BSR 2012 Original
BSR 2012 Original
BSR 2012 Original
AT TRINCOMALEE
EXCAVATION
Labour Cost
Consider an area of 10.00 Sqrs. i.e 5.00
Cubes of excavation
Unskilled Labour Day 10.00 650.00
Per Sqr
Per M2
Labour Cost
Unskilled Labour (1 5/8) Day 1.625 950.00
Per Cube
Per M3
1
3 Excavation in trenches for walls column
pits in soft /loose soil from 0' 0" to 5' 0"
deep and depositing excavated material
to a distance not exceeding 30' 0" (Earth
work support to be paid seperately where
necessary)
Labour Cost
Unskilled Labour Day 1.00 950.00
Per Cube
Per M3
Labour Cost
Unskilled Labour Day 2.25 950.00
Per Cube
Per M3
2
Materials Cost Unit Qty. Rate
Labour Cost
Unskilled Labour Day 3.50 650.00
Per Cube
Per M3
Labour Cost
Unskilled Labour Day 3.00 650.00
Per Cube
Per M3
Labour Cost
Unskilled Labour Day 2.50 650.00
3
Add Over head & Profit 20%
Rate per Cube
Per Cube
Per M3
Labour Cost
Skilled Labour Day 1.00 1,200.00
Unskilled Labour Day 2.00 650.00
Per Cube
Per M3
Labour Cost
Drilling, Chipping & wedging:-
Skilled Labour Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00
Steel, Fuel & Forge - 25% of Labour Cost
4
Rate per Sq.ft
Per Sq.ft
Labour Cost
Unskilled Labour Day 0.50 650.00
Per Sqr
Per M2
EARTH WORK
Labour Cost
Unskilled Labour Day 1.00 950.00
5
Per Cube
Per M3
Labour Cost
Unskilled Labour (Filling & Compacting) Day 1.25 950.00
Per Cube
Per M3
Labour Cost
Unskilled Labour Day 2.00 650.00
Per Cube
Per M3
6
Materials Cost Unit Qty. Rate
Earth delivered at site Cube 1.00 2,750.00
Allow 15% compaction
Labour Cost
Unskilled Labour Day 2.00 650.00
Per Cube
Per M3
Labour Cost
Unskilled Labour (Laying turf rids at site) Day 2.50 650.00
Unskilled Labour (Watering for 30 days) Day 0.50 650.00
Unskilled Labour Day 1.50 650.00
Water Gal 60.00 10.00
Per Sqr
Per M2
Consider trench 15' 0" long 3' 0" wide and 5'
0" depth open planking to both faces.
7
Data: Per 150.0 Sq.ft
Labour Cost
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 3.00 650.00
Per Sq.ft
Consider trench 15' 0" long 3' 0" wide and 5'
0" depth open planking to both faces.
Labour Cost
Carpenter Day 2.00 1,200.00
Unskilled Labour Day 6.00 650.00
Per Sq.ft
8
Consider trench of length 15' 0" width 5' 6"
at top, 3' 6" bottom
Labour Cost
Carpenter Day 8.00 1,200.00
Unskilled Labour Day 20.00 650.00
Per Sq.ft
CONCRETE
Labour Cost
Mason Day 1.00 1,350.00
Labour Day 8.00 950.00
Basket 0.66 75.00
Water Allow
Per Cube
Per M3
9
2 Cement concrete 1:3:6 ( 2" ). (Shuttering
paid for seperately)
As in Item 1
Per Cube
Per M3
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 8.00 800.00
Basket 0.66 75.00
Water Allow
Per Cube
Per M3
As in Item 3
10
Add Over head & Profit 20%
Rate per Cube
Per Cube
Per M3
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 8.00 900.00
Basket 0.66 300.00
Water Allow
Per Cube
Per M3
As in Item 5
Per Cube
Per M3
11
7 Channels 2" semi - circular, formed in
cement concrete floors and 1/2" cement
rendered 1:2 (Extra over concrete floor)
Labour Cost
Mason Day 0.25 1,200.00
Labour Day 0.125 650.00
Per L.ft
Per M
Labour Cost
Mason Day 0.25 1,200.00
Labour Day 0.125 650.00
Per L.ft
Per M
12
Materials Cost Unit Qty. Rate
1/2 Cu.ft Materials for concrete as in Item
(5)
3/8" MS Rods Lbs 1.85
Labour Cost
Mason Day 0.09 1,200.00
Labour Day 0.09 650.00
Allow for Moulds and curing
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 1.00 650.00
Allow for shuttering, excavation,curing etc.
Per L.ft
Per M
13
Materials Cost Unit Qty. Rate
Cement Cwt. 1.25 950.00
Sand Cube 0.06 4,000.00
1" Metal Cube 0.08 8,500.00
Rendering
Mason Day 0.50 1,200.00
Labour Day 0.50 650.00
Allow for shuttering, baskets etc.
Per L.ft
Per M
LabourCost
Erection & Removing shuttering
Carpenter Hrs 2.00 200.00
Labour Hrs 2.00 150.00
14
Rate per 10.0 L.ft
Rate per L.ft
Per L.ft
Per M
LabourCost
Erection & Removing shuttering
Carpenter Hrs 2.00 200.00
Labour Hrs 2.00 150.00
Per L.ft
Per M
15
LabourCost
Erection & Removing shuttering
Carpenter Hrs 3.00 150.00
Labour Hrs 3.00 81.25
Per L.ft
Per M
LabourCost
Erection & Removing shuttering
Carpenter Day 0.50 1,200.00
Labour Day 0.50 650.00
Per L.ft
16
Per M
LabourCost
Erection & Removing shuttering
Carpenter Day 0.50 1,200.00
Labour Day 0.50 650.00
Per L.ft
Per M
LabourCost
17
Erection & Removing shuttering
Carpenter Day 0.50 1,200.00
Labour Day 0.50 650.00
Per L.ft
Per M
LabourCost
Erection & Removing shuttering
Carpenter Day 0.75 1,200.00
Labour Day 0.75 650.00
Per L.ft
Per M
18
19 Lintol, cement concrete 1:2:4 (3/4" ),
precast or insitu. (Reinforcement paid for
seperately)
LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25
Per Stone
Shuttering
Planks at (1/4 new Cost) Sq.ft 115.00 40.00
Round timber props at (1/4 new cost) L.ft 80.00 70.00
2" Nails Lbs. 2.00 250.00
Mould oil Gln. 0.25 90.00
Timber in joists Cu.ft 5.00 1,000.00
LabourCost
19
Mason Day 1.75 1,200.00
Carpenter Day 1.00 1,200.00
Labour Day 8.50 650.00
Rendering
Cement Cwt. 1.50 950.00
Sand Cube 0.075 4,000.00
Padlo Cement Lbs. 8.50 200.00
Per Sqr
Per M2
LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 4.00 81.25
Rendering
Cement Cwt. 0.23 950.00
Sand Cube 0.010 4,000.00
20
Add Over head & Profit 20%
Rate per 15.0 Sq.ft
Rate per Sq.ft
Per Sq.ft
Per M2
LabourCost
Mason Day 0.75 1,200.00
Labour Day 0.75 650.00
Per Stone
LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25
21
Add Over head & Profit 20%
Rate per 10 stone
Rate per Stone
Per Stone
Data: Per
LabourCost
Smith Hrs 0.50 150.00
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 6.00 650.00
Basket 0.66 75.00
Allow for Water & curing Allow
22
Allow for 1/3 day hire of mixer, vibrator,
wages of operator,fuel etc.
Per Cube
Per M3
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 6.00 650.00
Basket 0.66 75.00
Allow for Water & curing Allow
Allow for 1/3 day hire of mixer, vibrator,
wages of operator,fuel etc.
Per Cube
Per M3
As per Item 26
Labour Day 2.00 650.00
23
Rate per Cube
Per Cube
Per M3
As per Item 26
Labour Day 5.00 650.00
Per Cube
Per M3
Labour Cost
Mason Day 2.50 1,200.00
Labour Day 16.00 650.00
Basket 1.33 75.00
Allow for Water & curing Allow
Allow for 2/3 day hire of mixer, vibrator,
wages of operator,fuel etc.
Per Cube
Per M3
24
30 Cement concrete as per Item 29 in 1st
floor.
As per Item 29
Labour Day 2.00 650.00
Per Cube
Per M3
As per Item 29
Labour Day 5.00 650.00
Per Cube
Per M3
Labour Cost
Carpenter Day 1.00 1,200.00
Labour Day 3.00 800.00
25
Add Over head & Profit 20%
Rate per Sqr
Per Sqr
Per M2
Labour Cost
Carpenter Day 0.375 1,000.00
Labour Day 0.375 800.00
Per Sq.ft
Per M2
26
Labour Cost
Carpenter Day 1.00 1,000.00
Labour Day 1.00 800.00
Per Sq.ft
Per M2
Labour Cost
Mason Day 2.00 1,200.00
Labour Day 16.00 650.00
Basket 0.66 75.00
Allow for Water & curing Allow
Allow for 1/2 day hire of mixer, vibrator,
wages of operator,fuel etc.
Per Cube
Per M3
27
Add Over head & Profit 20%
Rate per Cube
Per Cube
Per M3
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 24.00 650.00
Allow for Water & curing Allow
Per Sqr
Per M2
Labour Cost
28
Mason Day 4.00 1,200.00
Labour Day 25.00 650.00
Allow for Water & curing Allow
Per Sqr
Per M2
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 1.50 650.00
Allow for shuttering Allow
Per L.ft
Per M
29
Add Over head & Profit 20%
Rate per 10.0 L.ft
Rate per L.ft
Per L.ft
Per M
Labour Cost
Skilled Labour Day 0.33 1,350.00
Unskilled Labour Day 2.00 950.00
Per Cube
Per M3
Labour Cost
Skilled Labour Day 0.125 1,200.00
Unskilled Labour Day 0.25 650.00
30
Per Sqr
Per M2
Labour Cost
Skilled Labour Day 0.125 1,350.00
Unskilled Labour Day 0.75 950.00
Per Sqr
Per M2
Labour Cost
Skilled Labour Day 0.25 1,200.00
Unskilled Labour Day 0.75 650.00
31
Add Over head & Profit 20%
Rate per Sqr
Per Sqr
Per M2
Labour Cost
Vibrator operator Hrs 0.50 81.25
Mason (2 x 1/2 day) Hrs 1.00 150.00
Labour (4 x 1/2 day) Hrs 2.00 81.25
Carpenter Hrs 0.50 150.00
Allow for curing
Per Cube
Per M3
STEEL FABRICATOR
32
Allow for wastage 10%
Binding wire Lbs. 1.00 45.45
Labour Cost
Steel Fabricator Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per Cwt.
Per kg
Labour Cost
Steel Fabricator Day 1.00 1,350.00
Unskilled Labour Day 1.00 950.00
Per Cwt.
Per kg
BRICK MASONRY
33
Wastage 5%
Cement Cwts 4.00 950.00
Sand Cube 0.25 4,000.00
Water Glns. 150.00 10.00
Labour Cost
Mason Day 3.00 1,200.00
Labour Day 4.00 650.00
Per Cube
Per M3
Labour Cost
Mason Day 3.00 1,200.00
Labour Day 4.00 650.00
Per Cube
Per M3
34
Wastage 5%
Cement Cwts 1.30 800.00
Sand Cube 0.10 7,000.00
Water Glns. 50.00 10.00
Labour Cost
Mason Day 1.50 1,350.00
Labour Day 2.00 850.00
Scaffolding ( Add 5%)
Per Sqr
Per M2
Labour Cost
Mason Day 2.25 1,350.00
Labour Day 3.75 950.00
Scaffolding ( Add 3%)
Per Sqr
Per M2
35
Materials Cost Unit Qty. Rate
Bricks Nos. 1630 6.00
Wastage 5%
Cement Cwts 4.50 950.00
Sand Cube 0.30 4,000.00
Water Glns. 170.00 10.00
Labour Cost
Mason Day 3.50 1,200.00
Labour Day 5.50 650.00
Scaffolding ( Add 2%)
Per Sqr
Per M2
Labour Cost
Mason Day 2.25 1,350.00
Labour Day 3.00 950.00
Scaffolding ( Add 3%)
Per Sqr
Per M2
36
Data: Per Sqr
Labour Cost
Mason Day 1.50 1,200.00
Labour Day 2.00 650.00
Scaffolding ( Add 5%)
Per Sqr
Per M2
Labour Cost
Mason Day 2.25 1,200.00
Labour Day 3.75 650.00
Scaffolding ( Add 3%)
Per Sqr
Per M2
37
9 13 1/2" thick brick wall (wire cut) in
cement sand 1:5 in ground floor. (Facing
to brick work measured seperately)
Labour Cost
Mason Day 3.75 1,200.00
Labour Day 5.50 650.00
Scaffolding ( Add 2%)
Per Sqr
Per M2
Labour Cost
Mason Day 5.00 1,200.00
Labour Day 3.50 650.00
38
Per Sqr
Per M2
Labour Cost
Mason Day 1.25 1,200.00
Labour Day 2.50 650.00
Per Sqr
Per M2
Labour Cost
Mason Day 0.50 1,200.00
Labour Day 0.50 650.00
39
Per L.ft
Per M
Labour Cost
Mason Day 1.75 1,200.00
Labour Day 1.25 650.00
Per L.ft
Per M
Labour Cost
Mason Day 1.50 1,200.00
Labour Day 1.25 650.00
40
Add Over head & Profit 20%
Rate per 10.0 L.ft
Rate per L.ft
Per L.ft
Per M
Labour Cost
Mason Day 1.50 1,200.00
Labour Day 2.50 650.00
Scaffolding (Add 3%)
Per Sqr
Per M2
41
Labour Cost
Mason Day 1.00 1,000.00
Labour Day 2.00 850.00
Scaffolding (Add 5%)
Per Sqr
Per M2
RUBBLE MASONRY
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 6.00 800.00
Per Cube
Per M3
42
Water Glns. 100.00 10.00
Labour Cost
Mason Day 2.50 1,000.00
Labour Day 7.50 800.00
Scaffolding - Add 3%.
