cost Unit Qty. Rate
1/2 Cu.ft Materials for concrete as in Item
(5)
3/8" MS Rods Lbs 1.85

Labour Cost
Mason Day 0.09 1,200.00
Labour Day 0.09 650.00
Allow for Moulds and curing

Add Over head & Profit 20%


Rate per Cu.ft

10 Curb in cement concrete 1:2:4 (3/4" ) 9"


high and 3" thick, Cement rendered 1/2"
thick including, Excavation.

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


Materials for concrete as in Item (5) Cu.ft 2.00 302.66
Cement for 7 1/2 Sq.ft rendering at Cwt. 0.125 950.00
Allow for sand for rendering

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 1.00 650.00
Allow for shuttering, excavation,curing etc.

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

11 Drains, Semi - Circular, in cement


concrete1:3:6 (1" ) 9" wide and 9" average
depth, with 3" thick sides and base,
inclusive of 1/2" cement rendering 1:3
and expansion joints as necessary,
including necessary excavation.(without
ramp)

Data: Per 10.0 L.ft

13
Materials Cost Unit Qty. Rate
Cement Cwt. 1.25 950.00
Sand Cube 0.06 4,000.00
1" Metal Cube 0.08 8,500.00

Labour , Excavation & laying concrete


Mason Day 0.50 1,200.00
Labour Day 1.00 650.00

Rendering
Mason Day 0.50 1,200.00
Labour Day 0.50 650.00
Allow for shuttering, baskets etc.

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

12 Lintol, cement concrete 1:2:4 (3/4" ), 4


1/2" x 6" (Reinforcement paid for
seperately)

Data: Per 10.0 L.ft


(2 Lintols each 5' 0" )
Materials Cost Unit Qty. Rate
Cement Cwt. 0.30 800.00
Sand Cube 0.01 7,000.00
3/4" Metal Cube 0.02 11,750.00
Planks Sq.ft 14.00 75.00
Allow for timber props and nails

LabourCost
Erection & Removing shuttering
Carpenter Hrs 2.00 200.00
Labour Hrs 2.00 150.00

Concreting, including curing


Mason Hrs 2.00 170.00
Labour Hrs 2.00 125.00

Add Over head & Profit 20%

14
Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

13 Lintol, cement concrete 1:2:4 (3/4" ), 9" x


6" (Reinforcement paid for seperately)

Data: Per 10.0 L.ft


(2 Lintols each 5' 0" )
Materials Cost Unit Qty. Rate
Cement Cwt. 0.60 800.00
Sand Cube 0.02 7,000.00
3/4" Metal Cube 0.035 11,750.00
Planks at (1/4 Cost) Sq.ft 17.00 75.00
Allow for timber props and nails

LabourCost
Erection & Removing shuttering
Carpenter Hrs 2.00 200.00
Labour Hrs 2.00 150.00

Concreting, including curing


Mason Hrs 2.00 170.00
Labour Hrs 2.00 125.00

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

14 Lintol, cement concrete 1:2:4 (3/4" ), 9" x


9" (Reinforcement paid for seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
Materials Cost Unit Qty. Rate
Cement Cwt. 1.35 950.00
Sand Cube 0.04 4,000.00
3/4" Metal Cube 0.08 8,500.00
Planks at (1/4 new Cost) Sq.ft 34.00 75.00
Allow for timber props and nails

15
LabourCost
Erection & Removing shuttering
Carpenter Hrs 3.00 150.00
Labour Hrs 3.00 81.25

Concreting, including curing


Mason Day 0.50 1,200.00
Labour Day 1.00 650.00

Add Over head & Profit 20%


Rate per 15.0 L.ft
Rate per L.ft

Per L.ft
Per M

15 Lintol, cement concrete 1:2:4 (3/4" ), 12"


x 9" (Reinforcement paid for seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
Materials Cost Unit Qty. Rate
Cement Cwt. 1.85 950.00
Sand Cube 0.05 4,000.00
3/4" Metal Cube 0.11 8,500.00
Planks at (1/4 new Cost) Sq.ft 36.00 75.00
Allow for timber props and nails

LabourCost
Erection & Removing shuttering
Carpenter Day 0.50 1,200.00
Labour Day 0.50 650.00

Concreting, including curing


Mason Day 0.50 1,200.00
Labour Day 1.00 650.00

Add Over head & Profit 20%


Rate per 15.0 L.ft
Rate per L.ft

Per L.ft

16
Per M

16 Lintol, cement concrete 1:2:4 (3/4" ), 13


1/2" x 6" (Reinforcement paid for
seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
Materials Cost Unit Qty. Rate
Cement Cwt. 1.40 950.00
Sand Cube 0.05 4,000.00
3/4" Metal Cube 0.08 8,500.00
Planks at (1/4 new Cost) Sq.ft 24.00 75.00
Allow for timber props and nails

LabourCost
Erection & Removing shuttering
Carpenter Day 0.50 1,200.00
Labour Day 0.50 650.00

Concreting, including curing


Mason Day 0.50 1,200.00
Labour Day 1.00 650.00

Add Over head & Profit 20%


Rate per 15.0 L.ft
Rate per L.ft

Per L.ft
Per M

17 Lintol, cement concrete 1:2:4 (3/4" ), 13


1/2" x 9" (Reinforcement paid for
seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
Materials Cost Unit Qty. Rate
Cement Cwt. 2.12 950.00
Sand Cube 0.06 4,000.00
3/4" Metal Cube 0.115 8,500.00
Planks at (1/4 new Cost) Sq.ft 38.00 75.00
Allow for timber props and nails

LabourCost

17
Erection & Removing shuttering
Carpenter Day 0.50 1,200.00
Labour Day 0.50 650.00

Concreting, including curing


Mason Day 0.625 1,200.00
Labour Day 1.25 650.00

Add Over head & Profit 20%


Rate per 15.0 L.ft
Rate per L.ft

Per L.ft
Per M

18 Lintol, cement concrete 1:2:4 (3/4" ), 13


1/2" x 12" (Reinforcement paid for
seperately)

Data: Per 20.0 L.ft


(2 Lintols each 8' 0" )
Materials Cost Unit Qty. Rate
Cement Cwt. 3.50 950.00
Sand Cube 0.11 4,000.00
3/4" Metal Cube 0.21 8,500.00
Planks at (1/4 new Cost) Sq.ft 42.00 75.00
Allow for timber props and nails

LabourCost
Erection & Removing shuttering
Carpenter Day 0.75 1,200.00
Labour Day 0.75 650.00

Concreting, including curing


Mason Day 1.00 1,200.00
Labour Day 2.00 650.00

Add Over head & Profit 20%


Rate per 20.0 L.ft
Rate per L.ft

Per L.ft
Per M

18
19 Lintol, cement concrete 1:2:4 (3/4" ),
precast or insitu. (Reinforcement paid for
seperately)

Data: Per 4 stone (1' 6" x 1' 6" x 0' 6" )


(2 Lintols each 7' 6" )
Materials Cost Unit Qty. Rate
Cement Cwt. 0.58 950.00
Sand Cube 0.02 4,000.00
3/4" Metal Cube 0.35 8,500.00
Planks at (1/4 new Cost) Sq.ft 12.00 75.00
Allow for timber props and nails

LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25

Add Over head & Profit 20%


Rate per 4 stone
Rate per stone

Per Stone

20 Roof flat, Cement concrete 4" thick, 1:2:4


(3/4" ) and 1/2" cement rendered 1:2 with
5% Padlo and reinforced with expanded
metal, and lime puttying soffit complete.
(Reinforcement paid for seperately)

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 6.50 950.00
Sand Cube 0.20 4,000.00
3/4" Metal Cube 0.33 8,500.00
Boiled Lime Bushel 0.75 10.00

Shuttering
Planks at (1/4 new Cost) Sq.ft 115.00 40.00
Round timber props at (1/4 new cost) L.ft 80.00 70.00
2" Nails Lbs. 2.00 250.00
Mould oil Gln. 0.25 90.00
Timber in joists Cu.ft 5.00 1,000.00

LabourCost

19
Mason Day 1.75 1,200.00
Carpenter Day 1.00 1,200.00
Labour Day 8.50 650.00

Rendering
Cement Cwt. 1.50 950.00
Sand Cube 0.075 4,000.00
Padlo Cement Lbs. 8.50 200.00

Mason Day 0.75 1,200.00


Labour Day 1.50 650.00

Basket 0.33 75.00


Allow for water

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

21 Slabs over drain cement concrete 3" thick


1:2:4 (3/4" ) reinforced with expanded
metal and 1/2" cement rendered 1:2
( Reinfoecement paid for seperately)

Data: Per 10' 0" Length (15.0 Sq.ft)

Materials Cost Unit Qty. Rate


Cement Cwt. 0.60 950.00
Sand Cube 0.02 4,000.00
3/4" Metal Cube 0.04 8,500.00
Shuttering Planks at (1/4 new Cost) Sq.ft 16.00 50.00

LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 4.00 81.25

Rendering
Cement Cwt. 0.23 950.00
Sand Cube 0.010 4,000.00

Mason Hrs 1.00 150.00


Labour Hrs 1.00 81.25

20
Add Over head & Profit 20%
Rate per 15.0 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

22 Spur stone cement concrete 1:2:4(3/4" )


for verandah posts supplied and fixed. (8"
x 8" x 6" )

Data: Per 10 Stone

Materials Cost Unit Qty. Rate


Cement Cwt. 0.36 950.00
Sand Cube 0.01 4,000.00
3/4" Metal Cube 0.02 8,500.00
Allow for moulds

LabourCost
Mason Day 0.75 1,200.00
Labour Day 0.75 650.00

Add Over head & Profit 20%


Rate per 10 stone
Rate per Stone

Per Stone

23 Spur stone cement concrete 1:2:4(3/4" )


for door posts supplied and fixed. (4" x 3"
x 2" )

Data: Per 10 Stone

Materials Cost Unit Qty. Rate


Cement Cwt. 0.03 950.00
Sand Cu.ft 0.07 40.00
3/4" Metal Cu.ft 0.015 85.00
Allow for moulds

LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25

21
Add Over head & Profit 20%
Rate per 10 stone
Rate per Stone

Per Stone

24 Squatting plate for latrines, cement


concrete 1:2:4(3/4" ) as per type plan.

Data: Per

Materials Cost Unit Qty. Rate


Cement Cwt. 0.30 950.00
Sand Cu.ft 0.80 40.00
3/4" Metal Cu.ft 1.50 85.00
1/4"MS rod Lbs. 5.00
Allow for Binding wire and use of Moulds

LabourCost
Smith Hrs 0.50 150.00
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25

Add Over head & Profit 20%

25 Cement concrete 1:2 1/2:5 ( 1" ) using


concrete mixer & vibrator. (Shuttering
paid for seperately)

Data: Per Cube

Materials Cost Unit Qty. Rate


Cement Cwts 14.00 950.00
Sand Cube 0.60 4,000.00
1" Metal Cube 1.00 8,500.00

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 6.00 650.00
Basket 0.66 75.00
Allow for Water & curing Allow

22
Allow for 1/3 day hire of mixer, vibrator,
wages of operator,fuel etc.

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

26 Cement concrete 1:2:4 ( 3/4" ) in column


shafts (Reinforcements, shuttering and
finishes paid for seperately) in ground
floor using concrete mixer & vibrator.

Data: Per Cube

Materials Cost Unit Qty. Rate


Cement Cwts 18.00 950.00
Sand Cube 0.60 4,000.00
3/4" Metal Cube 1.00 8,500.00

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 6.00 650.00
Basket 0.66 75.00
Allow for Water & curing Allow
Allow for 1/3 day hire of mixer, vibrator,
wages of operator,fuel etc.

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

27 Cement concrete as per Item 26 in 1st


floor.

Data: Per Cube

As per Item 26
Labour Day 2.00 650.00

Add Over head & Profit 20%

23
Rate per Cube

Per Cube
Per M3

28 Cement concrete as per Item 26 in 2nd


floor.

Data: Per Cube

As per Item 26
Labour Day 5.00 650.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

29 Cement concrete 1:2:4 ( 3/4" ) in beams


(Reinforcements, shuttering and finishes
paid for seperately) in ground floor using
concrete mixer & vibrator.

Data: Per 2.0 Cube

Materials Cost Unit Qty. Rate


Cement Cwts 36.00 950.00
Sand Cube 1.20 4,000.00
3/4" Metal Cube 1.80 8,500.00

Labour Cost
Mason Day 2.50 1,200.00
Labour Day 16.00 650.00
Basket 1.33 75.00
Allow for Water & curing Allow
Allow for 2/3 day hire of mixer, vibrator,
wages of operator,fuel etc.

Add Over head & Profit 20%


Rate per 2.0 Cube
Rate per Cube

Per Cube
Per M3

24
30 Cement concrete as per Item 29 in 1st
floor.

Data: Per Cube

As per Item 29
Labour Day 2.00 650.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

31 Cement concrete as per Item 29 in 2nd


floor.

Data: Per Cube

As per Item 29
Labour Day 5.00 650.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

32 Shuttering for floor slab concrete and


dismantling.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Planks (Rubber) 1/2 new cost Sq.ft 115.00 55.00
4" x 2" Class II joist (1/4 new cost) L.ft 50.00 95.00
Props (10-12) ft. Round jungle timber (1/4
cost) Nos. 32.00 200.00
Wire nail 2" Lbs. 2.00 150.00
Mould oil Gln. 0.25 90.00

Labour Cost
Carpenter Day 1.00 1,200.00
Labour Day 3.00 800.00

25
Add Over head & Profit 20%
Rate per Sqr

Per Sqr
Per M2

33 Shuttering for Column shaft and


dismantling. (for column 9" x 9" x 4 ft.
high. i.e. 4 1/2 ft. Box)

Data: Per 12 Sq.ft of column surface area

Materials Cost Unit Qty. Rate


1" Ginisappu Planks. (1/4 new cost) Sq.ft 16.25 55.00
2" x 2" Class II battens (1/4 new cost) L.ft 15.00 25.00
Props Bamboos (1/3 cost) Nos. 5.00 200.00
3/8" dia. 18" bolts, nuts & washers (1/18
cost) Nos. 6.00 25.00
Mould oil pint 0.25 90.00
Allow for screws and nails

Labour Cost
Carpenter Day 0.375 1,000.00
Labour Day 0.375 800.00

Add Over head & Profit 25%


Rate per 12 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

34 Shuttering for beam including


dismantling. (12" x 18" Beam 20 ft. long)

Data: Per 80.0 Sq.ft

Materials Cost Unit Qty. Rate


Ginisappu Planks. (1/2 cost) Sq.ft 86.00 55.00
2" x 2" Class II Timber (1/4 new cost) L.ft 200.00 25.00
Round timber Props (10-12 L.ft) (1/4 cost) Nos. 20.00 200.00
2' to 3" wire nails Lbs. 7.00 100.00
Mould oil Gln. 0.125 90.00

26
Labour Cost
Carpenter Day 1.00 1,000.00
Labour Day 1.00 800.00

Add Over head & Profit 20%


Rate per 80.0 Sq.ft (Three Sides)
Rate per Sq.ft

Per Sq.ft
Per M2

35 Cement concrete 1:2:4 ( 3/4" ) Lintol in


ground floor (Reinforcements and
shuttering paid for seperately) using
concrete mixer & vibrator.

Data: Per Cube

Materials Cost Unit Qty. Rate


Cement Cwts 18.00 950.00
Sand Cube 0.60 4,000.00
3/4" Metal Cube 0.90 8,500.00

Labour Cost
Mason Day 2.00 1,200.00
Labour Day 16.00 650.00
Basket 0.66 75.00
Allow for Water & curing Allow
Allow for 1/2 day hire of mixer, vibrator,
wages of operator,fuel etc.

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

36 Cement concrete lintols as per Item 35 in


1st floor.

Data: Per Cube

As per Item 35 in Ground floor


Labour Day 2.00 650.00

27
Add Over head & Profit 20%
Rate per Cube

Per Cube
Per M3

37 4" thick R.C.C 1:2:4 (3/4" ) in first floor


slab (Reinforcements and shuttering paid
for seperately) using concrete mixer &
vibrator.

Data: Per 8.00 Sqrs

Materials Cost Unit Qty. Rate


Cement Cwts 45.33 950.00
Sand Cube 1.60 4,000.00
3/4" Metal Cube 2.40 8,500.00
Hire of mixer, Vibrator with operator & fuel
Day 1.00

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 24.00 650.00
Allow for Water & curing Allow

Add Over head & Profit 20%


Rate per 8.00 Sqr
Rate per Sqr

Per Sqr
Per M2

38 5" thick R.C.C 1:2:4 (3/4" ) in first floor


slab (Reinforcements and shuttering paid
for seperately) using concrete mixer &
vibrator.

Data: Per 8.00 Sqrs

Materials Cost Unit Qty. Rate


Cement Cwts 56.66 950.00
Sand Cube 2.00 4,000.00
3/4" Metal Cube 3.00 8,500.00
Hire of mixer, Vibrator with operator & fuel
Day 1.00

Labour Cost

28
Mason Day 4.00 1,200.00
Labour Day 25.00 650.00
Allow for Water & curing Allow

Add Over head & Profit 20%


Rate per 8.00 Sqr
Rate per Sqr

Per Sqr
Per M2

39 Drains semi circular in cement concrete


1:3:6 (1" ), 9" wide and 9" average depth,
3" thick sides and base, inclusive of 1/2"
cement rendering 1:3 with necessary
expansion joints and excavation, but
without ramp.

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


Cement Cwts 1.25 950.00
Sand Cube 0.06 4,000.00
1" Metal Cube 0.08 8,500.00

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 1.50 650.00
Allow for shuttering Allow

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

40 Drains in cement concrete 1:3:6 (1" ), as


above, but with ramp 1' 6" wide.

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


Drain as per Item 39
1:3:6 (1" ) Concrete Cu.ft 3.75 272.66
1:3 Rendering (1/2" th.) Sq.ft 15.00 38.81

29
Add Over head & Profit 20%
Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

41 Mixing concrete 1:3:6 ( 1 1/2" )

Data: Per Cube

Materials Cost Unit Qty. Rate


Cement Cwts 13.00 800.00
Sand Cube 0.53 7,000.00
1 1/2" Metal Cube 0.92 11,750.00
Hire of mixer Day 0.33
Water Glns. 110.00

Labour Cost
Skilled Labour Day 0.33 1,350.00
Unskilled Labour Day 2.00 950.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

42 Bulking 2" thick cement concrete screed


in foundation at depth not exceeding 5' 0"

Data: Per Sqr

Materials Cost Unit Qty. Rate


Concrete Cube 0.17 27,265.50
Wastage 10%

Labour Cost
Skilled Labour Day 0.125 1,200.00
Unskilled Labour Day 0.25 650.00

Add Over head & Profit 20%


Rate per Sqr

30
Per Sqr
Per M2

Note: For laying concrete at depths more


than 5' 0" Add 1/6 day unskilled labour for
each additional 5' 0" or part the roof per sqr.

43 3" thick cement concrete screed in


foundation at depth not exceeding 5' 0"
1:3:6 (1 1/2" )

Data: Per Sqr

Materials Cost Unit Qty. Rate


Concrete Cube 0.25 32,718.00

Labour Cost
Skilled Labour Day 0.125 1,350.00
Unskilled Labour Day 0.75 950.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

Note: For laying concrete at depths more


than 5' 0" Add 1/4 day unskilled labour for
each additional 5' 0" or part the roof per sqr.

44 6" thick cement concrete floor (Mass


concrete) 1:3:6 (1 1/2" )

Data: Per Sqr

Materials Cost Unit Qty. Rate


Concrete Cube 0.50 27,265.50
Water Glns. 200.00 10.00

Labour Cost
Skilled Labour Day 0.25 1,200.00
Unskilled Labour Day 0.75 650.00

31
Add Over head & Profit 20%
Rate per Sqr

Per Sqr
Per M2

Note: a) Water available at site. b)


If water is not available allowance must be
made for transport of water.

45 Supply and laying Grade 20 Ready mix


concrete. Rate include for pump, vibrator
and for laying changes.

Data: Per 1 M3 (0.353 Cube)

Materials Cost Unit Qty. Rate


Ready mix concrete M3 1.00
Pumping charges M3 1.00
Hire of vibrator Hrs 0.06

Labour Cost
Vibrator operator Hrs 0.50 81.25
Mason (2 x 1/2 day) Hrs 1.00 150.00
Labour (4 x 1/2 day) Hrs 2.00 81.25
Carpenter Hrs 0.50 150.00
Allow for curing

Add Over head & Profit 20%


Rate per M3

Per Cube
Per M3

STEEL FABRICATOR

46 Mild steel reinforcement to Lintols, Slabs,


Beams and Columns bent to shape, laid in
position and tied with G.I wire as
directed.

Data: Per 1.0 Cwt.

Materials Cost Unit Qty. Rate


Mild Steel (including transport) Cwt. 1.00 6,000.00

32
Allow for wastage 10%
Binding wire Lbs. 1.00 45.45

Labour Cost
Steel Fabricator Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Add Over head & Profit 20%


Rate per Cwt.

Per Cwt.
Per kg

47 Tor steel reinforcement to Lintols, Slabs,


Beams and Columns bent to shape, laid in
position and tied with G.I wire as
directed.

Data: Per 1.0 Cwt.

Materials Cost Unit Qty. Rate


Tor Steel (including transport) Cwt. 1.00 6,000.00
Allow for wastage 10%
Binding wire Lbs. 1.00 45.45

Labour Cost
Steel Fabricator Day 1.00 1,350.00
Unskilled Labour Day 1.00 950.00

Add Over head & Profit 20%


Rate per Cwt.

Per Cwt.
Per kg

BRICK MASONRY

1 Brick work in cement sand 1:5 in


foundation upto D.P.C

Data: Per Cube

Materials Cost Unit Qty. Rate


Bricks Nos. 1450 6.00

33
Wastage 5%
Cement Cwts 4.00 950.00
Sand Cube 0.25 4,000.00
Water Glns. 150.00 10.00

Labour Cost
Mason Day 3.00 1,200.00
Labour Day 4.00 650.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

2 Brick work in cement sand 1:8 in


foundation upto D.P.C

Data: Per Cube

Materials Cost Unit Qty. Rate


Bricks Nos. 1450 6.00
Wastage 5%
Cement Cwts 2.33 950.00
Sand Cube 0.38 4,000.00
Water Glns. 150.00 10.00

Labour Cost
Mason Day 3.00 1,200.00
Labour Day 4.00 650.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

3 Brick work in cement sand 1:5 in 4" thick


walls in ground floor.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Bricks Nos. 550 10.00

34
Wastage 5%
Cement Cwts 1.30 800.00
Sand Cube 0.10 7,000.00
Water Glns. 50.00 10.00

Labour Cost
Mason Day 1.50 1,350.00
Labour Day 2.00 850.00
Scaffolding ( Add 5%)

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

4 9" thick brick wall in cement sand 1:5 in


ground floor.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Bricks Nos. 1090 15.00
Wastage 5%
Cement Cwts 3.00 800.00
Sand Cube 0.20 7,000.00
Water Glns. 115.00 10.00

Labour Cost
Mason Day 2.25 1,350.00
Labour Day 3.75 950.00
Scaffolding ( Add 3%)

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

5 Brick work 13 1/2" thick in cement sand


1:5 in super structure in ground floor.

Data: Per Sqr

35
Materials Cost Unit Qty. Rate
Bricks Nos. 1630 6.00
Wastage 5%
Cement Cwts 4.50 950.00
Sand Cube 0.30 4,000.00
Water Glns. 170.00 10.00

Labour Cost
Mason Day 3.50 1,200.00
Labour Day 5.50 650.00
Scaffolding ( Add 2%)

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

6 9" thick brick wall in cement sand 1:8 in


super structure in ground floor.

Data: Per Sqr (i.e. 0.75 Cube)

Materials Cost Unit Qty. Rate


Bricks Nos. 1090 15.00
Wastage 5%
Cement Cwts 1.75 800.00
Sand Cube 0.30 7,000.00
Water Glns. 115.00 10.00

Labour Cost
Mason Day 2.25 1,350.00
Labour Day 3.00 950.00
Scaffolding ( Add 3%)

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

7 4 1/2" thick brick wall (wire cut) in


cement sand 1:5 in ground floor. (Facing
to brick work measured seperately)

36
Data: Per Sqr

Materials Cost Unit Qty. Rate


Wire Cut Bricks Nos. 550 -
Wastage 2%
Cement Cwts 1.20 950.00
Sand Cube 0.08 4,000.00
Water Glns. 30.00 10.00

Labour Cost
Mason Day 1.50 1,200.00
Labour Day 2.00 650.00
Scaffolding ( Add 5%)

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

8 9" thick brick wall (wire cut) in cement


sand 1:5 in ground floor. (Facing to brick
work measured seperately)

Data: Per Sqr

Materials Cost Unit Qty. Rate


Wire Cut Bricks Nos. 1080 -
Wastage 4%
Cement Cwts 2.50 950.00
Sand Cube 0.18 4,000.00
Water Glns. 100.00 10.00

Labour Cost
Mason Day 2.25 1,200.00
Labour Day 3.75 650.00
Scaffolding ( Add 3%)

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

37
9 13 1/2" thick brick wall (wire cut) in
cement sand 1:5 in ground floor. (Facing
to brick work measured seperately)

Data: Per Sqr

Materials Cost Unit Qty. Rate


Wire Cut Bricks Nos. 1630 -
Wastage 2%
Cement Cwts 4.50 950.00
Sand Cube 0.30 4,000.00
Water Glns. 50.00 10.00

Labour Cost
Mason Day 3.75 1,200.00
Labour Day 5.50 650.00
Scaffolding ( Add 2%)

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

10 Extra over fire facing including raised


pointing 1/8" thick in cement and sand
1:1 mixture in ground floor.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwts 0.50 950.00
Sand Cube 1.00 4,000.00
Acid Glns. 0.10
Water Glns. 10.00 10.00

Labour Cost
Mason Day 5.00 1,200.00
Labour Day 3.50 650.00

Add Over head & Profit 20%


Rate per Sqr

38
Per Sqr
Per M2

11 3" thick floor paved in lime mortar 2:5 in


ground floor.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Brick Nos 350.00 6.00
Slaked Lime Cwt. 1.20
Sand Cube 0.11 4,000.00
Water Glns. 45.00 10.00

Labour Cost
Mason Day 1.25 1,200.00
Labour Day 2.50 650.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

12 Steps 1' 1 1/2" x 0' 6" in brick in cement


and sand 1:5 with 1/2" thick cement and
sand 1:2 rendering including necessary
excavation.

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


Brick Nos 120.00 6.00
Cement Cwt. 0.50 950.00
Sand Cube 0.50 4,000.00
Water Glns. 15.00 10.00

Labour Cost
Mason Day 0.50 1,200.00
Labour Day 0.50 650.00

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

39
Per L.ft
Per M

13 Brick drains in cement and sand 1:5, 9"


wide and 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to
exposed faces with 1' 6" ramp including
necessary excavation.

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


Brick Nos 140.00 6.00
Cement Cwt. 0.80 950.00
Sand Cube 0.05 4,000.00
Water Glns. 20.00 10.00

Labour Cost
Mason Day 1.75 1,200.00
Labour Day 1.25 650.00

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

14 Brick drains in cement and sand 1:5, 9"


wide and 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to
exposed faces without ramp including
necessary excavation.

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


Brick Nos 110.00 6.00
Cement Cwt. 0.70 950.00
Sand Cube 0.04 4,000.00
Water Glns. 15.00 10.00

Labour Cost
Mason Day 1.50 1,200.00
Labour Day 1.25 650.00

40
Add Over head & Profit 20%
Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

HOLLOW BLOCK MASONRY

1 8" thick hollow block work in cement and


sand mortar 1:5 in ground floor (Cavities
unfilled)

Data: Per Sqr


10' 0" x 10' 0" area ( size of each block 16"
x 8" x 8" )
Materials Cost Unit Qty. Rate
Hollow Cement Blocks Nos 112.00 45.00
Wastage 5%
Cement Cwt. 0.75 950.00
Sand Cube 0.06 4,000.00

Labour Cost
Mason Day 1.50 1,200.00
Labour Day 2.50 650.00
Scaffolding (Add 3%)

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

2 4" thick hollow block work in cement and


sand mortar 1:5 in ground floor (Cavities
unfilled)

Data: Per Sqr


10' 0" x 10' 0" area ( size of each block 16"
x 8" x 4" )
Materials Cost Unit Qty. Rate
Hollow Cement Blocks Nos 200.00 38.00
Wastage 5%
Cement Cwt. 0.40 800.00
Sand Cube 0.03 7,500.00

41
Labour Cost
Mason Day 1.00 1,000.00
Labour Day 2.00 850.00
Scaffolding (Add 5%)

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

RUBBLE MASONRY

1 Random rubble masonry in cement


mortar1:5 in foundation.

Data: Per Cube (14" thick)

Materials Cost Unit Qty. Rate


6" x 9" Rubble Cube 1.30 5,000.00
Cement Cwts 5.00 800.00
Sand Cube 0.30 7,500.00
Water Glns. 100.00 10.00

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 6.00 800.00

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

2 Random rubble masonry in cement


mortar1:5 in super structure.

Data: Per Cube (14" thick)

Materials Cost Unit Qty. Rate


6" x 9" Rubble Cube 1.30 5,000.00
Cement Cwts 5.00 800.00
Sand Cube 0.30 7,500.00

42
Water Glns. 100.00 10.00

Labour Cost
Mason Day 2.50 1,000.00
Labour Day 7.50 800.00
Scaffolding - Add 3%.

Add Over head & Profit 20%


Rate per Cube

Per Cube
Per M3

TILING

1 Pressed floor tiles bedded in 1/2" cement


mortar 1:2 and pointing in neat cement
in ground floor.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Pressed tiles 8" x 8" Nos 225.00 85.00
Wastage 5%
Cement Cwt. 1.25 800.00
Sand Cube 0.07 7,500.00
Polish Lbs. 0.25 50.00
Coloured pigment Lbs. 0.25 50.00
Cotton waste Lbs. 2.00 50.00

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 900.00
Unskilled labour to polishing Day 0.50 800.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

2 Glazed tiles fixed to walls including


bedding in cement mortar 1:2 and raking
in ground floor. (including specials)

43
Data: Per Sqr

Materials Cost Unit Qty. Rate


Glazed tiles 12" x 9" Nos 150.00 85.00
Wastage 10% on cutting
Cement Cwt. 2.50 800.00
Sand Cube 0.11 7,500.00
White cement Lbs. 1.00 200.00
Allow for specials

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 950.00
Unskilled labour for cleaning Day 0.25 800.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

3 Terrazzo floor tiles on 1/2" thick cement


and sand 1:2 in ground floor.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Terrazzo tiles 12" x 12" Nos 100.00
Wastage 5%
Cement Cwt. 1.25 950.00
Sand Cube 0.07 4,000.00
Wax Polish Lbs. 0.50
Coloured pigment Lbs. 2.00
Cotton waste Lbs. 2.00

Labour Cost
Mason Day 5.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour to polishing Day 0.50 650.00

Add Over head & Profit 20%


Rate per Sqr

44
Per Sqr
Per M2

4 Glazed wall tiles 4 1/4" x 4 1/4" including


bedding in cement mortar 1/2" thick and
raking in ground floor. (special measured
seperately)

Data: Per Sqr

Materials Cost Unit Qty. Rate


Glazed wall tiles (white) Nos 150.00 65.00
Wastage 10% on cutting
Cement Cwt. 2.50 950.00
Sand Cube 0.11 4,000.00
White cement Lbs. 1.00 200.00

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour for cleaning Day 0.25 650.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

5 Glazed floor tiles 12" x 12" including


bedding in cement mortar 1:2 and raking
in ground floor. (special measured
seperately)

Data: Per Sqr

Materials Cost Unit Qty. Rate


Glazed floor tiles (Coloured) Nos 100.00 97.00
Wastage 10% on cutting
Cement Cwt. 2.50 950.00
Sand Cube 0.11 4,000.00
White cement Lbs. 1.00 200.00

Labour Cost
Special Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour for polishing Day 0.25 650.00

45
Add Over head & Profit 20%
Rate per Sqr

Per Sqr
Per M2

ROOF PLUMBING

1 Timber frame work for calicut pattern tile


hip roof in single storey building
consisting of wall plate, beam, ridge plate,
rafters etc. ( Preservative treatment to be
measured seperately)

Data: Per 6.0 Sqr

Materials Cost Unit Qty. Rate


Timber Cu.ft 34.00 2,800.00
Wastage 10%
2" x 1" Reepers L.ft 660.00 15.00
Wastage 5%
6" Wire Nail Lbs. 8.00 125.00
2" Wire Nail Lbs. 2.00 125.00

Labour Cost
Carpenter Day 7.00 1,200.00
Unskilled Labour Day 8.00 900.00

Add Over head & Profit 20%


Rate per 6.0 Sqr
Rate per Sqr

Per Sqr
Per M2

2 Roof covering with calicut pattern clay


tiles in single storeyed building. (Timber
frame work and ridge covering measured
seperately)

Data: Per 6.0 Sqr

Materials Cost Unit Qty. Rate


Tiles Nos. 750.00 35.00

46
Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 900.00

Add Over head & Profit 20%


Rate per 6.0 Sqr
Rate per Sqr

Per Sqr
Per M2

3 Timber frame work for corrugated


Asbestos sheet roof in single storeyed
building.

Data: Per 3.60 Sqr

Materials Cost Unit Qty. Rate


Timber Purlins Cu.ft 13.25 3,000.00
Wastage 10%

Labour Cost
Carpenter Day 2.50 1,500.00
Unskilled Labour Day 3.00 1,000.00

Add Over head & Profit 20%


Rate per 3.6 Sqr
Rate per Sqr

Per Sqr
Per M2

4 Roof covering with corrugated Asbestos


sheets (timber frame work and ridge
covering measured seperately)

Data: Per 3.60 Sqr

Materials Cost Unit Qty. Rate


Asbestos Corrugated Sheets Sq.ft 420.00 40.00
Roofing screws and washers Nos. 72.00 20.00

Labour Cost

47
Carpenter Day 1.00 1,350.00
Unskilled Labour Day 2.00 950.00

Add Over head & Profit 20%


Rate per 3.6 Sqr
Rate per Sqr

Per Sqr
Per M2

5 One layer half round clay tiles over


corrugated Asbestos roof covering.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Half Round clay tiles Nos. 350.00 60.00

Labour Cost
Unskilled Labour Day 2.00 950.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

6 Asbestos close fittings ridging fixed


complete with roofing screws or
bolts(hook)

Data: Per 13' 4" Length

Materials Cost Unit Qty. Rate


3' 8" Long Ridges Pairs 4.00 950.00
Roofing screws or bolts Nos. 16.00 20.00

Labour Cost
Carpenter Day 0.50 1,200.00
Unskilled Labour Day 0.25 650.00

Add Over head & Profit 20%


Rate per 13' 4" L.ft
Rate per L.ft

48
Per L.ft
Per M

7 Ridging covering with calicut pattern


ridge tiles bedded in cement lime mortar
1:1:4

Data: Per 12 L.ft ridging

Materials Cost Unit Qty. Rate


Ridge Tiles Nos. 9.00 65.00
Cement Cwt 0.33 800.00
Sand Cube 0.02 7,500.00
Slaked Lime Lbs. 15.00 30.00
Colouring Powder Lbs. 0.50 450.00

Labour Cost
Mason Day 0.25 1,200.00
Unskilled Labour Day 0.25 900.00

Add Over head & Profit 20%


Rate per 12.0 L.ft
Rate per L.ft

Per L.ft
Per M

8 3/4" x 9" high valence board fixed with


brass screws to ends of rafters (for tile
roofing)

Data: Per 100 L.ft

Materials Cost Unit Qty. Rate


1" Planks Sq.ft 75.00 100.00
Wastage 5%
1 1/2" Brass Screw Nos. 70.00 6.00

Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 900.00
Scaffolding 5%

Add Over head & Profit 20%

49
Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

9 3/4" x 9" high brass board fixed with


brass screws at 2' 0" centres to sides of
rafters.

Data: Per 100 L.ft

Materials Cost Unit Qty. Rate


Planks Sq.ft 75.00
Wastage 5%
1 1/2" Brass Screw Nos. 50.00

Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00
Scaffolding 5%

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

ROOF PLUMBING

10 18 B.W.G (1.2 mm) galvernized iron sheet


valley gutter 3' 0" girth over all once bent
with and laps not less than 9" width
including 3/4" tongued and grooved
planks laid to slope and profile on timber
members.

Data: Per 15.0 L.ft

Materials Cost Unit Qty. Rate


8' x 4' G.I Sheet Nos. 2.00
Wood Preservative Gln. 0.25 2,700.00
Cement Cwt. 0.10 950.00
Slaked Lime Cwt. 0.05
Sand Cu.ft 1.00 40.00

50
Planks Sq.ft 50.00
Wire Nails Lbs. 2.00

Labour Cost
a) Fixing boarding and applying wood
preservative
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

b) Making and fixing G.I Sheets


Tinker Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

c) Building Sides
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Add Over head & Profit 20%


Rate per 15.0 L.ft
Rate per L.ft

Per L.ft
Per M

11 20 B.W.G (1.2 mm) galvernized iron


flashing 1' 6" girth overall 3 bent with
end laps not less than 6" lead solder,
turned and tucked up to not less than 6"
into chase cut in wall and pointed in
cement mortar 1:2 lower end dressed over
roof covering not less than 1' 0" wide.

Data: Per 15.0 L.ft

Materials Cost Unit Qty. Rate


8' x 4' G.I Sheet Nos. 1.00
Cement Cwt. 0.05 950.00
Sand Cu.ft 1.00 40.00
Soldiering Lead Lbs. 1.00

Labour Cost
Cutting, bending, soldering and fixing
Tinker Day 0.50 1,200.00
Mason Day 0.125 1,200.00
Unskilled Labour Day 0.75 650.00

51
Add Over head & Profit 20%
Rate per 15.0 L.ft
Rate per L.ft

Per L.ft
Per M

12 6" dia. Half round PVC eaves gutter fixed


to timber valance board including gutter
joiner and brackets fixed at 18" centres
(Other specials paid seperately)

Data: Per 24.0 L.ft

Materials Cost Unit Qty. Rate


6" dia. Eaves Gutter Lth. 2.00 823.88
Joiner Nos. 1.00 58.50
Gutter Brackets Nos. 17.00 15.00
3/4" Brass screws Nos. 34.00
Solvent Cement grams 20.00 1.50

Labour Cost
Plumber Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Scaffolding Add 5%

Add Over head & Profit 20%


Rate per 24.0 L.ft
Rate per L.ft

Per L.ft
Per M

13 6" dia. PVC Gutter head (Running)


Consider 1No. Gutter head

Data: Per No.

Materials Cost Unit Qty. Rate


PVC Gutter head Nos. 1.00 130.00
Gutter Joiners Nos. 2.00 58.50
Gutter Brackets Nos. 2.00 15.00
3/4" Brass screws Nos. 4.00
Solvent Cement grams 12.00 1.50

52
Labour Cost
Plumber Day 0.125 1,200.00
Unskilled Labour Day 0.125 650.00
Scaffolding Add 5%

Add Over head & Profit 20%


Rate per No.

Per No.

14 6" dia. PVC Mitres Consider 1 No. Mitre

Data: Per No.

Materials Cost Unit Qty. Rate


Mitre head Nos. 1.00 180.00
Gutter Joiners Nos. 2.00 58.50
Brackets Nos. 2.00 15.00
3/4" Brass screws Nos. 4.00
Solvent Cement grams 12.00 1.50

Labour Cost
Plumber Day 0.125 1,200.00
Unskilled Labour Day 0.125 650.00
Scaffolding Add 5%

Add Over head & Profit 20%


Rate per No.

Per No.

15 6" dia. PVC End cap Consider 1 No. End


cap

Data: Per No.

Materials Cost Unit Qty. Rate


End cap Nos. 1.00
Solvent Cement grams 12.00 1.50

Labour Cost
Plumber Day 0.063 1,200.00

53
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%

Add Over head & Profit 20%


Rate per No.

Per No.

16 3 1/2" dia. PVC Rain Water Down Pipes


fixed to brick wall with wooden plugs
buried in wall. (Specials measured
seperately)

Data: Per 24.0 L.ft

Materials Cost Unit Qty. Rate


3 1/2" PVC Pipe Lth. 2.00
3 1/2" Joiner Nos. 1.00
PVC Straps Nos. 4.00
1" Brass screws Nos. 8.00
Solvent Cement grams 30.00 1.50

Labour Cost
Plumber Day 0.33 1,200.00
Unskilled Labour Day 0.33 650.00
Scaffolding Add 5%

Add Over head & Profit 20%


Rate per 24.0 L.ft
Rate per L.ft

Per L.ft
Per M

17 3 1/2" dia. PVC Elbow.

Data: Per No.

Materials Cost Unit Qty. Rate


60/80 Elbow Nos. 1.00
Solvent Cement grams 32.00 1.50

Labour Cost
Plumber Day 0.063 1,200.00

54
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%

Add Over head & Profit 20%


Rate per No.

Per No.

18 3 1/2" dia. PVC Shoe.