Per Cube
Per M3
TILING
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 900.00
Unskilled labour to polishing Day 0.50 800.00
Per Sqr
Per M2
43
Data: Per Sqr
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 950.00
Unskilled labour for cleaning Day 0.25 800.00
Per Sqr
Per M2
Labour Cost
Mason Day 5.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour to polishing Day 0.50 650.00
44
Per Sqr
Per M2
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour for cleaning Day 0.25 650.00
Per Sqr
Per M2
Labour Cost
Special Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour for polishing Day 0.25 650.00
45
Add Over head & Profit 20%
Rate per Sqr
Per Sqr
Per M2
ROOF PLUMBING
Labour Cost
Carpenter Day 7.00 1,200.00
Unskilled Labour Day 8.00 900.00
Per Sqr
Per M2
46
Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 900.00
Per Sqr
Per M2
Labour Cost
Carpenter Day 2.50 1,500.00
Unskilled Labour Day 3.00 1,000.00
Per Sqr
Per M2
Labour Cost
47
Carpenter Day 1.00 1,350.00
Unskilled Labour Day 2.00 950.00
Per Sqr
Per M2
Labour Cost
Unskilled Labour Day 2.00 950.00
Per Sqr
Per M2
Labour Cost
Carpenter Day 0.50 1,200.00
Unskilled Labour Day 0.25 650.00
48
Per L.ft
Per M
Labour Cost
Mason Day 0.25 1,200.00
Unskilled Labour Day 0.25 900.00
Per L.ft
Per M
Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 900.00
Scaffolding 5%
49
Rate per 100.0 L.ft
Rate per L.ft
Per L.ft
Per M
Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00
Scaffolding 5%
Per L.ft
Per M
ROOF PLUMBING
50
Planks Sq.ft 50.00
Wire Nails Lbs. 2.00
Labour Cost
a) Fixing boarding and applying wood
preservative
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
c) Building Sides
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per L.ft
Per M
Labour Cost
Cutting, bending, soldering and fixing
Tinker Day 0.50 1,200.00
Mason Day 0.125 1,200.00
Unskilled Labour Day 0.75 650.00
51
Add Over head & Profit 20%
Rate per 15.0 L.ft
Rate per L.ft
Per L.ft
Per M
Labour Cost
Plumber Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Scaffolding Add 5%
Per L.ft
Per M
52
Labour Cost
Plumber Day 0.125 1,200.00
Unskilled Labour Day 0.125 650.00
Scaffolding Add 5%
Per No.
Labour Cost
Plumber Day 0.125 1,200.00
Unskilled Labour Day 0.125 650.00
Scaffolding Add 5%
Per No.
Labour Cost
Plumber Day 0.063 1,200.00
53
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%
Per No.
Labour Cost
Plumber Day 0.33 1,200.00
Unskilled Labour Day 0.33 650.00
Scaffolding Add 5%
Per L.ft
Per M
Labour Cost
Plumber Day 0.063 1,200.00
54
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%
Per No.
Labour Cost
Plumber Day 0.063 1,200.00
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%
Per No.
55
Labour Cost
Carpenter Day 2.50 1,500.00
Mason Day 0.50 1,000.00
Unskilled Labour Day 1.50 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
Labour Cost
Carpenter Day 1.50 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
56
Data: Per 1.95 Sqr
Labour Cost
Making holes, fixing joists and making good
Ceiling boards
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 4.00 800.00
Scaffolding - Add 3%
Per Sqr
Per M2
Labour Cost
57
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 6.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
Labour Cost
Carpenter Day 5.00 1,200.00
Unskilled Labour Day 1.50 1,000.00
Per Sq.ft
Per M2
58
Data: Per 28.0 Sq.ft (4' 0" x 7' 0" )
Labour Cost
Carpenter Day 6.00 1,200.00
Unskilled Labour Day 2.00 1,000.00
Per Sq.ft
Per M2
Labour Cost
Carpenter Day 0.75 1,200.00
Unskilled Labour Day 0.37 650.00
59
Mason (Fixing frame) Day 0.25 1,200.00
Unskilled Labour (Fixing frame) Day 0.25 650.00
Per Sq.ft
Per M2
Labour Cost
Carpenter Day 2.25 1,200.00
Unskilled Labour Day 1.00 650.00
Mason (Fixing frame) Day 0.75 1,200.00
Unskilled Labour (Fixing frame) Day 0.75 650.00
Per Sq.ft
Per M2
60
9 Window glazed 7' 0" x 4' 0" high ovrall
with frame comprising 3 Nos. openable
sashes and 3 3/4" x 2 3/4" frame
Glazing, ironmongery and painting
measured seperately)
Labour Cost
Carpenter Day 6.00 1,500.00
Unskilled Labour Day 2.50 1,000.00
Mason (Fixing frame) Day 0.50 1,200.00
Unskilled Labour (Fixing frame) Day 0.50 950.00
Per Sq.ft
Per M2
BRASS FOUNDER
Labour Cost
Carpenter Hrs 0.50 150.00
61
Per No.
Labour Cost
Carpenter Hrs 0.33 150.00
Per No.
Labour Cost
Carpenter Hrs 0.33 150.00
Per No.
62
4" Brass Barrel bolt Nos. 1.00
1" Screws Doz. 0.50
Labour Cost
Carpenter Hrs 0.33 150.00
Per No.
Labour Cost
Carpenter Hrs 0.33 150.00
Per No.
Labour Cost
Carpenter Hrs 0.33 150.00
63
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
64
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
65
12 Cabin Hooks 3" polished, cast brass,
heavy quality supplied and fixed with
brass screws.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
66
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
67
17 Cabin Hooks 12" polished, cast brass,
heavy quality supplied and fixed with
brass screws.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
68
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Per No.
69
22 Handles, door, brass, polished heavy
quality supplied and fixed with brass
screws complete.
Labour Cost
Carpenter Hrs 0.25 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
70
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
71
27 Hinges, butt, 4" x 3" brass, polished
heavy quality supplied and fixed with
brass screws complete.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
72
Materials Cost Unit Qty. Rate
4" x 4" Hinges pair 1.00
3/4 " x 1/2" Screws Doz. 1.00
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
Labour Cost
Carpenter Hrs 1.00 150.00
73
Labour Hrs 1.00 81.25
Per No.
Labour Cost
Carpenter Hrs 1.00 150.00
Labour Hrs 1.00 81.25
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
74
34 Hinges, Parliamentary, 6" x 5" brass,
polished heavy quality supplied and fixed
with brass screws complete.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
Labour Cost
Carpenter Hrs 1.50 150.00
Per No.
75
1" Brass Screws Doz. 0.50
Labour Cost
Carpenter Hrs 1.50 150.00
Per No.
Labour Cost
Carpenter Hrs 1.50 150.00
Per No.
Labour Cost
Carpenter Hrs 1.50 150.00
Per No.
76
39 Locks, Yale or Union, night latch,
supplied and fixed with duplicate keys.
Labour Cost
Carpenter Hrs 2.00 150.00
Per No.
Labour Cost
Carpenter Day 0.50 1,200.00
Per No.
Labour Cost
Carpenter Day 1.00 1,200.00
77
Add Over head & Profit 20%
Rate per No.
Per No.
Labour Cost
Carpenter Day 0.50 1,200.00
Per No.
Labour Cost
Carpenter Day 1.00 1,200.00
Per No.
PLASTERING
78
Materials Cost Unit Qty. Rate
Slaked Lime Cwt. 1.30
Sand Cube 0.07 4,000.00
Water Gln. 10.00 10.00
LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.75 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.50 900.00
Scaffolding - Add 3%
Per Sqr
Per M2
79
Data: Per Sqr
LabourCost
Mason Day 2.50 1,200.00
Unskilled Labour Day 2.50 900.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
80
5 5/8" thick plastering to wall in lime,
cement and sand 1:1:5 finished semi
rough with wooden float.
LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.25 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00
Scaffolding - Add 3%
81
Per Sqr
Per M2
LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour (Curing) Day 1.50 900.00
Per Sqr
Per M2
LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.50 800.00
Unskilled Labour (Curing) Day 0.25 800.00
82
Per Sqr
Per M2
LabourCost
Mason Day 1.25 800.00
Unskilled Labour Day 2.00 600.00
Unskilled Labour (Curing) Day 0.25 550.00
Per Sqr
Per M2
LabourCost
Mason Day 1.25 1,200.00
Unskilled Labour Day 2.00 650.00
Unskilled Labour (Curing) Day 0.25 650.00
83
Per Sqr
Per M2
LabourCost
Mason Day 1.25 1,200.00
Unskilled Labour Day 2.00 650.00
Unskilled Labour (Curing) Day 0.25 650.00
Per Sqr
Per M2
LabourCost
Mason Day 0.375 1,200.00
Unskilled Labour Day 0.312 800.00
84
Per L.ft
Per M
LabourCost
Painter Day 0.75 1,200.00
Unskilled Labour Day 0.50 650.00
Per Sqr
Per M2
LabourCost
Painter Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00
85
Rate per Sqr
Per Sqr
Per M2
LabourCost
Painter Day 2.50 1,200.00
Unskilled Labour Day 1.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 0.50 1,200.00
86
Unskilled Labour Day 0.75 650.00
Per Sqr
Per M2
LabourCost
Painter Day 1.50 1,200.00
Per Sqr
Per M2
LabourCost
Painter Day 0.50 1,200.00
87
Per Sqr
Per M2
LabourCost
Painter Day 1.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per Sqr
Per M2
LabourCost
Painter Day 2.50 1,200.00
Unskilled Labour Day 2.50 650.00
Scaffolding - Add 3%
88
Add Over head & Profit 20%
Rate per 10.0 Sqr
Rate per Sqr
Per Sqr
Per M2
LabourCost
Painter Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 1.25 1,200.00
Scaffolding - Add 3%
89
Add Over head & Profit 20%
Rate per Sqr
Per Sqr
Per M2
LabourCost
Painter Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 0.75 1,200.00
Scaffolding - Add 3%
90
Add Over head & Profit 20%
Rate per Sqr
Per Sqr
Per M2
LabourCost
Painter Day 1.75 1,200.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
91
Per Sqr
Per M2
LabourCost
Unskilled Labour Hrs 3.00 81.25
Per Sqr
Per M2
LabourCost
Painter Day 1.25 1,200.00
Scaffoldings - Add 3%
92
Per Sqr
Per M2
LabourCost
Painter Day 1.25 1,200.00
Scaffoldings - Add 3%
Per Sqr
Per M2
LabourCost
93
Laying Concrete Bedding
Unskilled Labour Day 1.50 650.00
Laying and testing pipes
Plumber Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Back filling
Unskilled Labour Day 2.50 650.00
Per L.ft
Per M
LabourCost
Plumber Day 0.25 1,200.00
Unskilled Labour Day 0.25 650.00
Scaffolding - Add 5%
Per L.ft
Per M
94
Data: Per 6.0 L.ft
LabourCost
Plumber Day 0.25 1,200.00
Unskilled Labour Day 0.25 650.00
Scaffolding - Add 5%
Per L.ft
Per M
Labour Cost
95
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per No.
Labour Cost
Mason Day 1.50 1,200.00
Unskilled Labour Day 2.50 650.00
Per No.
96
6 22" x 16" glazed fireclay wash basin with
1/2" dia. Chromium plated pillar tap,
waste plug, chromium plated waste chain
and stay, including fixing wash basin on
brackets. (Water supply and waste water
connection measured seperately)
Labour Cost
Mason Day 0.50 1,200.00
Unskilled Labour Day 1.00 650.00
Per No.
Labour Cost
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
97
Add Over head & Profit 20%
Rate per No.
Per No.
Labour Cost
Mason Day 0.25 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per No.
98
Sand Cu.ft 0.25
3/4" metal Cu.ft 0.75
1 1/2" brass screws Doz 1.00
Labour Cost
Mason Day 0.50 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per No.
Labour Cost
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per No.
99
Cement Lbs. 4.00
Sand Cu.ft 0.125
Labour Cost
Mason Day 0.25 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per No.
LabourCost
Plumber Hrs 1.00 150.00
Unskilled Labour Hrs 1.00 81.25
Per L.ft
Per M
100
Solvent cement grm 3.00 1.50
LabourCost
Plumber Hrs 1.00 150.00
Unskilled Labour Hrs 1.00 81.25
Per L.ft
Per M
LabourCost
Plumber Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per L.ft
Per M
101
1 1/4" dia. Sockets Nos. 8.00 25.00
Solvent cement grm 48.00 1.50
Clips and Nails Nos. 35.00 -
LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00
Per L.ft
Per M
LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00
Per L.ft
Per M
102
2" Pipes L.ft 100.00 93.00
Add 5% Wastage
2" dia. Sockets Nos. 8.00 62.00
Solvent cement grm 112.00 1.50
Clips and Nails Nos. 35.00 -
LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00
Per L.ft
Per M
LabourCost
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per L.ft
Per M
103
Data: Per 100.0 L.ft
LabourCost
Unskilled Labour Day 2.25 650.00
Per L.ft
Per M
LabourCost
Mason Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00
Per L.ft
Per M
104
Sand Cube 0.03 4,000.00
LabourCost
Mason Day 3.50 1,200.00
Unskilled Labour Day 3.50 650.00
Per L.ft
Per M
Labour Cost
Plumber Hrs 2.00 150.00
Per No.
Labour Cost
Plumber Hrs 2.00 150.00
105
Add Over head & Profit 20%
Rate per 10 Nos.
Rate per No.
Per No.
Labour Cost
Plumber Hrs 2.00 150.00
Per No.
Labour Cost
Plumber Hrs 2.00 150.00
Per No.
106
Data: Per 10 Nos.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
107
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
108
20 3/4" dia. PVC specials viz Tees.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
109
Add Over head & Profit 20%
Rate per 10 Nos.
Rate per No.
Per No.
Labour Cost
Plumber Day 1.00 1,200.00
Per No.
Labour Cost
Plumber Day 1.00 1,200.00
Per No.
110
Data: Per 10 Nos.
Labour Cost
Plumber Day 1.50 1,200.00
Per No.
Labour Cost
Plumber Day 1.50 1,200.00
Per No.
LabourCost
Plumber Hrs 1.50 150.00
Unskilled Labour Hrs 1.50 81.25
111
Allow for Solvent cement, Blow lamp etc.
Per L.ft
Per M
LabourCost
Plumber Hrs 1.50 150.00
Unskilled Labour Hrs 1.50 81.25
Allow for Solvent cement, Blow lamp etc.
Per L.ft
Per M
LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25
Allow for Solvent cement, Blow lamp etc.
112
Rate per L.ft
Per L.ft
Per M
LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25
Allow for Solvent cement, Blow lamp etc.
Per L.ft
Per M
LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25
Allow for Solvent cement, Blow lamp etc.
Per L.ft
Per M
113
32 Pipes PVC 1" supplied and fixed.
LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 650.00
Plumber Hrs 3.00 150.00
Unskilled Labour Hrs 3.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.
Per L.ft
Per M
LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 1.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.
Per L.ft
Per M
114
Data: Per 100.0 L.ft
LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 650.00
Plumber Hrs 3.00 150.00
Unskilled Labour Hrs 3.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.
Per L.ft
Per M
LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 7,500.00
Plumber Hrs 5.00 150.00
Unskilled Labour Hrs 5.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.
Per L.ft
Per M
115
36 Pipes PVC 2" supplied and fixed. (fittings,
excavation and back filling measured
seperately)
LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 4.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.
Per L.ft
Per M
LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 4.00 81.25
Allow for Solvent cement, Petrol, Blow lamp
etc.
Per L.ft
Per M
GLAZIER
116
1 1/8" thick clear sheet panes exceeding 1
Sq.ft but not exceeding 4 Sq.ft, cut and
fixed with class I timber beading to doors
and windows.
Consider sash 3' 0" x 4' 0" with 3' 1 1/4"
style and 4 Nos. Glass panes.
Data: Per 9.0 Sq.ft
LabourCost
Glazier Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per Sq.ft
Per M2
LabourCost
Glazier Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per Sq.ft
117
Per M2
118
YEAR 2005
Amount
6,500.00
6,500.00
1,300.00
7,800.00
780.00
780.00
84.00
Amount
1,543.75
1,543.75
308.75
1,852.50
1,853.00
655.00
119
Amount
950.00
950.00
190.00
1,140.00
1,140.00
403.00
Amount
2,137.50
2,137.50
427.50
2,565.00
2,565.00
906.00
120
Amount
2,275.00
2,275.00
455.00
2,730.00
2,730.00
965.00
Amount
1,950.00
1,950.00
390.00
2,340.00
2,340.00
827.00
Amount
1,625.00
1,625.00
121
325.00
1,950.00
1,950.00
689.00
Amount
-
-
-
-
1,200.00
1,300.00
2,500.00
500.00
3,000.00
3,000.00
1,060.00
Amount
1,800.00
975.00
693.75
3,468.75
693.75
4,162.50
122
416.25
416.00
Amount
800.00
200.00
325.00
1,325.00
265.00
1,590.00
1,590.00
171.00
Amount
950.00
950.00
190.00
1,140.00
123
1,140.00
403.00
Amount
1,750.00
262.50
1,187.50
3,200.00
640.00
3,840.00
3,840.00
1,357.00
Amount
1,300.00
1,300.00
260.00
1,560.00
1,560.00
551.00
124
Amount
2,750.00
412.50
1,300.00
4,462.50
892.50
5,355.00
5,355.00
1,892.00
Amount
1,625.00
325.00
975.00
600.00
3,525.00
705.00
4,230.00
4,230.00
455.00
125
Amount
2,843.75
142.19
1,200.00
1,950.00
3,150.00
630.00
3,780.00
25.20
25.00
Amount
4,875.00
243.75
2,400.00
3,900.00
6,300.00
1,260.00
7,560.00
50.40
50.00
126
Amount
16,250.00
812.50
9,600.00
13,000.00
22,600.00
4,520.00
27,120.00
60.27
60.00
Amount
9,000.00
3,920.00
11,750.00
1,350.00
7,600.00
49.50
33,669.50
6,733.90
40,403.40
40,403.00
14,277.00
127
33,669.50
2,237.50
35,907.00
7,181.40
43,088.40
43,088.00
15,225.00
Amount
10,880.00
4,500.00
11,666.00
1,200.00
6,400.00
49.50
34,695.50
6,939.10
41,634.60
41,635.00
14,712.00
34,695.50
1,900.00
128
36,595.50
7,319.10
43,914.60
43,915.00
15,518.00
Amount
14,400.00
4,200.00
11,666.00
1,200.00
7,200.00
198.00
38,864.00
7,772.80
46,636.80
46,637.00
16,480.00
38,864.00
2,100.00
40,964.00
8,192.80
49,156.80
49,157.00
17,370.00
129
Amount
300.00
81.25
381.25
76.25
457.50
45.75
46.00
151.00
Amount
300.00
81.25
381.25
76.25
457.50
45.75
46.00
151.00
130
Amount
151.33
-
108.00
58.50
317.83
63.57
381.40
Amount
605.32
118.75
1,200.00
650.00
2,574.07
514.81
3,088.88
308.89
309.00
1,014.00
131
Amount
1,187.50
240.00
680.00
600.00
650.00
600.00
325.00
4,282.50
856.50
5,139.00
513.90
514.00
1,686.00
Amount
240.00
70.00
235.00
1,050.00
400.00
300.00
340.00
250.00
2,885.00
577.00
132
3,462.00
346.20
346.00
1,135.00
Amount
480.00
140.00
411.25
1,275.00
400.00
300.00
340.00
250.00
3,596.25
719.25
4,315.50
431.55
432.00
1,417.00
Amount
1,282.50
160.00
680.00
637.50
133
450.00
243.75
600.00
650.00
4,703.75
940.75
5,644.50
376.30
376.00
1,234.00
Amount
1,757.50
200.00
935.00
675.00
600.00
325.00
600.00
650.00
5,742.50
1,148.50
6,891.00
459.40
459.00
134
1,506.00
Amount
1,330.00
200.00
680.00
450.00
600.00
325.00
600.00
650.00
4,835.00
967.00
5,802.00
386.80
387.00
1,270.00
Amount
2,014.00
240.00
977.50
712.50
135
600.00
325.00
750.00
812.50
6,431.50
1,286.30
7,717.80
514.52
515.00
1,690.00
Amount
3,325.00
440.00
1,785.00
787.50
900.00
487.50
1,200.00
1,300.00
10,225.00
2,045.00
12,270.00
613.50
614.00
2,015.00
136
Amount
551.00
80.00
2,975.00
225.00
300.00
162.50
4,293.50
858.70
5,152.20
1,288.05
1,288.00
Amount
6,175.00
800.00
2,805.00
7.50
1,150.00
1,400.00
500.00
22.50
5,000.00
137
2,100.00
1,200.00
5,525.00
1,425.00
300.00
1,700.00
900.00
975.00
24.75
32,009.75
6,401.95
38,411.70
38,412.00
4,135.00
Amount
570.00
80.00
340.00
200.00
300.00
325.00
218.50
40.00
150.00
81.25
138
2,304.75
460.95
2,765.70
184.38
184.00
1,981.00
Amount
342.00
40.00
170.00
900.00
487.50
1,939.50
387.90
2,327.40
232.74
233.00
Amount
28.50
2.80
1.28
300.00
162.50
139
495.08
99.02
594.09
59.41
59.00
Amount
285.00
32.00
127.50
-
75.00
300.00
162.50
982.00
196.40
1,178.40
Amount
13,300.00
2,400.00
8,500.00
1,200.00
3,900.00
49.50
140
29,349.50
5,869.90
35,219.40
35,219.00
12,445.00
Amount
17,100.00
2,400.00
8,500.00
1,200.00
3,900.00
49.50
33,149.50
6,629.90
39,779.40
39,779.00
14,056.00
33,149.50
1,300.00
34,449.50
6,889.90
141
41,339.40
41,339.00
14,607.00
33,149.50
3,250.00
36,399.50
7,279.90
43,679.40
43,679.00
15,434.00
Amount
34,200.00
4,800.00
15,300.00
3,000.00
10,400.00
99.75
67,799.75
13,559.95
81,359.70
40,679.85
40,680.00
14,375.00
142
33,899.88
1,300.00
35,199.88
7,039.98
42,239.85
42,240.00
14,926.00
33,899.88
3,250.00
37,149.88
7,429.98
44,579.85
44,580.00
15,753.00
Amount
3,162.50
1,187.50
1,600.00
300.00
22.50
1,200.00
2,400.00
143
9,872.50
1,974.50
11,847.00
11,847.00
1,275.00
Amount
223.44
93.75
333.33
10.00
22.50
375.00
300.00
1,358.02
271.60
1,629.63
135.80
136.00
1,464.00
Amount
2,365.00
1,250.00
1,000.00
700.00
11.25
144
1,000.00
800.00
7,126.25
1,425.25
8,551.50
106.89
107.00
1,152.00
Amount
17,100.00
2,400.00
7,650.00
2,400.00
10,400.00
49.50
39,999.50
7,999.90
47,999.40
47,999.00
16,961.00
39,999.50
1,300.00
41,299.50
145
8,259.90
49,559.40
49,559.00
17,512.00
Amount
43,063.50
6,400.00
20,400.00
4,800.00
15,600.00
90,263.50
18,052.70
108,316.20
13,539.53
13,540.00
1,457.00
Amount
53,827.00
8,000.00
25,500.00
146
4,800.00
16,250.00
108,377.00
21,675.40
130,052.40
16,256.55
16,257.00
1,750.00
Amount
1,187.50
240.00
680.00
1,200.00
975.00
4,282.50
856.50
5,139.00
513.90
514.00
1,686.00
Amount
4,282.50
1,022.46
582.15
147
1,604.61
320.92
1,925.53
192.55
193.00
633.00
Amount
10,400.00
3,710.00
10,810.00
-
-
445.50
1,900.00
27,265.50
5,453.10
32,718.60
32,719.00
11,561.00
Amount
4,635.14
463.51
150.00
162.50
312.50
62.50
375.00
148
375.00
40.00
Amount
8,179.50
168.75
712.50
9,060.75
1,812.15
10,872.90
10,873.00
1,170.00
Amount
13,632.75
2,000.00
300.00
487.50
787.50
149
157.50
945.00
945.00
102.00
Amount
-
-
-
40.63
150.00
162.50
75.00
428.13
85.63
513.75
1,455.00
514.00
Amount
6,000.00
150
600.00
45.45
1,200.00
650.00
8,495.45
1,699.09
10,194.55
10,195.00
204.00
Amount
6,000.00
600.00
45.45
1,350.00
950.00
8,945.45
1,789.09
10,734.55
10,735.00
215.00
Amount
8,700.00
151
435.00
3,800.00
1,000.00
1,500.00
3,600.00
2,600.00
21,635.00
4,327.00
25,962.00
25,962.00
9,174.00
Amount
8,700.00
435.00
2,213.50
1,520.00
1,500.00
3,600.00
2,600.00
20,568.50
4,113.70
24,682.20
24,682.00
8,722.00
Amount
5,500.00
152
275.00
1,040.00
700.00
500.00
2,025.00
1,700.00
186.25
11,926.25
2,385.25
14,311.50
14,312.00
1,541.00
Amount
16,350.00
817.50
2,400.00
1,400.00
1,150.00
3,037.50
3,562.50
198.00
28,915.50
5,783.10
34,698.60
34,699.00
3,735.00
153
Amount
9,780.00
489.00
4,275.00
1,200.00
1,700.00
4,200.00
3,575.00
155.50
25,374.50
5,074.90
30,449.40
30,449.00
3,278.00
Amount
16,350.00
817.50
1,400.00
2,100.00
1,150.00
3,037.50
2,850.00
176.63
27,881.63
5,576.33
33,457.95
33,458.00
3,602.00
154
Amount
-
-
1,140.00
320.00
300.00
1,800.00
1,300.00
155.00
5,015.00
1,003.00
6,018.00
6,018.00
648.00
Amount
-
-
2,375.00
720.00
1,000.00
2,700.00
2,437.50
154.13
9,386.63
1,877.33
11,263.95
11,264.00
1,212.00
155
Amount
-
-
4,275.00
1,200.00
500.00
4,500.00
3,575.00
161.50
14,211.50
2,842.30
17,053.80
17,054.00
1,836.00
Amount
475.00
4,000.00
-
100.00
6,000.00
2,275.00
12,850.00
2,570.00
15,420.00
156
15,420.00
1,660.00
Amount
2,100.00
-
440.00
450.00
1,500.00
1,625.00
6,115.00
1,223.00
7,338.00
7,338.00
790.00
Amount
720.00
475.00
2,000.00
150.00
600.00
325.00
4,270.00
854.00
5,124.00
512.40
157
512.00
1,680.00
Amount
840.00
760.00
200.00
200.00
2,100.00
812.50
4,912.50
982.50
5,895.00
589.50
590.00
1,936.00
Amount
660.00
665.00
160.00
150.00
1,800.00
812.50
158
4,247.50
849.50
5,097.00