Data: Per No.

Materials Cost Unit Qty. Rate


60/80 Shoe Nos. 1.00
Solvent Cement grams 15.00 1.50

Labour Cost
Plumber Day 0.063 1,200.00
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%

Add Over head & Profit 20%


Rate per No.

Per No.

CEILING AND DOOR & WINDOW

1 Timber frame work for 4' 0" x 4' 0" flat


asbestos ceiling (Sheet measured
seperately) comprising of 4" x 2" joints
and 2" x 2" bearers in class I timber.

Data: Per 1.95 Sqr

Materials Cost Unit Qty. Rate


Timber ClassI Cu.ft 8.00 3,000.00
2" Nails Lbs. 1.00
Fibre/plastic plugs Nos. 26.00 -
Cement Lbs. 25.00
Sand Cu.ft 2.00 40.00
Brush 2" (1/4 Cost) Nos. 1.00
Wood preservative Gln. 0.33 2,700.00

55
Labour Cost
Carpenter Day 2.50 1,500.00
Mason Day 0.50 1,000.00
Unskilled Labour Day 1.50 650.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per 1.95 Sqr
Rate per Sqr

Per Sqr
Per M2

2 Horizontal ceiling lining using 4' 0" x 4'


0" flat asbestos ceiling sheets fixed with
and including beading and cove
mouldings on timber frame work. (Timber
frame work and painting measured
seperately)

Data: Per 1.95 Sqr

Materials Cost Unit Qty. Rate


Flat Asbestos sheet Sq.ft 210.00 14.50
Class I Cove Moulding L.ft 60.00 -
Class I Beading L.ft 125.00 -
Clout rails Lbs. 0.25 -
1/2" Brass screws Doz. 8.00

Labour Cost
Carpenter Day 1.50 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per 1.95 Sqr
Rate per Sqr

Per Sqr
Per M2

3 3/4" thick tongued and grooved


Lunimidella ceiling fixed horizontal on 4"
x 2" class I timber joists at 2' 0" centres
with 1 1/2" brass nails.

56
Data: Per 1.95 Sqr

Materials Cost Unit Qty. Rate


4" x 2" Timber Joists L.ft 115.00 175.00
6" x 3/4" Lunimidella Ceiling Planks Sq.ft 215.00 60.00
Cement Lbs. 3.00 800.00
Sand Cu.ft 4.00 7,500.00
Brass nails - 1 1/2" kg 4.00 500.00

Labour Cost
Making holes, fixing joists and making good

Mason Day 1.00 1,200.00


Carpenter Day 1.00 1,200.00
Unskilled Labour Day 3.00 800.00

Ceiling boards
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 4.00 800.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per 1.95 Sqr
Rate per Sqr

Per Sqr
Per M2

4 3/4" x 6" wide tongued and grooved


Lunimidella ceiling boards fixed to under
side of roof rafters, (existing) with 1 1/2"
brass nails including levelling with timber
strips where necessary.

Data: Per 1.80 Sqr (Consider room 15' 0" x


12' 0" )

Materials Cost Unit Qty. Rate


Ceiling Planks Sq.ft 220.00
2" x 1/4" Timber stirrups L.ft 40.00
3/4" Nails kg 2.00
Iron nails - 1 1/2" kg 4.00

Labour Cost

57
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 6.00 650.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per 1.80 Sqr
Rate per Sqr

Per Sqr
Per M2

5 Door single hung 3' 3" x 7' 0" high ovrall


with frame having 1 1/4" thick sash and
3 1/4" x 2 1/4" timber frame (Glazing,
iron mongery and painting
measuredseperately)

Data: Per 22.75 Sq.ft (3' 3" x 7' 0" )

Materials Cost Unit Qty. Rate


Frame
4" x 3" Timber Cu.ft 1.50 3,000.00
Spur stone Nos. 2.00 49.51
Fibre/Plastic plug with 4" brass screw Nos. 6.00 2.00
5/8" mild steel dowels - 4" long Nos. 2.00 80.00
Sash
1 1/2" Planks Sq.ft 1.25 500.00
1" planks Sq.ft 5.00 400.00

Labour Cost
Carpenter Day 5.00 1,200.00
Unskilled Labour Day 1.50 1,000.00

Add Over head & Profit 20%


Rate per 22.75 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

6 Door glazed and panelled double hung 4'


0" x 7' 0" high ovrall with frame including
1 1/4" thick sash and 3 1/4" x 2 3/4"
frame (Glazing, iron mongery and
painting measured seperately)

58
Data: Per 28.0 Sq.ft (4' 0" x 7' 0" )

Materials Cost Unit Qty. Rate


Frame
4" x 3" Timber Cu.ft 1.66 3,000.00
Spur stone Nos. 2.00 49.51
Fibre/Plastic plug with 4" long plastic
screws Nos. 6.00 2.00
5/8" mild steel dowels - 4" long Nos. 2.00 80.00
Sash
1 1/2" Planks Sq.ft 16.00 500.00
1" planks Sq.ft 7.00 400.00

Labour Cost
Carpenter Day 6.00 1,200.00
Unskilled Labour Day 2.00 1,000.00

Add Over head & Profit 20%


Rate per 28.0 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

7 Plywood Door single hung3' 1 1/2" x 6' 1


1/2" high ovrall with frame having 1 3/4"
x 1 1/4" thick sash and 3 3/4" x 2 3/4"
frame (Iron mongery and painting
measuredseperately)

Data: Per 21.75 Sq.ft (3' 1 1/2" x 6' 1 1/2" )

Materials Cost Unit Qty. Rate


Frame
4" x 3" Timber Cu.ft 1.80 2,200.00
Spur stone Nos. 2.00 49.51
Fibre/Plastic plug with 4" long brass screws
Nos. 6.00 -
Sash
6' 9" x 2' 9" Plywood sash Nos. 1.00

Labour Cost
Carpenter Day 0.75 1,200.00
Unskilled Labour Day 0.37 650.00

59
Mason (Fixing frame) Day 0.25 1,200.00
Unskilled Labour (Fixing frame) Day 0.25 650.00

Add Over head & Profit 20%


Rate per 21.75 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

8 Door ledged, braced and battened single


hung 2' 6" x 6' 6" ovrall, with frame
having 7/8" thick tongued & grooved
planks and 3 3/4" x 2 3/4" frame
(Ironmongery and painting measured
seperately)

Data: Per 16.25 Sq.ft (2' 6" x 6' 6" )

Materials Cost Unit Qty. Rate


4" x 3" Timber Cu.ft 1.70 2,200.00
Spur stone Nos. 2.00 49.51
Fibre/Plastic plug with 4" long brass screws
Nos. 6.00 -
5/8" mild steel dowels - 4" long Nos. 2.00

1" Planks Sq.ft 21.00


1 1/4" long brass screws Doz. 3.00

Labour Cost
Carpenter Day 2.25 1,200.00
Unskilled Labour Day 1.00 650.00
Mason (Fixing frame) Day 0.75 1,200.00
Unskilled Labour (Fixing frame) Day 0.75 650.00

Add Over head & Profit 20%


Rate per 16.25 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

60
9 Window glazed 7' 0" x 4' 0" high ovrall
with frame comprising 3 Nos. openable
sashes and 3 3/4" x 2 3/4" frame
Glazing, ironmongery and painting
measured seperately)

Data: Per 28.0 Sq.ft (7' 0" x 4' 0" )

Materials Cost Unit Qty. Rate


Frame
4" x 3" Timber Cu.ft 3.20 3,000.00
Fibre/Plastic plug with 4" long brass screws
Nos. 4.00 -
Sash
3" x 1 1/2" Timber Sq.ft 9.25

Labour Cost
Carpenter Day 6.00 1,500.00
Unskilled Labour Day 2.50 1,000.00
Mason (Fixing frame) Day 0.50 1,200.00
Unskilled Labour (Fixing frame) Day 0.50 950.00

Add Over head & Profit 20%


Rate per 28.0 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

BRASS FOUNDER

1 Bolts, Casement fasteners or stays,


removed and refixed including making
good to holes in frames and sashes

Data: Per No.

Materials Cost Unit Qty. Rate

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

61
Per No.

2 Bolts, barrel, brass, polished, 2 1/2"


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


2" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50

Labour Cost
Carpenter Hrs 0.33 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

3 Bolts, barrel, brass, polished, 3" heavy


quality supplied and fixed with brass
screws.

Data: Per No.

Materials Cost Unit Qty. Rate


3" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50

Labour Cost
Carpenter Hrs 0.33 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

4 Bolts, barrel, brass, polished, 4" heavy


quality supplied and fixed with brass
screws.

Data: Per No.

Materials Cost Unit Qty. Rate

62
4" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50

Labour Cost
Carpenter Hrs 0.33 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

5 Bolts, barrel, brass, polished, 5" heavy


quality supplied and fixed with brass
screws.

Data: Per No.

Materials Cost Unit Qty. Rate


5" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50

Labour Cost
Carpenter Hrs 0.33 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

6 Bolts, barrel, brass, polished, 6" heavy


quality supplied and fixed with brass
screws.

Data: Per No.

Materials Cost Unit Qty. Rate


6" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50

Labour Cost
Carpenter Hrs 0.33 150.00

Add Over head & Profit 20%


Rate per No.

63
Per No.

7 Bolts, brass, Skeleton 8" supplied and


fixed with brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


8" Skeleton bolt Nos. 1.00
Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

8 Bolts, brass, Skeleton 10" supplied and


fixed with brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


10" Skeleton bolt Nos. 1.00
Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

9 Bolts, brass, Skeleton 12" supplied and


fixed with brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


12" Skeleton bolt Nos. 1.00
Screws Doz. 0.75

64
Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

10 Bolts, brass, Skeleton 18" supplied and


fixed with brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


18" Brass Skeleton bolt Nos. 1.00
Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

11 Cabin Hooks 2" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


2" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

65
12 Cabin Hooks 3" polished, cast brass,
heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


3" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

13 Cabin Hooks 6" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


6" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

14 Cabin Hooks 8" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


8" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

66
Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

15 Cabin Hooks 9" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


9" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

16 Cabin Hooks 10" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


10" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

67
17 Cabin Hooks 12" polished, cast brass,
heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


12" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

18 Casement fasteners, brass, with morruce


oblate, polished heavy quality supplied
and fixed with brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


Casement fastener Nos. 1.00
1" Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

19 Casement stays, polished 10" heavy


quality supplied and fixed.

Data: Per No.

Materials Cost Unit Qty. Rate


10" Casement Stays Nos. 1.00
1" Screws Doz. 0.33

68
Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

20 Casement stays, polished 12" heavy


quality supplied and fixed.

Data: Per No.

Materials Cost Unit Qty. Rate


12" Casement Stays Nos. 1.00
1" Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

21 Fanlight catches, brass heavy quality with


brass screws fixed complete.

Data: Per No.

Materials Cost Unit Qty. Rate


Fanlight Catch Nos. 1.00
1" Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.75 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

69
22 Handles, door, brass, polished heavy
quality supplied and fixed with brass
screws complete.

Data: Per No.

Materials Cost Unit Qty. Rate


Door Handle Nos. 1.00
1" Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.25 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

23 Hasp and staple, safety type, 6" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Materials Cost Unit Qty. Rate


6" Hasp & Staple Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

24 Hasp and staple, safety type, 4" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Materials Cost Unit Qty. Rate


4" Hasp & Staple Nos. 1.00
1" Screws Doz. 0.75

70
Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

25 Hat Hooks, brass, supplied and fixed with


brass screws.

Data: Per No.

Materials Cost Unit Qty. Rate


Hat Hook large Nos. 1.00
Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

26 Hinges, butt, 4" x 2" brass, polished


heavy quality supplied and fixed with
brass screws complete.

Data: Per No.

Materials Cost Unit Qty. Rate


4" x 2" Hinges pair 1.00
3/4" Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Add Over head & Profit 20%


Rate per No.

Per No.

71
27 Hinges, butt, 4" x 3" brass, polished
heavy quality supplied and fixed with
brass screws complete.

Data: Per No.

Materials Cost Unit Qty. Rate


4" x 3" Hinges pair 1.00
1" Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Add Over head & Profit 20%


Rate per No.

Per No.

28 Hinges, butt, 4" x 2 1/2" brass, polished


heavy quality supplied and fixed with
brass screws complete.

Data: Per No.

Materials Cost Unit Qty. Rate


4" x 2 1/2" Hinges pair 1.00
3/4 " x 1/2" Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Add Over head & Profit 20%


Rate per No.

Per No.

29 Hinges, butt, 4" x 4" brass, polished


heavy quality supplied and fixed with
brass screws complete.

Data: Per No.

72
Materials Cost Unit Qty. Rate
4" x 4" Hinges pair 1.00
3/4 " x 1/2" Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Add Over head & Profit 20%


Rate per No.

Per No.

30 Hinges, butt, 5" brass, polished heavy


quality supplied and fixed with brass
screws complete.

Data: Per No.

Materials Cost Unit Qty. Rate


5" Hinges pair 1.00
3/4 " x 1/2" Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Add Over head & Profit 20%


Rate per No.

Per No.

31 Hinges centre pivot (consisting of 2


pieces) brass, polished heavy quality
supplied and fixed with brass screws
complete.

Data: Per No.

Materials Cost Unit Qty. Rate


3"Centre pivots, set of 4 pieces Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 1.00 150.00

73
Labour Hrs 1.00 81.25

Add Over head & Profit 20%


Rate per No.

Per No.

32 Hinges, gravity, brass, supplied and


fixed with brass screws complete.

Data: Per No.

Materials Cost Unit Qty. Rate


Gravity Hinges set Pair 1.00
1 1/2" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 1.00 150.00
Labour Hrs 1.00 81.25

Add Over head & Profit 20%


Rate per No.

Per No.

33 Hinges, Parliamentary, 6" x 4" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Materials Cost Unit Qty. Rate


4" Hinges Pair 1.00
1 1/2" Screws Doz. 1.50

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Add Over head & Profit 20%


Rate per No.

Per No.

74
34 Hinges, Parliamentary, 6" x 5" brass,
polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Materials Cost Unit Qty. Rate


5" Hinges Pair 1.00
1 1/2" Screws Doz. 1.50

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Add Over head & Profit 20%


Rate per No.

Per No.

35 Locks, rim 6", polished brass, 2 levers,


superior quality and English
Manufacture, supplied and fixed.

Data: Per No.

Materials Cost Unit Qty. Rate


6" Lock (2 Levers) Nos. 1.00
1" Brass Screws Doz. 0.50

Labour Cost
Carpenter Hrs 1.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

36 Locks, rim 6", polished brass, Single


levers, superior quality and English
Manufacture, supplied and fixed.

Data: Per No.

Materials Cost Unit Qty. Rate


6" Lock Nos. 1.00

75
1" Brass Screws Doz. 0.50

Labour Cost
Carpenter Hrs 1.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

37 Locks, rim 6", polished brass, 4 lever of


best quality Local Manufacture, supplied
and fixed.

Data: Per No.

Materials Cost Unit Qty. Rate


6" Lock (4 Lever) Nos. 1.00
1" Brass Screws Doz. 0.50

Labour Cost
Carpenter Hrs 1.50 150.00

Add Over head & Profit 35%


Rate per No.

Per No.

38 Locks, rim 5" single lever of best quality


Local Manufacture, supplied and fixed.

Data: Per No.

Materials Cost Unit Qty. Rate


5" Lock Nos. 1.00
1" Brass Screws Doz. 0.50

Labour Cost
Carpenter Hrs 1.50 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

76
39 Locks, Yale or Union, night latch,
supplied and fixed with duplicate keys.

Data: Per No.

Materials Cost Unit Qty. Rate


Yale Night Latch Nos. 1.00
1" Brass Screws Doz. 0.50

Labour Cost
Carpenter Hrs 2.00 150.00

Add Over head & Profit 20%


Rate per No.

Per No.

40 Lock Mortice (Local) single supplied and


fixed.

Data: Per No.

Materials Cost Unit Qty. Rate


Mortice Lock (Single) Nos. 1.00 450.00

Labour Cost
Carpenter Day 0.50 1,200.00

Add Over head & Profit 20%


Rate per No.

Per No.

41 Lock Mortice (Local) double, supplied and


fixed.

Data: Per No.

Materials Cost Unit Qty. Rate


Mortice Lock (Local) Double Nos. 1.00

Labour Cost
Carpenter Day 1.00 1,200.00

77
Add Over head & Profit 20%
Rate per No.

Per No.

42 Lock Mortice Union (Imported) single,


supplied and fixed.

Data: Per No.

Materials Cost Unit Qty. Rate


Mortice Lock Union (Single) Nos. 1.00

Labour Cost
Carpenter Day 0.50 1,200.00

Add Over head & Profit 20%


Rate per No.

Per No.

43 Lock Mortice Union (Imported) double,


supplied and fixed.

Data: Per No.

Materials Cost Unit Qty. Rate


Mortice Lock Union (Imported) Double Nos. 1.00

Labour Cost
Carpenter Day 1.00 1,200.00

Add Over head & Profit 20%


Rate per No.

Per No.

PLASTERING

1 5/8" thick plastering to wall in lime and


sand 1:2 including floating with lime
putty.

Data: Per Sqr

78
Materials Cost Unit Qty. Rate
Slaked Lime Cwt. 1.30
Sand Cube 0.07 4,000.00
Water Gln. 10.00 10.00

LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.75 650.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

2 5/8" thick plastering to wall in cement


sand 1:3 including cement floating.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 1.40 800.00
Sand Cube 0.06 7,500.00
Water Gln. 10.00 10.00

LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.50 900.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

3 3/8" thick plastering to soffit of slab in


cement and sand 1:3 including floating
with lime putty.

79
Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 0.80 800.00
Slaked Lime Cwt. 0.16
Sand Cube 0.03 7,500.00
Water Gln. 5.00 10.00

LabourCost
Mason Day 2.50 1,200.00
Unskilled Labour Day 2.50 900.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

4 3/8" thick plastering to sides and soffit


of beams in cement and sand 1:3
including floating with lime putty.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 0.80 950.00
Slaked Lime Cwt. 0.16
Sand Cube 0.03 4,000.00
Water Gln. 5.00 10.00

LabourCost
Mason Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

80
5 5/8" thick plastering to wall in lime,
cement and sand 1:1:5 finished semi
rough with wooden float.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 0.80 950.00
Slaked Lime Cwt. 0.40
Sand Cube 0.07 4,000.00
Water Gln. 10.00 10.00

LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.25 650.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

6 5/8" thick plastering to wall in lime,


cement and sand 1:1:5 finished smooth
with lime putty floating.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 0.80 950.00
Slaked Lime Cwt. 0.60
Sand Cube 0.07 4,000.00
Water Gln. 10.00 10.00

LabourCost
Mason Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per Sqr

81
Per Sqr
Per M2

7 1/2" thick rendering in cement and sand


1:3 finished smooth.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 1.07 800.00
Sand Cube 0.05 7,500.00
Water Gln. 10.00 10.00

LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour (Curing) Day 1.50 900.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

8 1/2" thick rendering in cement and sand


1:2 in floors, finished smooth.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 1.50 800.00
Sand Cube 0.05 7,500.00
Water Gln. 10.00 10.00

LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.50 800.00
Unskilled Labour (Curing) Day 0.25 800.00

Add Over head & Profit 20%


Rate per Sqr

82
Per Sqr
Per M2

9 3/4" thick rendering in cement and sand


1:3 finished smooth.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 1.75 850.00
Sand Cube 0.08 7,500.00
Water Gln. 10.00 10.00

LabourCost
Mason Day 1.25 800.00
Unskilled Labour Day 2.00 600.00
Unskilled Labour (Curing) Day 0.25 550.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

10 3/4" thick rendering in cement and sand


1:2 in floors finished smooth.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 2.25 950.00
Sand Cube 0.08 4,000.00
Water Gln. 10.00 10.00

LabourCost
Mason Day 1.25 1,200.00
Unskilled Labour Day 2.00 650.00
Unskilled Labour (Curing) Day 0.25 650.00

Add Over head & Profit 20%


Rate per Sqr

83
Per Sqr
Per M2

11 3/4" thick rendering in cement and sand


1:2 in coloured cement floors finished
smooth.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 2.25 950.00
Sand Cube 0.08 4,000.00
Powdered pigment Lbs. 1.00
Water Gln. 10.00 10.00

LabourCost
Mason Day 1.25 1,200.00
Unskilled Labour Day 2.00 650.00
Unskilled Labour (Curing) Day 0.25 650.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

12 1/2" x 6" skirting in cement and sand 1:3


projected of flush to walls finished with
floating including forming groove.

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


Cement Cwt. 0.10 800.00
Sand Cube 0.003 7,500.00
Powdered pigment Lbs. 0.25

LabourCost
Mason Day 0.375 1,200.00
Unskilled Labour Day 0.312 800.00

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

84
Per L.ft
Per M

PAINTING AND DECORATING

1 Prepare and apply one coat of


preservative (Oil type) to structural
timber including touching up cut ends
etc. after fixing.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Wood preservative (Oil type) Ltr. 2.75 525.00
Brush 3" (1/10 use) Nos. 1.00

LabourCost
Painter Day 0.75 1,200.00
Unskilled Labour Day 0.50 650.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

2 Prepare surface of steel truss and apply


two coats of anti-corrosive primer.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Anti Corrosive Primer Ltr. 2.25 315.00
Mineral Turpentine or thinner Ltr. 0.15 100.00
Wire brush Nos. 1.00 65.00
2" Brush(1/8 Use) Nos. 1.00 400.00

LabourCost
Painter Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00

Add Over head & Profit 20%

85
Rate per Sqr

Per Sqr
Per M2

3 Apply one coat of anti-corrosive primer


and two coats of enamel paint on already
shop primed and erected steel roof truss.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Anti Corrosive Primer Ltr. 0.20 315.00
Enamel Paint Ltr. 1.33 380.00
Mineral Turpentine or thinner Ltr. 0.20 100.00
2" Brush(1/5 Use) Nos. 1.00 400.00

LabourCost
Painter Day 2.50 1,200.00
Unskilled Labour Day 1.00 650.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

4 Prepare and apply two coats of primer


and finishing coat of enamel paint to mild
steel (angle/flat) gate.

Data: Per 50.0 Sq.ft

Materials Cost Unit Qty. Rate


Anti Corrosive Primer Ltr. 1.50 315.00
Enamel Paint Ltr. 0.66 380.00
Mineral Turpentine or thinner Ltr. 0.20 100.00
Wire Brush Nos. 0.50 65.00
2" Brush(1/5 Use) Nos. 1.00

LabourCost
Painter Day 0.50 1,200.00

86
Unskilled Labour Day 0.75 650.00

Add Over head & Profit 20%


Rate per 0.50 Sqr

Per Sqr
Per M2

5 Painting steel on new work with 2 coats


of anti-corrosive paint.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Anti Corrosive Paint Ltr. 0.66 315.00
2" Brush(1/5 Use) Nos. 1.00

LabourCost
Painter Day 1.50 1,200.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

6 Painting new timber work with 2 coats


of wood preservative.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Wood preservative Gln. 1.50 2,700.00
2" Brush(1/5 Use) Nos. 1.00

LabourCost
Painter Day 0.50 1,200.00

Add Over head & Profit 20%


Rate per Sqr

87
Per Sqr
Per M2

7 Preparing and painting wood work with


primer and 2 coats of enamel paint.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Primer Ltr. 0.75 525.00
Enamel paint Ltr. 2.50 380.00
2" Brush(1/10 Use) Nos. 1.00 400.00
Sand Paper Nos. 2.00 22.50

LabourCost
Painter Day 1.50 1,200.00
Unskilled Labour Day 0.50 650.00

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

8 White or colour washing 2 coats in single


storey.

Data: Per 10.0 Sqr

Materials Cost Unit Qty. Rate


Boiled Lime Cwt. 0.50 500.00
Salt Lbs. 2.00 5.50
Yellow Ochre Lbs. 0.50 7.00
Blue Oze 2.00 2.50
6" Brush(1/3 Use) Nos. 1.00
Water Gln. 10.00 10.00

LabourCost
Painter Day 2.50 1,200.00
Unskilled Labour Day 2.50 650.00
Scaffolding - Add 3%

88
Add Over head & Profit 20%
Rate per 10.0 Sqr
Rate per Sqr

Per Sqr
Per M2

9 White or colour washing 2 coats in two


storeyed building.

Data: Per 10.0 Sqr

Materials Cost Unit Qty. Rate


As per above

LabourCost
Painter Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per 10.0 Sqr
Rate per Sqr

Per Sqr
Per M2

10 Prepare and apply one coat of Alkali


resistant primer and two coats of
emulsion paint to walls.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Primer Ltr. 0.90 150.00
Emulsion paint Ltr. 1.40 800.00
Water Gln. 0.10 10.00
6" Brush(1/10 Use) Nos. 1.00 650.00
Sand Paper Nos. 2.00 22.50

LabourCost
Painter Day 1.25 1,200.00
Scaffolding - Add 3%

89
Add Over head & Profit 20%
Rate per Sqr

Per Sqr
Per M2

11 Cement washing to walls of single


storeyed building 2 coats.

Data: Per 10.0 Sqr

Materials Cost Unit Qty. Rate


Cement Cwt. 0.625 950.00
Coir Brush (1' 6") Nos. 1.00 40.00
Water Gln. 5.00 10.00

LabourCost
Painter Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per 10.0 Sqr
Rate per Sqr

Per Sqr
Per M2

12 Painting walls with emulsion paint (2


Coats).

Data: Per Sqr

Materials Cost Unit Qty. Rate


1st Coat - Emulsion Paint Gln. 0.16 1,575.00
Emulsion paint Gln. 0.14 1,575.00
Water Gln. 0.10 10.00
6" Brush(1/10 Use) Nos. 1.00

LabourCost
Painter Day 0.75 1,200.00
Scaffolding - Add 3%

90
Add Over head & Profit 20%
Rate per Sqr

Per Sqr
Per M2

13 Prepare and apply one coat of Alkali


resistant primer and two coats of
emulsion paint to soffit of slabs.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Primer Ltr. 0.90
Emulsion paint Ltr. 1.50 350.00
6" Brush(1/10 Use) Nos. 1.00

LabourCost
Painter Day 1.75 1,200.00
Scaffolding - Add 3%

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

14 Varnishing two coats with copal varnish


after sand papering.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Varnish (1.8 Ltr.) Gln. 0.40 1,422.00
3" Brush(1/3 Use) Nos. 1.00

LabourCost
Painter Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Add Over head & Profit 20%


Rate per Sqr

91
Per Sqr
Per M2

15 Wax polishing to timber in panels and


floors.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Wax Polish Lbs. 0.75 185.00
Sand Paper Doz 0.50 270.00
2" Brush(1/10 Use) Nos. 1.00
Flannel Cloth Yards 0.50

LabourCost
Unskilled Labour Hrs 3.00 81.25

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

16 Prepare and apply one coat of Alkali


resistance primer and two coats of
weather shield emulsion paint to walls
external.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Primer Ltr. 0.90 150.00
Weather Shield Emulsion Paint Ltr. 1.40 1,000.00
6" Brush(1/10 Use) Nos. 1.00
Sand Paper Nos. 2.00 22.50

LabourCost
Painter Day 1.25 1,200.00
Scaffoldings - Add 3%

Add Over head & Profit 20%


Rate per Sqr

92
Per Sqr
Per M2

17 Prepare and apply two coats of weather


shield emulsion paint to walls external.

Data: Per Sqr

Materials Cost Unit Qty. Rate


Weather Shield Emulsion Paint Ltr. 1.40 440.00
6" Brush(1/10 Use) Nos. 1.00 400.00
Sand Paper Nos. 2.00 22.50

LabourCost
Painter Day 1.25 1,200.00
Scaffoldings - Add 3%

Add Over head & Profit 20%


Rate per Sqr

Per Sqr
Per M2

EXTERNAL DRAINAGE & PLUMBING LINE

1 4" dia. PVC pipe type 400 earth ware


pipes laid on 6" thick bedding in cement
concrete 1:3:6(1 1/2" ) including
excavation average 2' 0" depth, back
filling with selected excavated materials
and concrete to haunching to joints.

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


4" dia. PVC pipe Nos. 50.00 106.00
Cement Concrete 1:3:6(1 1/2") Cube 0.75 27,265.50
Yarn Lbs. 2.00 -
Cement (Jointing) Cwt. 0.50 950.00
Excavation Cube 4.00 2,137.50

LabourCost

93
Laying Concrete Bedding
Unskilled Labour Day 1.50 650.00
Laying and testing pipes
Plumber Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Back filling
Unskilled Labour Day 2.50 650.00

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

2 4" dia. G.I Soil / Vent pipe fixed vertically


to walls jointed with cement caulking
(Special measured seperately)

Data: Per 6.0 L.ft

Materials Cost Unit Qty. Rate


4" dia. G.I pipe L.ft 6.00
Wastage 10%
Yarn Lbs. 0.312 -
Timber Plug (6" x 6" x 2" ) Nos. 1.00
3" Iron screws Nos. 2.00
Cement Lbs. 2.00

LabourCost
Plumber Day 0.25 1,200.00
Unskilled Labour Day 0.25 650.00
Scaffolding - Add 5%

Add Over head & Profit 20%


Rate per 6.0 L.ft
Rate per L.ft

Per L.ft
Per M

3 4" dia. G.I pipes fixed to walls jointed


with lead caulking. (Special measured
seperately)

94
Data: Per 6.0 L.ft

Materials Cost Unit Qty. Rate


4" dia. G.I pipe L.ft 6.00
Wastage 10%
Lead Lbs. 6.00 -
Yarn Lbs. 0.312 -
Timber Plug (6" x 6" x 2" ) Nos. 1.00
3" Iron screws Nos. 2.00
Fire wood Lbs. 0.06

LabourCost
Plumber Day 0.25 1,200.00
Unskilled Labour Day 0.25 650.00
Scaffolding - Add 5%

Add Over head & Profit 20%


Rate per 6.0 L.ft
Rate per L.ft

Per L.ft
Per M

4 4" dia. Stoneware gulley with 6" x 6" x 6"


gulley box including excavation, 4"
cement concrete 1:2:4(3/4" ) base
surrounded by 4 1/2" thick cement and
sand 1:5 extended 6" above top of gulley
box including making connection, 1/2"
cement and sand 1:2 rendering internally
and exposted faces finished smooth with
neat cement floating and providing G.I
Grating on top of gulley.

Data: Per No.

Materials Cost Unit Qty. Rate


4" S.W. Gulley Nos. 1.00 350.00
Excavation Cu.ft 4.00 21.38
4 1/2" Brick work Sq.ft 5.50 119.26
Cement concrete 1:2:4(3/4" ) Cu.ft 0.80 388.64
1/2" Cement rendering Sq.ft 1.00 42.75
4" G.I Grating Nos. 1.00

Labour Cost

95
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Add Over head & Profit 20%


Rate per No.

Per No.

5 Manhole 2' 0" x 2' 0" internally with


invert depth not exceeding 2' 0" including
excavation, back filling 6" cement
concrete 1:2:4(3/4" ) base with 3/8" dia.
Mild steel rods at 4" centres both ways,
forming channels and benching in similar
concrete, 4 1/2" walls in brick in cement
sand 1:5 1/2" thick cement and sand 1:2
rendering internally and exposed surfaces
including channels, benching and 2" thick
RCC removable cover slab 2' 3" x 2' 3"
inlet and outlet connection all complete
to working order.

Data: Per No.

Materials Cost Unit Qty. Rate


Excavation Cu.ft 35.00 21.38
4 1/2" Brick work Sq.ft 33.00 119.26
Cement concrete 1:2:4(3/4" ) in base &
channels Cu.ft 7.00 388.64
1/2" Cement rendering Sq.ft 28.00 42.75
RCC cover slab (5.06 Sq.ft + 0.08 Cwt. Tor
steel) Nos. 1.00 794.64
Tor Steel Cwt. 0.08 6,000.00

Labour Cost
Mason Day 1.50 1,200.00
Unskilled Labour Day 2.50 650.00

Add Over head & Profit 20%


Rate per No.

Per No.

96
6 22" x 16" glazed fireclay wash basin with
1/2" dia. Chromium plated pillar tap,
waste plug, chromium plated waste chain
and stay, including fixing wash basin on
brackets. (Water supply and waste water
connection measured seperately)

Data: Per No.

Materials Cost Unit Qty. Rate


Wash basin complete with brackets Nos. 1.00 6,500.00
1/2" tap Nos. 1.00
Waste plug and chain Nos. 1.00
Wooden plugs Nos. 4.00
1 1/2" brass screws Nos. 6.00
Cement Lbs. 2.00

Labour Cost
Mason Day 0.50 1,200.00
Unskilled Labour Day 1.00 650.00

Add Over head & Profit 20%


Rate per No.

Per No.

7 Sink 24" x 15" x 7" overall vitreous China


with rubber plug and chromium plated
chain waste carried on iron brackets
painted and fixed to walls. (Water supply
and waste water connection measured
seperately)

Data: Per No.

Materials Cost Unit Qty. Rate


24" x 15" x 7" Sink Nos. 1.00
Iron Brackets 2" x 2" x 1/4" Nos. 2.00
2" thick tapered wooden blocks Nos. 2.00
1 1/2" brass screws Nos. 8.00
Cement Lbs. 2.00

Labour Cost
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

97
Add Over head & Profit 20%
Rate per No.

Per No.

8 Closet pedestal type with L/L flushing


cistern, flush pipe double plastic seat
cover 1/2" dia. Stop cock, supplied and
fixed complete to working order.

Data: Per No.

Materials Cost Unit Qty. Rate


Low level suite complete Nos. 1.00
1/2" dia. Stop cock Nos. 1.00
Cement Lbs. 2.00
Sand Cu.ft 0.25
1 1/2" brass screws Nos. 2.00

Labour Cost
Mason Day 0.25 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Add Over head & Profit 20%


Rate per No.

Per No.

9 Closet Squatting type with trap including


high level cistern best quality plastic
fixed complete with flush pipe and 1/2"
dia. Stop cock, all complete to working
order.

Data: Per No.

Materials Cost Unit Qty. Rate


Squatting Pan with trap Nos. 1.00
Plastic cistern with 1/4" flush Gln. 2.00
Pipe, chain and overflow pipe
Clip
Wooden plugs Nos. 5.00
Stop cock Nos. 1.00
Cement Cwt. 0.25

98
Sand Cu.ft 0.25
3/4" metal Cu.ft 0.75
1 1/2" brass screws Doz 1.00

Labour Cost
Mason Day 0.50 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Add Over head & Profit 20%


Rate per No.

Per No.

10 Vitreous China bidet suite fixed complete


to working order. (Imported)

Data: Per No.

Materials Cost Unit Qty. Rate


Bidet (White) Nos. 1.00

Labour Cost
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Add Over head & Profit 20%


Rate per No.

Per No.

11 4 No. Bowl type Urinal with trap and 2


gallon automatic flashing cistern and
spreaders complete to working orders.
(Ceylon ceramic)

Data: Per No.

Materials Cost Unit Qty. Rate


Brinals bowls Nos. 4.00
2 Gal cistern Nos. 1.00
Rawl plugs Nos. 8.00
Spreader Nos. 1.00
Wooden plugs (for cistern) Nos. 4.00
1 1/2" brass screws Nos. 4.00

99
Cement Lbs. 4.00
Sand Cu.ft 0.125

Labour Cost
Mason Day 0.25 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Add Over head & Profit 20%


Rate per No.

Per No.

PLUMBING - PVC PIPE

1 1/2" dia. PVC pipes fixed to walls.


(Specials paid seperately)

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


1/2" Pipes L.ft 13.00 9.00
Clips and nails Nos. 3.000 -
Solvent cement grm 2.00 1.50

LabourCost
Plumber Hrs 1.00 150.00
Unskilled Labour Hrs 1.00 81.25

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

2 3/4" dia. PVC pipes fixed to walls.


(Specials paid seperately)

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


3/4" Pipes L.ft 13.00 17.50
Clips and nails Nos. 3.000 -

100
Solvent cement grm 3.00 1.50

LabourCost
Plumber Hrs 1.00 150.00
Unskilled Labour Hrs 1.00 81.25

Add Over head & Profit 20%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

3 1" dia. PVC pipes fixed to walls. (Specials


paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


1" Pipes L.ft 100.00 26.00
Add 5% Wastage
1" dia. Sockets Nos. 8.00 18.00
Solvent cement grm 32.00 1.50
Nails Nos. 35.00 -

LabourCost
Plumber Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

4 1 1/4" dia. PVC pipes fixed to walls.


(Specials paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


1 1/4" Pipes L.ft 100.00 38.00
Add 5% Wastage

101
1 1/4" dia. Sockets Nos. 8.00 25.00
Solvent cement grm 48.00 1.50
Clips and Nails Nos. 35.00 -

LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

5 1 1/2" dia. PVC pipes fixed to walls.


(Specials paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


1 1/2" Pipes L.ft 100.00 55.00
Add 5% Wastage
1 1/2" dia. Sockets Nos. 8.00 38.00
Solvent cement grm 64.00 1.50
Clips and Nails Nos. 35.00 -

LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

6 2" dia. PVC pipes fixed to walls. (Specials


paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate

102
2" Pipes L.ft 100.00 93.00
Add 5% Wastage
2" dia. Sockets Nos. 8.00 62.00
Solvent cement grm 112.00 1.50
Clips and Nails Nos. 35.00 -

LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

7 3" dia. PVC pipes fixed to walls. (Specials


paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


3" Pipes L.ft 100.00 238.00
Add 5% Wastage
3" dia. Sockets Nos. 8.00 248.00
Solvent cement grm 200.00 1.50
Clips and Screws Nos. 35.00 -

LabourCost
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

8 Excavation for laying 1/2" to 3" dia. PVC


pipes in ground not less than 1' 6" deep,
back filling and connecting.

103
Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate

LabourCost
Unskilled Labour Day 2.25 650.00

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

9 Chasing brick work for laying 1/2" to 1


1/2" dia. PVC pipes and making good
average depth 2" (Pipes and specials paid
seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


Cement Cwt. 0.10 950.00
Sand Cube 0.01 4,000.00

LabourCost
Mason Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

10 Chasing brick work for laying 1 1/2" to 3"


dia. PVC pipes in ground or floor and
making good average depth 3" (Pipes and
specials paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


Cement Cwt. 0.20 950.00

104
Sand Cube 0.03 4,000.00

LabourCost
Mason Day 3.50 1,200.00
Unskilled Labour Day 3.50 650.00

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

11 1/2" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


1/2" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 20.00 1.50

Labour Cost
Plumber Hrs 2.00 150.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

12 3/4" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


3/4" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 30.00 1.50

Labour Cost
Plumber Hrs 2.00 150.00

105
Add Over head & Profit 20%
Rate per 10 Nos.
Rate per No.

Per No.

13 1" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


1" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 40.00 1.50

Labour Cost
Plumber Hrs 2.00 150.00

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

14 1 1/4" dia. PVC specials viz - elbows,


bends, sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


1 1/4" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 60.00 1.50

Labour Cost
Plumber Hrs 2.00 150.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

15 1 1/2" dia. PVC specials viz - elbows,


bends, sockets (Type 1000)

106
Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


1 1/2" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 80.00 1.50

Labour Cost
Plumber Day 0.50 1,200.00

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

16 2" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


2" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 140.00 1.50

Labour Cost
Plumber Day 0.50 1,200.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

17 2 1/2" dia. PVC specials viz - elbows,


bends, sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


2 1/2" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 200.00 1.50

Labour Cost

107
Plumber Day 0.50 1,200.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

18 3" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


3" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 240.00 1.50

Labour Cost
Plumber Day 0.50 1,200.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

19 1/2" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


1/2" Tees Nos. 10.00 12.00
Solvent Cement grm 45.00 1.50

Labour Cost
Plumber Day 0.50 1,200.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

108
20 3/4" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


3/4" Tees Nos. 10.00 18.00
Solvent Cement grm 45.00 1.50

Labour Cost
Plumber Day 0.50 1,200.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

21 1" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


1" Tees Nos. 10.00 29.00
Solvent Cement grm 60.00 1.50

Labour Cost
Plumber Day 0.50 1,200.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

22 1 1/4" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


1 1/4" Tees Nos. 10.00 44.00
Solvent Cement grm 90.00 1.50

Labour Cost
Plumber Day 0.50 1,200.00

109
Add Over head & Profit 20%
Rate per 10 Nos.
Rate per No.

Per No.

23 1 1/2" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


1 1/2" Tees Nos. 10.00 77.00
Solvent Cement grm 120.00 1.50

Labour Cost
Plumber Day 1.00 1,200.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

24 2" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


2" Tees Nos. 10.00 118.00
Solvent Cement grm 210.00 1.50

Labour Cost
Plumber Day 1.00 1,200.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

25 2 1/2" dia. PVC specials viz Tees.

110
Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


2 1/2" Tees Nos. 10.00 216.00
Solvent Cement grm 300.00 1.50

Labour Cost
Plumber Day 1.50 1,200.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

26 3" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty. Rate


3" Tees Nos. 10.00 494.00
Solvent Cement grm 360.00 1.50

Labour Cost
Plumber Day 1.50 1,200.00

Add Over head & Profit 20%


Rate per 10 Nos.
Rate per No.

Per No.