509.70
510.00
1,673.00
Amount
5,040.00
252.00
712.50
240.00
1,800.00
1,625.00
102.75
9,772.25
1,954.45
11,726.70
11,727.00
1,262.00
Amount
7,600.00
380.00
320.00
225.00
159
1,000.00
1,700.00
135.00
11,360.00
2,272.00
13,632.00
13,632.00
1,467.00
Amount
6,500.00
4,000.00
2,250.00
1,000.00
4,800.00
4,800.00
23,350.00
4,670.00
28,020.00
28,020.00
9,901.00
Amount
6,500.00
4,000.00
2,250.00
160
1,000.00
2,500.00
6,000.00
255.00
22,505.00
4,501.00
27,006.00
27,006.00
9,543.00
Amount
19,125.00
956.25
1,000.00
525.00
12.50
12.50
100.00
4,800.00
3,600.00
400.00
30,531.25
6,106.25
36,637.50
36,638.00
3,944.00
161
Amount
12,750.00
1,275.00
2,000.00
825.00
200.00
4,800.00
3,800.00
200.00
25,850.00
5,170.00
31,020.00
31,020.00
3,339.00
Amount
-
-
1,187.50
280.00
-
-
-
6,000.00
2,600.00
325.00
10,392.50
2,078.50
12,471.00
162
12,471.00
1,342.00
Amount
9,750.00
975.00
2,375.00
440.00
200.00
4,800.00
2,600.00
162.50
21,302.50
4,260.50
25,563.00
25,563.00
2,752.00
Amount
9,700.00
970.00
2,375.00
440.00
200.00
4,800.00
2,600.00
162.50
163
21,247.50
4,249.50
25,497.00
25,497.00
2,745.00
Amount
95,200.00
9,520.00
9,900.00
495.00
1,000.00
250.00
8,400.00
7,200.00
131,965.00
26,393.00
158,358.00
26,393.00
26,393.00
2,841.00
Amount
26,250.00
164
3,600.00
2,700.00
32,550.00
6,510.00
39,060.00
6,510.00
6,510.00
701.00
Amount
39,750.00
3,975.00
3,750.00
3,000.00
50,475.00
10,095.00
60,570.00
16,825.00
16,825.00
1,811.00
Amount
16,800.00
1,440.00
165
1,350.00
1,900.00
21,490.00
4,298.00
25,788.00
7,163.33
7,163.00
771.00
Amount
21,000.00
1,900.00
22,900.00
4,580.00
27,480.00
27,480.00
2,958.00
Amount
3,800.00
320.00
600.00
162.50
4,882.50
976.50
5,859.00
439.53
166
440.00
1,444.00
Amount
585.00
264.00
150.00
450.00
225.00
300.00
225.00
2,199.00
439.80
2,638.80
219.90
220.00
722.00
Amount
7,500.00
375.00
420.00
3,600.00
2,700.00
315.00
14,910.00
2,982.00
167
17,892.00
178.92
179.00
587.00
Amount
-
-
-
3,600.00
1,950.00
277.50
5,827.50
1,165.50
6,993.00
69.93
70.00
230.00
Amount
-
675.00
95.00
-
40.00
168
-
-
1,200.00
650.00
600.00
325.00
600.00
325.00
4,510.00
902.00
5,412.00
360.80
361.00
1,184.00
Amount
-
47.50
40.00
-
600.00
150.00
487.50
169
1,325.00
265.00
1,590.00
106.00
106.00
348.00
Amount
1,647.75
58.50
255.00
-
30.00
600.00
325.00
46.25
2,962.50
592.50
3,555.00
148.13
148.00
486.00
Amount
130.00
117.00
30.00
-
18.00
170
150.00
81.25
11.56
537.81
107.56
645.38
645.00
Amount
180.00
117.00
30.00
-
18.00
150.00
81.25
11.56
587.81
117.56
705.38
705.00
Amount
-
18.00
75.60
171
40.95
5.83
140.38
28.08
168.45
168.00
Amount
-
-
-
-
45.00
396.00
214.50
30.53
686.03
137.21
823.23
34.30
34.00
112.00
Amount
-
48.00
75.60
172
40.95
5.83
170.38
34.08
204.45
204.00
Amount
-
22.50
75.60
40.95
5.83
144.88
28.98
173.85
174.00
Amount
24,000.00
-
-
-
80.00
-
891.00
173
3,750.00
500.00
975.00
156.75
30,352.75
6,070.55
36,423.30
18,678.62
18,679.00
2,011.00
Amount
3,045.00
-
-
-
-
1,800.00
1,300.00
93.00
6,238.00
1,247.60
7,485.60
3,838.77
3,839.00
413.00
174
Amount
20,125.00
12,900.00
2,400.00
30,000.00
2,000.00
1,200.00
1,200.00
2,400.00
3,600.00
3,200.00
204.00
79,229.00
15,845.80
95,074.80
48,756.31
48,756.00
5,248.00
Amount
-
-
175
3,600.00
3,900.00
225.00
7,725.00
1,545.00
9,270.00
5,150.00
5,150.00
554.00
Amount
4,500.00
99.02
12.00
160.00
625.00
2,000.00
6,000.00
1,500.00
14,896.02
2,979.20
17,875.22
785.72
786.00
8,461.00
176
Amount
4,980.00
99.02
12.00
160.00
8,000.00
2,800.00
7,200.00
2,000.00
25,251.02
5,050.20
30,301.22
1,082.19
1,082.00
11,647.00
Amount
3,960.00
99.02
900.00
240.50
177
300.00
162.50
5,662.02
1,132.40
6,794.42
312.39
312.00
3,358.00
Amount
3,740.00
99.02
-
-
-
-
2,700.00
650.00
900.00
487.50
8,576.52
1,715.30
10,291.82
633.34
633.00
6,814.00
178
Amount
9,600.00
9,000.00
2,500.00
600.00
475.00
22,175.00
4,435.00
26,610.00
950.36
950.00
10,226.00
Amount
75.00
75.00
15.00
90.00
179
90.00
Amount
-
-
49.50
49.50
9.90
59.40
59.00
Amount
-
-
49.50
49.50
9.90
59.40
59.00
Amount
180
-
-
49.50
49.50
9.90
59.40
59.00
Amount
-
-
49.50
49.50
9.90
59.40
59.00
Amount
-
-
49.50
49.50
9.90
59.40
181
59.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
182
75.00
75.00
15.00
90.00
90.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
183
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
184
75.00
75.00
15.00
90.00
90.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
185
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
186
75.00
75.00
15.00
90.00
90.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
112.50
112.50
22.50
135.00
135.00
187
Amount
-
-
37.50
37.50
7.50
45.00
45.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
188
75.00
75.00
15.00
90.00
90.00
Amount
-
-
75.00
75.00
15.00
90.00
90.00
Amount
-
-
112.50
60.94
173.44
34.69
208.13
208.00
189
Amount
-
-
112.50
60.94
173.44
34.69
208.13
208.00
Amount
-
-
112.50
60.94
173.44
34.69
208.13
208.00
190
Amount
-
-
112.50
60.94
173.44
34.69
208.13
208.00
Amount
-
-
112.50
60.94
173.44
34.69
208.13
208.00
Amount
-
-
150.00
191
81.25
231.25
46.25
277.50
278.00
Amount
-
-
150.00
81.25
231.25
46.25
277.50
278.00
Amount
-
-
112.50
60.94
173.44
34.69
208.13
208.00
192
Amount
-
-
112.50
60.94
173.44
34.69
208.13
208.00
Amount
-
-
225.00
225.00
45.00
270.00
270.00
Amount
-
193
-
225.00
225.00
45.00
270.00
270.00
Amount
-
-
225.00
225.00
78.75
303.75
304.00
Amount
-
-
225.00
225.00
45.00
270.00
270.00
194
Amount
-
-
300.00
300.00
60.00
360.00
360.00
Amount
450.00
600.00
1,050.00
210.00
1,260.00
1,260.00
Amount
-
1,200.00
195
1,200.00
240.00
1,440.00
1,440.00
Amount
-
600.00
600.00
120.00
720.00
720.00
Amount
-
1,200.00
1,200.00
240.00
1,440.00
1,440.00
196
Amount
-
280.00
100.00
1,200.00
1,137.50
70.13
2,787.63
557.53
3,345.15
3,345.00
360.00
Amount
1,120.00
450.00
100.00
1,200.00
1,350.00
76.50
4,296.50
859.30
5,155.80
5,156.00
555.00
197
Amount
640.00
225.00
50.00
3,000.00
2,250.00
157.50
6,322.50
1,264.50
7,587.00
7,587.00
817.00
Amount
760.00
120.00
50.00
2,400.00
1,300.00
111.00
4,741.00
948.20
5,689.20
5,689.00
612.00
198
Amount
760.00
280.00
100.00
1,200.00
812.50
60.38
3,212.88
642.58
3,855.45
3,855.00
415.00
Amount
760.00
280.00
100.00
1,800.00
975.00
83.25
3,998.25
799.65
4,797.90
199
4,798.00
516.00
Amount
856.00
375.00
100.00
1,200.00
1,350.00
3,881.00
776.20
4,657.20
4,657.00
501.00
Amount
1,200.00
375.00
100.00
1,200.00
1,200.00
200.00
4,275.00
855.00
5,130.00
200
5,130.00
552.00
Amount
1,487.50
600.00
100.00
1,000.00
1,200.00
137.50
4,525.00
905.00
5,430.00
5,430.00
584.00
Amount
2,137.50
320.00
100.00
1,500.00
1,300.00
162.50
5,520.00
1,104.00
6,624.00
201
6,624.00
713.00
Amount
2,137.50
320.00
-
100.00
1,500.00
1,300.00
162.50
5,520.00
1,104.00
6,624.00
6,624.00
713.00
Amount
80.00
22.50
-
450.00
249.60
802.10
160.42
962.52
96.25
202
96.00
315.00
Amount
1,443.75
-
900.00
325.00
2,668.75
533.75
3,202.50
3,203.00
345.00
Amount
708.75
15.00
65.00
50.00
1,800.00
975.00
3,613.75
722.75
203
4,336.50
4,337.00
467.00
Amount
63.00
505.40
20.00
80.00
3,000.00
650.00
109.50
4,427.90
885.58
5,313.48
5,313.00
572.00
Amount
472.50
250.80
20.00
32.50
-
600.00
204
487.50
1,863.30
372.66
2,235.96
4,472.00
481.00
Amount
207.90
-
1,800.00
2,007.90
401.58
2,409.48
2,409.00
259.00
Amount
4,050.00
-
600.00
4,650.00
930.00
5,580.00
205
5,580.00
601.00
Amount
393.75
950.00
40.00
4.50
1,800.00
325.00
3,513.25
702.65
4,215.90
4,216.00
454.00
Amount
250.00
11.00
3.50
5.00
-
100.00
3,000.00
1,625.00
138.75
5,133.25
206
1,026.65
6,159.90
615.99
616.00
66.00
Amount
5,133.25
600.00
325.00
27.75
6,086.00
1,217.20
7,303.20
730.32
730.00
79.00
Amount
135.00
1,120.00
1.00
65.00
45.00
1,500.00
45.00
2,911.00
207
582.20
3,493.20
3,493.00
376.00
Amount
593.75
40.00
50.00
2,400.00
1,300.00
111.00
4,494.75
898.95
5,393.70
539.37
539.00
58.00
Amount
252.00
220.50
1.00
-
900.00
27.00
1,400.50
208
280.10
1,680.60
1,681.00
181.00
Amount
-
525.00
-
2,100.00
63.00
2,688.00
537.60
3,225.60
3,226.00
347.00
Amount
568.80
-
600.00
325.00
1,493.80
298.76
1,792.56
209
1,793.00
193.00
Amount
138.75
135.00
-
-
243.75
517.50
103.50
621.00
621.00
67.00
Amount
135.00
1,400.00
-
45.00
1,500.00
45.00
3,125.00
625.00
3,750.00
210
3,750.00
404.00
Amount
616.00
40.00
45.00
1,500.00
45.00
2,246.00
449.20
2,695.20
2,695.00
290.00
Amount
5,300.00
20,449.13
-
475.00
8,550.00
211
975.00
2,400.00
1,300.00
1,625.00
41,074.13
8,214.83
49,288.95
492.89
493.00
1,618.00
Amount
-
-
-
-
-
-
300.00
162.50
23.13
485.63
97.13
582.75
97.13
97.00
318.00
212
Amount
-
-
-
-
-
-
-
300.00
162.50
23.13
485.63
97.13
582.75
97.13
97.00
318.00
Amount
350.00
85.50
655.94
310.91
42.75
-
213
600.00
325.00
2,370.11
474.02
2,844.13
2,844.00
Amount
748.13
3,935.66
2,720.48
1,197.00
794.64
480.00
1,800.00
1,625.00
13,300.91
2,660.18
15,961.09
15,961.00
214
Amount
6,500.00
-
-
-
-
-
600.00
650.00
7,750.00
1,550.00
9,300.00
9,300.00
Amount
-
-
-
-
-
600.00
325.00
215
925.00
185.00
1,110.00
1,110.00
Amount
-
-
-
-
-
300.00
1,200.00
650.00
2,150.00
430.00
2,580.00
2,580.00
Amount
-
-
-
-
-
216
-
-
-
600.00
1,200.00
650.00
2,450.00
490.00
2,940.00
2,940.00
Amount
-
1,200.00
650.00
1,850.00
370.00
2,220.00
2,220.00
Amount
-
-
-
-
-
-
217
-
-
300.00
1,200.00
650.00
2,150.00
430.00
2,580.00
2,580.00
Amount
117.00
-
3.00
150.00
81.25
351.25
70.25
421.50
42.15
42.00
138.00
Amount
227.50
-
218
4.50
150.00
81.25
463.25
92.65
555.90
55.59
56.00
184.00
Amount
2,600.00
130.00
144.00
48.00
-
600.00
325.00
3,847.00
769.40
4,616.40
46.16
46.00
151.00
Amount
3,800.00
190.00
219
200.00
72.00
-
900.00
487.50
5,649.50
1,129.90
6,779.40
67.79
68.00
223.00
Amount
5,500.00
275.00
304.00
96.00
-
900.00
487.50
7,562.50
1,512.50
9,075.00
90.75
91.00
299.00
Amount
220
9,300.00
465.00
496.00
168.00
-
900.00
487.50
11,816.50
2,363.30
14,179.80
141.80
142.00
466.00
Amount
23,800.00
1,190.00
1,984.00
300.00
-
1,200.00
650.00
29,124.00
5,824.80
34,948.80
349.49
349.00
1,145.00
221
Amount
1,462.50
1,462.50
292.50
1,755.00
17.55
18.00
59.00
Amount
95.00
40.00
3,600.00
1,950.00
5,685.00
1,137.00
6,822.00
68.22
68.00
223.00
Amount
190.00
222
120.00
4,200.00
2,275.00
6,785.00
1,357.00
8,142.00
81.42
81.00
266.00
Amount
-
30.00
300.00
330.00
66.00
396.00
39.60
40.00
Amount
-
45.00
300.00
345.00
223
69.00
414.00
41.40
41.00
Amount
-
60.00
300.00
360.00
126.00
486.00
48.60
49.00
Amount
-
90.00
300.00
390.00
78.00
468.00
46.80
47.00
224
Amount
-
120.00
600.00
720.00
252.00
972.00
97.20
97.00
Amount
-
210.00
600.00
810.00
162.00
972.00
97.20
97.00
Amount
-
300.00
225
600.00
900.00
180.00
1,080.00
108.00
108.00
Amount
-
360.00
600.00
960.00
192.00
1,152.00
115.20
115.00
Amount
120.00
67.50
600.00
787.50
157.50
945.00
94.50
95.00
226
Amount
180.00
67.50
600.00
847.50
169.50
1,017.00
101.70
102.00
Amount
290.00
90.00
600.00
980.00
196.00
1,176.00
117.60
118.00
Amount
440.00
135.00
600.00
227
1,175.00
235.00
1,410.00
141.00
141.00
Amount
770.00
180.00
1,200.00
2,150.00
430.00
2,580.00
258.00
258.00
Amount
1,180.00
315.00
1,200.00
2,695.00
539.00
3,234.00
323.40
323.00
228
Amount
2,160.00
450.00
1,800.00
4,410.00
882.00
5,292.00
529.20
529.00
Amount
4,940.00
540.00
1,800.00
7,280.00
1,456.00
8,736.00
873.60
874.00
Amount
900.00
225.00
121.88
229
1,246.88
249.38
1,496.25
14.96
15.00
49.00
Amount
1,750.00
225.00
121.88
2,096.88
419.38
2,516.25
25.16
25.00
82.00
Amount
2,600.00
300.00
162.50
3,062.50
612.50
3,675.00
230
36.75
37.00
121.00
Amount
900.00
225.00
300.00
162.50
1,587.50
317.50
1,905.00
19.05
19.00
62.00
Amount
1,750.00
437.50
300.00
162.50
2,650.00
530.00
3,180.00
31.80
32.00
105.00
231
Amount
2,600.00
650.00
450.00
243.75
3,943.75
788.75
4,732.50
47.33
47.00
154.00
Amount
3,800.00
950.00
600.00
81.25
5,431.25
1,086.25
6,517.50
65.18
65.00
213.00
232
Amount
5,500.00
1,375.00
450.00
243.75
7,568.75
1,513.75
9,082.50
90.83
91.00
299.00
Amount
9,300.00
2,325.00
750.00
406.25
12,781.25
2,556.25
15,337.50
153.38
153.00
502.00
233
Amount
9,300.00
600.00
325.00
10,225.00
2,045.00
12,270.00
122.70
123.00
404.00
Amount
23,800.00
600.00
325.00
24,725.00
4,945.00
29,670.00
296.70
297.00
974.00
234
Amount
-
-
-
600.00
325.00
925.00
185.00
1,110.00
123.33
123.00
1,324.00
Amount
-
-
-
600.00
325.00
925.00
185.00
1,110.00
123.33
123.00
235
1,324.00
236
B.S.R FOR THE YEAR 2005 AT TRINCOMALEE
SUMMARY
EXCAVATION
237
9 Benching rock in foundation in 3' 6" steps.(Blasting prohibited)
Per Sq.ft 416.00
EARTH WORK
12 Back filling to trenches with selected imported material. Per Cube 3,840.00
Per M3 1,357.00
CONCRETE
1 Cement concrete 1:3:6 ( 2" ). (Shuttering paid for seperately) Per Cube 40,403.00
Per M3 14,277.00
2 Cement concrete 1:3:6 ( 2" ). (Shuttering paid for seperately) Per Cube 43,088.00
238
Per M3 15,225.00
10 Curb in cement concrete 1:2:4 (3/4" ) 9" high and 3" thick,
Cement rendered 1/2" thick including, Excavation.
Per L.ft 309.00
Per M 1,014.00
239
14 Lintol, cement concrete 1:2:4 (3/4" ), 9" x 9" (Reinforcement paid
for seperately)
Per L.ft 376.00
Per M 1,234.00
20 Roof flat, Cement concrete 4" thick, 1:2:4 (3/4" ) and 1/2"
cement rendered 1:2 with 5% Padlo and reinforced with
expanded metal, and lime puttying soffit complete.
(Reinforcement paid for seperately)
Per Sqr 38,412.00
Per M 2
4,135.00
21 Slabs over drain cement concrete 3" thick 1:2:4 (3/4" ) reinforced
with expanded metal and 1/2" cement rendered 1:2
( Reinfoecement paid for seperately)
Per Sq.ft 184.00
Per M 2
1,981.00
25 Cement concrete 1:2 1/2:5 ( 1" ) using concrete mixer & vibrator.
(Shuttering paid for seperately) Per Cube 35,219.00
Per M 3
12,445.00
240
26 Cement concrete 1:2:4 ( 3/4" ) in column shafts (Reinforcements,
shuttering and finishes paid for seperately) in ground floor using
concrete mixer & vibrator.
Per Cube 39,779.00
Per M3 14,056.00
32 Shuttering for floor slab concrete and dismantling. Per Sqr 11,847.00
Per M 2
1,275.00
33 Shuttering for Column shaft and dismantling. (for column 9" x 9"
x 4 ft. high. i.e. 4 1/2 ft. Box) Per Sq.ft 136.00
Per M 2
1,464.00
36 Cement concrete lintols as per Item 35 in 1st floor. Per Cube 49,559.00
Per M3 17,512.00
241
38 5" thick R.C.C 1:2:4 (3/4" ) in first floor slab (Reinforcements
and shuttering paid for seperately) using concrete mixer &
vibrator.
Per Sqr 16,257.00
Per M2 1,750.00
39 Drains semi circular in cement concrete 1:3:6 (1" ), 9" wide and
9" average depth, 3" thick sides and base, inclusive of 1/2"
cement rendering 1:3 with necessary expansion joints and
excavation, but without ramp.
Per L.ft 514.00
Per M 1,686.00
40 Drains in cement concrete 1:3:6 (1" ), as above, but with ramp 1'
6" wide.
Per L.ft 193.00
Per M 633.00
44 6" thick cement concrete floor (Mass concrete) 1:3:6 (1 1/2" ) Per Sqr 945.00
Per M2 102.00
45 Supply and laying Grade 20 Ready mix concrete. Rate include for
pump, vibrator and for laying changes. Per Cube 1,455.00
Per M 3
514.00
STEEL FABRICATOR
BRICK MASONRY
1 Brick work in cement sand 1:5 in foundation upto D.P.C Per Cube 25,962.00
242
Per M3 9,174.00
2 Brick work in cement sand 1:8 in foundation upto D.P.C Per Cube 24,682.00
Per M 3
8,722.00
3 Brick work in cement sand 1:5 in 4" thick walls in ground floor.
Per Sqr 14,312.00
Per M 2
1,541.00
4 9" thick brick wall in cement sand 1:5 in ground floor. Per Sqr 34,699.00
Per M 2
3,735.00
7 4 1/2" thick brick wall (wire cut) in cement sand 1:5 in ground
floor. (Facing to brick work measured seperately) Per Sqr 6,018.00
Per M 2
648.00
8 9" thick brick wall (wire cut) in cement sand 1:5 in ground floor.
(Facing to brick work measured seperately) Per Sqr 11,264.00
Per M 2
1,212.00
9 13 1/2" thick brick wall (wire cut) in cement sand 1:5 in ground
floor. (Facing to brick work measured seperately) Per Sqr 17,054.00
Per M2 1,836.00
11 3" thick floor paved in lime mortar 2:5 in ground floor. Per Sqr 7,338.00
Per M2 790.00
12 Steps 1' 1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2"
thick cement and sand 1:2 rendering including necessary
excavation.
Per L.ft 512.00
Per M 1,680.00
13 Brick drains in cement and sand 1:5, 9" wide and 6" - 9" average
depth including cement rendering 1/2" thick 1:2 to exposed
faces with 1' 6" ramp including necessary excavation.
Per L.ft 590.00
Per M 1,936.00
243
14 Brick drains in cement and sand 1:5, 9" wide and 6" - 9" average
depth including cement rendering 1/2" thick 1:2 to exposed
faces without ramp including necessary excavation.
Per L.ft 510.00
Per M 1,673.00
1 8" thick hollow block work in cement and sand mortar 1:5 in
ground floor (Cavities unfilled) Per Sqr 11,727.00
Per M 2
1,262.00
2 4" thick hollow block work in cement and sand mortar 1:5 in
ground floor (Cavities unfilled) Per Sqr 13,632.00
Per M2 1,467.00
RUBBLE MASONRY
TILING
1 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and pointing
in neat cement in ground floor. Per Sqr 36,638.00
Per M 2
3,944.00
3 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground
floor. Per Sqr 12,471.00
Per M 2
1,342.00
244
ROOF PLUMBING
1 Timber frame work for calicut pattern tile hip roof in single storey
building consisting of wall plate, beam, ridge plate, rafters etc.
( Preservative treatment to be measured seperately)
5 One layer half round clay tiles over corrugated Asbestos roof
covering. Per Sqr 27,480.00
Per M2 2,958.00
8 3/4" x 9" high valence board fixed with brass screws to ends of
rafters (for tile roofing)
Per L.ft 179.00
Per M 587.00
9 3/4" x 9" high brass board fixed with brass screws at 2' 0"
centres to sides of rafters. Per L.ft 70.00
Per M 230.00
10 18 B.W.G (1.2 mm) galvernized iron sheet valley gutter 3' 0" girth
over all once bent with and laps not less than 9" width including
3/4" tongued and grooved planks laid to slope and profile on
timber members.
Per L.ft 361.00
Per M 1,184.00
245
11 20 B.W.G (1.2 mm) galvernized iron flashing 1' 6" girth overall 3
bent with end laps not less than 6" lead solder, turned and
tucked up to not less than 6" into chase cut in wall and pointed
in cement mortar 1:2 lower end dressed over roof covering not
less than 1' 0" wide.
Per L.ft 106.00
Per M 348.00
12 6" dia. Half round PVC eaves gutter fixed to timber valance board
including gutter joiner and brackets fixed at 18" centres (Other
specials paid seperately)
Per L.ft 148.00
Per M 486.00
13 6" dia. PVC Gutter head (Running) Consider 1No. Gutter head
Per No. 645.00
14 6" dia. PVC Mitres Consider 1 No. Mitre Per No. 705.00
15 6" dia. PVC End cap Consider 1 No. End cap Per No. 168.00
16 3 1/2" dia. PVC Rain Water Down Pipes fixed to brick wall with
wooden plugs buried in wall. (Specials measured seperately)
Per L.ft 34.00
Per M 112.00
1 Timber frame work for 4' 0" x 4' 0" flat asbestos ceiling (Sheet
measured seperately) comprising of 4" x 2" joints and 2" x 2"
bearers in class I timber.
Per Sqr 18,679.00
Per M 2
2,011.00
2 Horizontal ceiling lining using 4' 0" x 4' 0" flat asbestos ceiling
sheets fixed with and including beading and cove mouldings on
timber frame work. (Timber frame work and painting measured
seperately)
Per Sqr 3,839.00
Per M 2
413.00
246
Per M2 554.00
5 Door single hung 3' 3" x 7' 0" high ovrall with frame having 1
1/4" thick sash and 3 1/4" x 2 1/4" timber frame (Glazing, iron
mongery and painting measuredseperately)
Per Sq.ft 786.00
Per M 2
8,461.00
6 Door glazed and panelled double hung 4' 0" x 7' 0" high ovrall
with frame including 1 1/4" thick sash and 3 1/4" x 2 3/4"
frame (Glazing, iron mongery and painting measured seperately)
7 Plywood Door single hung3' 1 1/2" x 6' 1 1/2" high ovrall with
frame having 1 3/4" x 1 1/4" thick sash and 3 3/4" x 2 3/4"
frame (Iron mongery and painting measuredseperately)
Per Sq.ft 312.00
Per M 2
3,358.00
8 Door ledged, braced and battened single hung 2' 6" x 6' 6" ovrall,
with frame having 7/8" thick tongued & grooved planks and 3
3/4" x 2 3/4" frame (Ironmongery and painting measured
seperately)
Per Sq.ft 633.00
Per M 2
6,814.00
9 Window glazed 7' 0" x 4' 0" high ovrall with frame comprising 3
Nos. openable sashes and 3 3/4" x 2 3/4" frame Glazing,
ironmongery and painting measured seperately)