27 Pipes PVC 1/2" supplied and fixed.


(fittings, excavation and back filling
measured seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 1/2" dia. L.ft 100.00 9.00

LabourCost
Plumber Hrs 1.50 150.00
Unskilled Labour Hrs 1.50 81.25

111
Allow for Solvent cement, Blow lamp etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

28 Pipes PVC 3/4" supplied and fixed.


(fittings, excavation and back filling
measured seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 3/4" dia. L.ft 100.00 17.50

LabourCost
Plumber Hrs 1.50 150.00
Unskilled Labour Hrs 1.50 81.25
Allow for Solvent cement, Blow lamp etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

29 Pipes PVC 1" supplied and fixed. (fittings,


excavation and back filling measured
seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 1" dia. L.ft 100.00 26.00

LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25
Allow for Solvent cement, Blow lamp etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft

112
Rate per L.ft

Per L.ft
Per M

30 Pipes PVC 1/2" supplied and fixed.


(fittings, excavation and back filling
measured seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 1/2" dia. L.ft 100.00 9.00
Add 25% for specials

LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25
Allow for Solvent cement, Blow lamp etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

31 Pipes PVC 3/4" supplied and fixed.

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 3/4" dia. L.ft 100.00 17.50
Add 25% for specials

LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25
Allow for Solvent cement, Blow lamp etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

113
32 Pipes PVC 1" supplied and fixed.

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 1" dia. L.ft 100.00 26.00
Add 25% for specials

LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 650.00
Plumber Hrs 3.00 150.00
Unskilled Labour Hrs 3.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

33 Pipes PVC 1 1/4" supplied and fixed.

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 1 1/4" dia. L.ft 100.00 38.00
Add 25% for specials

LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 1.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

34 Pipes PVC 1 1/2" supplied and fixed.

114
Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 1 1/2" dia. L.ft 100.00 55.00
Add 25% for specials

LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 650.00
Plumber Hrs 3.00 150.00
Unskilled Labour Hrs 3.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

35 Pipes PVC 2" supplied and fixed.

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 2" dia. L.ft 100.00 93.00
Add 25% for specials

LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 7,500.00
Plumber Hrs 5.00 150.00
Unskilled Labour Hrs 5.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

115
36 Pipes PVC 2" supplied and fixed. (fittings,
excavation and back filling measured
seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 2" dia. L.ft 100.00 93.00

LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 4.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

37 Pipes PVC 3" supplied and fixed. (fittings,


excavation and back filling measured
seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty. Rate


PVC pipe 3" dia. L.ft 100.00 238.00

LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 4.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.

Add Over head & Profit 20%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

GLAZIER

116
1 1/8" thick clear sheet panes exceeding 1
Sq.ft but not exceeding 4 Sq.ft, cut and
fixed with class I timber beading to doors
and windows.
Consider sash 3' 0" x 4' 0" with 3' 1 1/4"
style and 4 Nos. Glass panes.
Data: Per 9.0 Sq.ft

Materials Cost Unit Qty. Rate


1/8" Clear glass panes Sq.ft 9.00
1/2" x 1/2" beading L.ft 30.00
Brass pannel pins Doz 4.00

LabourCost
Glazier Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Add Over head & Profit 20%


Rate per 9.0 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

2 1/8" thick pin head/Reded sheet glass


panes exceeding 1 Sq.ft but not exceeding
4 Sq.ft, cut and fixed with class I timber
beading to doors and windows.

Data: Per 9.0 Sq.ft

Materials Cost Unit Qty. Rate


1/8" thick glass panes pin head Sq.ft 9.00
1/2" x 1/2" beading L.ft 30.00
Brass pannel pins Doz 4.00

LabourCost
Glazier Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Add Over head & Profit 20%


Rate per 9.0 Sq.ft
Rate per Sq.ft

Per Sq.ft

117
Per M2

118
YEAR 2005

Amount

6,500.00

6,500.00
1,300.00
7,800.00
780.00

780.00
84.00

Amount

1,543.75

1,543.75
308.75
1,852.50

1,853.00
655.00

119
Amount

950.00

950.00
190.00
1,140.00

1,140.00
403.00

Amount

2,137.50

2,137.50
427.50
2,565.00

2,565.00
906.00

120
Amount

2,275.00

2,275.00
455.00
2,730.00

2,730.00
965.00

Amount

1,950.00

1,950.00
390.00
2,340.00

2,340.00
827.00

Amount

1,625.00

1,625.00

121
325.00
1,950.00

1,950.00
689.00

Amount
-
-
-
-

1,200.00
1,300.00

2,500.00
500.00
3,000.00

3,000.00
1,060.00

Amount

1,800.00
975.00
693.75

3,468.75
693.75
4,162.50

122
416.25

416.00

Amount
800.00
200.00

325.00

1,325.00
265.00
1,590.00

1,590.00
171.00

Amount

950.00

950.00
190.00
1,140.00

123
1,140.00
403.00

Amount
1,750.00
262.50

1,187.50

3,200.00
640.00
3,840.00

3,840.00
1,357.00

Amount

1,300.00

1,300.00
260.00
1,560.00

1,560.00
551.00

124
Amount
2,750.00
412.50

1,300.00

4,462.50
892.50
5,355.00

5,355.00
1,892.00

Amount

1,625.00
325.00
975.00
600.00

3,525.00
705.00
4,230.00

4,230.00
455.00

125
Amount
2,843.75
142.19

1,200.00
1,950.00

3,150.00
630.00
3,780.00
25.20

25.00

Amount
4,875.00
243.75

2,400.00
3,900.00

6,300.00
1,260.00
7,560.00
50.40

50.00

126
Amount
16,250.00
812.50

9,600.00
13,000.00

22,600.00
4,520.00
27,120.00
60.27

60.00

Amount
9,000.00
3,920.00
11,750.00

1,350.00
7,600.00
49.50

33,669.50
6,733.90
40,403.40

40,403.00
14,277.00

127
33,669.50

2,237.50
35,907.00
7,181.40
43,088.40

43,088.00
15,225.00

Amount
10,880.00
4,500.00
11,666.00

1,200.00
6,400.00
49.50

34,695.50
6,939.10
41,634.60

41,635.00
14,712.00

34,695.50

1,900.00

128
36,595.50
7,319.10
43,914.60

43,915.00
15,518.00

Amount
14,400.00
4,200.00
11,666.00

1,200.00
7,200.00
198.00

38,864.00
7,772.80
46,636.80

46,637.00
16,480.00

38,864.00

2,100.00
40,964.00
8,192.80
49,156.80

49,157.00
17,370.00

129
Amount

300.00
81.25
381.25
76.25
457.50
45.75

46.00
151.00

Amount

300.00
81.25
381.25
76.25
457.50
45.75

46.00
151.00

130
Amount

151.33
-

108.00
58.50

317.83
63.57
381.40

Amount
605.32
118.75

1,200.00
650.00

2,574.07
514.81
3,088.88
308.89

309.00
1,014.00

131
Amount
1,187.50
240.00
680.00

600.00
650.00

600.00
325.00

4,282.50
856.50
5,139.00
513.90

514.00
1,686.00

Amount
240.00
70.00
235.00
1,050.00

400.00
300.00

340.00
250.00

2,885.00
577.00

132
3,462.00
346.20

346.00
1,135.00

Amount
480.00
140.00
411.25
1,275.00

400.00
300.00

340.00
250.00

3,596.25
719.25
4,315.50
431.55

432.00
1,417.00

Amount
1,282.50
160.00
680.00
637.50

133
450.00
243.75

600.00
650.00

4,703.75
940.75
5,644.50
376.30

376.00
1,234.00

Amount
1,757.50
200.00
935.00
675.00

600.00
325.00

600.00
650.00

5,742.50
1,148.50
6,891.00
459.40

459.00

134
1,506.00

Amount
1,330.00
200.00
680.00
450.00

600.00
325.00

600.00
650.00

4,835.00
967.00
5,802.00
386.80

387.00
1,270.00

Amount
2,014.00
240.00
977.50
712.50

135
600.00
325.00

750.00
812.50

6,431.50
1,286.30
7,717.80
514.52

515.00
1,690.00

Amount
3,325.00
440.00
1,785.00
787.50

900.00
487.50

1,200.00
1,300.00

10,225.00
2,045.00
12,270.00
613.50

614.00
2,015.00

136
Amount
551.00
80.00
2,975.00
225.00

300.00
162.50

4,293.50
858.70
5,152.20
1,288.05

1,288.00

Amount
6,175.00
800.00
2,805.00
7.50

1,150.00
1,400.00
500.00
22.50
5,000.00

137
2,100.00
1,200.00
5,525.00

1,425.00
300.00
1,700.00

900.00
975.00

24.75

32,009.75
6,401.95
38,411.70

38,412.00
4,135.00

Amount
570.00
80.00
340.00
200.00

300.00
325.00

218.50
40.00

150.00
81.25

138
2,304.75
460.95
2,765.70
184.38

184.00
1,981.00

Amount
342.00
40.00
170.00

900.00
487.50

1,939.50
387.90
2,327.40
232.74

233.00

Amount
28.50
2.80
1.28

300.00
162.50

139
495.08
99.02
594.09
59.41

59.00

Amount
285.00
32.00
127.50
-

75.00
300.00
162.50

982.00
196.40
1,178.40

Amount
13,300.00
2,400.00
8,500.00

1,200.00
3,900.00
49.50

140
29,349.50
5,869.90
35,219.40

35,219.00
12,445.00

Amount
17,100.00
2,400.00
8,500.00

1,200.00
3,900.00
49.50

33,149.50
6,629.90
39,779.40

39,779.00
14,056.00

33,149.50
1,300.00

34,449.50
6,889.90

141
41,339.40

41,339.00
14,607.00

33,149.50
3,250.00

36,399.50
7,279.90
43,679.40

43,679.00
15,434.00

Amount
34,200.00
4,800.00
15,300.00

3,000.00
10,400.00
99.75

67,799.75
13,559.95
81,359.70
40,679.85

40,680.00
14,375.00

142
33,899.88
1,300.00

35,199.88
7,039.98
42,239.85

42,240.00
14,926.00

33,899.88
3,250.00

37,149.88
7,429.98
44,579.85

44,580.00
15,753.00

Amount
3,162.50
1,187.50

1,600.00
300.00
22.50

1,200.00
2,400.00

143
9,872.50
1,974.50
11,847.00

11,847.00
1,275.00

Amount
223.44
93.75
333.33

10.00
22.50

375.00
300.00
1,358.02
271.60
1,629.63
135.80

136.00
1,464.00

Amount
2,365.00
1,250.00
1,000.00
700.00
11.25

144
1,000.00
800.00
7,126.25
1,425.25
8,551.50
106.89

107.00
1,152.00

Amount
17,100.00
2,400.00
7,650.00

2,400.00
10,400.00
49.50

39,999.50
7,999.90
47,999.40

47,999.00
16,961.00

39,999.50
1,300.00

41,299.50

145
8,259.90
49,559.40

49,559.00
17,512.00

Amount
43,063.50
6,400.00
20,400.00

4,800.00
15,600.00

90,263.50
18,052.70
108,316.20
13,539.53

13,540.00
1,457.00

Amount
53,827.00
8,000.00
25,500.00

146
4,800.00
16,250.00

108,377.00
21,675.40
130,052.40
16,256.55

16,257.00
1,750.00

Amount
1,187.50
240.00
680.00

1,200.00
975.00

4,282.50
856.50
5,139.00
513.90

514.00
1,686.00

Amount
4,282.50
1,022.46
582.15

147
1,604.61
320.92
1,925.53
192.55

193.00
633.00

Amount
10,400.00
3,710.00
10,810.00
-
-

445.50
1,900.00

27,265.50
5,453.10
32,718.60

32,719.00
11,561.00

Amount
4,635.14
463.51

150.00
162.50
312.50
62.50
375.00

148
375.00
40.00

Amount
8,179.50

168.75
712.50
9,060.75
1,812.15
10,872.90

10,873.00
1,170.00

Amount
13,632.75
2,000.00

300.00
487.50
787.50

149
157.50
945.00

945.00
102.00

Amount
-
-
-

40.63
150.00
162.50
75.00

428.13
85.63
513.75

1,455.00
514.00

Amount
6,000.00

150
600.00
45.45

1,200.00
650.00

8,495.45
1,699.09
10,194.55

10,195.00
204.00

Amount
6,000.00
600.00
45.45

1,350.00
950.00

8,945.45
1,789.09
10,734.55

10,735.00
215.00

Amount
8,700.00

151
435.00
3,800.00
1,000.00
1,500.00

3,600.00
2,600.00

21,635.00
4,327.00
25,962.00

25,962.00
9,174.00

Amount
8,700.00
435.00
2,213.50
1,520.00
1,500.00

3,600.00
2,600.00

20,568.50
4,113.70
24,682.20

24,682.00
8,722.00

Amount
5,500.00

152
275.00
1,040.00
700.00
500.00

2,025.00
1,700.00
186.25

11,926.25
2,385.25
14,311.50

14,312.00
1,541.00

Amount
16,350.00
817.50
2,400.00
1,400.00
1,150.00

3,037.50
3,562.50
198.00

28,915.50
5,783.10
34,698.60

34,699.00
3,735.00

153
Amount
9,780.00
489.00
4,275.00
1,200.00
1,700.00

4,200.00
3,575.00
155.50

25,374.50
5,074.90
30,449.40

30,449.00
3,278.00

Amount
16,350.00
817.50
1,400.00
2,100.00
1,150.00

3,037.50
2,850.00
176.63

27,881.63
5,576.33
33,457.95

33,458.00
3,602.00

154
Amount
-
-
1,140.00
320.00
300.00

1,800.00
1,300.00
155.00

5,015.00
1,003.00
6,018.00

6,018.00
648.00

Amount
-
-
2,375.00
720.00
1,000.00

2,700.00
2,437.50
154.13

9,386.63
1,877.33
11,263.95

11,264.00
1,212.00

155
Amount
-
-
4,275.00
1,200.00
500.00

4,500.00
3,575.00
161.50

14,211.50
2,842.30
17,053.80

17,054.00
1,836.00

Amount
475.00
4,000.00
-
100.00

6,000.00
2,275.00

12,850.00
2,570.00
15,420.00

156
15,420.00
1,660.00

Amount
2,100.00
-
440.00
450.00

1,500.00
1,625.00

6,115.00
1,223.00
7,338.00

7,338.00
790.00

Amount
720.00
475.00
2,000.00
150.00

600.00
325.00

4,270.00
854.00
5,124.00
512.40

157
512.00
1,680.00

Amount
840.00
760.00
200.00
200.00

2,100.00
812.50

4,912.50
982.50
5,895.00
589.50

590.00
1,936.00

Amount
660.00
665.00
160.00
150.00

1,800.00
812.50

158
4,247.50
849.50
5,097.00
509.70

510.00
1,673.00

Amount
5,040.00
252.00
712.50
240.00

1,800.00
1,625.00
102.75

9,772.25
1,954.45
11,726.70

11,727.00
1,262.00

Amount
7,600.00
380.00
320.00
225.00

159
1,000.00
1,700.00
135.00

11,360.00
2,272.00
13,632.00

13,632.00
1,467.00

Amount
6,500.00
4,000.00
2,250.00
1,000.00

4,800.00
4,800.00

23,350.00
4,670.00
28,020.00

28,020.00
9,901.00

Amount
6,500.00
4,000.00
2,250.00

160
1,000.00

2,500.00
6,000.00
255.00

22,505.00
4,501.00
27,006.00

27,006.00
9,543.00

Amount
19,125.00
956.25
1,000.00
525.00
12.50
12.50
100.00

4,800.00
3,600.00
400.00

30,531.25
6,106.25
36,637.50

36,638.00
3,944.00

161
Amount
12,750.00
1,275.00
2,000.00
825.00
200.00

4,800.00
3,800.00
200.00

25,850.00
5,170.00
31,020.00

31,020.00
3,339.00

Amount
-
-
1,187.50
280.00
-
-
-

6,000.00
2,600.00
325.00

10,392.50
2,078.50
12,471.00

162
12,471.00
1,342.00

Amount
9,750.00
975.00
2,375.00
440.00
200.00

4,800.00
2,600.00
162.50

21,302.50
4,260.50
25,563.00

25,563.00
2,752.00

Amount
9,700.00
970.00
2,375.00
440.00
200.00

4,800.00
2,600.00
162.50

163
21,247.50
4,249.50
25,497.00

25,497.00
2,745.00

Amount
95,200.00
9,520.00
9,900.00
495.00
1,000.00
250.00

8,400.00
7,200.00

131,965.00
26,393.00
158,358.00
26,393.00

26,393.00
2,841.00

Amount
26,250.00

164
3,600.00
2,700.00

32,550.00
6,510.00
39,060.00
6,510.00

6,510.00
701.00

Amount
39,750.00
3,975.00

3,750.00
3,000.00

50,475.00
10,095.00
60,570.00
16,825.00

16,825.00
1,811.00

Amount
16,800.00
1,440.00

165
1,350.00
1,900.00

21,490.00
4,298.00
25,788.00
7,163.33

7,163.00
771.00

Amount
21,000.00

1,900.00

22,900.00
4,580.00
27,480.00

27,480.00
2,958.00

Amount
3,800.00
320.00

600.00
162.50

4,882.50
976.50
5,859.00
439.53

166
440.00
1,444.00

Amount
585.00
264.00
150.00
450.00
225.00

300.00
225.00

2,199.00
439.80
2,638.80
219.90

220.00
722.00

Amount
7,500.00
375.00
420.00

3,600.00
2,700.00
315.00

14,910.00
2,982.00

167
17,892.00
178.92

179.00
587.00

Amount
-
-
-

3,600.00
1,950.00
277.50

5,827.50
1,165.50
6,993.00
69.93

70.00
230.00

Amount
-
675.00
95.00
-
40.00

168
-
-

1,200.00
650.00

600.00
325.00

600.00
325.00

4,510.00
902.00
5,412.00
360.80

361.00
1,184.00

Amount
-
47.50
40.00
-

600.00
150.00
487.50

169
1,325.00
265.00
1,590.00
106.00

106.00
348.00

Amount
1,647.75
58.50
255.00
-
30.00

600.00
325.00
46.25

2,962.50
592.50
3,555.00
148.13

148.00
486.00

Amount
130.00
117.00
30.00
-
18.00

170
150.00
81.25
11.56

537.81
107.56
645.38

645.00

Amount
180.00
117.00
30.00
-
18.00

150.00
81.25
11.56

587.81
117.56
705.38

705.00

Amount
-
18.00

75.60

171
40.95
5.83

140.38
28.08
168.45

168.00

Amount
-
-
-
-
45.00

396.00
214.50
30.53

686.03
137.21
823.23
34.30

34.00
112.00

Amount
-
48.00

75.60

172
40.95
5.83

170.38
34.08
204.45

204.00

Amount
-
22.50

75.60
40.95
5.83

144.88
28.98
173.85

174.00

Amount
24,000.00
-
-
-
80.00
-
891.00

173
3,750.00
500.00
975.00
156.75

30,352.75
6,070.55
36,423.30
18,678.62

18,679.00
2,011.00

Amount
3,045.00
-
-
-
-

1,800.00
1,300.00
93.00

6,238.00
1,247.60
7,485.60
3,838.77

3,839.00
413.00

174
Amount
20,125.00
12,900.00
2,400.00
30,000.00
2,000.00

1,200.00
1,200.00
2,400.00

3,600.00
3,200.00
204.00

79,229.00
15,845.80
95,074.80
48,756.31

48,756.00
5,248.00

Amount
-
-

175
3,600.00
3,900.00
225.00

7,725.00
1,545.00
9,270.00
5,150.00

5,150.00
554.00

Amount

4,500.00
99.02
12.00
160.00

625.00
2,000.00

6,000.00
1,500.00

14,896.02
2,979.20
17,875.22
785.72

786.00
8,461.00

176
Amount

4,980.00
99.02

12.00
160.00

8,000.00
2,800.00

7,200.00
2,000.00

25,251.02
5,050.20
30,301.22
1,082.19

1,082.00
11,647.00

Amount

3,960.00
99.02

900.00
240.50

177
300.00
162.50

5,662.02
1,132.40
6,794.42
312.39

312.00
3,358.00

Amount
3,740.00
99.02

-
-

-
-

2,700.00
650.00
900.00
487.50

8,576.52
1,715.30
10,291.82
633.34

633.00
6,814.00

178
Amount

9,600.00

9,000.00
2,500.00
600.00
475.00

22,175.00
4,435.00
26,610.00
950.36

950.00
10,226.00

Amount

75.00

75.00
15.00
90.00

179
90.00

Amount
-
-

49.50

49.50
9.90
59.40

59.00

Amount
-
-

49.50

49.50
9.90
59.40

59.00

Amount

180
-
-

49.50

49.50
9.90
59.40

59.00

Amount
-
-

49.50

49.50
9.90
59.40

59.00

Amount
-
-

49.50

49.50
9.90
59.40

181
59.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

182
75.00

75.00
15.00
90.00

90.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

183
Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

184
75.00

75.00
15.00
90.00

90.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

185
Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

186
75.00

75.00
15.00
90.00

90.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

112.50

112.50
22.50
135.00

135.00

187
Amount
-
-

37.50

37.50
7.50
45.00

45.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

188
75.00

75.00
15.00
90.00

90.00

Amount
-
-

75.00

75.00
15.00
90.00

90.00

Amount
-
-

112.50
60.94

173.44
34.69
208.13

208.00

189
Amount
-
-

112.50
60.94

173.44
34.69
208.13

208.00

Amount
-
-

112.50
60.94

173.44
34.69
208.13

208.00

190
Amount
-
-

112.50
60.94

173.44
34.69
208.13

208.00

Amount
-
-

112.50
60.94

173.44
34.69
208.13

208.00

Amount
-
-

150.00

191
81.25

231.25
46.25
277.50

278.00

Amount
-
-

150.00
81.25

231.25
46.25
277.50

278.00

Amount
-
-

112.50
60.94

173.44
34.69
208.13

208.00

192
Amount
-
-

112.50
60.94

173.44
34.69
208.13

208.00

Amount
-
-

225.00

225.00
45.00
270.00

270.00

Amount
-

193
-

225.00

225.00
45.00
270.00

270.00

Amount
-
-

225.00

225.00
78.75
303.75

304.00

Amount
-
-

225.00

225.00
45.00
270.00

270.00

194
Amount
-
-

300.00

300.00
60.00
360.00

360.00

Amount
450.00

600.00

1,050.00
210.00
1,260.00

1,260.00

Amount
-

1,200.00

195
1,200.00
240.00
1,440.00

1,440.00

Amount
-

600.00

600.00
120.00
720.00

720.00

Amount
-

1,200.00

1,200.00
240.00
1,440.00

1,440.00

196
Amount
-
280.00
100.00

1,200.00
1,137.50
70.13

2,787.63
557.53
3,345.15

3,345.00
360.00

Amount
1,120.00
450.00
100.00

1,200.00
1,350.00
76.50

4,296.50
859.30
5,155.80

5,156.00
555.00

197
Amount
640.00

225.00
50.00

3,000.00
2,250.00
157.50

6,322.50
1,264.50
7,587.00

7,587.00
817.00

Amount
760.00

120.00
50.00

2,400.00
1,300.00
111.00

4,741.00
948.20
5,689.20

5,689.00
612.00

198
Amount
760.00

280.00
100.00

1,200.00
812.50
60.38

3,212.88
642.58
3,855.45

3,855.00
415.00

Amount
760.00

280.00
100.00

1,800.00
975.00
83.25

3,998.25
799.65
4,797.90

199
4,798.00
516.00

Amount
856.00
375.00
100.00

1,200.00
1,350.00

3,881.00
776.20
4,657.20

4,657.00
501.00

Amount
1,200.00
375.00
100.00

1,200.00
1,200.00
200.00

4,275.00
855.00
5,130.00

200
5,130.00
552.00

Amount
1,487.50
600.00
100.00

1,000.00
1,200.00
137.50

4,525.00
905.00
5,430.00

5,430.00
584.00

Amount
2,137.50
320.00
100.00

1,500.00
1,300.00
162.50

5,520.00
1,104.00
6,624.00

201
6,624.00
713.00

Amount
2,137.50
320.00
-
100.00

1,500.00
1,300.00
162.50

5,520.00
1,104.00
6,624.00

6,624.00
713.00

Amount
80.00
22.50
-

450.00
249.60

802.10
160.42
962.52
96.25

202
96.00
315.00

Amount
1,443.75
-

900.00
325.00

2,668.75
533.75
3,202.50

3,203.00
345.00

Amount
708.75
15.00
65.00
50.00

1,800.00
975.00

3,613.75
722.75

203
4,336.50

4,337.00
467.00

Amount
63.00
505.40
20.00
80.00

3,000.00
650.00
109.50

4,427.90
885.58
5,313.48

5,313.00
572.00

Amount
472.50
250.80
20.00
32.50
-

600.00

204
487.50

1,863.30
372.66
2,235.96

4,472.00
481.00

Amount
207.90
-

1,800.00

2,007.90
401.58
2,409.48

2,409.00
259.00

Amount
4,050.00
-

600.00

4,650.00
930.00
5,580.00

205
5,580.00
601.00

Amount
393.75
950.00
40.00
4.50

1,800.00
325.00

3,513.25
702.65
4,215.90

4,216.00
454.00

Amount
250.00
11.00
3.50
5.00
-
100.00

3,000.00
1,625.00
138.75

5,133.25

206
1,026.65
6,159.90
615.99

616.00
66.00

Amount
5,133.25

600.00
325.00
27.75

6,086.00
1,217.20
7,303.20
730.32

730.00
79.00

Amount
135.00
1,120.00
1.00
65.00
45.00

1,500.00
45.00

2,911.00

207
582.20
3,493.20

3,493.00
376.00

Amount
593.75
40.00
50.00

2,400.00
1,300.00
111.00

4,494.75
898.95
5,393.70
539.37

539.00
58.00

Amount
252.00
220.50
1.00
-

900.00
27.00

1,400.50

208
280.10
1,680.60

1,681.00
181.00

Amount
-
525.00
-

2,100.00
63.00

2,688.00
537.60
3,225.60

3,226.00
347.00

Amount
568.80
-

600.00
325.00

1,493.80
298.76
1,792.56

209
1,793.00
193.00

Amount
138.75
135.00
-
-

243.75

517.50
103.50
621.00

621.00
67.00

Amount
135.00
1,400.00
-
45.00

1,500.00
45.00

3,125.00
625.00
3,750.00

210
3,750.00
404.00

Amount
616.00
40.00
45.00

1,500.00
45.00

2,246.00
449.20
2,695.20

2,695.00
290.00

Amount
5,300.00
20,449.13
-
475.00
8,550.00

211
975.00

2,400.00
1,300.00

1,625.00

41,074.13
8,214.83
49,288.95
492.89

493.00
1,618.00

Amount
-
-
-
-
-
-

300.00
162.50
23.13

485.63
97.13
582.75
97.13

97.00
318.00

212
Amount
-
-
-
-
-
-
-

300.00
162.50
23.13

485.63
97.13
582.75
97.13

97.00
318.00

Amount
350.00
85.50
655.94
310.91
42.75
-

213
600.00
325.00

2,370.11
474.02
2,844.13

2,844.00

Amount
748.13
3,935.66

2,720.48
1,197.00

794.64
480.00

1,800.00
1,625.00

13,300.91
2,660.18
15,961.09

15,961.00

214
Amount
6,500.00
-
-
-
-
-

600.00
650.00

7,750.00
1,550.00
9,300.00

9,300.00

Amount
-
-
-
-
-

600.00
325.00

215
925.00
185.00
1,110.00

1,110.00

Amount
-
-
-
-
-

300.00
1,200.00
650.00

2,150.00
430.00
2,580.00

2,580.00

Amount
-
-

-
-
-

216
-
-
-

600.00
1,200.00
650.00

2,450.00
490.00
2,940.00

2,940.00

Amount
-

1,200.00
650.00

1,850.00
370.00
2,220.00

2,220.00

Amount
-
-
-
-
-
-

217
-
-

300.00
1,200.00
650.00

2,150.00
430.00
2,580.00

2,580.00

Amount
117.00
-
3.00

150.00
81.25

351.25
70.25
421.50
42.15

42.00
138.00

Amount
227.50
-

218
4.50

150.00
81.25

463.25
92.65
555.90
55.59

56.00
184.00

Amount
2,600.00
130.00
144.00
48.00
-

600.00
325.00

3,847.00
769.40
4,616.40
46.16

46.00
151.00

Amount
3,800.00
190.00

219
200.00
72.00
-

900.00
487.50

5,649.50
1,129.90
6,779.40
67.79

68.00
223.00

Amount
5,500.00
275.00
304.00
96.00
-

900.00
487.50

7,562.50
1,512.50
9,075.00
90.75

91.00
299.00

Amount

220
9,300.00
465.00
496.00
168.00
-

900.00
487.50

11,816.50
2,363.30
14,179.80
141.80

142.00
466.00

Amount
23,800.00
1,190.00
1,984.00
300.00
-

1,200.00
650.00

29,124.00
5,824.80
34,948.80
349.49

349.00
1,145.00

221
Amount

1,462.50

1,462.50
292.50
1,755.00
17.55

18.00
59.00

Amount
95.00
40.00

3,600.00
1,950.00

5,685.00
1,137.00
6,822.00
68.22

68.00
223.00

Amount
190.00

222
120.00

4,200.00
2,275.00

6,785.00
1,357.00
8,142.00
81.42

81.00
266.00

Amount
-
30.00

300.00

330.00
66.00
396.00
39.60

40.00

Amount
-
45.00

300.00

345.00

223
69.00
414.00
41.40

41.00

Amount
-
60.00

300.00

360.00
126.00
486.00
48.60

49.00

Amount
-
90.00

300.00

390.00
78.00
468.00
46.80

47.00

224
Amount
-
120.00

600.00

720.00
252.00
972.00
97.20

97.00

Amount
-
210.00

600.00

810.00
162.00
972.00
97.20

97.00

Amount
-
300.00

225
600.00

900.00
180.00
1,080.00
108.00

108.00

Amount
-
360.00

600.00

960.00
192.00
1,152.00
115.20

115.00

Amount
120.00
67.50

600.00

787.50
157.50
945.00
94.50

95.00

226
Amount
180.00
67.50

600.00

847.50
169.50
1,017.00
101.70

102.00

Amount
290.00
90.00

600.00

980.00
196.00
1,176.00
117.60

118.00

Amount
440.00
135.00

600.00

227
1,175.00
235.00
1,410.00
141.00

141.00

Amount
770.00
180.00

1,200.00

2,150.00
430.00
2,580.00
258.00

258.00

Amount
1,180.00
315.00

1,200.00

2,695.00
539.00
3,234.00
323.40

323.00

228
Amount
2,160.00
450.00

1,800.00

4,410.00
882.00
5,292.00
529.20

529.00

Amount
4,940.00
540.00

1,800.00

7,280.00
1,456.00
8,736.00
873.60

874.00

Amount
900.00

225.00
121.88

229
1,246.88
249.38
1,496.25
14.96

15.00
49.00

Amount
1,750.00

225.00
121.88

2,096.88
419.38
2,516.25
25.16

25.00
82.00

Amount
2,600.00

300.00
162.50

3,062.50
612.50
3,675.00

230
36.75

37.00
121.00

Amount
900.00
225.00

300.00
162.50

1,587.50
317.50
1,905.00
19.05

19.00
62.00

Amount
1,750.00
437.50

300.00
162.50

2,650.00
530.00
3,180.00
31.80

32.00
105.00

231
Amount
2,600.00
650.00

450.00
243.75

3,943.75
788.75
4,732.50
47.33

47.00
154.00

Amount
3,800.00
950.00

600.00
81.25

5,431.25
1,086.25
6,517.50
65.18

65.00
213.00

232
Amount
5,500.00
1,375.00

450.00
243.75

7,568.75
1,513.75
9,082.50
90.83

91.00
299.00

Amount
9,300.00
2,325.00

750.00
406.25

12,781.25
2,556.25
15,337.50
153.38

153.00
502.00

233
Amount
9,300.00

600.00
325.00

10,225.00
2,045.00
12,270.00
122.70

123.00
404.00

Amount
23,800.00

600.00
325.00

24,725.00
4,945.00
29,670.00
296.70

297.00
974.00

234
Amount
-
-
-

600.00
325.00

925.00
185.00
1,110.00
123.33

123.00
1,324.00

Amount
-
-
-

600.00
325.00

925.00
185.00
1,110.00
123.33

123.00

235
1,324.00

236
B.S.R FOR THE YEAR 2005 AT TRINCOMALEE
SUMMARY

NO DESCRIPTION UNIT RATE

EXCAVATION

1 Removing top soil to a depth not exceeding 6" depositing as


directed within site. Per Sqr 780.00
Per M 2
84.00

2 Excavation over site to reduced level, in any material except rock


requiring blasting including depositing and levelling as directed
upto a distance not exceeding 30' 0"
Per Cube 1,853.00
Per M 3
655.00

3 Excavation in trenches for walls column pits in soft /loose soil


from 0' 0" to 5' 0" deep and depositing excavated material to a
distance not exceeding 30' 0" (Earth work support to be paid
seperately where necessary)
Per Cube 1,140.00
Per M 3
403.00

4 Excavation in trenches for walls column pits in ordinary soil from


0' 0" to 5' 0" deep and depositing excavated material to a distance
not exceeding 30' 0"
Per Cube 2,565.00
Per M3 906.00

5 Excavation in trenches for walls column pits in Hard/Dense soil


upto a depth of 5' 0" and depositing excavated material to a
distance not exceeding 30' 0"
Per Cube 2,730.00
Per M3 965.00

6 Excavation in trenches for walls column pits in Mud/Wet soil


upto a depth of 5' 0" and depositing excavated material to a
distance not exceeding 30' 0" (Earth work and dewatering paid
for seperately)
Per Cube 2,340.00
Per M 3
827.00

7 Excavation in trenches for walls column pits in soft


disintergrated rock (Not requiring blasting) upto a depth of 5' 0"
and depositing excavated material to a distance not exceeding 30'
0"
Per Cube 1,950.00
Per M 3
689.00

8 Excavation in trenches for walls column pits in Hard rock


requiring blasting upto a depth of 5' 0" and depositing excavated
material to a distance not exceeding 30' 0"
Per Cube 3,000.00
Per M 3
1,060.00

237
9 Benching rock in foundation in 3' 6" steps.(Blasting prohibited)
Per Sq.ft 416.00

ANTI - TERMITE TREATMENT

10 Anti - Termite treatment on excavated foundation and compacted


soil under floor. Per Sqr 1,590.00
Per M 2
171.00

EARTH WORK

11 Earth work - Back filling and compacting


Back filling to trenches with selected earth available at site. Per Cube 1,140.00
Per M 3
403.00

12 Back filling to trenches with selected imported material. Per Cube 3,840.00
Per M3 1,357.00

13 Filling under floors including levelling, watering and compacting


in 3" layers with available and selected earth at site.
Per Cube 1,560.00
Per M 3
551.00

14 Filling under floors including levelling, watering and compacting


in 3" layers with selected imported earth.
Per Cube 5,355.00
Per M 3
1,892.00

15 Cutting turf sods, loading to hand carts and transporting upto 30


yards, laying and watering for 30 days. (Royalty for turf, pegging
and transport beyond 30 years paid seperately)
Per Sqr 4,230.00
Per M2 455.00

16 Earth work support (Open planking) in trenches upto a depth of


5' 0" Per Sq.ft 25.00

17 Earth work support (Close planking) in trenches upto a depth of


5' 0" Per Sq.ft 50.00

18 Earth support (Close planking) in deep excavation in trenches


upto a depth of 15' 0" Per Sq.ft 60.00

CONCRETE

1 Cement concrete 1:3:6 ( 2" ). (Shuttering paid for seperately) Per Cube 40,403.00
Per M3 14,277.00

2 Cement concrete 1:3:6 ( 2" ). (Shuttering paid for seperately) Per Cube 43,088.00

238
Per M3 15,225.00

3 Cement concrete 1:2 1/2:5 ( 1" ). (Shuttering paid for seperately)


Per Cube 41,635.00
Per M3 14,712.00

4 Cement concrete 1:2 1/2:5 ( 1" ). (Shuttering paid for seperately)


Per Cube 43,915.00
Per M 3
15,518.00

5 Cement concrete 1:2:4 ( 3/4" ). (Shuttering paid for seperately)


Per Cube 46,637.00
Per M 3
16,480.00

6 Cement concrete 1:2:4 ( 3/4" ). (Shuttering paid for seperately)


Per Cube 49,157.00
Per M 3
17,370.00

7 Channels 2" semi - circular, formed in cement concrete floors


and 1/2" cement rendered 1:2 (Extra over concrete floor)
Per L.ft 46.00
Per M 151.00

8 Channels 4" semi - circular, formed in cement concrete floors


and 1/2" cement rendered 1:2 (Extra over concrete floor) Per L.ft 46.00
Per M 151.00

9 Corbel stones in cement concrete 1:2:4 (3/4" ) reinforced with 4


nos. 3/8" rods upto 1 Cu.ft in volume. Per corbel stone 6' x 9" x
15"
Per Cu.ft 381.40

10 Curb in cement concrete 1:2:4 (3/4" ) 9" high and 3" thick,
Cement rendered 1/2" thick including, Excavation.
Per L.ft 309.00
Per M 1,014.00

11 Drains, Semi - Circular, in cement concrete1:3:6 (1" ) 9" wide and


9" average depth, with 3" thick sides and base, inclusive of 1/2"
cement rendering 1:3 and expansion joints as necessary,
including necessary excavation.(without ramp)
Per L.ft 514.00
Per M 1,686.00

12 Lintol, cement concrete 1:2:4 (3/4" ), 4 1/2" x 6" (Reinforcement


paid for seperately)
Per L.ft 346.00
Per M 1,135.00

13 Lintol, cement concrete 1:2:4 (3/4" ), 9" x 6" (Reinforcement paid


for seperately)
Per L.ft 432.00
Per M 1,417.00

239
14 Lintol, cement concrete 1:2:4 (3/4" ), 9" x 9" (Reinforcement paid
for seperately)
Per L.ft 376.00
Per M 1,234.00

15 Lintol, cement concrete 1:2:4 (3/4" ), 12" x 9" (Reinforcement


paid for seperately)
Per L.ft 459.00
Per M 1,506.00

16 Lintol, cement concrete 1:2:4 (3/4" ), 13 1/2" x 6"


(Reinforcement paid for seperately)
Per L.ft 387.00
Per M 1,270.00

17 Lintol, cement concrete 1:2:4 (3/4" ), 13 1/2" x 9"


(Reinforcement paid for seperately)
Per L.ft 515.00
Per M 1,690.00

18 Lintol, cement concrete 1:2:4 (3/4" ), 13 1/2" x 12"


(Reinforcement paid for seperately)
Per L.ft 614.00
Per M 2,015.00

19 Lintol, cement concrete 1:2:4 (3/4" ), precast or insitu.


(Reinforcement paid for seperately)
Per Stone 1,288.00

20 Roof flat, Cement concrete 4" thick, 1:2:4 (3/4" ) and 1/2"
cement rendered 1:2 with 5% Padlo and reinforced with
expanded metal, and lime puttying soffit complete.
(Reinforcement paid for seperately)
Per Sqr 38,412.00
Per M 2
4,135.00

21 Slabs over drain cement concrete 3" thick 1:2:4 (3/4" ) reinforced
with expanded metal and 1/2" cement rendered 1:2
( Reinfoecement paid for seperately)
Per Sq.ft 184.00
Per M 2
1,981.00

22 Spur stone cement concrete 1:2:4(3/4" ) for verandah posts


supplied and fixed. (8" x 8" x 6" )
Per Stone 233.00

23 Spur stone cement concrete 1:2:4(3/4" ) for door posts supplied


and fixed. (4" x 3" x 2" )
Per Stone 59.00

24 Squatting plate for latrines, cement concrete 1:2:4(3/4" ) as per


type plan.
1,178.40

25 Cement concrete 1:2 1/2:5 ( 1" ) using concrete mixer & vibrator.
(Shuttering paid for seperately) Per Cube 35,219.00
Per M 3
12,445.00

240
26 Cement concrete 1:2:4 ( 3/4" ) in column shafts (Reinforcements,
shuttering and finishes paid for seperately) in ground floor using
concrete mixer & vibrator.
Per Cube 39,779.00
Per M3 14,056.00

27 Cement concrete as per Item 26 in 1st floor. Per Cube 41,339.00


Per M 3
14,607.00

28 Cement concrete as per Item 26 in 2nd floor. Per Cube 43,679.00


Per M 3
15,434.00

29 Cement concrete 1:2:4 ( 3/4" ) in beams (Reinforcements,


shuttering and finishes paid for seperately) in ground floor using
concrete mixer & vibrator.
Per Cube 40,680.00
Per M 3
14,375.00

30 Cement concrete as per Item 29 in 1st floor. Per Cube 42,240.00


Per M3 14,926.00

31 Cement concrete as per Item 29 in 2nd floor. Per Cube 44,580.00


Per M 3
15,753.00

32 Shuttering for floor slab concrete and dismantling. Per Sqr 11,847.00
Per M 2
1,275.00

33 Shuttering for Column shaft and dismantling. (for column 9" x 9"
x 4 ft. high. i.e. 4 1/2 ft. Box) Per Sq.ft 136.00
Per M 2
1,464.00

34 Shuttering for beam including dismantling. (12" x 18" Beam 20


ft. long)
Per Sq.ft 107.00
Per M 2
1,152.00

35 Cement concrete 1:2:4 ( 3/4" ) Lintol in ground floor


(Reinforcements and shuttering paid for seperately) using
concrete mixer & vibrator.
Per Cube 47,999.00
Per M 3
16,961.00

36 Cement concrete lintols as per Item 35 in 1st floor. Per Cube 49,559.00
Per M3 17,512.00

37 4" thick R.C.C 1:2:4 (3/4" ) in first floor slab (Reinforcements


and shuttering paid for seperately) using concrete mixer &
vibrator.
Per Sqr 13,540.00
Per M2 1,457.00

241
38 5" thick R.C.C 1:2:4 (3/4" ) in first floor slab (Reinforcements
and shuttering paid for seperately) using concrete mixer &
vibrator.
Per Sqr 16,257.00
Per M2 1,750.00

39 Drains semi circular in cement concrete 1:3:6 (1" ), 9" wide and
9" average depth, 3" thick sides and base, inclusive of 1/2"
cement rendering 1:3 with necessary expansion joints and
excavation, but without ramp.
Per L.ft 514.00
Per M 1,686.00

40 Drains in cement concrete 1:3:6 (1" ), as above, but with ramp 1'
6" wide.
Per L.ft 193.00
Per M 633.00

41 Mixing concrete 1:3:6 ( 1 1/2" ) Per Cube 32,719.00


Per M 3
11,561.00

42 Bulking 2" thick cement concrete screed in foundation at depth


not exceeding 5' 0" Per Sqr 375.00
Per M 2
40.00

43 3" thick cement concrete screed in foundation at depth not


exceeding 5' 0" 1:3:6 (1 1/2" ) Per Sqr 10,873.00
Per M 2
1,170.00

44 6" thick cement concrete floor (Mass concrete) 1:3:6 (1 1/2" ) Per Sqr 945.00
Per M2 102.00

45 Supply and laying Grade 20 Ready mix concrete. Rate include for
pump, vibrator and for laying changes. Per Cube 1,455.00
Per M 3
514.00

STEEL FABRICATOR

46 Mild steel reinforcement to Lintols, Slabs, Beams and Columns


bent to shape, laid in position and tied with G.I wire as directed.
Per Cwt. 10,195.00
Per kg 204.00

47 Tor steel reinforcement to Lintols, Slabs, Beams and Columns


bent to shape, laid in position and tied with G.I wire as directed.
Per Cwt. 10,735.00
Per kg 215.00

BRICK MASONRY

1 Brick work in cement sand 1:5 in foundation upto D.P.C Per Cube 25,962.00

242
Per M3 9,174.00

2 Brick work in cement sand 1:8 in foundation upto D.P.C Per Cube 24,682.00
Per M 3
8,722.00

3 Brick work in cement sand 1:5 in 4" thick walls in ground floor.
Per Sqr 14,312.00
Per M 2
1,541.00

4 9" thick brick wall in cement sand 1:5 in ground floor. Per Sqr 34,699.00
Per M 2
3,735.00

5 Brick work 13 1/2" thick in cement sand 1:5 in super structure


in ground floor. Per Sqr 30,449.00
Per M 2
3,278.00

6 9" thick brick wall in cement sand 1:8 in super structure in


ground floor. Per Sqr 33,458.00
Per M2 3,602.00

7 4 1/2" thick brick wall (wire cut) in cement sand 1:5 in ground
floor. (Facing to brick work measured seperately) Per Sqr 6,018.00
Per M 2
648.00

8 9" thick brick wall (wire cut) in cement sand 1:5 in ground floor.
(Facing to brick work measured seperately) Per Sqr 11,264.00
Per M 2
1,212.00

9 13 1/2" thick brick wall (wire cut) in cement sand 1:5 in ground
floor. (Facing to brick work measured seperately) Per Sqr 17,054.00
Per M2 1,836.00

10 Extra over fire facing including raised pointing 1/8" thick in


cement and sand 1:1 mixture in ground floor. Per Sqr 15,420.00
Per M 2
1,660.00

11 3" thick floor paved in lime mortar 2:5 in ground floor. Per Sqr 7,338.00
Per M2 790.00

12 Steps 1' 1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2"
thick cement and sand 1:2 rendering including necessary
excavation.
Per L.ft 512.00
Per M 1,680.00

13 Brick drains in cement and sand 1:5, 9" wide and 6" - 9" average
depth including cement rendering 1/2" thick 1:2 to exposed
faces with 1' 6" ramp including necessary excavation.
Per L.ft 590.00
Per M 1,936.00

243
14 Brick drains in cement and sand 1:5, 9" wide and 6" - 9" average
depth including cement rendering 1/2" thick 1:2 to exposed
faces without ramp including necessary excavation.
Per L.ft 510.00
Per M 1,673.00

HOLLOW BLOCK MASONRY

1 8" thick hollow block work in cement and sand mortar 1:5 in
ground floor (Cavities unfilled) Per Sqr 11,727.00
Per M 2
1,262.00

2 4" thick hollow block work in cement and sand mortar 1:5 in
ground floor (Cavities unfilled) Per Sqr 13,632.00
Per M2 1,467.00

RUBBLE MASONRY

1 Random rubble masonry in cement mortar1:5 in foundation. Per Cube 28,020.00


Per M 3
9,901.00

2 Random rubble masonry in cement mortar1:5 in super structure.


Per Cube 27,006.00
Per M 3
9,543.00

TILING

1 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and pointing
in neat cement in ground floor. Per Sqr 36,638.00
Per M 2
3,944.00

2 Glazed tiles fixed to walls including bedding in cement mortar


1:2 and raking in ground floor. (including specials) Per Sqr 31,020.00
Per M2 3,339.00

3 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground
floor. Per Sqr 12,471.00
Per M 2
1,342.00

4 Glazed wall tiles 4 1/4" x 4 1/4" including bedding in cement


mortar 1/2" thick and raking in ground floor. (special measured
seperately)
Per Sqr 25,563.00
Per M2 2,752.00

5 Glazed floor tiles 12" x 12" including bedding in cement mortar


1:2 and raking in ground floor. (special measured seperately)
Per Sqr 25,497.00
Per M2 2,745.00

244
ROOF PLUMBING

1 Timber frame work for calicut pattern tile hip roof in single storey
building consisting of wall plate, beam, ridge plate, rafters etc.
( Preservative treatment to be measured seperately)

Per Sqr 26,393.00


Per M 2
2,841.00

2 Roof covering with calicut pattern clay tiles in single storeyed


building. (Timber frame work and ridge covering measured
seperately)
Per Sqr 6,510.00
Per M 2
701.00

3 Timber frame work for corrugated Asbestos sheet roof in single


storeyed building. Per Sqr 16,825.00
Per M2 1,811.00

4 Roof covering with corrugated Asbestos sheets (timber frame


work and ridge covering measured seperately)
Per Sqr 7,163.00
Per M 2
771.00

5 One layer half round clay tiles over corrugated Asbestos roof
covering. Per Sqr 27,480.00
Per M2 2,958.00

6 Asbestos close fittings ridging fixed complete with roofing screws


or bolts(hook) Per L.ft 440.00
Per M 1,444.00

7 Ridging covering with calicut pattern ridge tiles bedded in cement


lime mortar 1:1:4 Per L.ft 220.00
Per M 722.00

8 3/4" x 9" high valence board fixed with brass screws to ends of
rafters (for tile roofing)
Per L.ft 179.00
Per M 587.00

9 3/4" x 9" high brass board fixed with brass screws at 2' 0"
centres to sides of rafters. Per L.ft 70.00
Per M 230.00

10 18 B.W.G (1.2 mm) galvernized iron sheet valley gutter 3' 0" girth
over all once bent with and laps not less than 9" width including
3/4" tongued and grooved planks laid to slope and profile on
timber members.
Per L.ft 361.00
Per M 1,184.00

245
11 20 B.W.G (1.2 mm) galvernized iron flashing 1' 6" girth overall 3
bent with end laps not less than 6" lead solder, turned and
tucked up to not less than 6" into chase cut in wall and pointed
in cement mortar 1:2 lower end dressed over roof covering not
less than 1' 0" wide.
Per L.ft 106.00
Per M 348.00

12 6" dia. Half round PVC eaves gutter fixed to timber valance board
including gutter joiner and brackets fixed at 18" centres (Other
specials paid seperately)
Per L.ft 148.00
Per M 486.00

13 6" dia. PVC Gutter head (Running) Consider 1No. Gutter head
Per No. 645.00

14 6" dia. PVC Mitres Consider 1 No. Mitre Per No. 705.00

15 6" dia. PVC End cap Consider 1 No. End cap Per No. 168.00

16 3 1/2" dia. PVC Rain Water Down Pipes fixed to brick wall with
wooden plugs buried in wall. (Specials measured seperately)
Per L.ft 34.00
Per M 112.00

17 3 1/2" dia. PVC Elbow. Per No. 204.00

18 3 1/2" dia. PVC Shoe. Per No. 174.00

CEILING AND DOOR & WINDOW

1 Timber frame work for 4' 0" x 4' 0" flat asbestos ceiling (Sheet
measured seperately) comprising of 4" x 2" joints and 2" x 2"
bearers in class I timber.
Per Sqr 18,679.00
Per M 2
2,011.00

2 Horizontal ceiling lining using 4' 0" x 4' 0" flat asbestos ceiling
sheets fixed with and including beading and cove mouldings on
timber frame work. (Timber frame work and painting measured
seperately)
Per Sqr 3,839.00
Per M 2
413.00

3 3/4" thick tongued and grooved Lunimidella ceiling fixed


horizontal on 4" x 2" class I timber joists at 2' 0" centres with 1
1/2" brass nails.
Per Sqr 48,756.00
Per M 2
5,248.00

4 3/4" x 6" wide tongued and grooved Lunimidella ceiling boards


fixed to under side of roof rafters, (existing) with 1 1/2" brass
nails including levelling with timber strips where necessary.
Per Sqr 5,150.00

246
Per M2 554.00

5 Door single hung 3' 3" x 7' 0" high ovrall with frame having 1
1/4" thick sash and 3 1/4" x 2 1/4" timber frame (Glazing, iron
mongery and painting measuredseperately)
Per Sq.ft 786.00
Per M 2
8,461.00

6 Door glazed and panelled double hung 4' 0" x 7' 0" high ovrall
with frame including 1 1/4" thick sash and 3 1/4" x 2 3/4"
frame (Glazing, iron mongery and painting measured seperately)

Per Sq.ft 1,082.00


Per M 2
11,647.00

7 Plywood Door single hung3' 1 1/2" x 6' 1 1/2" high ovrall with
frame having 1 3/4" x 1 1/4" thick sash and 3 3/4" x 2 3/4"
frame (Iron mongery and painting measuredseperately)
Per Sq.ft 312.00
Per M 2
3,358.00

8 Door ledged, braced and battened single hung 2' 6" x 6' 6" ovrall,
with frame having 7/8" thick tongued & grooved planks and 3
3/4" x 2 3/4" frame (Ironmongery and painting measured
seperately)
Per Sq.ft 633.00
Per M 2
6,814.00

9 Window glazed 7' 0" x 4' 0" high ovrall with frame comprising 3
Nos. openable sashes and 3 3/4" x 2 3/4" frame Glazing,
ironmongery and painting measured seperately)
Per Sq.ft 950.00
Per M 2
10,226.00

BRASS FOUNDER

1 Bolts, Casement fasteners or stays, removed and refixed


including making good to holes in frames and sashes Per No. 90.00

2 Bolts, barrel, brass, polished, 2 1/2" heavy quality supplied and


fixed with brass screws. Per No. 59.00

3 Bolts, barrel, brass, polished, 3" heavy quality supplied and


fixed with brass screws. Per No. 59.00

4 Bolts, barrel, brass, polished, 4" heavy quality supplied and


fixed with brass screws. Per No. 59.00

5 Bolts, barrel, brass, polished, 5" heavy quality supplied and


fixed with brass screws. Per No. 59.00

6 Bolts, barrel, brass, polished, 6" heavy quality supplied and


fixed with brass screws. Per No. 59.00

247
7 Bolts, brass, Skeleton 8" supplied and fixed with brass screws.
Per No. 90.00

8 Bolts, brass, Skeleton 10" supplied and fixed with brass screws.
Per No. 90.00

9 Bolts, brass, Skeleton 12" supplied and fixed with brass screws.
Per No. 90.00

10 Bolts, brass, Skeleton 18" supplied and fixed with brass screws.
Per No. 90.00

11 Cabin Hooks 2" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00

12 Cabin Hooks 3" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00

13 Cabin Hooks 6" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00

14 Cabin Hooks 8" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00

15 Cabin Hooks 9" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00

16 Cabin Hooks 10" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00

17 Cabin Hooks 12" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00

18 Casement fasteners, brass, with morruce oblate, polished heavy


quality supplied and fixed with brass screws. Per No. 90.00

19 Casement stays, polished 10" heavy quality supplied and fixed.


Per No. 90.00

20 Casement stays, polished 12" heavy quality supplied and fixed.


Per No. 90.00

21 Fanlight catches, brass heavy quality with brass screws fixed


complete. Per No. 135.00

22 Handles, door, brass, polished heavy quality supplied and fixed


with brass screws complete. Per No. 45.00

248
23 Hasp and staple, safety type, 6" brass, polished heavy quality
supplied and fixed with brass screws complete. Per No. 90.00

24 Hasp and staple, safety type, 4" brass, polished heavy quality
supplied and fixed with brass screws complete. Per No. 90.00

25 Hat Hooks, brass, supplied and fixed with brass screws. Per No. 90.00

26 Hinges, butt, 4" x 2" brass, polished heavy quality supplied and
fixed with brass screws complete. Per No. 208.00

27 Hinges, butt, 4" x 3" brass, polished heavy quality supplied and
fixed with brass screws complete. Per No. 208.00

28 Hinges, butt, 4" x 2 1/2" brass, polished heavy quality supplied


and fixed with brass screws complete. Per No. 208.00

29 Hinges, butt, 4" x 4" brass, polished heavy quality supplied and
fixed with brass screws complete. Per No. 208.00

30 Hinges, butt, 5" brass, polished heavy quality supplied and


fixed with brass screws complete. Per No. 208.00

31 Hinges centre pivot (consisting of 2 pieces) brass, polished heavy


quality supplied and fixed with brass screws complete.
Per No. 278.00

32 Hinges, gravity, brass, supplied and fixed with brass screws


complete. Per No. 278.00

33 Hinges, Parliamentary, 6" x 4" brass, polished heavy quality


supplied and fixed with brass screws complete. Per No. 208.00

34 Hinges, Parliamentary, 6" x 5" brass, polished heavy quality


supplied and fixed with brass screws complete. Per No. 208.00

35 Locks, rim 6", polished brass, 2 levers, superior quality and


English Manufacture, supplied and fixed. Per No. 270.00

36 Locks, rim 6", polished brass, Single levers, superior quality and
English Manufacture, supplied and fixed. Per No. 270.00

37 Locks, rim 6", polished brass, 4 lever of best quality Local


Manufacture, supplied and fixed. Per No. 304.00

38 Locks, rim 5" single lever of best quality Local Manufacture,


supplied and fixed. Per No. 270.00

39 Locks, Yale or Union, night latch, supplied and fixed with


duplicate keys. Per No. 360.00

249
40 Lock Mortice (Local) single supplied and fixed. Per No. 1,260.00

41 Lock Mortice (Local) double, supplied and fixed. Per No. 1,440.00

42 Lock Mortice Union (Imported) single, supplied and fixed. Per No. 720.00

43 Lock Mortice Union (Imported) double, supplied and fixed. Per No. 1,440.00

PLASTERING

1 5/8" thick plastering to wall in lime and sand 1:2 including


floating with lime putty.
Per Sqr 3,345.00
Per M 2
360.00

2 5/8" thick plastering to wall in cement sand 1:3 including


cement floating.
Per Sqr 5,156.00
Per M2 555.00

3 3/8" thick plastering to soffit of slab in cement and sand 1:3


including floating with lime putty.
Per Sqr 7,587.00
Per M 2
817.00

4 3/8" thick plastering to sides and soffit of beams in cement and


sand 1:3 including floating with lime putty.
Per Sqr 5,689.00
Per M 2
612.00

5 5/8" thick plastering to wall in lime, cement and sand 1:1:5


finished semi rough with wooden float. Per Sqr 3,855.00
Per M 2
415.00

6 5/8" thick plastering to wall in lime, cement and sand 1:1:5


finished smooth with lime putty floating.
Per Sqr 4,798.00
Per M2 516.00

7 1/2" thick rendering in cement and sand 1:3 finished smooth.


Per Sqr 4,657.00
Per M 2
501.00

8 1/2" thick rendering in cement and sand 1:2 in floors, finished


smooth. Per Sqr 5,130.00
Per M 2
552.00

9 3/4" thick rendering in cement and sand 1:3 finished smooth.


Per Sqr 5,430.00
Per M 2
584.00

250
10 3/4" thick rendering in cement and sand 1:2 in floors finished
smooth. Per Sqr 6,624.00
Per M 2
713.00

11 3/4" thick rendering in cement and sand 1:2 in coloured


cement floors finished smooth. Per Sqr 6,624.00
Per M 2
713.00

12 1/2" x 6" skirting in cement and sand 1:3 projected of flush to


walls finished with floating including forming groove.
Per L.ft 96.00
Per M 315.00

PAINTING AND DECORATING

1 Prepare and apply one coat of preservative (Oil type) to structural


timber including touching up cut ends etc. after fixing.

Per Sqr 3,203.00


Per M 2
345.00

2 Prepare surface of steel truss and apply two coats of anti-


corrosive primer. Per Sqr 4,337.00
Per M 2
467.00

3 Apply one coat of anti-corrosive primer and two coats of enamel


paint on already shop primed and erected steel roof truss.
Per Sqr 5,313.00
Per M 2
572.00

4 Prepare and apply two coats of primer and finishing coat of


enamel paint to mild steel (angle/flat) gate. Per Sqr 4,472.00
Per M2 481.00

5 Painting steel on new work with 2 coats of anti-corrosive paint.


Per Sqr 2,409.00
Per M 2
259.00

6 Painting new timber work with 2 coats of wood preservative. Per Sqr 5,580.00
Per M 2
601.00

7 Preparing and painting wood work with primer and 2 coats of


enamel paint. Per Sqr 4,216.00
Per M 2
454.00

8 White or colour washing 2 coats in single storey. Per Sqr 616.00


Per M2 66.00

9 White or colour washing 2 coats in two storeyed building. Per Sqr 730.00
Per M2 79.00

251
10 Prepare and apply one coat of Alkali resistant primer and two
coats of emulsion paint to walls. Per Sqr 3,493.00
Per M2 376.00

11 Cement washing to walls of single storeyed building 2 coats. Per Sqr 539.00
Per M2 58.00

12 Painting walls with emulsion paint (2 Coats). Per Sqr 1,681.00


Per M2 181.00

13 Prepare and apply one coat of Alkali resistant primer and two
coats of emulsion paint to soffit of slabs.
Per Sqr 3,226.00
Per M 2
347.00

14 Varnishing two coats with copal varnish after sand papering. Per Sqr 1,793.00
Per M 2
193.00

15 Wax polishing to timber in panels and floors. Per Sqr 621.00


Per M 2
67.00

16 Prepare and apply one coat of Alkali resistance primer and two
coats of weather shield emulsion paint to walls external. Per Sqr 3,750.00
Per M 2
404.00

17 Prepare and apply two coats of weather shield emulsion paint to


walls external. Per Sqr 2,695.00
Per M 2
290.00

EXTERNAL DRAINAGE & PLUMBING LINE

1 4" dia. PVC pipe type 400 earth ware pipes laid on 6" thick
bedding in cement concrete 1:3:6(1 1/2" ) including excavation
average 2' 0" depth, back filling with selected excavated materials
and concrete to haunching to joints.
Per L.ft 493.00
Per M 1,618.00

2 4" dia. G.I Soil / Vent pipe fixed vertically to walls jointed with
cement caulking (Special measured seperately)
Per L.ft 97.00
Per M 318.00

3 4" dia. G.I pipes fixed to walls jointed with lead caulking. (Special
measured seperately)
Per L.ft 97.00
Per M 318.00

252
4 4" dia. Stoneware gulley with 6" x6" x 6" gulley box including
excavation, 4" cement concrete 1:2:4(3/4" ) base surrounded by 4
1/2" thick cement and sand 1:5 extended 6" above top of gulley
box including making connection, 1/2" cement and sand 1:2
rendering internally and exposted faces finished smooth with
neat cement floating and providing G.I Grating on top of gulley.

Per No. 2,844.00

5 Manhole 2' 0" x 2' 0" internally with invert depth not exceeding 2'
0" including excavation, back filling 6" cement concrete
1:2:4(3/4" ) base with 3/8" dia. Mild steel rods at 4" centres both
ways, forming channels and benching in similar concrete, 4 1/2"
walls in brick in cement sand 1:5 1/2" thick cement and sand
1:2 rendering internally and exposed surfaces including
channels, benching and 2" thick RCC removable cover slab 2' 3"
x 2' 3" inlet and outlet connection all complete to working order.

Per No. 15,961.00

6 22" x 16" glazed fireclay wash basin with 1/2" dia. Chromium
plated pillar tap, waste plug, chromium plated waste chain and
stay, including fixing wash basin on brackets. (Water supply and
waste water connection measured seperately)
Per No. 9,300.00

7 Sink 24" x 15" x 7" overall vitreous China with rubber plug and
chromium plated chain waste carried on iron brackets painted
and fixed to walls. (Water supply and waste water connection
measured seperately)
Per No. 1,110.00

8 Closet pedestal type with L/L flushing cistern, flush pipe double
plastic seat cover 1/2" dia. Stop cock, supplied and fixed
complete to working order.
Per No. 2,580.00

9 Closet Squatting type with trap including high level cistern best
quality plastic fixed complete with flush pipe and 1/2" dia. Stop
cock, all complete to working order.
Per No. 2,940.00

10 Vitreous China bidet suite fixed complete to working order.


(Imported)
Per No. 2,220.00

11 4 No. Bowl type Urinal with trap and 2 gallon automatic flashing
cistern and spreaders complete to working orders.(Ceylon
ceramic)
Per No. 2,580.00

PLUMBING - PVC PIPE

1 1/2" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 42.00
Per M 138.00

253
2 3/4" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 56.00
Per M 184.00

3 1" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 46.00
Per M 151.00

4 1 1/4" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 68.00
Per M 223.00

5 1 1/2" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 91.00
Per M 299.00

6 2" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 142.00
Per M 466.00

7 3" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 349.00
Per M 1,145.00

8 Excavation for laying 1/2" to 3" dia. PVC pipes in ground not less
than 1' 6" deep, back filling and connecting. Per L.ft 18.00
Per M 59.00

9 Chasing brick work for laying 1/2" to 1 1/2" dia. PVC pipes and
making good average depth 2" (Pipes and specials paid
seperately)
Per L.ft 68.00
Per M 223.00

10 Chasing brick work for laying 1 1/2" to 3" dia. PVC pipes in
ground or floor and making good average depth 3" (Pipes and
specials paid seperately)
Per L.ft 81.00
Per M 266.00

11 1/2" dia. PVC specials viz - elbows, bends, sockets (Type 1000) Per No. 40.00

12 3/4" dia. PVC specials viz - elbows, bends, sockets (Type 1000) Per No. 41.00

13 1" dia. PVC specials viz - elbows, bends, sockets (Type 1000) Per No. 49.00

14 1 1/4" dia. PVC specials viz - elbows, bends, sockets (Type 1000)
Per No. 47.00

15 1 1/2" dia. PVC specials viz - elbows, bends, sockets (Type 1000)
Per No. 97.00

16 2" dia. PVC specials viz - elbows, bends, sockets (Type 1000) Per No. 97.00

17 2 1/2" dia. PVC specials viz - elbows, bends, sockets (Type 1000)
Per No. 108.00

254
18 3" dia. PVC specials viz - elbows, bends, sockets (Type 1000) Per No. 115.00

19 1/2" dia. PVC specials viz Tees. Per No. 95.00

20 3/4" dia. PVC specials viz Tees. Per No. 102.00

21 1" dia. PVC specials viz Tees. Per No. 118.00

22 1 1/4" dia. PVC specials viz Tees. Per No. 141.00

23 1 1/2" dia. PVC specials viz Tees. Per No. 258.00

24 2" dia. PVC specials viz Tees. Per No. 323.00

25 2 1/2" dia. PVC specials viz Tees. Per No. 529.00

26 3" dia. PVC specials viz Tees. Per No. 874.00

27 Pipes PVC 1/2" supplied and fixed. (fittings, excavation and back
filling measured seperately)
Per L.ft 15.00
Per M 49.00

28 Pipes PVC 3/4" supplied and fixed. (fittings, excavation and back
filling measured seperately)
Per L.ft 25.00
Per M 82.00

29 Pipes PVC 1" supplied and fixed. (fittings, excavation and back
filling measured seperately)
Per L.ft 37.00
Per M 121.00

30 Pipes PVC 1/2" supplied and fixed. (fittings, excavation and back
filling measured seperately)
Per L.ft 19.00
Per M 62.00

31 Pipes PVC 3/4" supplied and fixed. Per L.ft 32.00


Per M 105.00

32 Pipes PVC 1" supplied and fixed. Per L.ft 47.00


Per M 154.00

33 Pipes PVC 1 1/4" supplied and fixed. Per L.ft 65.00


Per M 213.00

34 Pipes PVC 1 1/2" supplied and fixed. Per L.ft 91.00


Per M 299.00

35 Pipes PVC 2" supplied and fixed. Per L.ft 153.00


Per M 502.00

255
36 Pipes PVC 2" supplied and fixed. (fittings, excavation and back
filling measured seperately) Per L.ft 123.00
Per M 404.00

37 Pipes PVC 3" supplied and fixed. (fittings, excavation and back
filling measured seperately)
Per L.ft 297.00
Per M 974.00

GLAZIER

1 1/8" thick clear sheet panes exceeding 1 Sq.ft but not exceeding
4 Sq.ft, cut and fixed with class I timber beading to doors and
windows.
Per Sq.ft 123.00
Consider sash 3' 0" x 4' 0" with 3' 1 1/4" style and 4 Nos. Glass
panes. Per M2 1,324.00

2 1/8" thick pin head/Reded sheet glass panes exceeding 1 Sq.ft


but not exceeding 4 Sq.ft, cut and fixed with class I timber
beading to doors and windows.
Per Sq.ft 123.00
Per M2 1,324.00

256
PRICE LIST OF BUILDING MATERIALS FOR THE YEAR 2005
AT THIRUKKOVIL
Kanna's
NO. MATERIAL UNIT PRICE

Building materials
1 Cement -- Mitsui Bag 950.00 562.00
Cement -- Hinodi Bag 950.00 530.00
Cement -- Holcim Bag 950.00 530.00
2 Sand Cube 4,000.00
3 Metal -- ½” Cube -
-- ¾” Cube 8,500.00
-- 1” Cube 8,500.00
-- 1 ½” Cube 8,500.00
-- 2” Cube 8,500.00
4 Rubble Cube 4,000.00
5 Cement Blocks 6" x 9" x 4" No 45.00
6 Wire cut brick No -
Brick No 6.00
Roofing Materials
7 Calicut pattern flat tiles No 23.00 25.00
8 Calicut pattern Ridge tile No 40.00 40.00
9 Corrugated Asbestos Sheet (all sizes) Sq.ft 24.00 24.00
10 Flat Asbestos sheet Sq.ft 14.50 14.50
11 Half round clay tiles No -
12 Asbestos Ridges Pairs 950.00
13 GI flat sheet -- 32 guage Sq.ft 30.00 34.00
GI flat sheet -- 30 guage Sq.ft 31.25
Reinforcement
14 Tor steel (all sizes) Kg 120.00
15 Mild steel Kg 120.00
16 Binding wire kg 100.00 105.00
17 Angle iron -- 1" x 1" Lth. 600.00 600.00
-- 1 1/2" x 1 1/2" Lth. 1,400.00 1,400.00
-- 2" x 2" Lth. 1,750.00 1,750.00
18 Flat iron -- 1" x 1/4" Lth. 550.00
19 Box iron -- 3/4" x 3/4" 0.9mm Lth. 195.00
Box iron -- 1" x 1" 0.9mm Lth. 245.00
20 G.I Pipe -- 1/2" Lth. 600.00 600.00
-- 3/4" Lth. 800.00 800.00
-- 1" Lth. 975.00 975.00
-- 1 1/4" Lth. 1,200.00 1,200.00
-- 1 1/2" Lth. 1,425.00 1,425.00
-- 2" Lth. 1,775.00 1,775.00
Timber
21 Class - 1 Timber (specify species) Cu.ft 2,200.00
22 Aluminium flat sheet (specify gauges) Sq.ft 25.00
23 Aluminium bar (specify gauges) L.ft -
24 Door locks (local type horizontal mort
ice locks –: specify). No 600.00 600.00
25
Door locks (imported type horizontal
mort ice locks – union/ Yale etc. specify) No 1,000.00 1,000.00
26 Hinges -- 4" x 3" Iron Pairs 96.00
27 4” long brass screws Doz 150.00
28 ¾” brass screws Doz 30.00
29 ¾” iron screws Doz 12.00
30 Rim lock with screws (single lever / 4
lever) No 360.00
31 Door closer (hydraulic) No 2,750.00
32 Tower / Skeleton bolt No 68.50
33 Barrel bolt No -
34 Casement fasteners No 37.00 37.00
35 Casement stays No 72.00 72.00
36 Wire nails Kg 93.00 93.00
37 Roofing screws and washers No 20.00
38 Mould oil Gln 90.00
39 Basket No 75.00
40 Shuttering Planks Sq.ft -
41 Cabin hooks 3" No 9.50
42 Fibre/plastic plug No -
43 Clout rails Lbs -
44 Class I Cove moulding L.ft -
45 Class I beading L.ft -
46 Yarn Lbs -
47 Lead Lbs -
Painting Materials
48 Colourless wood preservative Ltr 600.00
49 Wood primer Ltr 525.00
50 Emulsion paint Ltr 350.00 350.00
51 Weather shield emulsion Ltr 440.00 440.00
52 Anticorrosive paint Ltr 315.00 315.00
53 Enamel paint Ltr 380.00 380.00
54 Samara colour wash Kg 15.00
55 Green board paint Ltr -
56 Varnish Ltr 316.00 316.00
57 Mineral Turpentine Ltr 100.00 100.00
58 Thinner Ltr 150.00 150.00
59 Boiled lime Kg 10.00
60 Salt Lbs 5.50
61 Yellow ochre Lbs 7.00
62 Blue Ozs 2.50
63 Wax polish Lbs 185.00
64 Sand paper No 22.50
65 Brush -- 2" No 188.00
Brush -- 4" No 390.00
66 Coir Brush No 40.00
67 Wire Brush No 65.00

Bathroom Fittings
1 Ceramic sink (Available sizes) No 3,900.00
2 Wash basin with pedestal No 6,500.00
3 Bib tap (All sizes in brass & plastic) No 250.00
4 Shower rose -- Plastic No 125.00
5 Squatting pan with foot riser (different
types) No 1,250.00
6 Commode with cistern (plastic) No 8,500.00
7 Commode with cistern (ceramic) No 12,500.00
8 Urine bowl No 1,500.00
9 Bathroom mirror 18”x12” No 750.00
10 Cistern (2 Gal) No 1,750.00
Plumbing Materials
11 PVC pipe -- 1/2" L.ft 9.00 9.00
PVC pipe -- 3/4" L.ft 17.50 17.50
PVC pipe -- 1" L.ft 26.00 26.00
PVC pipe -- 1 1/4" L.ft 38.00 38.00
PVC pipe -- 1 1/2" L.ft 55.00 55.00
PVC pipe -- 2" L.ft 93.00 93.00
PVC pipe -- 3" L.ft 238.00 238.00
PVC pipe -- 4" (Type 400) L.ft 106.00 106.00
12 PVC bend -- 1/2" No 13.50 13.50
PVC bend -- 3/4" No 18.00 18.00
PVC bend -- 1" No 27.00 27.00
PVC bend -- 1 1/4" No 55.00 55.00
PVC bend -- 1 1/2" No 88.00 88.00
PVC bend -- 2" No 142.50 142.50
PVC bend -- 2 1/2" No 450.00 450.00
PVC bend -- 3" No 754.00 754.00
13 PVC ‘ T ’ -- 1/2" No 12.00 12.00
PVC ‘ T ’ -- 3/4" No 18.00 18.00
PVC ‘ T ’ -- 1" No 29.00 29.00
PVC ‘ T ’ -- 1 1/4" No 44.00 44.00
PVC ‘ T ’ -- 1 1/2" No 77.00 77.00
PVC ‘ T ’ -- 2" No 118.00 118.00
PVC ‘ T ’ -- 2 1/2" No 216.00 216.00
PVC ‘ T ’ -- 3" No 494.00 494.00
14 PVC Elbow -- 1/2" No 10.00 10.00
PVC Elbow -- 3/4" No 12.75 12.75
PVC Elbow -- 1" No 21.00 21.00
PVC Elbow -- 1 1/4" No 33.00 33.00
PVC Elbow -- 1 1/2" No 58.50 58.50
PVC Elbow -- 2" No 92.50 92.50
PVC Elbow -- 2 1/2" No 220.50 220.50
PVC Elbow -- 3" No 374.00 374.00
15 PVC Sockets -- 1/2" No 10.00 10.00
PVC Sockets -- 3/4" No 11.50 11.50
PVC Sockets -- 1" No 18.00 18.00
PVC Sockets -- 1 1/4" No 25.00 25.00
PVC Sockets -- 1 1/2" No 38.00 38.00
PVC Sockets -- 2" No 62.00 62.00
PVC Sockets -- 2 1/2" No 168.30 168.30
PVC Sockets -- 3" No 248.00 248.00
16 PVC End cap -- 1/2" No 11.00 11.00
PVC End cap -- 3/4" No 11.75 11.75
PVC End cap -- 1" No 15.75 15.75
PVC End cap -- 1 1/4" No 21.00 21.00
PVC End cap -- 1 1/2" No 30.50 30.50
PVC End cap -- 2" No 44.00 44.00
PVC End cap -- 2 1/2" No 139.00 139.00
PVC End cap -- 3" No 196.00 196.00
PVC End cap -- 4" No 231.00 231.00
17 PVC Shoe (specify sizes) No -
18 PVC Joiner (specify sizes) No -
19 PVC Straps (specify sizes) No -
20 6” uPVC gutter L.ft 42.25 42.25
21 PVC Mitre head No 180.00 180.00
22 PVC Gutter joiner No 58.50 58.50
23 PVC Gutter brackets No 15.00 15.00
24 PVC Gutter head No 130.00 130.00
25 4” uPVC down pipe L.ft 34.00 34.00
26 6” UPVC pipe L.ft -
27 4” UPVC pipe L.ft -
28 Compact Ball Valves -- 1/2" No 84.50 84.50
Compact Ball Valves -- 3/4" No 152.50 152.50
Compact Ball Valves -- 1" No 164.00 164.00
Compact Ball Valves -- 1 1/4" No 249.30 249.30
Compact Ball Valves -- 1 1/2" No 332.00 332.00
Compact Ball Valves -- 2" No 530.00 530.00
29 Lanka ceramic floor tiles -- 12" x 12" No 100.00
30 Wall tiles -- 12"x8" No 65.00
31 Solvent cement Grm 1.50 1.50
32 Clips & Nails No -
33 Stop cock No 160.00
34 Stone ware Gulley with Gulley box
(specify sizes) No 350.00

Electrical Items
1 5 amp Plug (all brands) No 195.00
2 15 amp Plug (all brands) No 260.00
3 13 amp Plug (all brands) No 280.00
4 Fluorescent light 4’ 0” (all brands) No 475.00
5 Pendant lamp fittings-ceiling rose No 16.50
Flat holder No 27.50
Angled holder No 8.50
6 30 amp power control box MCB No 75.00
7 30 amp Trip switch No 575.00
8 Main switch No 250.00
9 Conduits, Earth wire Yard 25.00
10 Ceiling fan (all brands) No 3,750.00
11 Ceiling swing fan No 6,500.00
12 Electric motor ¾ Hp, 1Hp, 1 1/2Hp No 22,500.00
13 Electric wire 1/044 870.00
14 Conduit pipe -- ½” Lth 55.00
Conduit pipe -- ¾” Lth 85.00
Conduit pipe -- 1” Lth 110.00
15 Switches – 1 gang No 70.00
Switches – 2 gang No 135.00
16 3 phase MEM main switch No 7,500.00

Labour Rates
1 Skilled Labour Day 1,200.00
2 Unskilled Labour Day 650.00

Water Glns. 10.00

Door
1 Iron gate with all fittings
2 Plastic door with fittings
Aathavan

560.00
525.00
535.00
2,150.00

8,000.00
7,000.00
6,000.00
5,500.00
3,000.00
30.00

6.00

23.00
42.50
24.00
21.25

950.00
30.00
31.25

80.00
65.00
100.00

2,400.00
550.00
195.00
245.00
2,200.00
25.00

625.00

96.00
150.00
30.00
12.00

360.00
2,750.00
68.50

42.00
80.00
100.00
20.00
90.00
75.00

9.50

600.00
525.00
415.00
488.00
320.00
435.00
15.00

360.00
125.00
240.00
10.00
5.50
7.00
2.50
185.00
22.50
188.00
390.00
40.00
65.00

3,900.00
6,500.00
250.00
125.00

1,250.00
8,500.00
12,500.00
1,500.00
750.00
1,750.00
100.00
65.00

160.00
350.00

195.00
260.00
280.00
475.00
16.50
27.50
8.50
75.00
575.00
250.00
25.00
3,750.00
6,500.00
22,500.00
870.00
55.00
85.00
110.00
70.00
135.00
7,500.00
BOQ QTY.
NO DESCRIPTION UNIT
Skl. Lab Unskl.Lab
Day Day
EXCAVATION

1 Removing top soil to a depth not


exceeding 6" depositing as directed
within site. Sqr
Unskilled Labour Day 1.00

2 Excavation over site to reduced level, in


any material except rock requiring
blasting including depositing and
levelling as directed upto a distance not
exceeding 30' 0" Cube
Unskilled Labour (1 5/8) Day 1.625

3 Excavation in trenches for walls column


pits in soft /loose soil from 0' 0" to 5' 0"
deep and depositing excavated material
to a distance not exceeding 30' 0" (Earth
work support to be paid seperately where
necessary)
Cube
Unskilled Labour Day 1.00

4 Excavation in trenches for walls column


pits in ordinary soil from 0' 0" to 5' 0"
deep and depositing excavated material
to a distance not exceeding 30' 0" Cube
Unskilled Labour Day 2.25

5 Excavation in trenches for walls column


pits in Hard/Dense soil upto a depth of 5'
0" and depositing excavated material to a
distance not exceeding 30' 0"
Cube
Unskilled Labour Day 3.50

6 Excavation in trenches for walls column


pits in Mud/Wet soil upto a depth of 5' 0"
and depositing excavated material to a
distance not exceeding 30' 0" (Earth work
and dewatering paid for seperately)
Cube
Unskilled Labour Day 3.00
7 Excavation in trenches for walls column
pits in soft disintergrated rock (Not
requiring blasting) upto a depth of 5' 0"
and depositing excavated material to a
distance not exceeding 30' 0"
Cube
Unskilled Labour Day 2.50

8 Excavation in trenches for walls column


pits in Hard rock requiring blasting upto a
depth of 5' 0" and depositing excavated
material to a distance not exceeding 30'
0" Cube
Blasting powder Lbs. 0.75
Fuse L.ft 10.00
Jumper Steel Lbs. 1.00
Fuel & Forge - 20% of Material Cost
Skilled Labour Day 1.00
Unskilled Labour Day 2.00

9 Benching rock in foundation in 3' 6"


steps.(Blasting prohibited) Sq.ft
Skilled Labour Day 0.15
Unskilled Labour Day 0.15

ANTI - TERMITE TREATMENT

10 Anti - Termite treatment on excavated


foundation and compacted soil under
floor. Sqr
D.D.T Powder Lbs. 16.00
Water Gal 20.00
Unskilled Labour Day 0.50

EARTH WORK

11 Earth work - Back filling and compacting


Sqr
Back filling to trenches with selected earth
available at site.
Unskilled Labour Day 1.00

12 Back filling to trenches with selected


imported material. Cube
Earth delivered at site Cube 1.15
Allow 15% compaction
Unskilled Labour Day 1.25

13 Filling under floors including levelling,


watering and compacting in 3" layers with
available and selected earth at site.
Cube
Unskilled Labour Day 2.00

14 Filling under floors including levelling,


watering and compacting in 3" layers with
selected imported earth. Cube
Earth delivered at site Cube 1.15
Allow 15% compaction
Unskilled Labour Day 2.00