Per Sq.ft 950.00
Per M 2
10,226.00
BRASS FOUNDER
247
7 Bolts, brass, Skeleton 8" supplied and fixed with brass screws.
Per No. 90.00
8 Bolts, brass, Skeleton 10" supplied and fixed with brass screws.
Per No. 90.00
9 Bolts, brass, Skeleton 12" supplied and fixed with brass screws.
Per No. 90.00
10 Bolts, brass, Skeleton 18" supplied and fixed with brass screws.
Per No. 90.00
11 Cabin Hooks 2" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00
12 Cabin Hooks 3" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00
13 Cabin Hooks 6" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00
14 Cabin Hooks 8" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00
15 Cabin Hooks 9" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00
16 Cabin Hooks 10" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00
17 Cabin Hooks 12" polished, cast brass, heavy quality supplied and
fixed with brass screws. Per No. 90.00
248
23 Hasp and staple, safety type, 6" brass, polished heavy quality
supplied and fixed with brass screws complete. Per No. 90.00
24 Hasp and staple, safety type, 4" brass, polished heavy quality
supplied and fixed with brass screws complete. Per No. 90.00
25 Hat Hooks, brass, supplied and fixed with brass screws. Per No. 90.00
26 Hinges, butt, 4" x 2" brass, polished heavy quality supplied and
fixed with brass screws complete. Per No. 208.00
27 Hinges, butt, 4" x 3" brass, polished heavy quality supplied and
fixed with brass screws complete. Per No. 208.00
29 Hinges, butt, 4" x 4" brass, polished heavy quality supplied and
fixed with brass screws complete. Per No. 208.00
36 Locks, rim 6", polished brass, Single levers, superior quality and
English Manufacture, supplied and fixed. Per No. 270.00
249
40 Lock Mortice (Local) single supplied and fixed. Per No. 1,260.00
41 Lock Mortice (Local) double, supplied and fixed. Per No. 1,440.00
42 Lock Mortice Union (Imported) single, supplied and fixed. Per No. 720.00
43 Lock Mortice Union (Imported) double, supplied and fixed. Per No. 1,440.00
PLASTERING
250
10 3/4" thick rendering in cement and sand 1:2 in floors finished
smooth. Per Sqr 6,624.00
Per M 2
713.00
6 Painting new timber work with 2 coats of wood preservative. Per Sqr 5,580.00
Per M 2
601.00
9 White or colour washing 2 coats in two storeyed building. Per Sqr 730.00
Per M2 79.00
251
10 Prepare and apply one coat of Alkali resistant primer and two
coats of emulsion paint to walls. Per Sqr 3,493.00
Per M2 376.00
11 Cement washing to walls of single storeyed building 2 coats. Per Sqr 539.00
Per M2 58.00
13 Prepare and apply one coat of Alkali resistant primer and two
coats of emulsion paint to soffit of slabs.
Per Sqr 3,226.00
Per M 2
347.00
14 Varnishing two coats with copal varnish after sand papering. Per Sqr 1,793.00
Per M 2
193.00
16 Prepare and apply one coat of Alkali resistance primer and two
coats of weather shield emulsion paint to walls external. Per Sqr 3,750.00
Per M 2
404.00
1 4" dia. PVC pipe type 400 earth ware pipes laid on 6" thick
bedding in cement concrete 1:3:6(1 1/2" ) including excavation
average 2' 0" depth, back filling with selected excavated materials
and concrete to haunching to joints.
Per L.ft 493.00
Per M 1,618.00
2 4" dia. G.I Soil / Vent pipe fixed vertically to walls jointed with
cement caulking (Special measured seperately)
Per L.ft 97.00
Per M 318.00
3 4" dia. G.I pipes fixed to walls jointed with lead caulking. (Special
measured seperately)
Per L.ft 97.00
Per M 318.00
252
4 4" dia. Stoneware gulley with 6" x6" x 6" gulley box including
excavation, 4" cement concrete 1:2:4(3/4" ) base surrounded by 4
1/2" thick cement and sand 1:5 extended 6" above top of gulley
box including making connection, 1/2" cement and sand 1:2
rendering internally and exposted faces finished smooth with
neat cement floating and providing G.I Grating on top of gulley.
5 Manhole 2' 0" x 2' 0" internally with invert depth not exceeding 2'
0" including excavation, back filling 6" cement concrete
1:2:4(3/4" ) base with 3/8" dia. Mild steel rods at 4" centres both
ways, forming channels and benching in similar concrete, 4 1/2"
walls in brick in cement sand 1:5 1/2" thick cement and sand
1:2 rendering internally and exposed surfaces including
channels, benching and 2" thick RCC removable cover slab 2' 3"
x 2' 3" inlet and outlet connection all complete to working order.
6 22" x 16" glazed fireclay wash basin with 1/2" dia. Chromium
plated pillar tap, waste plug, chromium plated waste chain and
stay, including fixing wash basin on brackets. (Water supply and
waste water connection measured seperately)
Per No. 9,300.00
7 Sink 24" x 15" x 7" overall vitreous China with rubber plug and
chromium plated chain waste carried on iron brackets painted
and fixed to walls. (Water supply and waste water connection
measured seperately)
Per No. 1,110.00
8 Closet pedestal type with L/L flushing cistern, flush pipe double
plastic seat cover 1/2" dia. Stop cock, supplied and fixed
complete to working order.
Per No. 2,580.00
9 Closet Squatting type with trap including high level cistern best
quality plastic fixed complete with flush pipe and 1/2" dia. Stop
cock, all complete to working order.
Per No. 2,940.00
11 4 No. Bowl type Urinal with trap and 2 gallon automatic flashing
cistern and spreaders complete to working orders.(Ceylon
ceramic)
Per No. 2,580.00
1 1/2" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 42.00
Per M 138.00
253
2 3/4" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 56.00
Per M 184.00
3 1" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 46.00
Per M 151.00
4 1 1/4" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 68.00
Per M 223.00
5 1 1/2" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 91.00
Per M 299.00
6 2" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 142.00
Per M 466.00
7 3" dia. PVC pipes fixed to walls. (Specials paid seperately) Per L.ft 349.00
Per M 1,145.00
8 Excavation for laying 1/2" to 3" dia. PVC pipes in ground not less
than 1' 6" deep, back filling and connecting. Per L.ft 18.00
Per M 59.00
9 Chasing brick work for laying 1/2" to 1 1/2" dia. PVC pipes and
making good average depth 2" (Pipes and specials paid
seperately)
Per L.ft 68.00
Per M 223.00
10 Chasing brick work for laying 1 1/2" to 3" dia. PVC pipes in
ground or floor and making good average depth 3" (Pipes and
specials paid seperately)
Per L.ft 81.00
Per M 266.00
11 1/2" dia. PVC specials viz - elbows, bends, sockets (Type 1000) Per No. 40.00
12 3/4" dia. PVC specials viz - elbows, bends, sockets (Type 1000) Per No. 41.00
13 1" dia. PVC specials viz - elbows, bends, sockets (Type 1000) Per No. 49.00
14 1 1/4" dia. PVC specials viz - elbows, bends, sockets (Type 1000)
Per No. 47.00
15 1 1/2" dia. PVC specials viz - elbows, bends, sockets (Type 1000)
Per No. 97.00
16 2" dia. PVC specials viz - elbows, bends, sockets (Type 1000) Per No. 97.00
17 2 1/2" dia. PVC specials viz - elbows, bends, sockets (Type 1000)
Per No. 108.00
254
18 3" dia. PVC specials viz - elbows, bends, sockets (Type 1000) Per No. 115.00
27 Pipes PVC 1/2" supplied and fixed. (fittings, excavation and back
filling measured seperately)
Per L.ft 15.00
Per M 49.00
28 Pipes PVC 3/4" supplied and fixed. (fittings, excavation and back
filling measured seperately)
Per L.ft 25.00
Per M 82.00
29 Pipes PVC 1" supplied and fixed. (fittings, excavation and back
filling measured seperately)
Per L.ft 37.00
Per M 121.00
30 Pipes PVC 1/2" supplied and fixed. (fittings, excavation and back
filling measured seperately)
Per L.ft 19.00
Per M 62.00
255
36 Pipes PVC 2" supplied and fixed. (fittings, excavation and back
filling measured seperately) Per L.ft 123.00
Per M 404.00
37 Pipes PVC 3" supplied and fixed. (fittings, excavation and back
filling measured seperately)
Per L.ft 297.00
Per M 974.00
GLAZIER
1 1/8" thick clear sheet panes exceeding 1 Sq.ft but not exceeding
4 Sq.ft, cut and fixed with class I timber beading to doors and
windows.
Per Sq.ft 123.00
Consider sash 3' 0" x 4' 0" with 3' 1 1/4" style and 4 Nos. Glass
panes. Per M2 1,324.00
256
PRICE LIST OF BUILDING MATERIALS FOR THE YEAR 2005
AT THIRUKKOVIL
Kanna's
NO. MATERIAL UNIT PRICE
Building materials
1 Cement -- Mitsui Bag 950.00 562.00
Cement -- Hinodi Bag 950.00 530.00
Cement -- Holcim Bag 950.00 530.00
2 Sand Cube 4,000.00
3 Metal -- ½” Cube -
-- ¾” Cube 8,500.00
-- 1” Cube 8,500.00
-- 1 ½” Cube 8,500.00
-- 2” Cube 8,500.00
4 Rubble Cube 4,000.00
5 Cement Blocks 6" x 9" x 4" No 45.00
6 Wire cut brick No -
Brick No 6.00
Roofing Materials
7 Calicut pattern flat tiles No 23.00 25.00
8 Calicut pattern Ridge tile No 40.00 40.00
9 Corrugated Asbestos Sheet (all sizes) Sq.ft 24.00 24.00
10 Flat Asbestos sheet Sq.ft 14.50 14.50
11 Half round clay tiles No -
12 Asbestos Ridges Pairs 950.00
13 GI flat sheet -- 32 guage Sq.ft 30.00 34.00
GI flat sheet -- 30 guage Sq.ft 31.25
Reinforcement
14 Tor steel (all sizes) Kg 120.00
15 Mild steel Kg 120.00
16 Binding wire kg 100.00 105.00
17 Angle iron -- 1" x 1" Lth. 600.00 600.00
-- 1 1/2" x 1 1/2" Lth. 1,400.00 1,400.00
-- 2" x 2" Lth. 1,750.00 1,750.00
18 Flat iron -- 1" x 1/4" Lth. 550.00
19 Box iron -- 3/4" x 3/4" 0.9mm Lth. 195.00
Box iron -- 1" x 1" 0.9mm Lth. 245.00
20 G.I Pipe -- 1/2" Lth. 600.00 600.00
-- 3/4" Lth. 800.00 800.00
-- 1" Lth. 975.00 975.00
-- 1 1/4" Lth. 1,200.00 1,200.00
-- 1 1/2" Lth. 1,425.00 1,425.00
-- 2" Lth. 1,775.00 1,775.00
Timber
21 Class - 1 Timber (specify species) Cu.ft 2,200.00
22 Aluminium flat sheet (specify gauges) Sq.ft 25.00
23 Aluminium bar (specify gauges) L.ft -
24 Door locks (local type horizontal mort
ice locks –: specify). No 600.00 600.00
25
Door locks (imported type horizontal
mort ice locks – union/ Yale etc. specify) No 1,000.00 1,000.00
26 Hinges -- 4" x 3" Iron Pairs 96.00
27 4” long brass screws Doz 150.00
28 ¾” brass screws Doz 30.00
29 ¾” iron screws Doz 12.00
30 Rim lock with screws (single lever / 4
lever) No 360.00
31 Door closer (hydraulic) No 2,750.00
32 Tower / Skeleton bolt No 68.50
33 Barrel bolt No -
34 Casement fasteners No 37.00 37.00
35 Casement stays No 72.00 72.00
36 Wire nails Kg 93.00 93.00
37 Roofing screws and washers No 20.00
38 Mould oil Gln 90.00