15 Cutting turf sods, loading to hand carts


and transporting upto 30 yards, laying
and watering for 30 days. (Royalty for
turf, pegging and transport beyond 30
years paid seperately)
Sqr
Unskilled Labour (Laying turf rids at site) Day 2.50
Unskilled Labour (Watering for 30 days) Day 0.50
Unskilled Labour Day 1.50
Water Gal 60.00

16 Earth work support (Open planking) in


trenches upto a depth of 5' 0" Sq.ft
Class II Timber (4 uses) Cu.ft 0.12
Carpenter Day 0.01
Unskilled Labour Day 0.02

17 Earth work support (Close planking) in


trenches upto a depth of 5' 0" Sq.ft
Class II Timber (4 uses) Cu.ft 0.20
Carpenter Day 0.01
Unskilled Labour Day 0.04

18 Earth support (Close planking) in deep


excavation in trenches upto a depth of
15' 0" Sq.ft
Class II Timber (4 uses) Cu.ft 0.22
Carpenter Day 0.02
Unskilled Labour Day 0.04

CONCRETE
1 Cement concrete 1:3:6 ( 2" ). (Shuttering
paid for seperately) Cube
Cement Cwts 11.25
Sand Cube 0.56
2" Metal Cube 1.00
Mason Day 1.00
Labour Day 8.00

3 Cement concrete 1:2 1/2:5 ( 1" ).


(Shuttering paid for seperately) Cube
Cement Cwts 13.60
Sand Cube 0.60
1" Metal Cube 1.00
Mason Day 1.00
Labour Day 8.00

5 Cement concrete 1:2:4 ( 3/4" ).


(Shuttering paid for seperately) Cube
Cement Cwts 18.00
Sand Cube 0.60
3/4" Metal Cube 1.00
Mason Day 1.00
Labour Day 8.00

7 Channels 2" semi - circular, formed in


cement concrete floors and 1/2" cement
rendered 1:2 (Extra over concrete floor) L.ft
Cement & Sand Allow
Mason Day 0.03
Labour Day 0.013

8 Channels 4" semi - circular, formed in


cement concrete floors and 1/2" cement
rendered 1:2 (Extra over concrete floor) L.ft
Cement & Sand Allow
Mason Day 0.03
Labour Day 0.013

9 Corbel stones in cement concrete 1:2:4


(3/4" ) reinforced with 4 nos. 3/8" rods
upto 1 Cu.ft in volume. Per corbel stone
6' x 9" x 15" Cu.ft
3/8" MS Rods Lbs 1.85
Mason Day 0.09
Labour Day 0.09

10 Curb in cement concrete 1:2:4 (3/4" ) 9"


high and 3" thick, Cement rendered 1/2"
thick including, Excavation. L.ft
Materials for concrete as in Item (5) Cu.ft 2.00
Cement for 7 1/2 Sq.ft rendering at Cwt. 0.125
Allow for sand for rendering
Mason Day 1.00
Labour Day 1.00

11 Drains, Semi - Circular, in cement


concrete1:3:6 (1" ) 9" wide and 9" average
depth, with 3" thick sides and base,
inclusive of 1/2" cement rendering 1:3
and expansion joints as necessary,
including necessary excavation.(without
ramp)

Data: Per 10.0 L.ft


Cement Cwt. 1.25
Sand Cube 0.06
1" Metal Cube 0.08
Mason Day 0.50
Labour Day 1.00
Mason Day 0.50
Labour Day 0.50

12 Lintol, cement concrete 1:2:4 (3/4" ), 4


1/2" x 6" (Reinforcement paid for
seperately)

Data: Per 10.0 L.ft


(2 Lintols each 5' 0" )
Cement Cwt. 0.30
Sand Cube 0.01
3/4" Metal Cube 0.02
Planks Sq.ft 14.00
Carpenter Hrs 2.00
Labour Hrs 2.00
Mason Hrs 2.00
Labour Hrs 2.00
13 Lintol, cement concrete 1:2:4 (3/4" ), 9" x
6" (Reinforcement paid for seperately)

Data: Per 10.0 L.ft


(2 Lintols each 5' 0" )
Cement Cwt. 0.60
Sand Cube 0.02
3/4" Metal Cube 0.035
Planks at (1/4 Cost) Sq.ft 17.00
Carpenter Hrs 2.00
Labour Hrs 2.00
Mason Hrs 2.00
Labour Hrs 2.00

14 Lintol, cement concrete 1:2:4 (3/4" ), 9" x


9" (Reinforcement paid for seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
Materials Cost Unit Qty.
Cement Cwt. 1.35
Sand Cube 0.04
3/4" Metal Cube 0.08
Planks at (1/4 new Cost) Sq.ft 34.00
Allow for timber props and nails

LabourCost
Erection & Removing shuttering
Carpenter Hrs 3.00
Labour Hrs 3.00

Concreting, including curing


Mason Day 0.50
Labour Day 1.00

Add Over head & Profit 35%


Rate per 15.0 L.ft
Rate per L.ft

Per L.ft
Per M
15 Lintol, cement concrete 1:2:4 (3/4" ), 12"
x 9" (Reinforcement paid for seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
Materials Cost Unit Qty.
Cement Cwt. 1.85
Sand Cube 0.05
3/4" Metal Cube 0.11
Planks at (1/4 new Cost) Sq.ft 36.00
Allow for timber props and nails

LabourCost
Erection & Removing shuttering
Carpenter Day 0.50
Labour Day 0.50

Concreting, including curing


Mason Day 0.50
Labour Day 1.00

Add Over head & Profit 35%


Rate per 15.0 L.ft
Rate per L.ft

Per L.ft
Per M

16 Lintol, cement concrete 1:2:4 (3/4" ), 13


1/2" x 6" (Reinforcement paid for
seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
Materials Cost Unit Qty.
Cement Cwt. 1.40
Sand Cube 0.05
3/4" Metal Cube 0.08
Planks at (1/4 new Cost) Sq.ft 24.00
Allow for timber props and nails
LabourCost
Erection & Removing shuttering
Carpenter Day 0.50
Labour Day 0.50

Concreting, including curing


Mason Day 0.50
Labour Day 1.00

Add Over head & Profit 35%


Rate per 15.0 L.ft
Rate per L.ft

Per L.ft
Per M

17 Lintol, cement concrete 1:2:4 (3/4" ), 13


1/2" x 9" (Reinforcement paid for
seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
Materials Cost Unit Qty.
Cement Cwt. 2.12
Sand Cube 0.06
3/4" Metal Cube 0.115
Planks at (1/4 new Cost) Sq.ft 38.00
Allow for timber props and nails

LabourCost
Erection & Removing shuttering
Carpenter Day 0.50
Labour Day 0.50

Concreting, including curing


Mason Day 0.625
Labour Day 1.25

Add Over head & Profit 35%


Rate per 15.0 L.ft
Rate per L.ft
Per L.ft
Per M

18 Lintol, cement concrete 1:2:4 (3/4" ), 13


1/2" x 12" (Reinforcement paid for
seperately)

Data: Per 20.0 L.ft


(2 Lintols each 8' 0" )
Materials Cost Unit Qty.
Cement Cwt. 3.50
Sand Cube 0.11
3/4" Metal Cube 0.21
Planks at (1/4 new Cost) Sq.ft 42.00
Allow for timber props and nails

LabourCost
Erection & Removing shuttering
Carpenter Day 0.75
Labour Day 0.75

Concreting, including curing


Mason Day 1.00
Labour Day 2.00

Add Over head & Profit 35%


Rate per 20.0 L.ft
Rate per L.ft

Per L.ft
Per M

19 Lintol, cement concrete 1:2:4 (3/4" ),


precast or insitu. (Reinforcement paid for
seperately)

Data: Per 4 stone (1' 6" x 1' 6" x 0' 6" )


(2 Lintols each 7' 6" )
Materials Cost Unit Qty.
Cement Cwt. 0.58
Sand Cube 0.02
3/4" Metal Cube 0.35
Planks at (1/4 new Cost) Sq.ft 12.00
Allow for timber props and nails

LabourCost
Mason Hrs 2.00
Labour Hrs 2.00

Add Over head & Profit 35%


Rate per 4 stone
Rate per stone

Per Stone

20 Roof flat, Cement concrete 4" thick, 1:2:4


(3/4" ) and 1/2" cement rendered 1:2 with
5% Padlo and reinforced with expanded
metal, and lime puttying soffit complete.
(Reinforcement paid for seperately)

Data: Per Sqr

Materials Cost Unit Qty.


Cement Cwt. 6.50
Sand Cube 0.20
3/4" Metal Cube 0.33
Boiled Lime Bushel 0.75

Shuttering
Planks at (1/4 new Cost) Sq.ft 115.00
Round timber props at (1/4 new cost) L.ft 80.00
2" Nails Lbs. 2.00
Mould oil Gln. 0.25
Timber in joists Cu.ft 5.00

LabourCost
Mason Day 1.75
Carpenter Day 1.00
Labour Day 8.50

Rendering
Cement Cwt. 1.50
Sand Cube 0.075
Padlo Cement Lbs. 8.50

Mason Day 0.75


Labour Day 1.50

Basket 0.33
Allow for water

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

21 Slabs over drain cement concrete 3" thick


1:2:4 (3/4" ) reinforced with expanded
metal and 1/2" cement rendered 1:2
( Reinfoecement paid for seperately)

Data: Per 10' 0" Length (15.0 Sq.ft)

Materials Cost Unit Qty.


Cement Cwt. 0.60
Sand Cube 0.02
3/4" Metal Cube 0.04
Shuttering Planks at (1/4 new Cost) Sq.ft 16.00

LabourCost
Mason Hrs 2.00
Labour Hrs 4.00

Rendering
Cement Cwt. 0.23
Sand Cube 0.010

Mason Hrs 1.00


Labour Hrs 1.00
Add Over head & Profit 35%
Rate per 15.0 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

22 Spur stone cement concrete 1:2:4(3/4" )


for verandah posts supplied and fixed. (8"
x 8" x 6" )

Data: Per 10 Stone

Materials Cost Unit Qty.


Cement Cwt. 0.36
Sand Cube 0.01
3/4" Metal Cube 0.02
Allow for moulds

LabourCost
Mason Day 0.75
Labour Day 0.75

Add Over head & Profit 35%


Rate per 10 stone
Rate per Stone

Per Stone

23 Spur stone cement concrete 1:2:4(3/4" )


for door posts supplied and fixed. (4" x 3"
x 2" )

Data: Per 10 Stone

Materials Cost Unit Qty.


Cement Cwt. 0.03
Sand Cu.ft 0.07
3/4" Metal Cu.ft 0.015
Allow for moulds

LabourCost
Mason Hrs 2.00
Labour Hrs 2.00

Add Over head & Profit 35%


Rate per 10 stone
Rate per Stone

Per Stone

24 Squatting plate for latrines, cement


concrete 1:2:4(3/4" ) as per type plan.

Data: Per

Materials Cost Unit Qty.


Cement Cwt. 0.30
Sand Cu.ft 0.80
3/4" Metal Cu.ft 1.50
1/4"MS rod Lbs. 5.00
Allow for Binding wire and use of Moulds

LabourCost
Smith Hrs 0.50
Mason Hrs 2.00
Labour Hrs 2.00

Add Over head & Profit 35%

25 Cement concrete 1:2 1/2:5 ( 1" ) using


concrete mixer & vibrator. (Shuttering
paid for seperately)

Data: Per Cube

Materials Cost Unit Qty.


Cement Cwts 14.00
Sand Cube 0.60
1" Metal Cube 1.00
Labour Cost
Mason Day 1.00
Labour Day 6.00
Basket 0.66
Allow for Water & curing Allow
Allow for 1/3 day hire of mixer, vibrator,
wages of operator,fuel etc.

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

26 Cement concrete 1:2:4 ( 3/4" ) in column


shafts (Reinforcements, shuttering and
finishes paid for seperately) in ground
floor using concrete mixer & vibrator.

Data: Per Cube

Materials Cost Unit Qty.


Cement Cwts 18.00
Sand Cube 0.60
3/4" Metal Cube 1.00

Labour Cost
Mason Day 1.00
Labour Day 6.00
Basket 0.66
Allow for Water & curing Allow
Allow for 1/3 day hire of mixer, vibrator,
wages of operator,fuel etc.

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

27 Cement concrete as per Item 26 in 1st


floor.
Data: Per Cube

As per Item 26
Labour Day 2.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

28 Cement concrete as per Item 26 in 2nd


floor.

Data: Per Cube

As per Item 26
Labour Day 5.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

29 Cement concrete 1:2:4 ( 3/4" ) in beams


(Reinforcements, shuttering and finishes
paid for seperately) in ground floor using
concrete mixer & vibrator.

Data: Per 2.0 Cube

Materials Cost Unit Qty.


Cement Cwts 36.00
Sand Cube 1.20
3/4" Metal Cube 1.80

Labour Cost
Mason Day 2.50
Labour Day 16.00
Basket 1.33
Allow for Water & curing Allow
Allow for 2/3 day hire of mixer, vibrator,
wages of operator,fuel etc.

Add Over head & Profit 35%


Rate per 2.0 Cube
Rate per Cube

Per Cube
Per M3

30 Cement concrete as per Item 29 in 1st


floor.

Data: Per Cube

As per Item 29
Labour Day 2.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

31 Cement concrete as per Item 29 in 2nd


floor.

Data: Per Cube

As per Item 29
Labour Day 5.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3
32 Shuttering for floor slab concrete and
dismantling.

Data: Per Sqr

Materials Cost Unit Qty.


Planks (Rubber) 1/2 new cost Sq.ft 115.00
4" x 2" Class II joist (1/4 new cost) L.ft 50.00
Props (10-12) ft. Round jungle timber (1/4
cost) Nos. 32.00
Wire nail 2" Lbs. 2.00
Mould oil Gln. 0.25

Labour Cost
Carpenter Day 1.00
Labour Day 3.00

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

33 Shuttering for Column shaft and


dismantling. (for column 9" x 9" x 4 ft.
high. i.e. 4 1/2 ft. Box)

Data: Per 12 Sq.ft of column surface area

Materials Cost Unit Qty.


1" Ginisappu Planks. (1/4 new cost) Sq.ft 16.25
2" x 2" Class II battens (1/4 new cost) L.ft 15.00
Props Bamboos (1/3 cost) Nos. 5.00
3/8" dia. 18" bolts, nuts & washers (1/18
cost) Nos. 6.00
Mould oil pint 0.25
Allow for screws and nails

Labour Cost
Carpenter Day 0.375
Labour Day 0.375
Add Over head & Profit 35%
Rate per 12 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

34 Shuttering for beam including


dismantling. (12" x 18" Beam 20 ft. long)

Data: Per 80.0 Sq.ft

Materials Cost Unit Qty.


Ginisappu Planks. (1/2 cost) Sq.ft 86.00
2" x 2" Class II Timber (1/4 new cost) L.ft 200.00
Round timber Props (10-12 L.ft) (1/4 cost) Nos. 20.00
2' to 3" wire nails Lbs. 7.00
Mould oil Gln. 0.125

Labour Cost
Carpenter Day 1.00
Labour Day 1.00

Add Over head & Profit 35%


Rate per 80.0 Sq.ft (Three Sides)
Rate per Sq.ft

Per Sq.ft
Per M2

35 Cement concrete 1:2:4 ( 3/4" ) Lintol in


ground floor (Reinforcements and
shuttering paid for seperately) using
concrete mixer & vibrator.

Data: Per Cube

Materials Cost Unit Qty.


Cement Cwts 18.00
Sand Cube 0.60
3/4" Metal Cube 0.90
Labour Cost
Mason Day 2.00
Labour Day 16.00
Basket 0.66
Allow for Water & curing Allow
Allow for 1/2 day hire of mixer, vibrator,
wages of operator,fuel etc.

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

36 Cement concrete lintols as per Item 35 in


1st floor.

Data: Per Cube

As per Item 35 in Ground floor


Labour Day 2.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

37 4" thick R.C.C 1:2:4 (3/4" ) in first floor


slab (Reinforcements and shuttering paid
for seperately) using concrete mixer &
vibrator.

Data: Per 8.00 Sqrs

Materials Cost Unit Qty.


Cement Cwts 45.33
Sand Cube 1.60
3/4" Metal Cube 2.40
Hire of mixer, Vibrator with operator & fuel
Day 1.00
Labour Cost
Mason Day 4.00
Labour Day 24.00
Allow for Water & curing Allow

Add Over head & Profit 35%


Rate per 8.00 Sqr
Rate per Sqr

Per Sqr
Per M2

38 5" thick R.C.C 1:2:4 (3/4" ) in first floor


slab (Reinforcements and shuttering paid
for seperately) using concrete mixer &
vibrator.

Data: Per 8.00 Sqrs

Materials Cost Unit Qty.


Cement Cwts 56.66
Sand Cube 2.00
3/4" Metal Cube 3.00
Hire of mixer, Vibrator with operator & fuel
Day 1.00

Labour Cost
Mason Day 4.00
Labour Day 25.00
Allow for Water & curing Allow

Add Over head & Profit 35%


Rate per 8.00 Sqr
Rate per Sqr

Per Sqr
Per M2

39 Drains semi circular in cement concrete


1:3:6 (1" ), 9" wide and 9" average depth,
3" thick sides and base, inclusive of 1/2"
cement rendering 1:3 with necessary
expansion joints and excavation, but
without ramp.
Data: Per 10.0 L.ft

Materials Cost Unit Qty.


Cement Cwts 1.25
Sand Cube 0.06
1" Metal Cube 0.08

Labour Cost
Mason Day 1.00
Labour Day 1.50
Allow for shuttering Allow

Add Over head & Profit 35%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

40 Drains in cement concrete 1:3:6 (1" ), as


above, but with ramp 1' 6" wide.

Data: Per 10.0 L.ft

Materials Cost Unit Qty.


Drain as per Item 39
1:3:6 (1" ) Concrete Cu.ft 3.75
1:3 Rendering (1/2" th.) Sq.ft 15.00

Add Over head & Profit 35%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

41 Mixing concrete 1:3:6 ( 1 1/2" )

Data: Per Cube

Materials Cost Unit Qty.


Cement Cwts 13.00
Sand Cube 0.53
1 1/2" Metal Cube 0.92
Hire of mixer Day 0.33
Water Glns. 110.00

Labour Cost
Skilled Labour Day 0.33
Unskilled Labour Day 2.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

42 Bulking 2" thick cement concrete screed


in foundation at depth not exceeding 5' 0"

Data: Per Sqr

Materials Cost Unit Qty.


Concrete Cube 0.17
Wastage 10%

Labour Cost
Skilled Labour Day 0.125
Unskilled Labour Day 0.25

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

Note: For laying concrete at depths more


than 5' 0" Add 1/6 day unskilled labour for
each additional 5' 0" or part the roof per sqr.
43 3" thick cement concrete screed in
foundation at depth not exceeding 5' 0"
1:3:6 (1 1/2" )

Data: Per Sqr

Materials Cost Unit Qty.


Concrete Cube 0.25

Labour Cost
Skilled Labour Day 0.125
Unskilled Labour Day 0.75

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

Note: For laying concrete at depths more


than 5' 0" Add 1/4 day unskilled labour for
each additional 5' 0" or part the roof per sqr.

44 6" thick cement concrete floor (Mass


concrete) 1:3:6 (1 1/2" )

Data: Per Sqr

Materials Cost Unit Qty.


Concrete Cube 0.50
Water Glns. 200.00

Labour Cost
Skilled Labour Day 0.25
Unskilled Labour Day 0.75

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2
Note: a) Water available at site. b)
If water is not available allowance must be
made for transport of water.

45 Supply and laying Grade 20 Ready mix


concrete. Rate include for pump, vibrator
and for laying changes.

Data: Per 1 M3 (0.353 Cube)

Materials Cost Unit Qty.


Ready mix concrete M 3
1.00
Pumping charges M 3
1.00
Hire of vibrator Hrs 0.06

Labour Cost
Vibrator operator Hrs 0.50
Mason (2 x 1/2 day) Hrs 1.00
Labour (4 x 1/2 day) Hrs 2.00
Carpenter Hrs 0.50
Allow for curing

Add Over head & Profit 35%


Rate per M3

Per Cube
Per M3

STEEL FABRICATOR

46 Mild steel reinforcement to Lintols, Slabs,


Beams and Columns bent to shape, laid in
position and tied with G.I wire as
directed.

Data: Per 1.0 Cwt.

Materials Cost Unit Qty.


Mild Steel (including transport) Cwt. 1.00
Allow for wastage 10%
Binding wire Lbs. 1.00
Labour Cost
Steel Fabricator Day 1.00
Unskilled Labour Day 1.00

Add Over head & Profit 35%


Rate per Cwt.

Per Cwt.
Per kg

47 Tor steel reinforcement to Lintols, Slabs,


Beams and Columns bent to shape, laid in
position and tied with G.I wire as
directed.

Data: Per 1.0 Cwt.

Materials Cost Unit Qty.


Tor Steel (including transport) Cwt. 1.00
Allow for wastage 10%
Binding wire Lbs. 1.00

Labour Cost
Steel Fabricator Day 1.00
Unskilled Labour Day 1.00

Add Over head & Profit 35%


Rate per Cwt.

Per Cwt.
Per kg

BRICK MASONRY

1 Brick work in cement sand 1:5 in


foundation upto D.P.C

Data: Per Cube

Materials Cost Unit Qty.


Bricks Nos. 1450
Wastage 5%
Cement Cwts 4.00
Sand Cube 0.25
Water Glns. 150.00

Labour Cost
Mason Day 3.00
Labour Day 4.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

2 Brick work in cement sand 1:8 in


foundation upto D.P.C

Data: Per Cube

Materials Cost Unit Qty.


Bricks Nos. 1450
Wastage 5%
Cement Cwts 2.33
Sand Cube 0.38
Water Glns. 150.00

Labour Cost
Mason Day 3.00
Labour Day 4.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

3 Brick work in cement sand 1:5 in 4" thick


walls in ground floor.

Data: Per Sqr


Materials Cost Unit Qty.
Bricks Nos. 550
Wastage 5%
Cement Cwts 1.30
Sand Cube 0.10
Water Glns. 50.00

Labour Cost
Mason Day 1.50
Labour Day 2.00
Scaffolding ( Add 5%)

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

4 9" thick brick wall in cement sand 1:5 in


ground floor.

Data: Per Sqr

Materials Cost Unit Qty.


Bricks Nos. 1090
Wastage 5%
Cement Cwts 3.00
Sand Cube 0.20
Water Glns. 115.00

Labour Cost
Mason Day 2.25
Labour Day 3.75
Scaffolding ( Add 3%)

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2
5 Brick work 13 1/2" thick in cement sand
1:5 in super structure in ground floor.

Data: Per Sqr

Materials Cost Unit Qty.


Bricks Nos. 1630
Wastage 5%
Cement Cwts 4.50
Sand Cube 0.30
Water Glns. 170.00

Labour Cost
Mason Day 3.50
Labour Day 5.50
Scaffolding ( Add 2%)

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

6 9" thick brick wall in cement sand 1:8 in


super structure in ground floor.

Data: Per Sqr (i.e. 0.75 Cube)

Materials Cost Unit Qty.


Bricks Nos. 1090
Wastage 5%
Cement Cwts 1.75
Sand Cube 0.30
Water Glns. 115.00

Labour Cost
Mason Day 2.25
Labour Day 3.00
Scaffolding ( Add 3%)
Add Over head & Profit 35%
Rate per Sqr

Per Sqr
Per M2

7 4 1/2" thick brick wall (wire cut) in


cement sand 1:5 in ground floor. (Facing
to brick work measured seperately)

Data: Per Sqr

Materials Cost Unit Qty.


Wire Cut Bricks Nos. 550
Wastage 2%
Cement Cwts 1.20
Sand Cube 0.08
Water Glns. 30.00

Labour Cost
Mason Day 1.50
Labour Day 2.00
Scaffolding ( Add 5%)

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

8 9" thick brick wall (wire cut) in cement


sand 1:5 in ground floor. (Facing to brick
work measured seperately)

Data: Per Sqr

Materials Cost Unit Qty.


Wire Cut Bricks Nos. 1080
Wastage 4%
Cement Cwts 2.50
Sand Cube 0.18
Water Glns. 100.00

Labour Cost
Mason Day 2.25
Labour Day 3.75
Scaffolding ( Add 3%)

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

9 13 1/2" thick brick wall (wire cut) in


cement sand 1:5 in ground floor. (Facing
to brick work measured seperately)

Data: Per Sqr

Materials Cost Unit Qty.


Wire Cut Bricks Nos. 1630
Wastage 2%
Cement Cwts 4.50
Sand Cube 0.30
Water Glns. 50.00

Labour Cost
Mason Day 3.75
Labour Day 5.50
Scaffolding ( Add 2%)

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

10 Extra over fire facing including raised


pointing 1/8" thick in cement and sand
1:1 mixture in ground floor.
Data: Per Sqr

Materials Cost Unit Qty.


Cement Cwts 0.50
Sand Cube 1.00
Acid Glns. 0.10
Water Glns. 10.00

Labour Cost
Mason Day 5.00
Labour Day 3.50

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

11 3" thick floor paved in lime mortar 2:5 in


ground floor.

Data: Per Sqr

Materials Cost Unit Qty.


Brick Nos 350.00
Slaked Lime Cwt. 1.20
Sand Cube 0.11
Water Glns. 45.00

Labour Cost
Mason Day 1.25
Labour Day 2.50

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2
12 Steps 1' 1 1/2" x 0' 6" in brick in cement
and sand 1:5 with 1/2" thick cement and
sand 1:2 rendering including necessary
excavation.

Data: Per 10.0 L.ft

Materials Cost Unit Qty.


Brick Nos 120.00
Cement Cwt. 0.50
Sand Cube 0.50
Water Glns. 15.00

Labour Cost
Mason Day 0.50
Labour Day 0.50

Add Over head & Profit 35%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

13 Brick drains in cement and sand 1:5, 9"


wide and 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to
exposed faces with 1' 6" ramp including
necessary excavation.

Data: Per 10.0 L.ft

Materials Cost Unit Qty.


Brick Nos 140.00
Cement Cwt. 0.80
Sand Cube 0.05
Water Glns. 20.00

Labour Cost
Mason Day 1.75
Labour Day 1.25
Add Over head & Profit 35%
Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

14 Brick drains in cement and sand 1:5, 9"


wide and 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to
exposed faces without ramp including
necessary excavation.

Data: Per 10.0 L.ft

Materials Cost Unit Qty.


Brick Nos 110.00
Cement Cwt. 0.70
Sand Cube 0.04
Water Glns. 15.00

Labour Cost
Mason Day 1.50
Labour Day 1.25

Add Over head & Profit 35%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

HOLLOW BLOCK MASONRY

1 8" thick hollow block work in cement and


sand mortar 1:5 in ground floor (Cavities
unfilled)

Data: Per Sqr


10' 0" x 10' 0" area ( size of each block 16"
x 8" x 8" )
Materials Cost Unit Qty.
Hollow Cement Blocks Nos 112.00
Wastage 5%
Cement Cwt. 0.75
Sand Cube 0.06

Labour Cost
Mason Day 1.50
Labour Day 2.50
Scaffolding (Add 3%)

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

2 4" thick hollow block work in cement and


sand mortar 1:5 in ground floor (Cavities
unfilled)

Data: Per Sqr


10' 0" x 10' 0" area ( size of each block 16"
x 8" x 4" )
Materials Cost Unit Qty.
Hollow Cement Blocks Nos 112.00
Wastage 5%
Cement Cwt. 0.40
Sand Cube 0.03

Labour Cost
Mason Day 1.00
Labour Day 2.00
Scaffolding (Add 5%)

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

RUBBLE MASONRY
1 Random rubble masonry in cement
mortar1:5 in foundation.

Data: Per Cube (14" thick)

Materials Cost Unit Qty.


6" x 9" Rubble Cube 1.30
Cement Cwts 5.00
Sand Cube 0.30
Water Glns. 100.00

Labour Cost
Mason Day 4.00
Labour Day 6.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

2 Random rubble masonry in cement


mortar1:5 in super structure.

Data: Per Cube (14" thick)

Materials Cost Unit Qty.


6" x 9" Rubble Cube 1.30
Cement Cwts 5.00
Sand Cube 0.30
Water Glns. 100.00

Labour Cost
Mason Day 2.50
Labour Day 7.50
Scaffolding - Add 3%.

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

TILING

1 Pressed floor tiles bedded in 1/2" cement


mortar 1:2 and pointing in neat cement
in ground floor.

Data: Per Sqr

Materials Cost Unit Qty.


Pressed tiles 8" x 8" Nos 225.00
Wastage 5%
Cement Cwt. 1.25
Sand Cube 0.07
Polish Lbs. 0.25
Coloured pigment Lbs. 0.25
Cotton waste Lbs. 2.00

Labour Cost
Mason Day 4.00
Labour Day 4.00
Unskilled labour to polishing Day 0.50

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

2 Glazed tiles fixed to walls including


bedding in cement mortar 1:2 and raking
in ground floor. (including specials)

Data: Per Sqr

Materials Cost Unit Qty.


Glazed tiles 6" x 6" Nos 400.00
Wastage 10% on cutting
Cement Cwt. 2.50
Sand Cube 0.11
White cement Lbs. 1.00
Allow for specials

Labour Cost
Mason Day 4.00
Labour Day 4.00
Unskilled labour for cleaning Day 0.25

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

3 Terrazzo floor tiles on 1/2" thick cement


and sand 1:2 in ground floor.

Data: Per Sqr

Materials Cost Unit Qty.


Terrazzo tiles 12" x 12" Nos 100.00
Wastage 5%
Cement Cwt. 1.25
Sand Cube 0.07
Wax Polish Lbs. 0.50
Coloured pigment Lbs. 2.00
Cotton waste Lbs. 2.00

Labour Cost
Mason Day 5.00
Labour Day 4.00
Unskilled labour to polishing Day 0.50

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

4 Glazed wall tiles 4 1/4" x 4 1/4" including


bedding in cement mortar 1/2" thick and
raking in ground floor. (special measured
seperately)
Data: Per Sqr

Materials Cost Unit Qty.


Glazed wall tiles (white) Nos 800.00
Wastage 10% on cutting
Cement Cwt. 2.50
Sand Cube 0.11
White cement Lbs. 1.00

Labour Cost
Mason Day 4.00
Labour Day 4.00
Unskilled labour for cleaning Day 0.25

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

5 Glazed floor tiles 12" x 12" including


bedding in cement mortar 1:2 and raking
in ground floor. (special measured
seperately)

Data: Per Sqr

Materials Cost Unit Qty.


Glazed floor tiles (Coloured) Nos 100.00
Wastage 10% on cutting
Cement Cwt. 2.50
Sand Cube 0.11
White cement Lbs. 1.00

Labour Cost
Special Mason Day 4.00
Labour Day 4.00
Unskilled labour for polishing Day 0.25

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

ROOF PLUMBING

1 Timber frame work for calicut pattern tile


hip roof in single storey building
consisting of wall plate, beam, ridge plate,
rafters etc. ( Preservative treatment to be
measured seperately)

Data: Per 6.0 Sqr

Materials Cost Unit Qty.


Timber Cu.ft 34.00
Wastage 10%
2" x 1" Reepers L.ft 660.00
Wastage 5%
6" Wire Nail Lbs. 8.00
2" Wire Nail Lbs. 2.00

Labour Cost
Carpenter Day 7.00
Unskilled Labour Day 8.00

Add Over head & Profit 35%


Rate per 6.0 Sqr
Rate per Sqr

Per Sqr
Per M2

2 Roof covering with calicut pattern clay


tiles in single storeyed building. (Timber
frame work and ridge covering measured
seperately)

Data: Per 6.0 Sqr

Materials Cost Unit Qty.


Tiles Nos. 750.00
Labour Cost
Carpenter Day 3.00
Unskilled Labour Day 3.00

Add Over head & Profit 35%


Rate per 6.0 Sqr
Rate per Sqr

Per Sqr
Per M2

3 Timber frame work for corrugated


Asbestos sheet roof in single storeyed
building.

Data: Per 3.60 Sqr

Materials Cost Unit Qty.


Timber Purlins Cu.ft 13.25
Wastage 10%

Labour Cost
Carpenter Day 2.50
Unskilled Labour Day 3.00

Add Over head & Profit 35%


Rate per 3.6 Sqr
Rate per Sqr

Per Sqr
Per M2

4 Roof covering with corrugated Asbestos


sheets (timber frame work and ridge
covering measured seperately)

Data: Per 3.60 Sqr

Materials Cost Unit Qty.


Asbestos Corrugated Sheets Sq.ft 420.00
Roofing screws and washers Nos. 72.00

Labour Cost
Carpenter Day 1.00
Unskilled Labour Day 2.00

Add Over head & Profit 35%


Rate per 3.6 Sqr
Rate per Sqr

Per Sqr
Per M2

5 One layer half round clay tiles over


corrugated Asbestos roof covering.

Data: Per Sqr

Materials Cost Unit Qty.


Half Round clay tiles Nos. 350.00

Labour Cost
Unskilled Labour Day 2.00

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

6 Asbestos close fittings ridging fixed


complete with roofing screws or
bolts(hook)

Data: Per 13' 4" Length

Materials Cost Unit Qty.


3' 8" Long Ridges Pairs 4.00
Roofing screws or bolts Nos. 16.00

Labour Cost
Carpenter Day 0.50
Unskilled Labour Day 0.25

Add Over head & Profit 35%


Rate per 13' 4" L.ft
Rate per L.ft

Per L.ft
Per M

7 Ridging covering with calicut pattern


ridge tiles bedded in cement lime mortar
1:1:4

Data: Per 12 L.ft ridging

Materials Cost Unit Qty.


Ridge Tiles Nos. 9.00
Cement Cwt 0.33
Sand Cube 0.02
Slaked Lime Lbs. 15.00
Colouring Powder Lbs. 0.50

Labour Cost
Mason Day 0.25
Unskilled Labour Day 0.25

Add Over head & Profit 35%


Rate per 12.0 L.ft
Rate per L.ft

Per L.ft
Per M

8 3/4" x 9" high valence board fixed with


brass screws to ends of rafters (for tile
roofing)

Data: Per 100 L.ft

Materials Cost Unit Qty.


1" Planks Sq.ft 75.00
Wastage 5%
1 1/2" Brass Screw Nos. 70.00

Labour Cost
Carpenter Day 3.00
Unskilled Labour Day 3.00
Scaffolding 5%

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

9 3/4" x 9" high brass board fixed with


brass screws at 2' 0" centres to sides of
rafters.

Data: Per 100 L.ft

Materials Cost Unit Qty.


Planks Sq.ft 75.00
Wastage 5%
1 1/2" Brass Screw Nos. 50.00

Labour Cost
Carpenter Day 3.00
Unskilled Labour Day 3.00
Scaffolding 5%

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

ROOF PLUMBING
10 18 B.W.G (1.2 mm) galvernized iron sheet
valley gutter 3' 0" girth over all once bent
with and laps not less than 9" width
including 3/4" tongued and grooved
planks laid to slope and profile on timber
members.

Data: Per 15.0 L.ft

Materials Cost Unit Qty.


8' x 4' G.I Sheet Nos. 2.00
Wood Preservative Gln. 0.25
Cement Cwt. 0.10
Slaked Lime Cwt. 0.05
Sand Cu.ft 1.00
Planks Sq.ft 50.00
Wire Nails Lbs. 2.00

Labour Cost
a) Fixing boarding and applying wood
preservative
Carpenter Day 1.00
Unskilled Labour Day 1.00

b) Making and fixing G.I Sheets


Tinker Day 0.50
Unskilled Labour Day 0.50

c) Building Sides
Mason Day 0.50
Unskilled Labour Day 0.50

Add Over head & Profit 35%


Rate per 15.0 L.ft
Rate per L.ft

Per L.ft
Per M
11 20 B.W.G (1.2 mm) galvernized iron
flashing 1' 6" girth overall 3 bent with
end laps not less than 6" lead solder,
turned and tucked up to not less than 6"
into chase cut in wall and pointed in
cement mortar 1:2 lower end dressed over
roof covering not less than 1' 0" wide.

Data: Per 15.0 L.ft

Materials Cost Unit Qty.


8' x 4' G.I Sheet Nos. 1.00
Cement Cwt. 0.05
Sand Cu.ft 1.00
Soldiering Lead Lbs. 1.00

Labour Cost
Cutting, bending, soldering and fixing
Tinker Day 0.50
Mason Day 0.125
Unskilled Labour Day 0.75

Add Over head & Profit 35%


Rate per 15.0 L.ft
Rate per L.ft

Per L.ft
Per M

12 6" dia. Half round PVC eaves gutter fixed


to timber valance board including gutter
joiner and brackets fixed at 18" centres
(Other specials paid seperately)

Data: Per 24.0 L.ft

Materials Cost Unit Qty.


6" dia. Eaves Gutter Lth. 2.00
Joiner Nos. 1.00
Gutter Brackets Nos. 17.00
3/4" Brass screws Nos. 34.00
Solvent Cement grams 20.00
Labour Cost
Plumber Day 0.50
Unskilled Labour Day 0.50
Scaffolding Add 5%

Add Over head & Profit 35%


Rate per 24.0 L.ft
Rate per L.ft

Per L.ft
Per M

13 6" dia. PVC Gutter head (Running)


Consider 1No. Gutter head

Data: Per No.

Materials Cost Unit Qty.


PVC Gutter head Nos. 1.00
Gutter Joiners Nos. 2.00
Gutter Brackets Nos. 2.00
3/4" Brass screws Nos. 4.00
Solvent Cement grams 12.00

Labour Cost
Plumber Day 0.125
Unskilled Labour Day 0.125
Scaffolding Add 5%

Add Over head & Profit 35%


Rate per No.

Per No.

14 6" dia. PVC Mitres Consider 1 No. Mitre

Data: Per No.

Materials Cost Unit Qty.


Mitre head Nos. 1.00
Gutter Joiners Nos. 2.00
Brackets Nos. 2.00
3/4" Brass screws Nos. 4.00
Solvent Cement grams 12.00

Labour Cost
Plumber Day 0.125
Unskilled Labour Day 0.125
Scaffolding Add 5%

Add Over head & Profit 35%


Rate per No.

Per No.

15 6" dia. PVC End cap Consider 1 No. End


cap

Data: Per No.

Materials Cost Unit Qty.


End cap Nos. 1.00
Solvent Cement grams 12.00

Labour Cost
Plumber Day 0.063
Unskilled Labour Day 0.063
Scaffolding Add 5%

Add Over head & Profit 35%


Rate per No.

Per No.

16 3 1/2" dia. PVC Rain Water Down Pipes


fixed to brick wall with wooden plugs
buried in wall. (Specials measured
seperately)

Data: Per 24.0 L.ft


Materials Cost Unit Qty.
3 1/2" PVC Pipe Lth. 2.00
3 1/2" Joiner Nos. 1.00
PVC Straps Nos. 4.00
1" Brass screws Nos. 8.00
Solvent Cement grams 30.00

Labour Cost
Plumber Day 0.33
Unskilled Labour Day 0.33
Scaffolding Add 5%

Add Over head & Profit 35%


Rate per 24.0 L.ft
Rate per L.ft

Per L.ft
Per M

17 3 1/2" dia. PVC Elbow.

Data: Per No.

Materials Cost Unit Qty.


60/80 Elbow Nos. 1.00
Solvent Cement grams 32.00

Labour Cost
Plumber Day 0.063
Unskilled Labour Day 0.063
Scaffolding Add 5%

Add Over head & Profit 35%


Rate per No.

Per No.

18 3 1/2" dia. PVC Shoe.

Data: Per No.


Materials Cost Unit Qty.
60/80 Shoe Nos. 1.00
Solvent Cement grams 15.00

Labour Cost
Plumber Day 0.063
Unskilled Labour Day 0.063
Scaffolding Add 5%

Add Over head & Profit 35%


Rate per No.

Per No.

CEILING AND DOOR & WINDOW

1 Timber frame work for 4' 0" x 4' 0" flat


asbestos ceiling (Sheet measured
seperately) comprising of 4" x 2" joints
and 2" x 2" bearers in class I timber.

Data: Per 1.95 Sqr

Materials Cost Unit Qty.


Timber ClassI Cu.ft 8.00
2" Nails Lbs. 1.00
Fibre/plastic plugs Nos. 26.00
Cement Lbs. 25.00
Sand Cu.ft 2.00
Brush 2" (1/4 Cost) Nos. 1.00
Wood preservative Gln. 0.33

Labour Cost
Carpenter Day 2.50
Mason Day 0.50
Unskilled Labour Day 1.50
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per 1.95 Sqr
Rate per Sqr
Per Sqr
Per M2

2 Horizontal ceiling lining using 4' 0" x 4'


0" flat asbestos ceiling sheets fixed with
and including beading and cove
mouldings on timber frame work. (Timber
frame work and painting measured
seperately)

Data: Per 1.95 Sqr

Materials Cost Unit Qty.


Flat Asbestos sheet Sq.ft 210.00
Class I Cove Moulding L.ft 60.00
Class I Beading L.ft 125.00
Clout rails Lbs. 0.25
1/2" Brass screws Doz. 8.00

Labour Cost
Carpenter Day 1.50
Unskilled Labour Day 2.00
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per 1.95 Sqr
Rate per Sqr

Per Sqr
Per M2

3 3/4" thick tongued and grooved


Lunimidella ceiling fixed horizontal on 4"
x 2" class I timber joists at 2' 0" centres
with 1 1/2" brass nails.

Data: Per 1.95 Sqr

Materials Cost Unit Qty.


4" x 2" Timber Joists L.ft 115.00
6" x 3/4" Lunimidella Ceiling Planks Sq.ft 215.00
Cement Lbs. 3.00
Sand Cu.ft 4.00
Brass nails - 1 1/2" kg 4.00

Labour Cost
Making holes, fixing joists and making good

Mason Day 1.00


Carpenter Day 1.00
Unskilled Labour Day 3.00

Ceiling boards
Carpenter Day 3.00
Unskilled Labour Day 4.00
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per 1.95 Sqr
Rate per Sqr

Per Sqr
Per M2

4 3/4" x 6" wide tongued and grooved


Lunimidella ceiling boards fixed to under
side of roof rafters, (existing) with 1 1/2"
brass nails including levelling with timber
strips where necessary.

Data: Per 1.80 Sqr (Consider room 15' 0" x


12' 0" )

Materials Cost Unit Qty.


Ceiling Planks Sq.ft 220.00
2" x 1/4" Timber stirrups L.ft 40.00
3/4" Nails kg 2.00
Iron nails - 1 1/2" kg 4.00

Labour Cost
Carpenter Day 3.00
Unskilled Labour Day 6.00
Scaffolding - Add 3%
Add Over head & Profit 35%
Rate per 1.80 Sqr
Rate per Sqr

Per Sqr
Per M2

5 Door single hung 3' 3" x 7' 0" high ovrall


with frame having 1 1/4" thick sash and
3 1/4" x 2 1/4" timber frame (Glazing,
iron mongery and painting
measuredseperately)

Data: Per 22.75 Sq.ft (3' 3" x 7' 0" )

Materials Cost Unit Qty.


Frame
4" x 3" Timber Cu.ft 1.50
Spur stone Nos. 2.00
Fibre/Plastic plug with 4" brass screw Nos. 6.00
5/8" mild steel dowels - 4" long Nos. 2.00
Sash
1 1/2" Planks Sq.ft 1.25
1" planks Sq.ft 5.00

Labour Cost
Carpenter Day 5.00
Unskilled Labour Day 1.50

Add Over head & Profit 35%


Rate per 22.75 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

6 Door glazed and panelled double hung 4'


0" x 7' 0" high ovrall with frame including
1 1/4" thick sash and 3 1/4" x 2 3/4"
frame (Glazing, iron mongery and
painting measured seperately)
Data: Per 28.0 Sq.ft (4' 0" x 7' 0" )

Materials Cost Unit Qty.


Frame
4" x 3" Timber Cu.ft 1.66
Spur stone Nos. 2.00
Fibre/Plastic plug with 4" long plastic
screws Nos. 6.00
5/8" mild steel dowels - 4" long Nos. 2.00
Sash
1 1/2" Planks Sq.ft 16.00
1" planks Sq.ft 7.00

Labour Cost
Carpenter Day 6.00
Unskilled Labour Day 2.00

Add Over head & Profit 35%


Rate per 28.0 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

7 Plywood Door single hung3' 1 1/2" x 6' 1


1/2" high ovrall with frame having 1 3/4"
x 1 1/4" thick sash and 3 3/4" x 2 3/4"
frame (Iron mongery and painting
measuredseperately)

Data: Per 21.75 Sq.ft (3' 1 1/2" x 6' 1 1/2" )

Materials Cost Unit Qty.


Frame
4" x 3" Timber Cu.ft 1.80
Spur stone Nos. 2.00
Fibre/Plastic plug with 4" long brass screws
Nos. 6.00
Sash
6' 9" x 2' 9" Plywood sash Nos. 1.00
Labour Cost
Carpenter Day 0.75
Unskilled Labour Day 0.37
Mason (Fixing frame) Day 0.25
Unskilled Labour (Fixing frame) Day 0.25

Add Over head & Profit 35%


Rate per 21.75 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

8 Door ledged, braced and battened single


hung 2' 6" x 6' 6" ovrall, with frame
having 7/8" thick tongued & grooved
planks and 3 3/4" x 2 3/4" frame
(Ironmongery and painting measured
seperately)

Data: Per 16.25 Sq.ft (2' 6" x 6' 6" )

Materials Cost Unit Qty.


4" x 3" Timber Cu.ft 1.70
Spur stone Nos. 2.00
Fibre/Plastic plug with 4" long brass screws
Nos. 6.00
5/8" mild steel dowels - 4" long Nos. 2.00

1" Planks Sq.ft 21.00


1 1/4" long brass screws Doz. 3.00

Labour Cost
Carpenter Day 2.25
Unskilled Labour Day 1.00
Mason (Fixing frame) Day 0.75
Unskilled Labour (Fixing frame) Day 0.75

Add Over head & Profit 35%


Rate per 16.25 Sq.ft
Rate per Sq.ft
Per Sq.ft
Per M2

9 Window glazed 7' 0" x 4' 0" high ovrall


with frame comprising 3 Nos. openable
sashes and 3 3/4" x 2 3/4" frame
Glazing, ironmongery and painting
measured seperately)

Data: Per 28.0 Sq.ft (7' 0" x 4' 0" )

Materials Cost Unit Qty.


Frame
4" x 3" Timber Cu.ft 3.20
Fibre/Plastic plug with 4" long brass screws
Nos. 4.00
Sash
3" x 1 1/2" Timber Sq.ft 9.25

Labour Cost
Carpenter Day 6.00
Unskilled Labour Day 2.50
Mason (Fixing frame) Day 0.50
Unskilled Labour (Fixing frame) Day 0.50

Add Over head & Profit 35%


Rate per 28.0 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

BRASS FOUNDER

1 Bolts, Casement fasteners or stays,


removed and refixed including making
good to holes in frames and sashes

Data: Per No.

Materials Cost Unit Qty.

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

2 Bolts, barrel, brass, polished, 2 1/2"


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty.


2" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50

Labour Cost
Carpenter Hrs 0.33

Add Over head & Profit 35%


Rate per No.

Per No.

3 Bolts, barrel, brass, polished, 3" heavy


quality supplied and fixed with brass
screws.

Data: Per No.

Materials Cost Unit Qty.


3" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50

Labour Cost
Carpenter Hrs 0.33

Add Over head & Profit 35%


Rate per No.
Per No.

4 Bolts, barrel, brass, polished, 4" heavy


quality supplied and fixed with brass
screws.

Data: Per No.

Materials Cost Unit Qty.


4" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50

Labour Cost
Carpenter Hrs 0.33

Add Over head & Profit 35%


Rate per No.

Per No.

5 Bolts, barrel, brass, polished, 5" heavy


quality supplied and fixed with brass
screws.

Data: Per No.

Materials Cost Unit Qty.


5" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50

Labour Cost
Carpenter Hrs 0.33

Add Over head & Profit 35%


Rate per No.

Per No.

6 Bolts, barrel, brass, polished, 6" heavy


quality supplied and fixed with brass
screws.
Data: Per No.

Materials Cost Unit Qty.


6" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50

Labour Cost
Carpenter Hrs 0.33

Add Over head & Profit 35%


Rate per No.

Per No.

7 Bolts, brass, Skeleton 8" supplied and


fixed with brass screws.

Data: Per No.

Materials Cost Unit Qty.


8" Skeleton bolt Nos. 1.00
Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

8 Bolts, brass, Skeleton 10" supplied and


fixed with brass screws.

Data: Per No.

Materials Cost Unit Qty.


10" Skeleton bolt Nos. 1.00
Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

9 Bolts, brass, Skeleton 12" supplied and


fixed with brass screws.

Data: Per No.

Materials Cost Unit Qty.


12" Skeleton bolt Nos. 1.00
Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

10 Bolts, brass, Skeleton 18" supplied and


fixed with brass screws.

Data: Per No.

Materials Cost Unit Qty.


18" Brass Skeleton bolt Nos. 1.00
Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.
11 Cabin Hooks 2" polished, cast brass,
heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty.


2" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

12 Cabin Hooks 3" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty.


3" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

13 Cabin Hooks 6" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.


Materials Cost Unit Qty.
6" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

14 Cabin Hooks 8" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty.


8" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

15 Cabin Hooks 9" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty.


9" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

16 Cabin Hooks 10" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty.


10" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

17 Cabin Hooks 12" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty.


12" Cabin Hook Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.
Per No.

18 Casement fasteners, brass, with morruce


oblate, polished heavy quality supplied
and fixed with brass screws.

Data: Per No.

Materials Cost Unit Qty.


Casement fastener Nos. 1.00
1" Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

19 Casement stays, polished 10" heavy


quality supplied and fixed.

Data: Per No.

Materials Cost Unit Qty.


10" Casement Stays Nos. 1.00
1" Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

20 Casement stays, polished 12" heavy


quality supplied and fixed.

Data: Per No.


Materials Cost Unit Qty.
12" Casement Stays Nos. 1.00
1" Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

21 Fanlight catches, brass heavy quality with


brass screws fixed complete.

Data: Per No.

Materials Cost Unit Qty.


Fanlight Catch Nos. 1.00
1" Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.75

Add Over head & Profit 35%


Rate per No.

Per No.

22 Handles, door, brass, polished heavy


quality supplied and fixed with brass
screws complete.

Data: Per No.

Materials Cost Unit Qty.


Door Handle Nos. 1.00
1" Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.25
Add Over head & Profit 35%
Rate per No.

Per No.

23 Hasp and staple, safety type, 6" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Materials Cost Unit Qty.


6" Hasp & Staple Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

24 Hasp and staple, safety type, 4" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Materials Cost Unit Qty.


4" Hasp & Staple Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.
25 Hat Hooks, brass, supplied and fixed with
brass screws.

Data: Per No.

Materials Cost Unit Qty.


Hat Hook large Nos. 1.00
Screws Doz. 0.33

Labour Cost
Carpenter Hrs 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

26 Hinges, butt, 4" x 2" brass, polished


heavy quality supplied and fixed with
brass screws complete.

Data: Per No.

Materials Cost Unit Qty.


4" x 2" Hinges pair 1.00
3/4" Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75

Add Over head & Profit 35%


Rate per No.

Per No.

27 Hinges, butt, 4" x 3" brass, polished


heavy quality supplied and fixed with
brass screws complete.

Data: Per No.


Materials Cost Unit Qty.
4" x 3" Hinges pair 1.00
1" Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75

Add Over head & Profit 35%


Rate per No.

Per No.

28 Hinges, butt, 4" x 2 1/2" brass, polished


heavy quality supplied and fixed with
brass screws complete.

Data: Per No.

Materials Cost Unit Qty.


4" x 2 1/2" Hinges pair 1.00
3/4 " x 1/2" Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75

Add Over head & Profit 35%


Rate per No.

Per No.

29 Hinges, butt, 4" x 4" brass, polished


heavy quality supplied and fixed with
brass screws complete.

Data: Per No.

Materials Cost Unit Qty.


4" x 4" Hinges pair 1.00
3/4 " x 1/2" Screws Doz. 1.00
Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75

Add Over head & Profit 35%


Rate per No.

Per No.

30 Hinges, butt, 5" brass, polished heavy


quality supplied and fixed with brass
screws complete.

Data: Per No.

Materials Cost Unit Qty.


5" Hinges pair 1.00
3/4 " x 1/2" Screws Doz. 1.00

Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75

Add Over head & Profit 35%


Rate per No.

Per No.

31 Hinges centre pivot (consisting of 2


pieces) brass, polished heavy quality
supplied and fixed with brass screws
complete.

Data: Per No.

Materials Cost Unit Qty.


3"Centre pivots, set of 4 pieces Nos. 1.00
1" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 1.00
Labour Hrs 1.00

Add Over head & Profit 35%


Rate per No.

Per No.

32 Hinges, gravity, brass, supplied and


fixed with brass screws complete.

Data: Per No.

Materials Cost Unit Qty.


Gravity Hinges set Pair 1.00
1 1/2" Screws Doz. 0.75

Labour Cost
Carpenter Hrs 1.00
Labour Hrs 1.00

Add Over head & Profit 35%


Rate per No.

Per No.

33 Hinges, Parliamentary, 6" x 4" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Materials Cost Unit Qty.


4" Hinges Pair 1.00
1 1/2" Screws Doz. 1.50

Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75

Add Over head & Profit 35%


Rate per No.

Per No.

34 Hinges, Parliamentary, 6" x 5" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Materials Cost Unit Qty.


5" Hinges Pair 1.00
1 1/2" Screws Doz. 1.50

Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75

Add Over head & Profit 35%


Rate per No.

Per No.

35 Locks, rim 6", polished brass, 2 levers,


superior quality and English
Manufacture, supplied and fixed.

Data: Per No.

Materials Cost Unit Qty.


6" Lock (2 Levers) Nos. 1.00
1" Brass Screws Doz. 0.50

Labour Cost
Carpenter Hrs 1.50

Add Over head & Profit 35%


Rate per No.

Per No.
36 Locks, rim 6", polished brass, Single
levers, superior quality and English
Manufacture, supplied and fixed.

Data: Per No.

Materials Cost Unit Qty.


6" Lock Nos. 1.00
1" Brass Screws Doz. 0.50

Labour Cost
Carpenter Hrs 1.50

Add Over head & Profit 35%


Rate per No.

Per No.

37 Locks, rim 6", polished brass, 4 lever of


best quality Local Manufacture, supplied
and fixed.

Data: Per No.

Materials Cost Unit Qty.


6" Lock (4 Lever) Nos. 1.00
1" Brass Screws Doz. 0.50

Labour Cost
Carpenter Hrs 1.50

Add Over head & Profit 35%


Rate per No.

Per No.

38 Locks, rim 5" single lever of best quality


Local Manufacture, supplied and fixed.

Data: Per No.

Materials Cost Unit Qty.


5" Lock Nos. 1.00
1" Brass Screws Doz. 0.50

Labour Cost
Carpenter Hrs 1.50

Add Over head & Profit 35%


Rate per No.

Per No.

39 Locks, Yale or Union, night latch,


supplied and fixed with duplicate keys.

Data: Per No.

Materials Cost Unit Qty.


Yale Night Latch Nos. 1.00
1" Brass Screws Doz. 0.50

Labour Cost
Carpenter Hrs 2.00

Add Over head & Profit 35%


Rate per No.

Per No.

40 Lock Mortice (Local) single supplied and


fixed.

Data: Per No.

Materials Cost Unit Qty.


Mortice Lock (Single) Nos. 1.00

Labour Cost
Carpenter Day 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

41 Lock Mortice (Local) double, supplied and


fixed.

Data: Per No.

Materials Cost Unit Qty.


Mortice Lock (Local) Double Nos. 1.00

Labour Cost
Carpenter Day 1.00

Add Over head & Profit 35%


Rate per No.

Per No.

42 Lock Mortice Union (Imported) single,


supplied and fixed.

Data: Per No.

Materials Cost Unit Qty.


Mortice Lock Union (Single) Nos. 1.00

Labour Cost
Carpenter Day 0.50

Add Over head & Profit 35%


Rate per No.

Per No.

43 Lock Mortice Union (Imported) double,


supplied and fixed.

Data: Per No.


Materials Cost Unit Qty.
Mortice Lock Union (Imported) Double Nos. 1.00

Labour Cost
Carpenter Day 1.00

Add Over head & Profit 35%


Rate per No.

Per No.

PLASTERING

1 5/8" thick plastering to wall in lime and


sand 1:2 including floating with lime
putty.

Data: Per Sqr

Materials Cost Unit Qty.


Slaked Lime Cwt. 1.30
Sand Cube 0.07
Water Gln. 10.00

LabourCost
Mason Day 1.00
Unskilled Labour Day 1.75
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

2 5/8" thick plastering to wall in cement


sand 1:3 including cement floating.

Data: Per Sqr


Materials Cost Unit Qty.
Cement Cwt. 1.40
Sand Cube 0.06
Water Gln. 10.00

LabourCost
Mason Day 1.00
Unskilled Labour Day 1.50
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

3 3/8" thick plastering to soffit of slab in


cement and sand 1:3 including floating
with lime putty.

Data: Per Sqr

Materials Cost Unit Qty.


Cement Cwt. 0.80
Slaked Lime Cwt. 0.16
Sand Cube 0.03
Water Gln. 5.00

LabourCost
Mason Day 2.50
Unskilled Labour Day 2.50
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2
4 3/8" thick plastering to sides and soffit
of beams in cement and sand 1:3
including floating with lime putty.

Data: Per Sqr

Materials Cost Unit Qty.


Cement Cwt. 0.80
Slaked Lime Cwt. 0.16
Sand Cube 0.03
Water Gln. 5.00

LabourCost
Mason Day 2.00
Unskilled Labour Day 2.00
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

5 5/8" thick plastering to wall in lime,


cement and sand 1:1:5 finished semi
rough with wooden float.

Data: Per Sqr

Materials Cost Unit Qty.


Cement Cwt. 0.80
Slaked Lime Cwt. 0.40
Sand Cube 0.07
Water Gln. 10.00

LabourCost
Mason Day 1.00
Unskilled Labour Day 1.25
Scaffolding - Add 3%
Add Over head & Profit 35%
Rate per Sqr

Per Sqr
Per M2

6 5/8" thick plastering to wall in lime,


cement and sand 1:1:5 finished smooth
with lime putty floating.

Data: Per Sqr

Materials Cost Unit Qty.


Cement Cwt. 0.80
Slaked Lime Cwt. 0.60
Sand Cube 0.07
Water Gln. 10.00

LabourCost
Mason Day 1.50
Unskilled Labour Day 1.50
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

7 1/2" thick rendering in cement and sand


1:3 finished smooth.

Data: Per Sqr

Materials Cost Unit Qty.


Cement Cwt. 1.07
Sand Cube 0.05
Water Gln. 10.00

LabourCost
Mason Day 1.00
Unskilled Labour (Curing) Day 1.50

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

8 1/2" thick rendering in cement and sand


1:2 in floors, finished smooth.

Data: Per Sqr

Materials Cost Unit Qty.


Cement Cwt. 1.50
Sand Cube 0.05
Water Gln. 10.00

LabourCost
Mason Day 1.00
Unskilled Labour Day 1.50
Unskilled Labour (Curing) Day 0.25

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

9 3/4" thick rendering in cement and sand


1:3 finished smooth.

Data: Per Sqr

Materials Cost Unit Qty.


Cement Cwt. 1.75
Sand Cube 0.08
Water Gln. 10.00
LabourCost
Mason Day 1.25
Unskilled Labour Day 2.00
Unskilled Labour (Curing) Day 0.25

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

10 3/4" thick rendering in cement and sand


1:2 in floors finished smooth.

Data: Per Sqr

Materials Cost Unit Qty.


Cement Cwt. 2.25
Sand Cube 0.08
Water Gln. 10.00

LabourCost
Mason Day 1.25
Unskilled Labour Day 2.00
Unskilled Labour (Curing) Day 0.25

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

11 3/4" thick rendering in cement and sand


1:2 in coloured cement floors finished
smooth.

Data: Per Sqr


Materials Cost Unit Qty.
Cement Cwt. 2.25
Sand Cube 0.08
Powdered pigment Lbs. 1.00
Water Gln. 10.00

LabourCost
Mason Day 1.25
Unskilled Labour Day 2.00
Unskilled Labour (Curing) Day 0.25

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

12 1/2" x 6" skirting in cement and sand 1:3


projected of flush to walls finished with
floating including forming groove.

Data: Per 10.0 L.ft

Materials Cost Unit Qty.


Cement Cwt. 0.10
Sand Cube 0.003
Powdered pigment Lbs. 0.25

LabourCost
Mason Day 0.375
Unskilled Labour Day 0.312

Add Over head & Profit 35%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

PAINTING AND DECORATING


1 Prepare and apply one coat of
preservative (Oil type) to structural
timber including touching up cut ends
etc. after fixing.

Data: Per Sqr

Materials Cost Unit Qty.


Wood preservative (Oil type) Ltr. 2.75
Brush 3" (1/10 use) Nos. 1.00

LabourCost
Painter Day 0.75
Unskilled Labour Day 0.50

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

2 Prepare surface of steel truss and apply


two coats of anti-corrosive primer.

Data: Per Sqr

Materials Cost Unit Qty.


Anti Corrosive Primer Ltr. 2.25
Mineral Turpentine or thinner Ltr. 0.15
Wire brush Nos. 1.00
2" Brush(1/8 Use) Nos. 1.00

LabourCost
Painter Day 1.50
Unskilled Labour Day 1.50

Add Over head & Profit 35%


Rate per Sqr
Per Sqr
Per M2

3 Apply one coat of anti-corrosive primer


and two coats of enamel paint on already
shop primed and erected steel roof truss.

Data: Per Sqr

Materials Cost Unit Qty.


Anti Corrosive Primer Ltr. 0.20
Enamel Paint Ltr. 1.33
Mineral Turpentine or thinner Ltr. 0.20
2" Brush(1/5 Use) Nos. 1.00

LabourCost
Painter Day 2.50
Unskilled Labour Day 1.00
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

4 Prepare and apply two coats of primer


and finishing coat of enamel paint to mild
steel (angle/flat) gate.

Data: Per 50.0 Sq.ft

Materials Cost Unit Qty.


Anti Corrosive Primer Ltr. 1.50
Enamel Paint Ltr. 0.66
Mineral Turpentine or thinner Ltr. 0.20
Wire Brush Nos. 0.50
2" Brush(1/5 Use) Nos. 1.00
LabourCost
Painter Day 0.50
Unskilled Labour Day 0.75

Add Over head & Profit 35%


Rate per 0.50 Sqr

Per Sqr
Per M2

5 Painting steel on new work with 2 coats


of anti-corrosive paint.

Data: Per Sqr

Materials Cost Unit Qty.


Anti Corrosive Paint Ltr. 0.66
2" Brush(1/5 Use) Nos. 1.00

LabourCost
Painter Day 1.50

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

6 Painting new timber work with 2 coats


of wood preservative.

Data: Per Sqr

Materials Cost Unit Qty.


Wood preservative Gln. 1.50
2" Brush(1/5 Use) Nos. 1.00

LabourCost
Painter Day 0.50
Add Over head & Profit 35%
Rate per Sqr

Per Sqr
Per M2

7 Preparing and painting wood work with


primer and 2 coats of enamel paint.

Data: Per Sqr

Materials Cost Unit Qty.


Primer Ltr. 0.75
Enamel paint Ltr. 2.50
2" Brush(1/10 Use) Nos. 1.00
Sand Paper Nos. 2.00

LabourCost
Painter Day 1.50
Unskilled Labour Day 0.50

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

8 White or colour washing 2 coats in single


storey.

Data: Per 10.0 Sqr

Materials Cost Unit Qty.


Boiled Lime Cwt. 0.50
Salt Lbs. 2.00
Yellow Ochre Lbs. 0.50
Blue Oze 2.00
6" Brush(1/3 Use) Nos. 1.00
Water Gln. 10.00

LabourCost
Painter Day 2.50
Unskilled Labour Day 2.50
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per 10.0 Sqr
Rate per Sqr

Per Sqr
Per M2

9 White or colour washing 2 coats in two


storeyed building.

Data: Per 10.0 Sqr

Materials Cost Unit Qty.


As per above

LabourCost
Painter Day 0.50
Unskilled Labour Day 0.50
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per 10.0 Sqr
Rate per Sqr

Per Sqr
Per M2

10 Prepare and apply one coat of Alkali


resistant primer and two coats of
emulsion paint to walls.

Data: Per Sqr

Materials Cost Unit Qty.


Primer Ltr. 0.90
Emulsion paint Ltr. 1.40
Water Gln. 0.10
6" Brush(1/10 Use) Nos. 1.00
Sand Paper Nos. 2.00

LabourCost
Painter Day 1.25
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

11 Cement washing to walls of single


storeyed building 2 coats.

Data: Per 10.0 Sqr

Materials Cost Unit Qty.


Cement Cwt. 0.625
Coir Brush (1' 6") Nos. 1.00
Water Gln. 5.00

LabourCost
Painter Day 2.00
Unskilled Labour Day 2.00
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per 10.0 Sqr
Rate per Sqr

Per Sqr
Per M2

12 Painting walls with emulsion paint (2


Coats).
Data: Per Sqr

Materials Cost Unit Qty.


1st Coat - Emulsion Paint Gln. 0.16
Emulsion paint Gln. 0.14
Water Gln. 0.10
6" Brush(1/10 Use) Nos. 1.00

LabourCost
Painter Day 0.75
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

13 Prepare and apply one coat of Alkali


resistant primer and two coats of
emulsion paint to soffit of slabs.

Data: Per Sqr

Materials Cost Unit Qty.


Primer Ltr. 0.90
Emulsion paint Ltr. 1.50
6" Brush(1/10 Use) Nos. 1.00

LabourCost
Painter Day 1.75
Scaffolding - Add 3%

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2
14 Varnishing two coats with copal varnish
after sand papering.

Data: Per Sqr

Materials Cost Unit Qty.


Varnish (1.8 Ltr.) Gln. 0.40
3" Brush(1/3 Use) Nos. 1.00

LabourCost
Painter Day 0.50
Unskilled Labour Day 0.50

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

15 Wax polishing to timber in panels and


floors.

Data: Per Sqr

Materials Cost Unit Qty.


Wax Polish Lbs. 0.75
Sand Paper Doz 0.50
2" Brush(1/10 Use) Nos. 1.00
Flannel Cloth Yards 0.50

LabourCost
Unskilled Labour Hrs 3.00

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2
16 Prepare and apply one coat of Alkali
resistance primer and two coats of
weather shield emulsion paint to walls
external.

Data: Per Sqr

Materials Cost Unit Qty.


Primer Ltr. 0.90
Weather Shield Emulsion Paint Ltr. 1.40
6" Brush(1/10 Use) Nos. 1.00
Sand Paper Nos. 2.00

LabourCost
Painter Day 1.25
Scaffoldings - Add 3%

Add Over head & Profit 35%


Rate per Sqr

Per Sqr
Per M2

17 Prepare and apply two coats of weather


shield emulsion paint to walls external.

Data: Per Sqr

Materials Cost Unit Qty.


Weather Shield Emulsion Paint Ltr. 1.40
6" Brush(1/10 Use) Nos. 1.00
Sand Paper Nos. 2.00

LabourCost
Painter Day 1.25
Scaffoldings - Add 3%

Add Over head & Profit 35%


Rate per Sqr
Per Sqr
Per M2

EXTERNAL DRAINAGE & PLUMBING LINE

1 4" dia. PVC pipe type 400 earth ware


pipes laid on 6" thick bedding in cement
concrete 1:3:6(1 1/2" ) including
excavation average 2' 0" depth, back
filling with selected excavated materials
and concrete to haunching to joints.

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


4" dia. PVC pipe Nos. 50.00
Cement Concrete 1:3:6(1 1/2") Cube 0.75
Yarn Lbs. 2.00
Cement (Jointing) Cwt. 0.50
Excavation Cube 4.00

LabourCost
Laying Concrete Bedding
Unskilled Labour Day 1.50
Laying and testing pipes
Plumber Day 2.00
Unskilled Labour Day 2.00
Back filling
Unskilled Labour Day 2.50

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

2 4" dia. G.I Soil / Vent pipe fixed vertically


to walls jointed with cement caulking
(Special measured seperately)
Data: Per 6.0 L.ft

Materials Cost Unit Qty.


4" dia. G.I pipe L.ft 6.00
Wastage 10%
Yarn Lbs. 0.312
Timber Plug (6" x 6" x 2" ) Nos. 1.00
3" Iron screws Nos. 2.00
Cement Lbs. 2.00

LabourCost
Plumber Day 0.25
Unskilled Labour Day 0.25
Scaffolding - Add 5%

Add Over head & Profit 35%


Rate per 6.0 L.ft
Rate per L.ft

Per L.ft
Per M

3 4" dia. G.I pipes fixed to walls jointed


with lead caulking. (Special measured
seperately)

Data: Per 6.0 L.ft

Materials Cost Unit Qty.


4" dia. G.I pipe L.ft 6.00
Wastage 10%
Lead Lbs. 6.00
Yarn Lbs. 0.312
Timber Plug (6" x 6" x 2" ) Nos. 1.00
3" Iron screws Nos. 2.00
Fire wood Lbs. 0.06

LabourCost
Plumber Day 0.25
Unskilled Labour Day 0.25
Scaffolding - Add 5%
Add Over head & Profit 35%
Rate per 6.0 L.ft
Rate per L.ft

Per L.ft
Per M

4 4" dia. Stoneware gulley with 6" x 6" x 6"


gulley box including excavation, 4"
cement concrete 1:2:4(3/4" ) base
surrounded by 4 1/2" thick cement and
sand 1:5 extended 6" above top of gulley
box including making connection, 1/2"
cement and sand 1:2 rendering internally
and exposted faces finished smooth with
neat cement floating and providing G.I
Grating on top of gulley.

Data: Per No.

Materials Cost Unit Qty.


4" S.W. Gulley Nos. 1.00
Excavation Cu.ft 4.00
4 1/2" Brick work Sq.ft 5.50
Cement concrete 1:2:4(3/4" ) Cu.ft 0.80
1/2" Cement rendering Sq.ft 1.00
4" G.I Grating Nos. 1.00

Labour Cost
Mason Day 0.50
Unskilled Labour Day 0.50

Add Over head & Profit 35%


Rate per No.

Per No.
5 Manhole 2' 0" x 2' 0" internally with
invert depth not exceeding 2' 0" including
excavation, back filling 6" cement
concrete 1:2:4(3/4" ) base with 3/8" dia.
Mild steel rods at 4" centres both ways,
forming channels and benching in similar
concrete, 4 1/2" walls in brick in cement
sand 1:5 1/2" thick cement and sand 1:2
rendering internally and exposed surfaces
including channels, benching and 2" thick
RCC removable cover slab 2' 3" x 2' 3"
inlet and outlet connection all complete
to working order.

Data: Per No.

Materials Cost Unit Qty.


Excavation Cu.ft 35.00
4 1/2" Brick work Sq.ft 33.00
Cement concrete 1:2:4(3/4" ) in base &
channels Cu.ft 7.00
1/2" Cement rendering Sq.ft 28.00
RCC cover slab (5.06 Sq.ft + 0.08 Cwt. Tor
steel) Nos. 1.00
Tor Steel Cwt. 0.08

Labour Cost
Mason Day 1.50
Unskilled Labour Day 2.50

Add Over head & Profit 35%


Rate per No.

Per No.

6 22" x 16" glazed fireclay wash basin with


1/2" dia. Chromium plated pillar tap,
waste plug, chromium plated waste chain
and stay, including fixing wash basin on
brackets. (Water supply and waste water
connection measured seperately)

Data: Per No.


Materials Cost Unit Qty.
Wash basin complete with brackets Nos. 1.00
1/2" tap Nos. 1.00
Waste plug and chain Nos. 1.00
Wooden plugs Nos. 4.00
1 1/2" brass screws Nos. 6.00
Cement Lbs. 2.00

Labour Cost
Mason Day 0.50
Unskilled Labour Day 1.00

Add Over head & Profit 35%


Rate per No.

Per No.

7 Sink 24" x 15" x 7" overall vitreous China


with rubber plug and chromium plated
chain waste carried on iron brackets
painted and fixed to walls. (Water supply
and waste water connection measured
seperately)

Data: Per No.

Materials Cost Unit Qty.


24" x 15" x 7" Sink Nos. 1.00
Iron Brackets 2" x 2" x 1/4" Nos. 2.00
2" thick tapered wooden blocks Nos. 2.00
1 1/2" brass screws Nos. 8.00
Cement Lbs. 2.00

Labour Cost
Mason Day 0.50
Unskilled Labour Day 0.50

Add Over head & Profit 35%


Rate per No.
Per No.

8 Closet pedestal type with L/L flushing


cistern, flush pipe double plastic seat
cover 1/2" dia. Stop cock, supplied and
fixed complete to working order.

Data: Per No.

Materials Cost Unit Qty.


Low level suite complete Nos. 1.00
1/2" dia. Stop cock Nos. 1.00
Cement Lbs. 2.00
Sand Cu.ft 0.25
1 1/2" brass screws Nos. 2.00

Labour Cost
Mason Day 0.25
Plumber Day 1.00
Unskilled Labour Day 1.00

Add Over head & Profit 35%


Rate per No.

Per No.

9 Closet Squatting type with trap including


high level cistern best quality plastic
fixed complete with flush pipe and 1/2"
dia. Stop cock, all complete to working
order.

Data: Per No.

Materials Cost Unit Qty.


Squatting Pan with trap Nos. 1.00
Plastic cistern with 1/4" flush Gln. 2.00
Pipe, chain and overflow pipe
Clip
Wooden plugs Nos. 5.00
Stop cock Nos. 1.00
Cement Cwt. 0.25
Sand Cu.ft 0.25
3/4" metal Cu.ft 0.75
1 1/2" brass screws Doz 1.00

Labour Cost
Mason Day 0.50
Plumber Day 1.00
Unskilled Labour Day 1.00

Add Over head & Profit 35%


Rate per No.

Per No.

10 Vitreous China bidet suite fixed complete


to working order. (Imported)

Data: Per No.

Materials Cost Unit Qty.


Bidet (White) Nos. 1.00

Labour Cost
Plumber Day 1.00
Unskilled Labour Day 1.00

Add Over head & Profit 35%


Rate per No.

Per No.

11 4 No. Bowl type Urinal with trap and 2


gallon automatic flashing cistern and
spreaders complete to working orders.
(Ceylon ceramic)

Data: Per No.

Materials Cost Unit Qty.


Brinals bowls Nos. 4.00
2 Gal cistern Nos. 1.00
Rawl plugs Nos. 8.00
Spreader Nos. 1.00
Wooden plugs (for cistern) Nos. 4.00
1 1/2" brass screws Nos. 4.00
Cement Lbs. 4.00
Sand Cu.ft 0.125

Labour Cost
Mason Day 0.25
Plumber Day 1.00
Unskilled Labour Day 1.00

Add Over head & Profit 35%


Rate per No.

Per No.

PLUMBING - PVC PIPE

1 1/2" dia. PVC pipes fixed to walls.


(Specials paid seperately)

Data: Per 10.0 L.ft

Materials Cost Unit Qty.


1/2" Pipes L.ft 13.00
Clips and nails Nos. 3.000
Solvent cement grm 2.00

LabourCost
Plumber Hrs 1.00
Unskilled Labour Hrs 1.00

Add Over head & Profit 35%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

2 3/4" dia. PVC pipes fixed to walls.


(Specials paid seperately)
Data: Per 10.0 L.ft

Materials Cost Unit Qty.


3/4" Pipes L.ft 13.00
Clips and nails Nos. 3.000
Solvent cement grm 3.00

LabourCost
Plumber Hrs 1.00
Unskilled Labour Hrs 1.00

Add Over head & Profit 35%


Rate per 10.0 L.ft
Rate per L.ft

Per L.ft
Per M

3 1" dia. PVC pipes fixed to walls. (Specials


paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


1" Pipes L.ft 100.00
Add 5% Wastage
1" dia. Sockets Nos. 8.00
Solvent cement grm 32.00
Nails Nos. 35.00

LabourCost
Plumber Day 0.50
Unskilled Labour Day 0.50

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M
4 1 1/4" dia. PVC pipes fixed to walls.
(Specials paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


1 1/4" Pipes L.ft 100.00
Add 5% Wastage
1 1/4" dia. Sockets Nos. 8.00
Solvent cement grm 48.00
Clips and Nails Nos. 35.00

LabourCost
Plumber Day 0.75
Unskilled Labour Day 0.75

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

5 1 1/2" dia. PVC pipes fixed to walls.


(Specials paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


1 1/2" Pipes L.ft 100.00
Add 5% Wastage
1 1/2" dia. Sockets Nos. 8.00
Solvent cement grm 64.00
Clips and Nails Nos. 35.00

LabourCost
Plumber Day 0.75
Unskilled Labour Day 0.75

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

6 2" dia. PVC pipes fixed to walls. (Specials


paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


2" Pipes L.ft 100.00
Add 5% Wastage
2" dia. Sockets Nos. 8.00
Solvent cement grm 112.00
Clips and Nails Nos. 35.00

LabourCost
Plumber Day 0.75
Unskilled Labour Day 0.75

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

7 3" dia. PVC pipes fixed to walls. (Specials


paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


3" Pipes L.ft 100.00
Add 5% Wastage
3" dia. Sockets Nos. 8.00
Solvent cement grm 200.00
Clips and Screws Nos. 35.00

LabourCost
Plumber Day 1.00
Unskilled Labour Day 1.00

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

8 Excavation for laying 1/2" to 3" dia. PVC


pipes in ground not less than 1' 6" deep,
back filling and connecting.

Data: Per 100.0 L.ft

Materials Cost Unit Qty.

LabourCost
Unskilled Labour Day 2.25

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

9 Chasing brick work for laying 1/2" to 1


1/2" dia. PVC pipes and making good
average depth 2" (Pipes and specials paid
seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


Cement Cwt. 0.10
Sand Cube 0.01

LabourCost
Mason Day 3.00
Unskilled Labour Day 3.00
Add Over head & Profit 35%
Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

10 Chasing brick work for laying 1 1/2" to 3"


dia. PVC pipes in ground or floor and
making good average depth 3" (Pipes and
specials paid seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


Cement Cwt. 0.20
Sand Cube 0.03

LabourCost
Mason Day 3.50
Unskilled Labour Day 3.50

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

11 1/2" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty.


1/2" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 20.00

Labour Cost
Plumber Hrs 2.00
Add Over head & Profit 35%
Rate per 10 Nos.
Rate per No.

Per No.

12 3/4" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty.


3/4" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 30.00

Labour Cost
Plumber Hrs 2.00

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

13 1" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty.


1" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 40.00

Labour Cost
Plumber Hrs 2.00

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.
Per No.

14 1 1/4" dia. PVC specials viz - elbows,


bends, sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty.


1 1/4" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 60.00

Labour Cost
Plumber Hrs 2.00

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

15 1 1/2" dia. PVC specials viz - elbows,


bends, sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty.


1 1/2" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 80.00

Labour Cost
Plumber Day 0.50

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

16 2" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)
Data: Per 10 Nos.

Materials Cost Unit Qty.


2" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 140.00

Labour Cost
Plumber Day 0.50

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

17 2 1/2" dia. PVC specials viz - elbows,


bends, sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty.


2 1/2" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 200.00

Labour Cost
Plumber Day 0.50

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

18 3" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Materials Cost Unit Qty.


3" Elbow, Bends, Socket Nos. 10.00
Solvent Cement grm 240.00

Labour Cost
Plumber Day 0.50

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

19 1/2" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty.


1/2" Tees Nos. 10.00
Solvent Cement grm 45.00

Labour Cost
Plumber Day 0.50

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

20 3/4" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty.


3/4" Tees Nos. 10.00
Solvent Cement grm 45.00

Labour Cost
Plumber Day 0.50

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

21 1" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty.


1" Tees Nos. 10.00
Solvent Cement grm 60.00

Labour Cost
Plumber Day 0.50

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

22 1 1/4" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty.


1 1/4" Tees Nos. 10.00
Solvent Cement grm 90.00

Labour Cost
Plumber Day 0.50

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

23 1 1/2" dia. PVC specials viz Tees.


Data: Per 10 Nos.

Materials Cost Unit Qty.


1 1/2" Tees Nos. 10.00
Solvent Cement grm 120.00

Labour Cost
Plumber Day 1.00

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

24 2" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty.


2" Tees Nos. 10.00
Solvent Cement grm 210.00

Labour Cost
Plumber Day 1.00

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

25 2 1/2" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty.


2 1/2" Tees Nos. 10.00
Solvent Cement grm 300.00

Labour Cost
Plumber Day 1.50

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

26 3" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Materials Cost Unit Qty.


3" Tees Nos. 10.00
Solvent Cement grm 360.00

Labour Cost
Plumber Day 1.50

Add Over head & Profit 35%


Rate per 10 Nos.
Rate per No.

Per No.

27 Pipes PVC 1/2" supplied and fixed.


(fittings, excavation and back filling
measured seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 1/2" dia. L.ft 100.00

LabourCost
Plumber Hrs 1.50
Unskilled Labour Hrs 1.50
Allow for Solvent cement, Blow lamp etc.

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

28 Pipes PVC 3/4" supplied and fixed.


(fittings, excavation and back filling
measured seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 3/4" dia. L.ft 100.00

LabourCost
Plumber Hrs 1.50
Unskilled Labour Hrs 1.50
Allow for Solvent cement, Blow lamp etc.

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

29 Pipes PVC 1" supplied and fixed. (fittings,


excavation and back filling measured
seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 1" dia. L.ft 100.00

LabourCost
Plumber Hrs 2.00
Unskilled Labour Hrs 2.00
Allow for Solvent cement, Blow lamp etc.