39 Basket No 75.00
40 Shuttering Planks Sq.ft -
41 Cabin hooks 3" No 9.50
42 Fibre/plastic plug No -
43 Clout rails Lbs -
44 Class I Cove moulding L.ft -
45 Class I beading L.ft -
46 Yarn Lbs -
47 Lead Lbs -
Painting Materials
48 Colourless wood preservative Ltr 600.00
49 Wood primer Ltr 525.00
50 Emulsion paint Ltr 350.00 350.00
51 Weather shield emulsion Ltr 440.00 440.00
52 Anticorrosive paint Ltr 315.00 315.00
53 Enamel paint Ltr 380.00 380.00
54 Samara colour wash Kg 15.00
55 Green board paint Ltr -
56 Varnish Ltr 316.00 316.00
57 Mineral Turpentine Ltr 100.00 100.00
58 Thinner Ltr 150.00 150.00
59 Boiled lime Kg 10.00
60 Salt Lbs 5.50
61 Yellow ochre Lbs 7.00
62 Blue Ozs 2.50
63 Wax polish Lbs 185.00
64 Sand paper No 22.50
65 Brush -- 2" No 188.00
Brush -- 4" No 390.00
66 Coir Brush No 40.00
67 Wire Brush No 65.00
Bathroom Fittings
1 Ceramic sink (Available sizes) No 3,900.00
2 Wash basin with pedestal No 6,500.00
3 Bib tap (All sizes in brass & plastic) No 250.00
4 Shower rose -- Plastic No 125.00
5 Squatting pan with foot riser (different
types) No 1,250.00
6 Commode with cistern (plastic) No 8,500.00
7 Commode with cistern (ceramic) No 12,500.00
8 Urine bowl No 1,500.00
9 Bathroom mirror 18”x12” No 750.00
10 Cistern (2 Gal) No 1,750.00
Plumbing Materials
11 PVC pipe -- 1/2" L.ft 9.00 9.00
PVC pipe -- 3/4" L.ft 17.50 17.50
PVC pipe -- 1" L.ft 26.00 26.00
PVC pipe -- 1 1/4" L.ft 38.00 38.00
PVC pipe -- 1 1/2" L.ft 55.00 55.00
PVC pipe -- 2" L.ft 93.00 93.00
PVC pipe -- 3" L.ft 238.00 238.00
PVC pipe -- 4" (Type 400) L.ft 106.00 106.00
12 PVC bend -- 1/2" No 13.50 13.50
PVC bend -- 3/4" No 18.00 18.00
PVC bend -- 1" No 27.00 27.00
PVC bend -- 1 1/4" No 55.00 55.00
PVC bend -- 1 1/2" No 88.00 88.00
PVC bend -- 2" No 142.50 142.50
PVC bend -- 2 1/2" No 450.00 450.00
PVC bend -- 3" No 754.00 754.00
13 PVC ‘ T ’ -- 1/2" No 12.00 12.00
PVC ‘ T ’ -- 3/4" No 18.00 18.00
PVC ‘ T ’ -- 1" No 29.00 29.00
PVC ‘ T ’ -- 1 1/4" No 44.00 44.00
PVC ‘ T ’ -- 1 1/2" No 77.00 77.00
PVC ‘ T ’ -- 2" No 118.00 118.00
PVC ‘ T ’ -- 2 1/2" No 216.00 216.00
PVC ‘ T ’ -- 3" No 494.00 494.00
14 PVC Elbow -- 1/2" No 10.00 10.00
PVC Elbow -- 3/4" No 12.75 12.75
PVC Elbow -- 1" No 21.00 21.00
PVC Elbow -- 1 1/4" No 33.00 33.00
PVC Elbow -- 1 1/2" No 58.50 58.50
PVC Elbow -- 2" No 92.50 92.50
PVC Elbow -- 2 1/2" No 220.50 220.50
PVC Elbow -- 3" No 374.00 374.00
15 PVC Sockets -- 1/2" No 10.00 10.00
PVC Sockets -- 3/4" No 11.50 11.50
PVC Sockets -- 1" No 18.00 18.00
PVC Sockets -- 1 1/4" No 25.00 25.00
PVC Sockets -- 1 1/2" No 38.00 38.00
PVC Sockets -- 2" No 62.00 62.00
PVC Sockets -- 2 1/2" No 168.30 168.30
PVC Sockets -- 3" No 248.00 248.00
16 PVC End cap -- 1/2" No 11.00 11.00
PVC End cap -- 3/4" No 11.75 11.75
PVC End cap -- 1" No 15.75 15.75
PVC End cap -- 1 1/4" No 21.00 21.00
PVC End cap -- 1 1/2" No 30.50 30.50
PVC End cap -- 2" No 44.00 44.00
PVC End cap -- 2 1/2" No 139.00 139.00
PVC End cap -- 3" No 196.00 196.00
PVC End cap -- 4" No 231.00 231.00
17 PVC Shoe (specify sizes) No -
18 PVC Joiner (specify sizes) No -
19 PVC Straps (specify sizes) No -
20 6” uPVC gutter L.ft 42.25 42.25
21 PVC Mitre head No 180.00 180.00
22 PVC Gutter joiner No 58.50 58.50
23 PVC Gutter brackets No 15.00 15.00
24 PVC Gutter head No 130.00 130.00
25 4” uPVC down pipe L.ft 34.00 34.00
26 6” UPVC pipe L.ft -
27 4” UPVC pipe L.ft -
28 Compact Ball Valves -- 1/2" No 84.50 84.50
Compact Ball Valves -- 3/4" No 152.50 152.50
Compact Ball Valves -- 1" No 164.00 164.00
Compact Ball Valves -- 1 1/4" No 249.30 249.30
Compact Ball Valves -- 1 1/2" No 332.00 332.00
Compact Ball Valves -- 2" No 530.00 530.00
29 Lanka ceramic floor tiles -- 12" x 12" No 100.00
30 Wall tiles -- 12"x8" No 65.00
31 Solvent cement Grm 1.50 1.50
32 Clips & Nails No -
33 Stop cock No 160.00
34 Stone ware Gulley with Gulley box
(specify sizes) No 350.00
Electrical Items
1 5 amp Plug (all brands) No 195.00
2 15 amp Plug (all brands) No 260.00
3 13 amp Plug (all brands) No 280.00
4 Fluorescent light 4’ 0” (all brands) No 475.00
5 Pendant lamp fittings-ceiling rose No 16.50
Flat holder No 27.50
Angled holder No 8.50
6 30 amp power control box MCB No 75.00
7 30 amp Trip switch No 575.00
8 Main switch No 250.00
9 Conduits, Earth wire Yard 25.00
10 Ceiling fan (all brands) No 3,750.00
11 Ceiling swing fan No 6,500.00
12 Electric motor ¾ Hp, 1Hp, 1 1/2Hp No 22,500.00
13 Electric wire 1/044 870.00
14 Conduit pipe -- ½” Lth 55.00
Conduit pipe -- ¾” Lth 85.00
Conduit pipe -- 1” Lth 110.00
15 Switches – 1 gang No 70.00
Switches – 2 gang No 135.00
16 3 phase MEM main switch No 7,500.00
Labour Rates
1 Skilled Labour Day 1,200.00
2 Unskilled Labour Day 650.00
Door
1 Iron gate with all fittings
2 Plastic door with fittings
Aathavan
560.00
525.00
535.00
2,150.00
8,000.00
7,000.00
6,000.00
5,500.00
3,000.00
30.00
6.00
23.00
42.50
24.00
21.25
950.00
30.00
31.25
80.00
65.00
100.00
2,400.00
550.00
195.00
245.00
2,200.00
25.00
625.00
96.00
150.00
30.00
12.00
360.00
2,750.00
68.50
42.00
80.00
100.00
20.00
90.00
75.00
9.50
600.00
525.00
415.00
488.00
320.00
435.00
15.00
360.00
125.00
240.00
10.00
5.50
7.00
2.50
185.00
22.50
188.00
390.00
40.00
65.00
3,900.00
6,500.00
250.00
125.00
1,250.00
8,500.00
12,500.00
1,500.00
750.00
1,750.00
100.00
65.00
160.00
350.00
195.00
260.00
280.00
475.00
16.50
27.50
8.50
75.00
575.00
250.00
25.00
3,750.00
6,500.00
22,500.00
870.00
55.00
85.00
110.00
70.00
135.00
7,500.00
BOQ QTY.
NO DESCRIPTION UNIT
Skl. Lab Unskl.Lab
Day Day
EXCAVATION
EARTH WORK
CONCRETE
1 Cement concrete 1:3:6 ( 2" ). (Shuttering
paid for seperately) Cube
Cement Cwts 11.25
Sand Cube 0.56
2" Metal Cube 1.00
Mason Day 1.00
Labour Day 8.00
LabourCost
Erection & Removing shuttering
Carpenter Hrs 3.00
Labour Hrs 3.00
Per L.ft
Per M
15 Lintol, cement concrete 1:2:4 (3/4" ), 12"
x 9" (Reinforcement paid for seperately)
LabourCost
Erection & Removing shuttering
Carpenter Day 0.50
Labour Day 0.50
Per L.ft
Per M
Per L.ft
Per M
LabourCost
Erection & Removing shuttering
Carpenter Day 0.50
Labour Day 0.50
LabourCost
Erection & Removing shuttering
Carpenter Day 0.75
Labour Day 0.75
Per L.ft
Per M
LabourCost
Mason Hrs 2.00
Labour Hrs 2.00
Per Stone
Shuttering
Planks at (1/4 new Cost) Sq.ft 115.00
Round timber props at (1/4 new cost) L.ft 80.00
2" Nails Lbs. 2.00
Mould oil Gln. 0.25
Timber in joists Cu.ft 5.00
LabourCost
Mason Day 1.75
Carpenter Day 1.00
Labour Day 8.50
Rendering
Cement Cwt. 1.50
Sand Cube 0.075
Padlo Cement Lbs. 8.50
Basket 0.33
Allow for water
Per Sqr
Per M2
LabourCost
Mason Hrs 2.00
Labour Hrs 4.00
Rendering
Cement Cwt. 0.23
Sand Cube 0.010
Per Sq.ft
Per M2
LabourCost
Mason Day 0.75
Labour Day 0.75
Per Stone
LabourCost
Mason Hrs 2.00
Labour Hrs 2.00
Per Stone
Data: Per
LabourCost
Smith Hrs 0.50
Mason Hrs 2.00
Labour Hrs 2.00
Per Cube
Per M3
Labour Cost
Mason Day 1.00
Labour Day 6.00
Basket 0.66
Allow for Water & curing Allow
Allow for 1/3 day hire of mixer, vibrator,
wages of operator,fuel etc.
Per Cube
Per M3
As per Item 26
Labour Day 2.00
Per Cube
Per M3
As per Item 26
Labour Day 5.00
Per Cube
Per M3
Labour Cost
Mason Day 2.50
Labour Day 16.00
Basket 1.33
Allow for Water & curing Allow
Allow for 2/3 day hire of mixer, vibrator,
wages of operator,fuel etc.
Per Cube
Per M3
As per Item 29
Labour Day 2.00
Per Cube
Per M3
As per Item 29
Labour Day 5.00
Per Cube
Per M3
32 Shuttering for floor slab concrete and
dismantling.
Labour Cost
Carpenter Day 1.00
Labour Day 3.00
Per Sqr
Per M2
Labour Cost
Carpenter Day 0.375
Labour Day 0.375
Add Over head & Profit 35%
Rate per 12 Sq.ft
Rate per Sq.ft
Per Sq.ft
Per M2
Labour Cost
Carpenter Day 1.00
Labour Day 1.00
Per Sq.ft
Per M2
Per Cube
Per M3
Per Cube
Per M3
Per Sqr
Per M2
Labour Cost
Mason Day 4.00
Labour Day 25.00
Allow for Water & curing Allow
Per Sqr
Per M2
Labour Cost
Mason Day 1.00
Labour Day 1.50
Allow for shuttering Allow
Per L.ft
Per M
Per L.ft
Per M
Labour Cost
Skilled Labour Day 0.33
Unskilled Labour Day 2.00
Per Cube
Per M3
Labour Cost
Skilled Labour Day 0.125
Unskilled Labour Day 0.25
Per Sqr
Per M2
Labour Cost
Skilled Labour Day 0.125
Unskilled Labour Day 0.75
Per Sqr
Per M2
Labour Cost
Skilled Labour Day 0.25
Unskilled Labour Day 0.75
Per Sqr
Per M2
Note: a) Water available at site. b)
If water is not available allowance must be
made for transport of water.
Labour Cost
Vibrator operator Hrs 0.50
Mason (2 x 1/2 day) Hrs 1.00
Labour (4 x 1/2 day) Hrs 2.00
Carpenter Hrs 0.50
Allow for curing
Per Cube
Per M3
STEEL FABRICATOR
Per Cwt.
Per kg
Labour Cost
Steel Fabricator Day 1.00
Unskilled Labour Day 1.00
Per Cwt.
Per kg
BRICK MASONRY
Labour Cost
Mason Day 3.00
Labour Day 4.00
Per Cube
Per M3
Labour Cost
Mason Day 3.00
Labour Day 4.00
Per Cube
Per M3
Labour Cost
Mason Day 1.50
Labour Day 2.00
Scaffolding ( Add 5%)
Per Sqr
Per M2
Labour Cost
Mason Day 2.25
Labour Day 3.75
Scaffolding ( Add 3%)
Per Sqr
Per M2
5 Brick work 13 1/2" thick in cement sand
1:5 in super structure in ground floor.
Labour Cost
Mason Day 3.50
Labour Day 5.50
Scaffolding ( Add 2%)
Per Sqr
Per M2
Labour Cost
Mason Day 2.25
Labour Day 3.00
Scaffolding ( Add 3%)
Add Over head & Profit 35%
Rate per Sqr
Per Sqr
Per M2
Labour Cost
Mason Day 1.50
Labour Day 2.00
Scaffolding ( Add 5%)
Per Sqr
Per M2
Labour Cost
Mason Day 2.25
Labour Day 3.75
Scaffolding ( Add 3%)
Per Sqr
Per M2
Labour Cost
Mason Day 3.75
Labour Day 5.50
Scaffolding ( Add 2%)
Per Sqr
Per M2
Labour Cost
Mason Day 5.00
Labour Day 3.50
Per Sqr
Per M2
Labour Cost
Mason Day 1.25
Labour Day 2.50
Per Sqr
Per M2
12 Steps 1' 1 1/2" x 0' 6" in brick in cement
and sand 1:5 with 1/2" thick cement and
sand 1:2 rendering including necessary
excavation.
Labour Cost
Mason Day 0.50
Labour Day 0.50
Per L.ft
Per M
Labour Cost
Mason Day 1.75
Labour Day 1.25
Add Over head & Profit 35%
Rate per 10.0 L.ft
Rate per L.ft
Per L.ft
Per M
Labour Cost
Mason Day 1.50
Labour Day 1.25
Per L.ft
Per M
Labour Cost
Mason Day 1.50
Labour Day 2.50
Scaffolding (Add 3%)
Per Sqr
Per M2
Labour Cost
Mason Day 1.00
Labour Day 2.00
Scaffolding (Add 5%)
Per Sqr
Per M2
RUBBLE MASONRY
1 Random rubble masonry in cement
mortar1:5 in foundation.
Labour Cost
Mason Day 4.00
Labour Day 6.00
Per Cube
Per M3
Labour Cost
Mason Day 2.50
Labour Day 7.50
Scaffolding - Add 3%.