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft
Per L.ft
Per M

30 Pipes PVC 1/2" supplied and fixed.


(fittings, excavation and back filling
measured seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 1/2" dia. L.ft 100.00
Add 25% for specials

LabourCost
Plumber Hrs 2.00
Unskilled Labour Hrs 2.00
Allow for Solvent cement, Blow lamp etc.

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

31 Pipes PVC 3/4" supplied and fixed.

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 3/4" dia. L.ft 100.00
Add 25% for specials

LabourCost
Plumber Hrs 2.00
Unskilled Labour Hrs 2.00
Allow for Solvent cement, Blow lamp etc.

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft
Per L.ft
Per M

32 Pipes PVC 1" supplied and fixed.

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 1" dia. L.ft 100.00
Add 25% for specials

LabourCost
Excavating 1 1/2 days labour Day 1.5
Return fill in 3/4 day labour Day 0.75
Plumber Hrs 3.00
Unskilled Labour Hrs 3.00
Allow for Solvent cement, Petrol, Blow lamp
etc.

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

33 Pipes PVC 1 1/4" supplied and fixed.

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 1 1/4" dia. L.ft 100.00
Add 25% for specials

LabourCost
Plumber Hrs 4.00
Unskilled Labour Hrs 1.00
Allow for Solvent cement, Petrol, Blow lamp
etc.

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft
Per L.ft
Per M

34 Pipes PVC 1 1/2" supplied and fixed.

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 1 1/2" dia. L.ft 100.00
Add 25% for specials

LabourCost
Excavating 1 1/2 days labour Day 1.5
Return fill in 3/4 day labour Day 0.75
Plumber Hrs 3.00
Unskilled Labour Hrs 3.00
Allow for Solvent cement, Petrol, Blow lamp
etc.

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

35 Pipes PVC 2" supplied and fixed.

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 2" dia. L.ft 100.00
Add 25% for specials

LabourCost
Excavating 1 1/2 days labour Day 1.5
Return fill in 3/4 day labour Day 0.75
Plumber Hrs 5.00
Unskilled Labour Hrs 5.00
Allow for Solvent cement, Petrol, Blow lamp
etc.
Add Over head & Profit 35%
Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

36 Pipes PVC 2" supplied and fixed. (fittings,


excavation and back filling measured
seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 2" dia. L.ft 100.00

LabourCost
Plumber Hrs 4.00
Unskilled Labour Hrs 4.00
Allow for Solvent cement, Petrol, Blow lamp
etc.

Add Over head & Profit 35%


Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

37 Pipes PVC 3" supplied and fixed. (fittings,


excavation and back filling measured
seperately)

Data: Per 100.0 L.ft

Materials Cost Unit Qty.


PVC pipe 3" dia. L.ft 100.00

LabourCost
Plumber Hrs 4.00
Unskilled Labour Hrs 4.00
Allow for Solvent cement, Petrol, Blow lamp
etc.
Add Over head & Profit 35%
Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

GLAZIER

1 1/8" thick clear sheet panes exceeding 1


Sq.ft but not exceeding 4 Sq.ft, cut and
fixed with class I timber beading to doors
and windows.
Consider sash 3' 0" x 4' 0" with 3' 1 1/4"
style and 4 Nos. Glass panes.
Data: Per 9.0 Sq.ft

Materials Cost Unit Qty.


1/8" Clear glass panes Sq.ft 9.00
1/2" x 1/2" beading L.ft 30.00
Brass pannel pins Doz 4.00

LabourCost
Glazier Day 0.50
Unskilled Labour Day 0.50

Add Over head & Profit 35%


Rate per 9.0 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2

2 1/8" thick pin head/Reded sheet glass


panes exceeding 1 Sq.ft but not exceeding
4 Sq.ft, cut and fixed with class I timber
beading to doors and windows.

Data: Per 9.0 Sq.ft

Materials Cost Unit Qty.


1/8" thick glass panes pin head Sq.ft 9.00
1/2" x 1/2" beading L.ft 30.00
Brass pannel pins Doz 4.00

LabourCost
Glazier Day 0.50
Unskilled Labour Day 0.50

Add Over head & Profit 35%


Rate per 9.0 Sq.ft
Rate per Sq.ft

Per Sq.ft
Per M2
Cement Sand 3/4" Met 1" Met 1 1/2" Met 2" Met Rubble Brick 6mm Bar 10mm Bar 12mm Bar
Cwt Cube Cube Cube Cube Cube Cube Nos
16mm Bar 20mm Bar 25mm Bar
LABOUR RATES FOR THE YEAR 2005
AT TRINCOMALEE

EXCAVATION

1 Removing top soil to a depth not


exceeding 6" depositing as directed
within site.

Data: Per Sqr

Labour Cost
Consider an area of 10.00 Sqrs. i.e 5.00
Cubes of excavation
Unskilled Labour Day 10.00 650.00

Rate per 10.00 Sqrs


Rate per Sqrs

Per Sqr
Per M2

2 Excavation over site to reduced level, in


any material except rock requiring
blasting including depositing and
levelling as directed upto a distance not
exceeding 30' 0"

Data: Per Cube

Labour Cost
Unskilled Labour (1 5/8) Day 1.625 650.00

Rate per Cube

Per Cube
Per M3

3 Excavation in trenches for walls column


pits in soft /loose soil from 0' 0" to 5' 0"
deep and depositing excavated material
to a distance not exceeding 30' 0" (Earth
work support to be paid seperately where
necessary)
Data: Per Cube

Labour Cost
Unskilled Labour Day 1.00 650.00

Rate per Cube

Per Cube
Per M3

4 Excavation in trenches for walls column


pits in ordinary soil from 0' 0" to 5' 0"
deep and depositing excavated material
to a distance not exceeding 30' 0"

Data: Per Cube

Labour Cost
Unskilled Labour Day 2.25 650.00

Rate per Cube

Per Cube
Per M3

5 Excavation in trenches for walls column


pits in Hard/Dense soil upto a depth of 5'
0" and depositing excavated material to a
distance not exceeding 30' 0"

Data: Per Cube

Labour Cost
Unskilled Labour Day 3.50 650.00

Rate per Cube

Per Cube
Per M3
6 Excavation in trenches for walls column
pits in Mud/Wet soil upto a depth of 5' 0"
and depositing excavated material to a
distance not exceeding 30' 0" (Earth work
and dewatering paid for seperately)

Data: Per Cube

Labour Cost
Unskilled Labour Day 3.00 650.00

Rate per Cube

Per Cube
Per M3

7 Excavation in trenches for walls column


pits in soft disintergrated rock (Not
requiring blasting) upto a depth of 5' 0"
and depositing excavated material to a
distance not exceeding 30' 0"

Data: Per Cube

Labour Cost
Unskilled Labour Day 2.50 650.00

Rate per Cube

Per Cube
Per M3

8 Excavation in trenches for walls column


pits in Hard rock requiring blasting upto a
depth of 5' 0" and depositing excavated
material to a distance not exceeding 30'
0"

Data: Per Cube

Labour Cost
Skilled Labour Day 1.00 1,200.00
Unskilled Labour Day 2.00 650.00

Rate per Cube


Per Cube
Per M3

9 Benching rock in foundation in 3' 6"


steps.(Blasting prohibited)

Data: Per 10.0 Sq.ft

Labour Cost
Drilling, Chipping & wedging:-
Skilled Labour Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00
Steel, Fuel & Forge - 25% of Labour Cost

Rate per 10.0 Sq.ft


Rate per Sq.ft

Per Sq.ft

ANTI - TERMITE TREATMENT

10 Anti - Termite treatment on excavated


foundation and compacted soil under
floor.

Data: Per Sqr

Labour Cost
Unskilled Labour Day 0.50 650.00

Rate per Sqr

Per Sqr
Per M2

EARTH WORK

11 Earth work - Back filling and compacting

Back filling to trenches with selected earth


available at site.
Data: Per Cube

Labour Cost
Unskilled Labour Day 1.00 650.00

Rate per Cube

Per Cube
Per M3

12 Back filling to trenches with selected


imported material.

Data: Per Cube

Labour Cost
Unskilled Labour (Filling & Compacting) Day 1.25 650.00

Rate per Cube

Per Cube
Per M3

13 Filling under floors including levelling,


watering and compacting in 3" layers with
available and selected earth at site.

Data: Per Cube

Labour Cost
Unskilled Labour Day 2.00 650.00

Rate per Cube

Per Cube
Per M3

14 Filling under floors including levelling,


watering and compacting in 3" layers with
selected imported earth.

Data: Per Cube


Labour Cost
Unskilled Labour Day 2.00 650.00

Rate per Cube

Per Cube
Per M3

15 Cutting turf sods, loading to hand carts


and transporting upto 30 yards, laying
and watering for 30 days. (Royalty for
turf, pegging and transport beyond 30
years paid seperately)

Data: Per Sqr

Labour Cost
Unskilled Labour (Laying turf rids at site) Day 2.50 650.00
Unskilled Labour (Watering for 30 days) Day 0.50 650.00
Unskilled Labour Day 1.50 650.00

Rate per Sqr

Per Sqr
Per M2

16 Earth work support (Open planking) in


trenches upto a depth of 5' 0"

Consider trench 15' 0" long 3' 0" wide and 5'
0" depth open planking to both faces.

Total Area - 2/15' 0" x 5' 0" = 150 Sq.ft

Data: Per 150.0 Sq.ft

Labour Cost
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 3.00 650.00

Rate per 150.0 Sq.ft


Rate per Sq.ft

Per Sq.ft
17 Earth work support (Close planking) in
trenches upto a depth of 5' 0"

Consider trench 15' 0" long 3' 0" wide and 5'
0" depth open planking to both faces.

Total Area - 2/15' 0" x 5' 0" = 150 Sq.ft

Data: Per 150.0 Sq.ft

Labour Cost
Carpenter Day 2.00 1,200.00
Unskilled Labour Day 6.00 650.00

Rate per 150.0 Sq.ft


Rate per Sq.ft

Per Sq.ft

18 Earth support (Close planking) in deep


excavation in trenches upto a depth of
15' 0"

Consider trench of length 15' 0" width 5' 6"


at top, 3' 6" bottom

Total Area - 2/15' 0" x 15' 0" = 450 Sq.ft

Data: Per 450.0 Sq.ft

Labour Cost
Carpenter Day 8.00 1,200.00
Unskilled Labour Day 20.00 650.00

Rate per 450.0 Sq.ft


Rate per Sq.ft

Per Sq.ft

CONCRETE

1 Cement concrete 1:3:6 ( 2" ). (Shuttering


paid for seperately)
Data: Per Cube

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 8.00 650.00

Rate per Cube

Per Cube
Per M3

2 Cement concrete 1:3:6 ( 2" ). (Shuttering


paid for seperately)

Data: Per Cube

As in Item 1

Add 25% of cost of Labour

Rate per Cube

Per Cube
Per M3

3 Cement concrete 1:2 1/2:5 ( 1" ).


(Shuttering paid for seperately)

Data: Per Cube

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 8.00 650.00
Rate per Cube

Per Cube
Per M3

4 Cement concrete 1:2 1/2:5 ( 1" ).


(Shuttering paid for seperately)

Data: Per Cube

As in Item 3
Add 25% of cost of Labour

Rate per Cube

Per Cube
Per M3

5 Cement concrete 1:2:4 ( 3/4" ).


(Shuttering paid for seperately)

Data: Per Cube (above 1.0 Cube)

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 8.00 650.00
Rate per Cube

Per Cube
Per M3

6 Cement concrete 1:2:4 ( 3/4" ).


(Shuttering paid for seperately)

Data: Per Cube

As in Item 5

Add 25% of cost of Labour

Rate per Cube

Per Cube
Per M3

7 Channels 2" semi - circular, formed in


cement concrete floors and 1/2" cement
rendered 1:2 (Extra over concrete floor)

Data: Per 10.0 L.ft

Labour Cost
Mason Day 0.25 1,200.00
Labour Day 0.125 650.00

Rate per 10.0 L.ft


Rate per L.ft
Per L.ft
Per M

8 Channels 4" semi - circular, formed in


cement concrete floors and 1/2" cement
rendered 1:2 (Extra over concrete floor)

Data: Per 10.0 L.ft

Labour Cost
Mason Day 0.25 1,200.00
Labour Day 0.125 650.00

Rate per 10.0 L.ft


Rate per L.ft

Per L.ft
Per M

9 Corbel stones in cement concrete 1:2:4


(3/4" ) reinforced with 4 nos. 3/8" rods
upto 1 Cu.ft in volume. Per corbel stone
6' x 9" x 15"

Data: Per Cu.ft

Labour Cost
Mason Day 0.09 1,200.00
Labour Day 0.09 650.00
Allow for Moulds and curing

Rate per Cu.ft

10 Curb in cement concrete 1:2:4 (3/4" ) 9"


high and 3" thick, Cement rendered 1/2"
thick including, Excavation.

Data: Per 10.0 L.ft

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 1.00 650.00

Rate per 10.0 L.ft


Rate per L.ft
Per L.ft
Per M

11 Drains, Semi - Circular, in cement


concrete1:3:6 (1" ) 9" wide and 9" average
depth, with 3" thick sides and base,
inclusive of 1/2" cement rendering 1:3
and expansion joints as necessary,
including necessary excavation.(without
ramp)

Data: Per 10.0 L.ft

Labour , Excavation & laying concrete


Mason Day 0.50 1,200.00
Labour Day 1.00 650.00

Rendering
Mason Day 0.50 1,200.00
Labour Day 0.50 650.00
Allow for shuttering, baskets etc.

Rate per 10.0 L.ft


Rate per L.ft

Per L.ft
Per M

12 Lintol, cement concrete 1:2:4 (3/4" ), 4


1/2" x 6" (Reinforcement paid for
seperately)

Data: Per 10.0 L.ft


(2 Lintols each 5' 0" )
LabourCost
Erection & Removing shuttering
Carpenter Hrs 2.00 150.00
Labour Hrs 2.00 81.25

Concreting, including curing


Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25

Rate per 10.0 L.ft


Rate per L.ft
Per L.ft
Per M

13 Lintol, cement concrete 1:2:4 (3/4" ), 9" x


6" (Reinforcement paid for seperately)

Data: Per 10.0 L.ft


(2 Lintols each 5' 0" )
LabourCost
Erection & Removing shuttering
Carpenter Hrs 2.00 150.00
Labour Hrs 2.00 81.25

Concreting, including curing


Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25

Rate per 10.0 L.ft


Rate per L.ft

Per L.ft
Per M

14 Lintol, cement concrete 1:2:4 (3/4" ), 9" x


9" (Reinforcement paid for seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
LabourCost
Erection & Removing shuttering
Carpenter Hrs 3.00 150.00
Labour Hrs 3.00 81.25

Concreting, including curing


Mason Day 0.50 1,200.00
Labour Day 1.00 650.00

Rate per 15.0 L.ft


Rate per L.ft

Per L.ft
Per M
15 Lintol, cement concrete 1:2:4 (3/4" ), 12"
x 9" (Reinforcement paid for seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
LabourCost
Erection & Removing shuttering
Carpenter Day 0.50 1,200.00
Labour Day 0.50 650.00

Concreting, including curing


Mason Day 0.50 1,200.00
Labour Day 1.00 650.00

Rate per 15.0 L.ft


Rate per L.ft

Per L.ft
Per M

16 Lintol, cement concrete 1:2:4 (3/4" ), 13


1/2" x 6" (Reinforcement paid for
seperately)

Data: Per 15.0 L.ft


(2 Lintols each 7' 6" )
LabourCost
Erection & Removing shuttering
Carpenter Day 0.50 1,200.00
Labour Day 0.50 650.00

Concreting, including curing


Mason Day 0.50 1,200.00
Labour Day 1.00 650.00

Rate per 15.0 L.ft


Rate per L.ft

Per L.ft
Per M

17 Lintol, cement concrete 1:2:4 (3/4" ), 13


1/2" x 9" (Reinforcement paid for
seperately)
Data: Per 15.0 L.ft
(2 Lintols each 7' 6" )
LabourCost
Erection & Removing shuttering
Carpenter Day 0.50 1,200.00
Labour Day 0.50 650.00

Concreting, including curing


Mason Day 0.625 1,200.00
Labour Day 1.25 650.00

Rate per 15.0 L.ft


Rate per L.ft

Per L.ft
Per M

18 Lintol, cement concrete 1:2:4 (3/4" ), 13


1/2" x 12" (Reinforcement paid for
seperately)

Data: Per 20.0 L.ft


(2 Lintols each 8' 0" )
LabourCost
Erection & Removing shuttering
Carpenter Day 0.75 1,200.00
Labour Day 0.75 650.00

Concreting, including curing


Mason Day 1.00 1,200.00
Labour Day 2.00 650.00

Rate per 20.0 L.ft


Rate per L.ft

Per L.ft
Per M

19 Lintol, cement concrete 1:2:4 (3/4" ),


precast or insitu. (Reinforcement paid for
seperately)

Data: Per 4 stone (1' 6" x 1' 6" x 0' 6" )


(2 Lintols each 7' 6" )
LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25

Rate per 4 stone


Rate per stone

Per Stone

20 Roof flat, Cement concrete 4" thick, 1:2:4


(3/4" ) and 1/2" cement rendered 1:2 with
5% Padlo and reinforced with expanded
metal, and lime puttying soffit complete.
(Reinforcement paid for seperately)

Data: Per Sqr

LabourCost
Mason Day 1.75 1,200.00
Carpenter Day 1.00 1,200.00
Labour Day 8.50 650.00

Rendering
Mason Day 0.75 1,200.00
Labour Day 1.50 650.00

Rate per Sqr

Per Sqr
Per M2

21 Slabs over drain cement concrete 3" thick


1:2:4 (3/4" ) reinforced with expanded
metal and 1/2" cement rendered 1:2
( Reinfoecement paid for seperately)

Data: Per 10' 0" Length (15.0 Sq.ft)

LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 4.00 81.25
Rendering
Mason Hrs 1.00 150.00
Labour Hrs 1.00 81.25

Rate per 15.0 Sq.ft


Rate per Sq.ft

Per Sq.ft
Per M2

22 Spur stone cement concrete 1:2:4(3/4" )


for verandah posts supplied and fixed. (8"
x 8" x 6" )

Data: Per 10 Stone

LabourCost
Mason Day 0.75 1,200.00
Labour Day 0.75 650.00

Rate per 10 stone


Rate per Stone

Per Stone

23 Spur stone cement concrete 1:2:4(3/4" )


for door posts supplied and fixed. (4" x 3"
x 2" )

Data: Per 10 Stone

LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25

Rate per 10 stone


Rate per Stone

Per Stone

24 Squatting plate for latrines, cement


concrete 1:2:4(3/4" ) as per type plan.
Data: Per

LabourCost
Smith Hrs 0.50 150.00
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25

25 Cement concrete 1:2 1/2:5 ( 1" ) using


concrete mixer & vibrator. (Shuttering
paid for seperately)

Data: Per Cube

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 6.00 650.00
Basket 0.66 75.00

Rate per Cube

Per Cube
Per M3

26 Cement concrete 1:2:4 ( 3/4" ) in column


shafts (Reinforcements, shuttering and
finishes paid for seperately) in ground
floor using concrete mixer & vibrator.

Data: Per Cube

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 6.00 650.00

Rate per Cube

Per Cube
Per M3
27 Cement concrete as per Item 26 in 1st
floor.

Data: Per Cube

As per Item 26
Labour Day 2.00 650.00

Rate per Cube

Per Cube
Per M3

28 Cement concrete as per Item 26 in 2nd


floor.

Data: Per Cube

As per Item 26
Labour Day 5.00 650.00

Rate per Cube

Per Cube
Per M3

29 Cement concrete 1:2:4 ( 3/4" ) in beams


(Reinforcements, shuttering and finishes
paid for seperately) in ground floor using
concrete mixer & vibrator.

Data: Per 2.0 Cube

Labour Cost
Mason Day 2.50 1,200.00
Labour Day 16.00 650.00

Rate per 2.0 Cube


Rate per Cube

Per Cube
Per M3

30 Cement concrete as per Item 29 in 1st


floor.
Data: Per Cube

As per Item 29
Labour Day 2.00 650.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

31 Cement concrete as per Item 29 in 2nd


floor.

Data: Per Cube

As per Item 29
Labour Day 5.00 650.00

Rate per Cube

Per Cube
Per M3

32 Shuttering for floor slab concrete and


dismantling.

Data: Per Sqr

Labour Cost
Carpenter Day 1.00 1,200.00
Labour Day 3.00 650.00

Rate per Sqr

Per Sqr
Per M2

33 Shuttering for Column shaft and


dismantling. (for column 9" x 9" x 4 ft.
high. i.e. 4 1/2 ft. Box)

Data: Per 12 Sq.ft of column surface area


Labour Cost
Carpenter Day 0.375 1,200.00
Labour Day 0.375 650.00

Rate per 12 Sq.ft


Rate per Sq.ft

Per Sq.ft
Per M2

34 Shuttering for beam including


dismantling. (12" x 18" Beam 20 ft. long)

Data: Per 80.0 Sq.ft

Labour Cost
Carpenter Day 1.00 1,200.00
Labour Day 1.00 650.00

Rate per 80.0 Sq.ft (Three Sides)


Rate per Sq.ft

Per Sq.ft
Per M2

35 Cement concrete 1:2:4 ( 3/4" ) Lintol in


ground floor (Reinforcements and
shuttering paid for seperately) using
concrete mixer & vibrator.

Data: Per Cube

Labour Cost
Mason Day 2.00 1,200.00
Labour Day 16.00 650.00
Basket 0.66 75.00

Rate per Cube

Per Cube
Per M3

36 Cement concrete lintols as per Item 35 in


1st floor.
Data: Per Cube

As per Item 35 in Ground floor


Labour Day 2.00 650.00

Add Over head & Profit 35%


Rate per Cube

Per Cube
Per M3

37 4" thick R.C.C 1:2:4 (3/4" ) in first floor


slab (Reinforcements and shuttering paid
for seperately) using concrete mixer &
vibrator.

Data: Per 8.00 Sqrs

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 24.00 650.00

Rate per 8.00 Sqr


Rate per Sqr

Per Sqr
Per M2

38 5" thick R.C.C 1:2:4 (3/4" ) in first floor


slab (Reinforcements and shuttering paid
for seperately) using concrete mixer &
vibrator.

Data: Per 8.00 Sqrs

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 25.00 650.00

Rate per 8.00 Sqr


Rate per Sqr

Per Sqr
Per M2
39 Drains semi circular in cement concrete
1:3:6 (1" ), 9" wide and 9" average depth,
3" thick sides and base, inclusive of 1/2"
cement rendering 1:3 with necessary
expansion joints and excavation, but
without ramp.

Data: Per 10.0 L.ft

Labour Cost
Mason Day 1.00 1,200.00
Labour Day 1.50 650.00

Rate per 10.0 L.ft


Rate per L.ft

Per L.ft
Per M

40 Drains in cement concrete 1:3:6 (1" ), as


above, but with ramp 1' 6" wide.

Data: Per 10.0 L.ft

Materials Cost Unit Qty. Rate


Drain as per Item 39

Rate per 10.0 L.ft


Rate per L.ft

Per L.ft
Per M

41 Mixing concrete 1:3:6 ( 1 1/2" )

Data: Per Cube

Labour Cost
Skilled Labour Day 0.33 1,200.00
Unskilled Labour Day 2.00 650.00

Rate per Cube


Per Cube
Per M3

42 Bulking 2" thick cement concrete screed


in foundation at depth not exceeding 5' 0"

Data: Per Sqr

Labour Cost
Skilled Labour Day 0.125 1,200.00
Unskilled Labour Day 0.25 650.00

Rate per Sqr

Per Sqr
Per M2

Note: For laying concrete at depths more


than 5' 0" Add 1/6 day unskilled labour for
each additional 5' 0" or part the roof per sqr.

43 3" thick cement concrete screed in


foundation at depth not exceeding 5' 0"
1:3:6 (1 1/2" )

Data: Per Sqr

Labour Cost
Skilled Labour Day 0.125 1,200.00
Unskilled Labour Day 0.75 650.00

Rate per Sqr

Per Sqr
Per M2

Note: For laying concrete at depths more


than 5' 0" Add 1/4 day unskilled labour for
each additional 5' 0" or part the roof per sqr.

44 6" thick cement concrete floor (Mass


concrete) 1:3:6 (1 1/2" )

Data: Per Sqr


Labour Cost
Skilled Labour Day 0.25 1,200.00
Unskilled Labour Day 0.75 650.00

Rate per Sqr

Per Sqr
Per M2

Note: a) Water available at site. b)


If water is not available allowance must be
made for transport of water.

45 Supply and laying Grade 20 Ready mix


concrete. Rate include for pump, vibrator
and for laying changes.

Data: Per 1 M3 (0.353 Cube)

Labour Cost
Vibrator operator Hrs 0.50 81.25
Mason (2 x 1/2 day) Hrs 1.00 150.00
Labour (4 x 1/2 day) Hrs 2.00 81.25
Carpenter Hrs 0.50 150.00

Rate per M3

Per Cube
Per M3

STEEL FABRICATOR

46 Mild steel reinforcement to Lintols, Slabs,


Beams and Columns bent to shape, laid in
position and tied with G.I wire as
directed.

Data: Per 1.0 Cwt.

Labour Cost
Steel Fabricator Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Rate per Cwt.


Per Cwt.
Per kg

47 Tor steel reinforcement to Lintols, Slabs,


Beams and Columns bent to shape, laid in
position and tied with G.I wire as
directed.

Data: Per 1.0 Cwt.

Labour Cost
Steel Fabricator Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Rate per Cwt.

Per Cwt.
Per kg

BRICK MASONRY

1 Brick work in cement sand 1:5 in


foundation upto D.P.C

Data: Per Cube

Labour Cost
Mason Day 3.00 1,200.00
Labour Day 4.00 650.00

Rate per Cube

Per Cube
Per M3

2 Brick work in cement sand 1:8 in


foundation upto D.P.C

Data: Per Cube

Labour Cost
Mason Day 3.00 1,200.00
Labour Day 4.00 650.00
Rate per Cube

Per Cube
Per M3

3 Brick work in cement sand 1:5 in 4" thick


walls in ground floor.

Data: Per Sqr

Labour Cost
Mason Day 1.50 1,200.00
Labour Day 2.00 650.00
Scaffolding ( Add 5%)

Rate per Sqr

Per Sqr
Per M2

4 9" thick brick wall in cement sand 1:5 in


ground floor.

Data: Per Sqr

Labour Cost
Mason Day 2.25 1,200.00
Labour Day 3.75 650.00
Scaffolding ( Add 3%)

Rate per Sqr

Per Sqr
Per M2

5 Brick work 13 1/2" thick in cement sand


1:5 in super structure in ground floor.

Data: Per Sqr

Labour Cost
Mason Day 3.50 1,200.00
Labour Day 5.50 650.00
Scaffolding ( Add 2%)

Rate per Sqr

Per Sqr
Per M2

6 9" thick brick wall in cement sand 1:8 in


super structure in ground floor.

Data: Per Sqr (i.e. 0.75 Cube)

Labour Cost
Mason Day 2.25 1,200.00
Labour Day 3.00 650.00
Scaffolding ( Add 3%)

Rate per Sqr

Per Sqr
Per M2

7 4 1/2" thick brick wall (wire cut) in


cement sand 1:5 in ground floor. (Facing
to brick work measured seperately)

Data: Per Sqr

Labour Cost
Mason Day 1.50 1,200.00
Labour Day 2.00 650.00
Scaffolding ( Add 5%)

Rate per Sqr

Per Sqr
Per M2

8 9" thick brick wall (wire cut) in cement


sand 1:5 in ground floor. (Facing to brick
work measured seperately)
Data: Per Sqr

Labour Cost
Mason Day 2.25 1,200.00
Labour Day 3.75 650.00
Scaffolding ( Add 3%)

Rate per Sqr

Per Sqr
Per M2

9 13 1/2" thick brick wall (wire cut) in


cement sand 1:5 in ground floor. (Facing
to brick work measured seperately)

Data: Per Sqr

Labour Cost
Mason Day 3.75 1,200.00
Labour Day 5.50 650.00
Scaffolding ( Add 2%)

Rate per Sqr

Per Sqr
Per M2

10 Extra over fire facing including raised


pointing 1/8" thick in cement and sand
1:1 mixture in ground floor.

Data: Per Sqr

Labour Cost
Mason Day 5.00 1,200.00
Labour Day 3.50 650.00

Rate per Sqr

Per Sqr
Per M2
11 3" thick floor paved in lime mortar 2:5 in
ground floor.

Data: Per Sqr

Labour Cost
Mason Day 1.25 1,200.00
Labour Day 2.50 650.00

Rate per Sqr

Per Sqr
Per M2

12 Steps 1' 1 1/2" x 0' 6" in brick in cement


and sand 1:5 with 1/2" thick cement and
sand 1:2 rendering including necessary
excavation.

Data: Per 10.0 L.ft

Labour Cost
Mason Day 0.50 1,200.00
Labour Day 0.50 650.00

Rate per 10.0 L.ft


Rate per L.ft

Per L.ft
Per M

13 Brick drains in cement and sand 1:5, 9"


wide and 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to
exposed faces with 1' 6" ramp including
necessary excavation.

Data: Per 10.0 L.ft

Labour Cost
Mason Day 1.75 1,200.00
Labour Day 1.25 650.00

Rate per 10.0 L.ft


Rate per L.ft
Per L.ft
Per M

14 Brick drains in cement and sand 1:5, 9"


wide and 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to
exposed faces without ramp including
necessary excavation.

Data: Per 10.0 L.ft

Labour Cost
Mason Day 1.50 1,200.00
Labour Day 1.25 650.00

Rate per 10.0 L.ft


Rate per L.ft

Per L.ft
Per M

HOLLOW BLOCK MASONRY

1 8" thick hollow block work in cement and


sand mortar 1:5 in ground floor (Cavities
unfilled)

Data: Per Sqr


10' 0" x 10' 0" area ( size of each block 16"
x 8" x 8" )
Labour Cost
Mason Day 1.50 1,200.00
Labour Day 2.50 650.00
Scaffolding (Add 3%)

Rate per Sqr

Per Sqr
Per M2

2 4" thick hollow block work in cement and


sand mortar 1:5 in ground floor (Cavities
unfilled)

Data: Per Sqr


10' 0" x 10' 0" area ( size of each block 16"
x 8" x 4" )
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 2.00 650.00
Scaffolding (Add 5%)

Rate per Sqr

Per Sqr
Per M2

RUBBLE MASONRY

1 Random rubble masonry in cement


mortar1:5 in foundation.

Data: Per Cube (14" thick)

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 6.00 650.00

Rate per Cube

Per Cube
Per M3

2 Random rubble masonry in cement


mortar1:5 in super structure.

Data: Per Cube (14" thick)

Labour Cost
Mason Day 2.50 1,200.00
Labour Day 7.50 650.00
Scaffolding - Add 3%.

Rate per Cube

Per Cube
Per M3
TILING

1 Pressed floor tiles bedded in 1/2" cement


mortar 1:2 and pointing in neat cement
in ground floor.

Data: Per Sqr

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour to polishing Day 0.50 650.00

Rate per Sqr

Per Sqr
Per M2

2 Glazed tiles fixed to walls including


bedding in cement mortar 1:2 and raking
in ground floor. (including specials)

Data: Per Sqr

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour for cleaning Day 0.25 650.00

Rate per Sqr

Per Sqr
Per M2

3 Terrazzo floor tiles on 1/2" thick cement


and sand 1:2 in ground floor.

Data: Per Sqr

Labour Cost
Mason Day 5.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour to polishing Day 0.50 650.00
Rate per Sqr

Per Sqr
Per M2

4 Glazed wall tiles 4 1/4" x 4 1/4" including


bedding in cement mortar 1/2" thick and
raking in ground floor. (special measured
seperately)

Data: Per Sqr

Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour for cleaning Day 0.25 650.00

Rate per Sqr

Per Sqr
Per M2

5 Glazed floor tiles 12" x 12" including


bedding in cement mortar 1:2 and raking
in ground floor. (special measured
seperately)

Data: Per Sqr

Labour Cost
Special Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour for polishing Day 0.25 650.00

Rate per Sqr

Per Sqr
Per M2

ROOF PLUMBING
1 Timber frame work for calicut pattern tile
hip roof in single storey building
consisting of wall plate, beam, ridge plate,
rafters etc. ( Preservative treatment to be
measured seperately)

Data: Per 6.0 Sqr

Labour Cost
Carpenter Day 7.00 1,200.00
Unskilled Labour Day 8.00 650.00

Rate per 6.0 Sqr


Rate per Sqr

Per Sqr
Per M2

2 Roof covering with calicut pattern clay


tiles in single storeyed building. (Timber
frame work and ridge covering measured
seperately)

Data: Per 6.0 Sqr

Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00

Rate per 6.0 Sqr


Rate per Sqr

Per Sqr
Per M2

3 Timber frame work for corrugated


Asbestos sheet roof in single storeyed
building.

Data: Per 3.60 Sqr

Labour Cost
Carpenter Day 2.50 1,200.00
Unskilled Labour Day 3.00 650.00
Rate per 3.6 Sqr
Rate per Sqr

Per Sqr
Per M2

4 Roof covering with corrugated Asbestos


sheets (timber frame work and ridge
covering measured seperately)

Data: Per 3.60 Sqr

Labour Cost
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 2.00 650.00

Rate per 3.6 Sqr


Rate per Sqr

Per Sqr
Per M2

5 One layer half round clay tiles over


corrugated Asbestos roof covering.

Data: Per Sqr

Labour Cost
Unskilled Labour Day 2.00 650.00

Rate per Sqr

Per Sqr
Per M2

6 Asbestos close fittings ridging fixed


complete with roofing screws or
bolts(hook)

Data: Per 13' 4" Length

Labour Cost
Carpenter Day 0.50 1,200.00
Unskilled Labour Day 0.25 650.00
Rate per 13' 4" L.ft
Rate per L.ft

Per L.ft
Per M

7 Ridging covering with calicut pattern


ridge tiles bedded in cement lime mortar
1:1:4

Data: Per 12 L.ft ridging

Labour Cost
Mason Day 0.25 1,200.00
Unskilled Labour Day 0.25 650.00

Rate per 12.0 L.ft


Rate per L.ft

Per L.ft
Per M

8 3/4" x 9" high valence board fixed with


brass screws to ends of rafters (for tile
roofing)

Data: Per 100 L.ft

Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00
Scaffolding 5%

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

9 3/4" x 9" high brass board fixed with


brass screws at 2' 0" centres to sides of
rafters.
Data: Per 100 L.ft

Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00
Scaffolding 5%

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

ROOF PLUMBING

10 18 B.W.G (1.2 mm) galvernized iron sheet


valley gutter 3' 0" girth over all once bent
with and laps not less than 9" width
including 3/4" tongued and grooved
planks laid to slope and profile on timber
members.

Data: Per 15.0 L.ft

Labour Cost
a) Fixing boarding and applying wood
preservative
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

b) Making and fixing G.I Sheets


Tinker Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

c) Building Sides
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Rate per 15.0 L.ft


Rate per L.ft

Per L.ft
Per M
11 20 B.W.G (1.2 mm) galvernized iron
flashing 1' 6" girth overall 3 bent with
end laps not less than 6" lead solder,
turned and tucked up to not less than 6"
into chase cut in wall and pointed in
cement mortar 1:2 lower end dressed over
roof covering not less than 1' 0" wide.

Data: Per 15.0 L.ft

Labour Cost
Cutting, bending, soldering and fixing
Tinker Day 0.50 1,200.00
Mason Day 0.125 1,200.00
Unskilled Labour Day 0.75 650.00

Rate per 15.0 L.ft


Rate per L.ft

Per L.ft
Per M

12 6" dia. Half round PVC eaves gutter fixed


to timber valance board including gutter
joiner and brackets fixed at 18" centres
(Other specials paid seperately)

Data: Per 24.0 L.ft

Labour Cost
Plumber Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Scaffolding Add 5%

Rate per 24.0 L.ft


Rate per L.ft

Per L.ft
Per M

13 6" dia. PVC Gutter head (Running)


Consider 1No. Gutter head

Data: Per No.


Labour Cost
Plumber Day 0.125 1,200.00
Unskilled Labour Day 0.125 650.00
Scaffolding Add 5%

Rate per No.

Per No.

14 6" dia. PVC Mitres Consider 1 No. Mitre

Data: Per No.

Labour Cost
Plumber Day 0.125 1,200.00
Unskilled Labour Day 0.125 650.00
Scaffolding Add 5%

Rate per No.

Per No.

15 6" dia. PVC End cap Consider 1 No. End


cap

Data: Per No.

Labour Cost
Plumber Day 0.063 1,200.00
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%

Rate per No.

Per No.

16 3 1/2" dia. PVC Rain Water Down Pipes


fixed to brick wall with wooden plugs
buried in wall. (Specials measured
seperately)

Data: Per 24.0 L.ft


Labour Cost
Plumber Day 0.33 1,200.00
Unskilled Labour Day 0.33 650.00
Scaffolding Add 5%

Rate per 24.0 L.ft


Rate per L.ft

Per L.ft
Per M

17 3 1/2" dia. PVC Elbow.

Data: Per No.

Labour Cost
Plumber Day 0.063 1,200.00
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%

Rate per No.

Per No.

18 3 1/2" dia. PVC Shoe.

Data: Per No.

Labour Cost
Plumber Day 0.063 1,200.00
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%

Rate per No.

Per No.

CEILING AND DOOR & WINDOW

1 Timber frame work for 4' 0" x 4' 0" flat


asbestos ceiling (Sheet measured
seperately) comprising of 4" x 2" joints
and 2" x 2" bearers in class I timber.
Data: Per 1.95 Sqr

Labour Cost
Carpenter Day 2.50 1,200.00
Mason Day 0.50 1,200.00
Unskilled Labour Day 1.50 650.00
Scaffolding - Add 3%

Rate per 1.95 Sqr


Rate per Sqr

Per Sqr
Per M2

2 Horizontal ceiling lining using 4' 0" x 4'


0" flat asbestos ceiling sheets fixed with
and including beading and cove
mouldings on timber frame work. (Timber
frame work and painting measured
seperately)

Data: Per 1.95 Sqr

Labour Cost
Carpenter Day 1.50 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%

Rate per 1.95 Sqr


Rate per Sqr

Per Sqr
Per M2

3 3/4" thick tongued and grooved


Lunimidella ceiling fixed horizontal on 4"
x 2" class I timber joists at 2' 0" centres
with 1 1/2" brass nails.

Data: Per 1.95 Sqr

Labour Cost
Making holes, fixing joists and making good
Mason Day 1.00 1,200.00
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 3.00 650.00

Ceiling boards
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 4.00 650.00
Scaffolding - Add 3%

Rate per 1.95 Sqr


Rate per Sqr

Per Sqr
Per M2

4 3/4" x 6" wide tongued and grooved


Lunimidella ceiling boards fixed to under
side of roof rafters, (existing) with 1 1/2"
brass nails including levelling with timber
strips where necessary.

Data: Per 1.80 Sqr (Consider room 15' 0" x


12' 0" )

Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 6.00 650.00
Scaffolding - Add 3%

Rate per 1.80 Sqr


Rate per Sqr

Per Sqr
Per M2

5 Door single hung 3' 3" x 7' 0" high ovrall


with frame having 1 1/4" thick sash and
3 1/4" x 2 1/4" timber frame (Glazing,
iron mongery and painting
measuredseperately)

Data: Per 22.75 Sq.ft (3' 3" x 7' 0" )

Labour Cost
Carpenter Day 5.00 1,200.00
Unskilled Labour Day 1.50 650.00

Rate per 22.75 Sq.ft


Rate per Sq.ft

Per Sq.ft
Per M2

6 Door glazed and panelled double hung 4'


0" x 7' 0" high ovrall with frame including
1 1/4" thick sash and 3 1/4" x 2 3/4"
frame (Glazing, iron mongery and
painting measured seperately)

Data: Per 28.0 Sq.ft (4' 0" x 7' 0" )

Labour Cost
Carpenter Day 6.00 1,200.00
Unskilled Labour Day 2.00 650.00

Rate per 28.0 Sq.ft


Rate per Sq.ft

Per Sq.ft
Per M2

7 Plywood Door single hung3' 1 1/2" x 6' 1


1/2" high ovrall with frame having 1 3/4"
x 1 1/4" thick sash and 3 3/4" x 2 3/4"
frame (Iron mongery and painting
measuredseperately)

Data: Per 21.75 Sq.ft (3' 1 1/2" x 6' 1 1/2" )

Labour Cost
Carpenter Day 0.75 1,200.00
Unskilled Labour Day 0.37 650.00
Mason (Fixing frame) Day 0.25 1,200.00
Unskilled Labour (Fixing frame) Day 0.25 650.00

Rate per 21.75 Sq.ft


Rate per Sq.ft
Per Sq.ft
Per M2

8 Door ledged, braced and battened single


hung 2' 6" x 6' 6" ovrall, with frame
having 7/8" thick tongued & grooved
planks and 3 3/4" x 2 3/4" frame
(Ironmongery and painting measured
seperately)

Data: Per 16.25 Sq.ft (2' 6" x 6' 6" )

Labour Cost
Carpenter Day 2.25 1,200.00
Unskilled Labour Day 1.00 650.00
Mason (Fixing frame) Day 0.75 1,200.00
Unskilled Labour (Fixing frame) Day 0.75 650.00

Rate per 16.25 Sq.ft


Rate per Sq.ft

Per Sq.ft
Per M2

9 Window glazed 7' 0" x 4' 0" high ovrall


with frame comprising 3 Nos. openable
sashes and 3 3/4" x 2 3/4" frame
Glazing, ironmongery and painting
measured seperately)

Data: Per 28.0 Sq.ft (7' 0" x 4' 0" )

Labour Cost
Carpenter Day 6.00 1,200.00
Unskilled Labour Day 2.50 650.00
Mason (Fixing frame) Day 0.50 1,200.00
Unskilled Labour (Fixing frame) Day 0.50 650.00

Rate per 28.0 Sq.ft


Rate per Sq.ft

Per Sq.ft
Per M2

BRASS FOUNDER
1 Bolts, Casement fasteners or stays,
removed and refixed including making
good to holes in frames and sashes

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

2 Bolts, barrel, brass, polished, 2 1/2"


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.33 150.00

Rate per No.

Per No.

3 Bolts, barrel, brass, polished, 3" heavy


quality supplied and fixed with brass
screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.33 150.00

Rate per No.

Per No.

4 Bolts, barrel, brass, polished, 4" heavy


quality supplied and fixed with brass
screws.

Data: Per No.


Labour Cost
Carpenter Hrs 0.33 150.00

Rate per No.

Per No.

5 Bolts, barrel, brass, polished, 5" heavy


quality supplied and fixed with brass
screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.33 150.00

Rate per No.

Per No.

6 Bolts, barrel, brass, polished, 6" heavy


quality supplied and fixed with brass
screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.33 150.00

Rate per No.

Per No.

7 Bolts, brass, Skeleton 8" supplied and


fixed with brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.


Per No.

8 Bolts, brass, Skeleton 10" supplied and


fixed with brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

9 Bolts, brass, Skeleton 12" supplied and


fixed with brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

10 Bolts, brass, Skeleton 18" supplied and


fixed with brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

11 Cabin Hooks 2" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.


Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

12 Cabin Hooks 3" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

13 Cabin Hooks 6" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

14 Cabin Hooks 8" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00
Rate per No.

Per No.

15 Cabin Hooks 9" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

16 Cabin Hooks 10" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

17 Cabin Hooks 12" polished, cast brass,


heavy quality supplied and fixed with
brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.
18 Casement fasteners, brass, with morruce
oblate, polished heavy quality supplied
and fixed with brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

19 Casement stays, polished 10" heavy


quality supplied and fixed.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

20 Casement stays, polished 12" heavy


quality supplied and fixed.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

21 Fanlight catches, brass heavy quality with


brass screws fixed complete.

Data: Per No.

Labour Cost
Carpenter Hrs 0.75 150.00
Rate per No.

Per No.

22 Handles, door, brass, polished heavy


quality supplied and fixed with brass
screws complete.

Data: Per No.

Labour Cost
Carpenter Hrs 0.25 150.00

Rate per No.

Per No.

23 Hasp and staple, safety type, 6" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

24 Hasp and staple, safety type, 4" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.
25 Hat Hooks, brass, supplied and fixed with
brass screws.

Data: Per No.

Labour Cost
Carpenter Hrs 0.50 150.00

Rate per No.

Per No.

26 Hinges, butt, 4" x 2" brass, polished


heavy quality supplied and fixed with
brass screws complete.

Data: Per No.

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Rate per No.

Per No.

27 Hinges, butt, 4" x 3" brass, polished


heavy quality supplied and fixed with
brass screws complete.

Data: Per No.

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Rate per No.

Per No.

28 Hinges, butt, 4" x 2 1/2" brass, polished


heavy quality supplied and fixed with
brass screws complete.
Data: Per No.

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Rate per No.

Per No.

29 Hinges, butt, 4" x 4" brass, polished


heavy quality supplied and fixed with
brass screws complete.

Data: Per No.

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Rate per No.

Per No.

30 Hinges, butt, 5" brass, polished heavy


quality supplied and fixed with brass
screws complete.

Data: Per No.

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Rate per No.

Per No.

31 Hinges centre pivot (consisting of 2


pieces) brass, polished heavy quality
supplied and fixed with brass screws
complete.

Data: Per No.


Labour Cost
Carpenter Hrs 1.00 150.00
Labour Hrs 1.00 81.25

Rate per No.

Per No.

32 Hinges, gravity, brass, supplied and


fixed with brass screws complete.

Data: Per No.

Labour Cost
Carpenter Hrs 1.00 150.00
Labour Hrs 1.00 81.25

Rate per No.

Per No.

33 Hinges, Parliamentary, 6" x 4" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25

Rate per No.

Per No.

34 Hinges, Parliamentary, 6" x 5" brass,


polished heavy quality supplied and fixed
with brass screws complete.

Data: Per No.

Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Rate per No.

Per No.

35 Locks, rim 6", polished brass, 2 levers,


superior quality and English
Manufacture, supplied and fixed.

Data: Per No.

Labour Cost
Carpenter Hrs 1.50 150.00

Rate per No.

Per No.

36 Locks, rim 6", polished brass, Single


levers, superior quality and English
Manufacture, supplied and fixed.

Data: Per No.

Labour Cost
Carpenter Hrs 1.50 150.00

Rate per No.

Per No.

37 Locks, rim 6", polished brass, 4 lever of


best quality Local Manufacture, supplied
and fixed.

Data: Per No.

Labour Cost
Carpenter Hrs 1.50 150.00

Rate per No.

Per No.
38 Locks, rim 5" single lever of best quality
Local Manufacture, supplied and fixed.

Data: Per No.

Labour Cost
Carpenter Hrs 1.50 150.00

Rate per No.

Per No.

39 Locks, Yale or Union, night latch,


supplied and fixed with duplicate keys.

Data: Per No.

Labour Cost
Carpenter Hrs 2.00 150.00

Rate per No.

Per No.

40 Lock Mortice (Local) single supplied and


fixed.

Data: Per No.

Labour Cost
Carpenter Day 0.50 1,200.00

Rate per No.

Per No.

41 Lock Mortice (Local) double, supplied and


fixed.

Data: Per No.

Labour Cost
Carpenter Day 1.00 1,200.00
Rate per No.

Per No.

42 Lock Mortice Union (Imported) single,


supplied and fixed.

Data: Per No.

Labour Cost
Carpenter Day 0.50 1,200.00

Rate per No.

Per No.

43 Lock Mortice Union (Imported) double,


supplied and fixed.

Data: Per No.

Labour Cost
Carpenter Day 1.00 1,200.00

Rate per No.

Per No.

PLASTERING

1 5/8" thick plastering to wall in lime and


sand 1:2 including floating with lime
putty.

Data: Per Sqr

LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.75 650.00
Scaffolding - Add 3%

Rate per Sqr


Per Sqr
Per M2

2 5/8" thick plastering to wall in cement


sand 1:3 including cement floating.

Data: Per Sqr

LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.50 650.00
Scaffolding - Add 3%

Rate per Sqr

Per Sqr
Per M2

3 3/8" thick plastering to soffit of slab in


cement and sand 1:3 including floating
with lime putty.

Data: Per Sqr

LabourCost
Mason Day 2.50 1,200.00
Unskilled Labour Day 2.50 650.00
Scaffolding - Add 3%

Rate per Sqr

Per Sqr
Per M2

4 3/8" thick plastering to sides and soffit


of beams in cement and sand 1:3
including floating with lime putty.

Data: Per Sqr

LabourCost
Mason Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%

Rate per Sqr

Per Sqr
Per M2

5 5/8" thick plastering to wall in lime,


cement and sand 1:1:5 finished semi
rough with wooden float.

Data: Per Sqr

LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.25 650.00
Scaffolding - Add 3%

Rate per Sqr

Per Sqr
Per M2

6 5/8" thick plastering to wall in lime,


cement and sand 1:1:5 finished smooth
with lime putty floating.

Data: Per Sqr

LabourCost
Mason Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00
Scaffolding - Add 3%

Rate per Sqr

Per Sqr
Per M2
7 1/2" thick rendering in cement and sand
1:3 finished smooth.

Data: Per Sqr

LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour (Curing) Day 1.50 650.00

Rate per Sqr

Per Sqr
Per M2

8 1/2" thick rendering in cement and sand


1:2 in floors, finished smooth.

Data: Per Sqr

LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.50 650.00
Unskilled Labour (Curing) Day 0.25 650.00

Rate per Sqr

Per Sqr
Per M2

9 3/4" thick rendering in cement and sand


1:3 finished smooth.

Data: Per Sqr

LabourCost
Mason Day 1.25 1,200.00
Unskilled Labour Day 2.00 650.00
Unskilled Labour (Curing) Day 0.25 650.00

Rate per Sqr


Per Sqr
Per M2

10 3/4" thick rendering in cement and sand


1:2 in floors finished smooth.

Data: Per Sqr

LabourCost
Mason Day 1.25 1,200.00
Unskilled Labour Day 2.00 650.00
Unskilled Labour (Curing) Day 0.25 650.00

Rate per Sqr

Per Sqr
Per M2

11 3/4" thick rendering in cement and sand


1:2 in coloured cement floors finished
smooth.

Data: Per Sqr

LabourCost
Mason Day 1.25 1,200.00
Unskilled Labour Day 2.00 650.00
Unskilled Labour (Curing) Day 0.25 650.00

Rate per Sqr

Per Sqr
Per M2

12 1/2" x 6" skirting in cement and sand 1:3


projected of flush to walls finished with
floating including forming groove.

Data: Per 10.0 L.ft

LabourCost
Mason Day 0.375 1,200.00
Unskilled Labour Day 0.312 650.00

Rate per 10.0 L.ft


Rate per L.ft

Per L.ft
Per M

PAINTING AND DECORATING

1 Prepare and apply one coat of


preservative (Oil type) to structural
timber including touching up cut ends
etc. after fixing.

Data: Per Sqr

LabourCost
Painter Day 0.75 1,200.00
Unskilled Labour Day 0.50 650.00

Rate per Sqr

Per Sqr
Per M2

2 Prepare surface of steel truss and apply


two coats of anti-corrosive primer.

Data: Per Sqr

LabourCost
Painter Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00

Rate per Sqr

Per Sqr
Per M2
3 Apply one coat of anti-corrosive primer
and two coats of enamel paint on already
shop primed and erected steel roof truss.

Data: Per Sqr

LabourCost
Painter Day 2.50 1,200.00
Unskilled Labour Day 1.00 650.00
Scaffolding - Add 3%

Rate per Sqr

Per Sqr
Per M2

4 Prepare and apply two coats of primer


and finishing coat of enamel paint to mild
steel (angle/flat) gate.

Data: Per 50.0 Sq.ft

LabourCost
Painter Day 0.50 1,200.00
Unskilled Labour Day 0.75 650.00

Rate per 0.50 Sqr

Per Sqr
Per M2

5 Painting steel on new work with 2 coats


of anti-corrosive paint.

Data: Per Sqr

LabourCost
Painter Day 1.50 1,200.00

Rate per Sqr


Per Sqr
Per M2

6 Painting new timber work with 2 coats


of wood preservative.

Data: Per Sqr

LabourCost
Painter Day 0.50 1,200.00

Rate per Sqr

Per Sqr
Per M2

7 Preparing and painting wood work with


primer and 2 coats of enamel paint.

Data: Per Sqr

LabourCost
Painter Day 1.50 1,200.00
Unskilled Labour Day 0.50 650.00

Rate per Sqr

Per Sqr
Per M2

8 White or colour washing 2 coats in single


storey.

Data: Per 10.0 Sqr

LabourCost
Painter Day 2.50 1,200.00
Unskilled Labour Day 2.50 650.00
Scaffolding - Add 3%
Rate per 10.0 Sqr
Rate per Sqr

Per Sqr
Per M2

9 White or colour washing 2 coats in two


storeyed building.

Data: Per 10.0 Sqr

LabourCost
Painter Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Scaffolding - Add 3%

Rate per 10.0 Sqr


Rate per Sqr

Per Sqr
Per M2

10 Prepare and apply one coat of Alkali


resistant primer and two coats of
emulsion paint to walls.

Data: Per Sqr

LabourCost
Painter Day 1.25 1,200.00
Scaffolding - Add 3%

Rate per Sqr

Per Sqr
Per M2

11 Cement washing to walls of single


storeyed building 2 coats.

Data: Per 10.0 Sqr

LabourCost
Painter Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%

Rate per 10.0 Sqr


Rate per Sqr

Per Sqr
Per M2

12 Painting walls with emulsion paint (2


Coats).

Data: Per Sqr

LabourCost
Painter Day 0.75 1,200.00
Scaffolding - Add 3%

Rate per Sqr

Per Sqr
Per M2

13 Prepare and apply one coat of Alkali


resistant primer and two coats of
emulsion paint to soffit of slabs.

Data: Per Sqr

LabourCost
Painter Day 1.75 1,200.00
Scaffolding - Add 3%

Rate per Sqr

Per Sqr
Per M2

14 Varnishing two coats with copal varnish


after sand papering.

Data: Per Sqr


LabourCost
Painter Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Rate per Sqr

Per Sqr
Per M2

15 Wax polishing to timber in panels and


floors.

Data: Per Sqr

LabourCost
Unskilled Labour Hrs 3.00 81.25

Rate per Sqr

Per Sqr
Per M2

16 Prepare and apply one coat of Alkali


resistance primer and two coats of
weather shield emulsion paint to walls
external.

Data: Per Sqr

LabourCost
Painter Day 1.25 1,200.00
Scaffoldings - Add 3%

Rate per Sqr

Per Sqr
Per M2

17 Prepare and apply two coats of weather


shield emulsion paint to walls external.
Data: Per Sqr

LabourCost
Painter Day 1.25 1,200.00
Scaffoldings - Add 3%

Rate per Sqr

Per Sqr
Per M2

EXTERNAL DRAINAGE & PLUMBING LINE

1 4" dia. PVC pipe type 400 earth ware


pipes laid on 6" thick bedding in cement
concrete 1:3:6(1 1/2" ) including
excavation average 2' 0" depth, back
filling with selected excavated materials
and concrete to haunching to joints.

Data: Per 100.0 L.ft

LabourCost
Laying Concrete Bedding
Unskilled Labour Day 1.50 650.00
Laying and testing pipes
Plumber Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Back filling
Unskilled Labour Day 2.50 650.00

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

2 4" dia. G.I Soil / Vent pipe fixed vertically


to walls jointed with cement caulking
(Special measured seperately)

Data: Per 6.0 L.ft


LabourCost
Plumber Day 0.25 1,200.00
Unskilled Labour Day 0.25 650.00
Scaffolding - Add 5%

Rate per 6.0 L.ft


Rate per L.ft

Per L.ft
Per M

3 4" dia. G.I pipes fixed to walls jointed


with lead caulking. (Special measured
seperately)

Data: Per 6.0 L.ft

LabourCost
Plumber Day 0.25 1,200.00
Unskilled Labour Day 0.25 650.00
Scaffolding - Add 5%

Rate per 6.0 L.ft


Rate per L.ft

Per L.ft
Per M

4 4" dia. Stoneware gulley with 6" x 6" x 6"


gulley box including excavation, 4"
cement concrete 1:2:4(3/4" ) base
surrounded by 4 1/2" thick cement and
sand 1:5 extended 6" above top of gulley
box including making connection, 1/2"
cement and sand 1:2 rendering internally
and exposted faces finished smooth with
neat cement floating and providing G.I
Grating on top of gulley.

Data: Per No.

Labour Cost
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Rate per No.

Per No.

5 Manhole 2' 0" x 2' 0" internally with


invert depth not exceeding 2' 0" including
excavation, back filling 6" cement
concrete 1:2:4(3/4" ) base with 3/8" dia.
Mild steel rods at 4" centres both ways,
forming channels and benching in similar
concrete, 4 1/2" walls in brick in cement
sand 1:5 1/2" thick cement and sand 1:2
rendering internally and exposed surfaces
including channels, benching and 2" thick
RCC removable cover slab 2' 3" x 2' 3"
inlet and outlet connection all complete
to working order.

Data: Per No.

Labour Cost
Mason Day 1.50 1,200.00
Unskilled Labour Day 2.50 650.00

Rate per No.

Per No.

6 22" x 16" glazed fireclay wash basin with


1/2" dia. Chromium plated pillar tap,
waste plug, chromium plated waste chain
and stay, including fixing wash basin on
brackets. (Water supply and waste water
connection measured seperately)

Data: Per No.

Labour Cost
Mason Day 0.50 1,200.00
Unskilled Labour Day 1.00 650.00

Rate per No.


Per No.

7 Sink 24" x 15" x 7" overall vitreous China


with rubber plug and chromium plated
chain waste carried on iron brackets
painted and fixed to walls. (Water supply
and waste water connection measured
seperately)

Data: Per No.

Labour Cost
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Rate per No.

Per No.

8 Closet pedestal type with L/L flushing


cistern, flush pipe double plastic seat
cover 1/2" dia. Stop cock, supplied and
fixed complete to working order.

Data: Per No.

Labour Cost
Mason Day 0.25 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Rate per No.

Per No.

9 Closet Squatting type with trap including


high level cistern best quality plastic
fixed complete with flush pipe and 1/2"
dia. Stop cock, all complete to working
order.

Data: Per No.

Labour Cost
Mason Day 0.50 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Rate per No.

Per No.

10 Vitreous China bidet suite fixed complete


to working order. (Imported)

Data: Per No.

Labour Cost
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Rate per No.

Per No.

11 4 No. Bowl type Urinal with trap and 2


gallon automatic flashing cistern and
spreaders complete to working orders.
(Ceylon ceramic)

Data: Per No.

Labour Cost
Mason Day 0.25 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Rate per No.

Per No.

PLUMBING - PVC PIPE

1 1/2" dia. PVC pipes fixed to walls.


(Specials paid seperately)

Data: Per 10.0 L.ft

LabourCost
Plumber Hrs 1.00 150.00
Unskilled Labour Hrs 1.00 81.25

Rate per 10.0 L.ft


Rate per L.ft

Per L.ft
Per M

2 3/4" dia. PVC pipes fixed to walls.


(Specials paid seperately)

Data: Per 10.0 L.ft

LabourCost
Plumber Hrs 1.00 150.00
Unskilled Labour Hrs 1.00 81.25

Rate per 10.0 L.ft


Rate per L.ft

Per L.ft
Per M

3 1" dia. PVC pipes fixed to walls. (Specials


paid seperately)

Data: Per 100.0 L.ft

LabourCost
Plumber Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

4 1 1/4" dia. PVC pipes fixed to walls.


(Specials paid seperately)

Data: Per 100.0 L.ft


LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

5 1 1/2" dia. PVC pipes fixed to walls.


(Specials paid seperately)

Data: Per 100.0 L.ft

LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

6 2" dia. PVC pipes fixed to walls. (Specials


paid seperately)

Data: Per 100.0 L.ft

LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

7 3" dia. PVC pipes fixed to walls. (Specials


paid seperately)
Data: Per 100.0 L.ft

LabourCost
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

8 Excavation for laying 1/2" to 3" dia. PVC


pipes in ground not less than 1' 6" deep,
back filling and connecting.

Data: Per 100.0 L.ft

LabourCost
Unskilled Labour Day 2.25 650.00

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

9 Chasing brick work for laying 1/2" to 1


1/2" dia. PVC pipes and making good
average depth 2" (Pipes and specials paid
seperately)

Data: Per 100.0 L.ft

LabourCost
Mason Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M
10 Chasing brick work for laying 1 1/2" to 3"
dia. PVC pipes in ground or floor and
making good average depth 3" (Pipes and
specials paid seperately)

Data: Per 100.0 L.ft

LabourCost
Mason Day 3.50 1,200.00
Unskilled Labour Day 3.50 650.00

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

11 1/2" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Labour Cost
Plumber Hrs 2.00 150.00

Rate per 10 Nos.


Rate per No.

Per No.

12 3/4" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Labour Cost
Plumber Hrs 2.00 150.00

Rate per 10 Nos.


Rate per No.

Per No.
13 1" dia. PVC specials viz - elbows, bends,
sockets (Type 1000)

Data: Per 10 Nos.

Labour Cost
Plumber Hrs 2.00 150.00

Rate per 10 Nos.


Rate per No.

Per No.

14 1 1/4" dia. PVC specials viz - elbows,


bends, sockets (Type 1000)

Data: Per 10 Nos.

Labour Cost
Plumber Hrs 2.00 150.00

Rate per 10 Nos.


Rate per No.

Per No.

15 1 1/2" dia. PVC specials viz - elbows,


bends, sockets (Type 1000)

Data: Per 10 Nos.

Labour Cost
Plumber Day 0.50 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

16 2" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.


Labour Cost
Plumber Day 0.50 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

17 2 1/2" dia. PVC specials viz - elbows,


bends, sockets (Type 1000)

Data: Per 10 Nos.

Labour Cost
Plumber Day 0.50 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

18 3" dia. PVC specials viz - elbows, bends,


sockets (Type 1000)

Data: Per 10 Nos.

Labour Cost
Plumber Day 0.50 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

19 1/2" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Labour Cost
Plumber Day 0.50 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

20 3/4" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Labour Cost
Plumber Day 0.50 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

21 1" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Labour Cost
Plumber Day 0.50 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

22 1 1/4" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Labour Cost
Plumber Day 0.50 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

23 1 1/2" dia. PVC specials viz Tees.

Data: Per 10 Nos.


Labour Cost
Plumber Day 1.00 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

24 2" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Labour Cost
Plumber Day 1.00 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

25 2 1/2" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Labour Cost
Plumber Day 1.50 1,200.00

Rate per 10 Nos.


Rate per No.

Per No.

26 3" dia. PVC specials viz Tees.

Data: Per 10 Nos.

Labour Cost
Plumber Day 1.50 1,200.00

Rate per 10 Nos.


Rate per No.
Per No.

27 Pipes PVC 1/2" supplied and fixed.


(fittings, excavation and back filling
measured seperately)

Data: Per 100.0 L.ft

LabourCost
Plumber Hrs 1.50 150.00
Unskilled Labour Hrs 1.50 81.25

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

28 Pipes PVC 3/4" supplied and fixed.


(fittings, excavation and back filling
measured seperately)

Data: Per 100.0 L.ft

LabourCost
Plumber Hrs 1.50 150.00
Unskilled Labour Hrs 1.50 81.25

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

29 Pipes PVC 1" supplied and fixed. (fittings,


excavation and back filling measured
seperately)

Data: Per 100.0 L.ft

LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25
Rate per 100.0 L.ft
Rate per L.ft

Per L.ft
Per M

30 Pipes PVC 1/2" supplied and fixed.


(fittings, excavation and back filling
measured seperately)

Data: Per 100.0 L.ft

LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

31 Pipes PVC 3/4" supplied and fixed.

Data: Per 100.0 L.ft

LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

32 Pipes PVC 1" supplied and fixed.

Data: Per 100.0 L.ft

LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 650.00
Plumber Hrs 3.00 150.00
Unskilled Labour Hrs 3.00 81.25

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

33 Pipes PVC 1 1/4" supplied and fixed.

Data: Per 100.0 L.ft

LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 1.00 81.25

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

34 Pipes PVC 1 1/2" supplied and fixed.

Data: Per 100.0 L.ft

LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 650.00
Plumber Hrs 3.00 150.00
Unskilled Labour Hrs 3.00 81.25

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

35 Pipes PVC 2" supplied and fixed.

Data: Per 100.0 L.ft


LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 7,500.00
Plumber Hrs 5.00 150.00
Unskilled Labour Hrs 5.00 81.25

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

36 Pipes PVC 2" supplied and fixed. (fittings,


excavation and back filling measured
seperately)

Data: Per 100.0 L.ft

LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 4.00 81.25

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M

37 Pipes PVC 3" supplied and fixed. (fittings,


excavation and back filling measured
seperately)

Data: Per 100.0 L.ft

LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 4.00 81.25

Rate per 100.0 L.ft


Rate per L.ft

Per L.ft
Per M
GLAZIER

1 1/8" thick clear sheet panes exceeding 1


Sq.ft but not exceeding 4 Sq.ft, cut and
fixed with class I timber beading to doors
and windows.
Consider sash 3' 0" x 4' 0" with 3' 1 1/4"
style and 4 Nos. Glass panes.
Data: Per 9.0 Sq.ft

LabourCost
Glazier Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Rate per 9.0 Sq.ft


Rate per Sq.ft

Per Sq.ft
Per M2

2 1/8" thick pin head/Reded sheet glass


panes exceeding 1 Sq.ft but not exceeding
4 Sq.ft, cut and fixed with class I timber
beading to doors and windows.

Data: Per 9.0 Sq.ft

LabourCost
Glazier Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00

Rate per 9.0 Sq.ft


Rate per Sq.ft

Per Sq.ft
Per M2
2005

6,500.00

6,500.00
6,500.00
650.00

650.00
70.00

1,056.25

1,056.25
1,056.25

1,056.00
373.00
650.00

650.00
650.00

650.00
230.00

1,462.50

1,462.50
1,462.50

1,463.00
517.00

2,275.00

2,275.00
2,275.00

2,275.00
804.00
1,950.00

1,950.00
1,950.00

1,950.00
689.00

1,625.00

1,625.00
1,625.00

1,625.00
574.00

1,200.00
1,300.00

2,500.00
2,500.00
2,500.00
883.00

1,800.00
975.00
693.75

3,468.75
3,468.75
346.88

347.00

325.00

325.00
325.00

325.00
35.00
650.00

650.00
650.00

650.00
230.00

812.50

812.50
812.50

813.00
287.00

1,300.00

1,300.00
1,300.00

1,300.00
459.00
1,300.00

1,300.00
1,300.00

1,300.00
459.00

1,625.00
325.00
975.00

2,925.00
2,925.00

2,925.00
315.00

1,200.00
1,950.00

3,150.00
3,150.00
21.00

21.00
2,400.00
3,900.00

6,300.00
6,300.00
42.00

42.00

9,600.00
13,000.00

22,600.00
22,600.00
50.22

50.00
1,200.00
5,200.00

6,400.00

6,400.00
2,261.00

6,400.00

1,600.00
8,000.00
8,000.00

8,000.00
2,827.00

1,200.00
5,200.00
6,400.00

6,400.00
2,261.00

6,400.00
1,600.00
8,000.00
8,000.00

8,000.00
2,827.00

1,200.00
5,200.00
6,400.00

6,400.00
2,261.00

6,400.00

1,600.00
8,000.00
8,000.00

8,000.00
2,827.00

300.00
81.25
381.25
381.25
38.13
38.00
125.00

300.00
81.25
381.25
381.25
38.13

38.00
125.00

108.00
58.50

166.50
166.50

1,200.00
650.00
1,850.00
1,850.00
185.00
185.00
607.00

600.00
650.00

600.00
325.00

2,175.00
2,175.00
217.50

218.00
715.00

300.00
162.50

300.00
162.50

925.00
925.00
92.50
93.00
305.00

300.00
162.50

300.00
162.50

925.00
925.00
92.50

93.00
305.00

450.00
243.75

600.00
650.00

1,943.75
1,943.75
129.58

130.00
427.00
600.00
325.00

600.00
650.00

2,175.00
2,175.00
145.00

145.00
476.00

600.00
325.00

600.00
650.00

2,175.00
2,175.00
145.00

145.00
476.00
600.00
325.00

750.00
812.50

2,487.50
2,487.50
165.83

166.00
545.00

900.00
487.50

1,200.00
1,300.00

3,887.50
3,887.50
194.38

194.00
637.00
300.00
162.50

462.50
462.50
115.63

116.00

2,100.00
1,200.00
5,525.00

900.00
975.00

10,700.00
10,700.00

10,700.00
1,152.00

300.00
325.00
150.00
81.25

856.25
856.25
57.08

57.00
614.00

900.00
487.50

1,387.50
1,387.50
138.75

139.00

300.00
162.50

462.50
462.50
46.25

46.00
75.00
300.00
162.50

537.50
537.50

1,200.00
3,900.00
49.50
5,149.50
5,149.50

5,150.00
1,820.00

1,200.00
3,900.00

5,100.00

5,100.00
1,802.00
5,100.00
1,300.00

6,400.00
6,400.00

6,400.00
2,261.00

5,100.00
3,250.00

8,350.00
8,350.00

8,350.00
2,951.00

3,000.00
10,400.00
13,400.00
13,400.00
6,700.00

6,700.00
2,367.00
6,700.00
1,300.00

8,000.00
2,800.00
10,800.00

10,800.00
3,816.00

6,700.00
3,250.00

9,950.00
9,950.00

9,950.00
3,516.00

1,200.00
1,950.00
3,150.00
3,150.00

3,150.00
339.00
450.00
243.75
693.75
693.75
57.81

58.00
624.00

1,200.00
650.00
1,850.00
1,850.00
23.13

23.00
248.00

2,400.00
10,400.00
49.50
12,849.50
12,849.50

12,850.00
4,541.00
12,849.50
1,300.00

14,149.50
4,952.33
19,101.83

19,102.00
6,750.00

4,800.00
15,600.00

20,400.00
20,400.00
2,550.00

2,550.00
274.00

4,800.00
16,250.00

21,050.00
21,050.00
2,631.25

2,631.00
283.00
1,200.00
975.00

2,175.00
2,175.00
217.50

218.00
715.00

Amount
2,175.00

2,175.00
2,175.00
217.50

218.00
715.00

396.00
1,300.00

1,696.00
1,696.00
1,696.00
599.00

150.00
162.50
312.50
312.50

313.00
34.00

150.00
487.50
637.50
637.50

638.00
69.00
300.00
487.50
787.50
787.50

788.00
85.00

40.63
150.00
162.50
75.00

428.13
428.13

1,211.00
428.00

1,200.00
650.00

1,850.00
1,850.00
1,850.00
37.00

1,200.00
650.00

1,850.00
1,850.00

1,850.00
37.00

3,600.00
2,600.00

6,200.00
6,200.00

6,200.00
2,191.00

3,600.00
2,600.00
6,200.00
6,200.00

6,200.00
2,191.00

1,800.00
1,300.00
155.00

3,255.00
3,255.00

3,255.00
350.00

2,700.00
2,437.50
154.13

5,291.63
5,291.63

5,292.00
570.00

4,200.00
3,575.00
155.50

7,930.50
7,930.50

7,931.00
854.00

2,700.00
1,950.00
139.50

4,789.50
4,789.50

4,790.00
516.00

1,800.00
1,300.00
155.00

3,255.00
3,255.00

3,255.00
350.00
2,700.00
2,437.50
154.13

5,291.63
5,291.63

5,292.00
570.00

4,500.00
3,575.00
161.50

8,236.50
8,236.50

8,237.00
887.00

6,000.00
2,275.00

8,275.00
8,275.00

8,275.00
891.00
1,500.00
1,625.00

3,125.00
3,125.00

3,125.00
336.00

600.00
325.00

925.00
925.00
92.50

93.00
305.00

2,100.00
812.50

2,912.50
2,912.50
291.25
291.00
955.00

1,800.00
812.50

2,612.50
2,612.50
261.25

261.00
856.00

1,800.00
1,625.00
102.75

3,527.75
3,527.75

3,528.00
380.00
1,200.00
1,300.00
125.00

2,625.00
2,625.00

2,625.00
283.00

4,800.00
3,900.00

8,700.00
8,700.00

8,700.00
3,074.00

3,000.00
4,875.00
236.25

8,111.25
8,111.25

8,111.00
2,866.00
4,800.00
2,600.00
325.00

7,725.00
7,725.00

7,725.00
832.00

4,800.00
2,600.00
162.50

7,562.50
7,562.50

7,563.00
814.00

6,000.00
2,600.00
325.00
8,925.00
8,925.00

8,925.00
961.00

4,800.00
2,600.00
162.50

7,562.50
7,562.50

7,563.00
814.00

4,800.00
2,600.00
162.50

7,562.50
7,562.50

7,563.00
814.00
8,400.00
5,200.00

13,600.00
13,600.00
2,266.67

2,267.00
244.00

3,600.00
1,950.00

5,550.00
5,550.00
925.00

925.00
100.00

3,000.00
1,950.00
4,950.00
4,950.00
1,375.00

1,375.00
148.00

1,200.00
1,300.00

2,500.00
2,500.00
694.44

694.00
75.00

1,300.00

1,300.00
1,300.00

1,300.00
140.00

600.00
162.50
762.50
762.50
57.20

57.00
187.00

300.00
162.50

462.50
462.50
38.54

39.00
128.00

3,600.00
1,950.00
277.50

5,827.50
5,827.50
58.28

58.00
190.00
3,600.00
1,950.00
277.50

5,827.50
5,827.50
58.28

58.00
190.00

1,200.00
650.00

600.00
325.00

600.00
325.00

3,700.00
3,700.00
246.67

247.00
810.00
600.00
150.00
487.50

1,237.50
1,237.50
82.50

83.00
272.00

600.00
325.00
46.25

971.25
971.25
40.47

40.00
131.00
150.00
81.25
11.56

242.81
242.81

243.00

150.00
81.25
11.56

242.81
242.81

243.00

75.60
40.95
5.83

122.38
122.38

122.00
396.00
214.50
30.53

641.03
641.03
26.71

27.00
89.00

75.60
40.95
5.83

122.38
122.38

122.00

75.60
40.95
5.83

122.38
122.38

122.00
3,000.00
600.00
975.00
137.25

4,712.25
4,712.25
2,416.54

2,417.00
260.00

1,800.00
1,300.00
93.00

3,193.00
3,193.00
1,637.44

1,637.00
176.00
1,200.00
1,200.00
1,950.00

3,600.00
2,600.00
186.00

10,736.00
10,736.00
5,505.64

5,506.00
593.00

3,600.00
3,900.00
225.00

7,725.00
7,725.00
4,291.67

4,292.00
462.00

6,000.00
975.00

6,975.00
6,975.00
306.59

307.00
3,305.00

7,200.00
1,300.00

8,500.00
8,500.00
303.57

304.00
3,272.00

900.00
240.50
300.00
162.50

1,603.00
1,603.00
73.70
74.00
797.00

2,700.00
650.00
900.00
487.50

4,737.50
4,737.50
291.54

292.00
3,143.00

7,200.00
1,625.00
600.00
325.00

9,750.00
9,750.00
348.21

348.00
3,746.00
75.00

75.00
75.00

75.00

49.50

49.50
49.50

50.00

49.50

49.50
49.50

50.00
49.50

49.50
49.50

50.00

49.50

49.50
49.50

50.00

49.50

49.50
49.50

50.00

75.00

75.00
75.00
75.00

75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00
75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00
75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00

112.50
112.50
112.50

113.00

37.50

37.50
37.50

38.00

75.00

75.00
75.00

75.00

75.00

75.00
75.00

75.00
75.00

75.00
75.00

75.00

112.50
60.94

173.44
173.44

173.00

112.50
60.94

173.44
173.44

173.00
112.50
60.94

173.44
173.44

173.00

112.50
60.94

173.44
173.44

173.00

112.50
60.94

173.44
173.44

173.00
150.00
81.25

231.25
231.25

231.00

150.00
81.25

231.25
231.25

231.00

112.50
60.94

173.44
173.44

173.00

112.50
60.94
173.44
173.44

173.00

225.00

225.00
225.00

225.00

225.00

225.00
225.00

225.00

225.00

225.00
225.00

225.00
225.00

225.00
225.00

225.00

300.00

300.00
300.00

300.00

600.00

600.00
600.00

600.00

1,200.00
1,200.00
1,200.00

1,200.00

600.00

600.00
600.00

600.00

1,200.00

1,200.00
1,200.00

1,200.00

1,200.00
1,137.50
70.13

2,407.63
2,407.63
2,408.00
259.00

1,200.00
975.00
65.25

2,240.25
2,240.25

2,240.00
241.00

3,000.00
1,625.00
138.75

4,763.75
4,763.75

4,764.00
513.00
2,400.00
1,300.00
111.00

3,811.00
3,811.00

3,811.00
410.00

1,200.00
812.50
60.38

2,072.88
2,072.88

2,073.00
223.00

1,800.00
975.00
83.25

2,858.25
2,858.25

2,858.00
308.00
1,200.00
975.00

2,175.00
2,175.00

2,175.00
234.00

1,200.00
975.00
162.50

2,337.50
2,337.50

2,338.00
252.00

1,500.00
1,300.00
162.50

2,962.50
2,962.50
2,963.00
319.00

1,500.00
1,300.00
162.50

2,962.50
2,962.50

2,963.00
319.00

1,500.00
1,300.00
162.50

2,962.50
2,962.50

2,963.00
319.00

450.00
202.80

652.80
652.80
65.28

65.00
213.00

900.00
325.00

1,225.00
1,225.00

1,225.00
132.00

1,800.00
975.00

2,775.00
2,775.00

2,775.00
299.00
3,000.00
650.00
109.50

3,759.50
3,759.50

3,760.00
405.00

600.00
487.50

1,087.50
1,087.50

2,175.00
234.00

1,800.00

1,800.00
1,800.00
1,800.00
194.00

600.00

600.00
600.00

600.00
65.00

1,800.00
325.00

2,125.00
2,125.00

2,125.00
229.00

3,000.00
1,625.00
138.75

4,763.75
4,763.75
476.38

476.00
51.00

600.00
325.00
27.75

952.75
952.75
95.28

95.00
10.00

1,500.00
45.00

1,545.00
1,545.00

1,545.00
166.00

2,400.00
1,300.00
111.00

3,811.00
3,811.00
381.10

381.00
41.00

900.00
27.00

927.00
927.00

927.00
100.00

2,100.00
63.00

2,163.00
2,163.00

2,163.00
233.00
600.00
325.00

925.00
925.00

925.00
100.00

243.75

243.75
243.75

244.00
26.00

1,500.00
45.00

1,545.00
1,545.00

1,545.00
166.00
1,500.00
45.00

1,545.00
1,545.00

1,545.00
166.00

975.00

2,400.00
1,300.00

1,625.00

6,300.00
6,300.00
63.00

63.00
207.00
300.00
162.50
23.13

485.63
485.63
80.94

81.00
266.00

300.00
162.50
23.13

485.63
485.63
80.94

81.00
266.00

600.00
325.00
925.00
925.00

925.00

1,800.00
1,625.00

3,425.00
3,425.00

3,425.00

600.00
650.00

1,250.00
1,250.00
1,250.00

600.00
325.00

925.00
925.00

925.00

300.00
1,200.00
650.00

2,150.00
2,150.00

2,150.00

600.00
1,200.00
650.00

2,450.00
2,450.00

2,450.00

1,200.00
650.00

1,850.00
1,850.00

1,850.00

300.00
1,200.00
650.00

2,150.00
2,150.00

2,150.00

150.00
81.25

231.25
231.25
23.13

23.00
75.00

150.00
81.25

231.25
231.25
23.13

23.00
75.00

600.00
325.00

925.00
925.00
9.25

9.00
30.00
900.00
487.50

1,387.50
1,387.50
13.88

14.00
46.00

900.00
487.50

1,387.50
1,387.50
13.88

14.00
46.00

900.00
487.50

1,387.50
1,387.50
13.88

14.00
46.00
1,200.00
650.00

1,850.00
1,850.00
18.50

19.00
62.00

1,462.50

1,462.50
1,462.50
14.63

15.00
49.00

3,600.00
1,950.00

5,550.00
5,550.00
55.50

56.00
184.00
4,200.00
2,275.00

6,475.00
6,475.00
64.75

65.00
213.00

300.00

300.00
300.00
30.00

30.00

300.00

300.00
300.00
30.00

30.00
300.00

300.00
300.00
30.00

30.00

300.00

300.00
300.00
30.00

30.00

600.00

600.00
600.00
60.00

60.00
600.00

600.00
600.00
60.00

60.00

600.00

600.00
600.00
60.00

60.00

600.00

600.00
600.00
60.00

60.00

600.00

600.00
600.00
60.00

60.00

600.00

600.00
600.00
60.00

60.00

600.00

600.00
600.00
60.00

60.00

600.00

600.00
600.00
60.00

60.00
1,200.00

1,200.00
1,200.00
120.00

120.00

1,200.00

1,200.00
1,200.00
120.00

120.00

1,800.00

1,800.00
1,800.00
180.00

180.00

1,800.00

1,800.00
1,800.00
180.00
180.00

225.00
121.88

346.88
346.88
3.47

3.00
10.00

225.00
121.88

346.88
346.88
3.47

3.00
10.00

300.00
162.50
462.50
462.50
4.63

5.00
16.00

300.00
162.50

462.50
462.50
4.63

5.00
16.00

300.00
162.50

462.50
462.50
4.63

5.00
16.00
450.00
243.75

693.75
693.75
6.94

7.00
23.00

600.00
81.25

681.25
681.25
6.81

7.00
23.00

450.00
243.75

693.75
693.75
6.94

7.00
23.00
750.00
406.25

1,156.25
1,156.25
11.56

12.00
39.00

600.00
325.00

925.00
925.00
9.25

9.00
30.00

600.00
325.00

925.00
925.00
9.25

9.00
30.00
600.00
325.00

925.00
925.00
102.78

103.00
1,109.00

600.00
325.00

925.00
925.00
102.78

103.00
1,109.00