Per Cube
Per M3
TILING
Labour Cost
Mason Day 4.00
Labour Day 4.00
Unskilled labour to polishing Day 0.50
Per Sqr
Per M2
Labour Cost
Mason Day 4.00
Labour Day 4.00
Unskilled labour for cleaning Day 0.25
Per Sqr
Per M2
Labour Cost
Mason Day 5.00
Labour Day 4.00
Unskilled labour to polishing Day 0.50
Per Sqr
Per M2
Labour Cost
Mason Day 4.00
Labour Day 4.00
Unskilled labour for cleaning Day 0.25
Per Sqr
Per M2
Labour Cost
Special Mason Day 4.00
Labour Day 4.00
Unskilled labour for polishing Day 0.25
Per Sqr
Per M2
ROOF PLUMBING
Labour Cost
Carpenter Day 7.00
Unskilled Labour Day 8.00
Per Sqr
Per M2
Per Sqr
Per M2
Labour Cost
Carpenter Day 2.50
Unskilled Labour Day 3.00
Per Sqr
Per M2
Labour Cost
Carpenter Day 1.00
Unskilled Labour Day 2.00
Per Sqr
Per M2
Labour Cost
Unskilled Labour Day 2.00
Per Sqr
Per M2
Labour Cost
Carpenter Day 0.50
Unskilled Labour Day 0.25
Per L.ft
Per M
Labour Cost
Mason Day 0.25
Unskilled Labour Day 0.25
Per L.ft
Per M
Labour Cost
Carpenter Day 3.00
Unskilled Labour Day 3.00
Scaffolding 5%
Per L.ft
Per M
Labour Cost
Carpenter Day 3.00
Unskilled Labour Day 3.00
Scaffolding 5%
Per L.ft
Per M
ROOF PLUMBING
10 18 B.W.G (1.2 mm) galvernized iron sheet
valley gutter 3' 0" girth over all once bent
with and laps not less than 9" width
including 3/4" tongued and grooved
planks laid to slope and profile on timber
members.
Labour Cost
a) Fixing boarding and applying wood
preservative
Carpenter Day 1.00
Unskilled Labour Day 1.00
c) Building Sides
Mason Day 0.50
Unskilled Labour Day 0.50
Per L.ft
Per M
11 20 B.W.G (1.2 mm) galvernized iron
flashing 1' 6" girth overall 3 bent with
end laps not less than 6" lead solder,
turned and tucked up to not less than 6"
into chase cut in wall and pointed in
cement mortar 1:2 lower end dressed over
roof covering not less than 1' 0" wide.
Labour Cost
Cutting, bending, soldering and fixing
Tinker Day 0.50
Mason Day 0.125
Unskilled Labour Day 0.75
Per L.ft
Per M
Per L.ft
Per M
Labour Cost
Plumber Day 0.125
Unskilled Labour Day 0.125
Scaffolding Add 5%
Per No.
Labour Cost
Plumber Day 0.125
Unskilled Labour Day 0.125
Scaffolding Add 5%
Per No.
Labour Cost
Plumber Day 0.063
Unskilled Labour Day 0.063
Scaffolding Add 5%
Per No.
Labour Cost
Plumber Day 0.33
Unskilled Labour Day 0.33
Scaffolding Add 5%
Per L.ft
Per M
Labour Cost
Plumber Day 0.063
Unskilled Labour Day 0.063
Scaffolding Add 5%
Per No.
Labour Cost
Plumber Day 0.063
Unskilled Labour Day 0.063
Scaffolding Add 5%
Per No.
Labour Cost
Carpenter Day 2.50
Mason Day 0.50
Unskilled Labour Day 1.50
Scaffolding - Add 3%
Labour Cost
Carpenter Day 1.50
Unskilled Labour Day 2.00
Scaffolding - Add 3%
Per Sqr
Per M2
Labour Cost
Making holes, fixing joists and making good
Ceiling boards
Carpenter Day 3.00
Unskilled Labour Day 4.00
Scaffolding - Add 3%
Per Sqr
Per M2
Labour Cost
Carpenter Day 3.00
Unskilled Labour Day 6.00
Scaffolding - Add 3%
Add Over head & Profit 35%
Rate per 1.80 Sqr
Rate per Sqr
Per Sqr
Per M2
Labour Cost
Carpenter Day 5.00
Unskilled Labour Day 1.50
Per Sq.ft
Per M2
Labour Cost
Carpenter Day 6.00
Unskilled Labour Day 2.00
Per Sq.ft
Per M2
Per Sq.ft
Per M2
Labour Cost
Carpenter Day 2.25
Unskilled Labour Day 1.00
Mason (Fixing frame) Day 0.75
Unskilled Labour (Fixing frame) Day 0.75
Labour Cost
Carpenter Day 6.00
Unskilled Labour Day 2.50
Mason (Fixing frame) Day 0.50
Unskilled Labour (Fixing frame) Day 0.50
Per Sq.ft
Per M2
BRASS FOUNDER
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.33
Per No.
Labour Cost
Carpenter Hrs 0.33
Labour Cost
Carpenter Hrs 0.33
Per No.
Labour Cost
Carpenter Hrs 0.33
Per No.
Labour Cost
Carpenter Hrs 0.33
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
11 Cabin Hooks 2" polished, cast brass,
heavy quality supplied and fixed with
brass screws.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.75
Per No.
Labour Cost
Carpenter Hrs 0.25
Add Over head & Profit 35%
Rate per No.
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.50
Per No.
25 Hat Hooks, brass, supplied and fixed with
brass screws.
Labour Cost
Carpenter Hrs 0.50
Per No.
Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75
Per No.
Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75
Per No.
Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75
Per No.
Per No.
Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75
Per No.
Labour Cost
Carpenter Hrs 1.00
Labour Hrs 1.00
Per No.
Labour Cost
Carpenter Hrs 1.00
Labour Hrs 1.00
Per No.
Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75
Per No.
Labour Cost
Carpenter Hrs 0.75
Labour Hrs 0.75
Per No.
Labour Cost
Carpenter Hrs 1.50
Per No.
36 Locks, rim 6", polished brass, Single
levers, superior quality and English
Manufacture, supplied and fixed.
Labour Cost
Carpenter Hrs 1.50
Per No.
Labour Cost
Carpenter Hrs 1.50
Per No.
Labour Cost
Carpenter Hrs 1.50
Per No.
Labour Cost
Carpenter Hrs 2.00
Per No.
Labour Cost
Carpenter Day 0.50
Per No.
Labour Cost
Carpenter Day 1.00
Per No.
Labour Cost
Carpenter Day 0.50
Per No.
Labour Cost
Carpenter Day 1.00
Per No.
PLASTERING
LabourCost
Mason Day 1.00
Unskilled Labour Day 1.75
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 1.00
Unskilled Labour Day 1.50
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 2.50
Unskilled Labour Day 2.50
Scaffolding - Add 3%
Per Sqr
Per M2
4 3/8" thick plastering to sides and soffit
of beams in cement and sand 1:3
including floating with lime putty.
LabourCost
Mason Day 2.00
Unskilled Labour Day 2.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 1.00
Unskilled Labour Day 1.25
Scaffolding - Add 3%
Add Over head & Profit 35%
Rate per Sqr
Per Sqr
Per M2
LabourCost
Mason Day 1.50
Unskilled Labour Day 1.50
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 1.00
Unskilled Labour (Curing) Day 1.50
Per Sqr
Per M2
LabourCost
Mason Day 1.00
Unskilled Labour Day 1.50
Unskilled Labour (Curing) Day 0.25
Per Sqr
Per M2
Per Sqr
Per M2
LabourCost
Mason Day 1.25
Unskilled Labour Day 2.00
Unskilled Labour (Curing) Day 0.25
Per Sqr
Per M2
LabourCost
Mason Day 1.25
Unskilled Labour Day 2.00
Unskilled Labour (Curing) Day 0.25
Per Sqr
Per M2
LabourCost
Mason Day 0.375
Unskilled Labour Day 0.312
Per L.ft
Per M
LabourCost
Painter Day 0.75
Unskilled Labour Day 0.50
Per Sqr
Per M2
LabourCost
Painter Day 1.50
Unskilled Labour Day 1.50
LabourCost
Painter Day 2.50
Unskilled Labour Day 1.00
Scaffolding - Add 3%
Per Sqr
Per M2
Per Sqr
Per M2
LabourCost
Painter Day 1.50
Per Sqr
Per M2
LabourCost
Painter Day 0.50
Add Over head & Profit 35%
Rate per Sqr
Per Sqr
Per M2
LabourCost
Painter Day 1.50
Unskilled Labour Day 0.50
Per Sqr
Per M2
LabourCost
Painter Day 2.50
Unskilled Labour Day 2.50
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 0.50
Unskilled Labour Day 0.50
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 1.25
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 2.00
Unskilled Labour Day 2.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 0.75
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 1.75
Scaffolding - Add 3%
Per Sqr
Per M2
14 Varnishing two coats with copal varnish
after sand papering.
LabourCost
Painter Day 0.50
Unskilled Labour Day 0.50
Per Sqr
Per M2
LabourCost
Unskilled Labour Hrs 3.00
Per Sqr
Per M2
16 Prepare and apply one coat of Alkali
resistance primer and two coats of
weather shield emulsion paint to walls
external.
LabourCost
Painter Day 1.25
Scaffoldings - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 1.25
Scaffoldings - Add 3%
LabourCost
Laying Concrete Bedding
Unskilled Labour Day 1.50
Laying and testing pipes
Plumber Day 2.00
Unskilled Labour Day 2.00
Back filling
Unskilled Labour Day 2.50
Per L.ft
Per M
LabourCost
Plumber Day 0.25
Unskilled Labour Day 0.25
Scaffolding - Add 5%
Per L.ft
Per M
LabourCost
Plumber Day 0.25
Unskilled Labour Day 0.25
Scaffolding - Add 5%
Add Over head & Profit 35%
Rate per 6.0 L.ft
Rate per L.ft
Per L.ft
Per M
Labour Cost
Mason Day 0.50
Unskilled Labour Day 0.50
Per No.
5 Manhole 2' 0" x 2' 0" internally with
invert depth not exceeding 2' 0" including
excavation, back filling 6" cement
concrete 1:2:4(3/4" ) base with 3/8" dia.
Mild steel rods at 4" centres both ways,
forming channels and benching in similar
concrete, 4 1/2" walls in brick in cement
sand 1:5 1/2" thick cement and sand 1:2
rendering internally and exposed surfaces
including channels, benching and 2" thick
RCC removable cover slab 2' 3" x 2' 3"
inlet and outlet connection all complete
to working order.
Labour Cost
Mason Day 1.50
Unskilled Labour Day 2.50
Per No.
Labour Cost
Mason Day 0.50
Unskilled Labour Day 1.00
Per No.
Labour Cost
Mason Day 0.50
Unskilled Labour Day 0.50
Labour Cost
Mason Day 0.25
Plumber Day 1.00
Unskilled Labour Day 1.00
Per No.
Labour Cost
Mason Day 0.50
Plumber Day 1.00
Unskilled Labour Day 1.00
Per No.
Labour Cost
Plumber Day 1.00
Unskilled Labour Day 1.00
Per No.
Labour Cost
Mason Day 0.25
Plumber Day 1.00
Unskilled Labour Day 1.00
Per No.
LabourCost
Plumber Hrs 1.00
Unskilled Labour Hrs 1.00
Per L.ft
Per M
LabourCost
Plumber Hrs 1.00
Unskilled Labour Hrs 1.00
Per L.ft
Per M
LabourCost
Plumber Day 0.50
Unskilled Labour Day 0.50
Per L.ft
Per M
4 1 1/4" dia. PVC pipes fixed to walls.
(Specials paid seperately)
LabourCost
Plumber Day 0.75
Unskilled Labour Day 0.75
Per L.ft
Per M
LabourCost
Plumber Day 0.75
Unskilled Labour Day 0.75
Per L.ft
Per M
LabourCost
Plumber Day 0.75
Unskilled Labour Day 0.75
Per L.ft
Per M
LabourCost
Plumber Day 1.00
Unskilled Labour Day 1.00
Per L.ft
Per M
LabourCost
Unskilled Labour Day 2.25
Per L.ft
Per M
LabourCost
Mason Day 3.00
Unskilled Labour Day 3.00
Add Over head & Profit 35%
Rate per 100.0 L.ft
Rate per L.ft
Per L.ft
Per M
LabourCost
Mason Day 3.50
Unskilled Labour Day 3.50
Per L.ft
Per M
Labour Cost
Plumber Hrs 2.00
Add Over head & Profit 35%
Rate per 10 Nos.
Rate per No.
Per No.
Labour Cost
Plumber Hrs 2.00
Per No.
Labour Cost
Plumber Hrs 2.00
Labour Cost
Plumber Hrs 2.00
Per No.
Labour Cost
Plumber Day 0.50
Per No.
Labour Cost
Plumber Day 0.50
Per No.
Labour Cost
Plumber Day 0.50
Per No.
Labour Cost
Plumber Day 0.50
Per No.
Labour Cost
Plumber Day 0.50
Per No.
Labour Cost
Plumber Day 0.50
Per No.
Labour Cost
Plumber Day 0.50
Per No.
Labour Cost
Plumber Day 0.50
Per No.
Labour Cost
Plumber Day 1.00
Per No.
Labour Cost
Plumber Day 1.00
Per No.
Labour Cost
Plumber Day 1.50
Per No.
Labour Cost
Plumber Day 1.50
Per No.
LabourCost
Plumber Hrs 1.50
Unskilled Labour Hrs 1.50
Allow for Solvent cement, Blow lamp etc.
Per L.ft
Per M
LabourCost
Plumber Hrs 1.50
Unskilled Labour Hrs 1.50
Allow for Solvent cement, Blow lamp etc.
Per L.ft
Per M
LabourCost
Plumber Hrs 2.00
Unskilled Labour Hrs 2.00
Allow for Solvent cement, Blow lamp etc.
LabourCost
Plumber Hrs 2.00
Unskilled Labour Hrs 2.00
Allow for Solvent cement, Blow lamp etc.
Per L.ft
Per M
LabourCost
Plumber Hrs 2.00
Unskilled Labour Hrs 2.00
Allow for Solvent cement, Blow lamp etc.
LabourCost
Excavating 1 1/2 days labour Day 1.5
Return fill in 3/4 day labour Day 0.75
Plumber Hrs 3.00
Unskilled Labour Hrs 3.00
Allow for Solvent cement, Petrol, Blow lamp
etc.
Per L.ft
Per M
LabourCost
Plumber Hrs 4.00
Unskilled Labour Hrs 1.00
Allow for Solvent cement, Petrol, Blow lamp
etc.
LabourCost
Excavating 1 1/2 days labour Day 1.5
Return fill in 3/4 day labour Day 0.75
Plumber Hrs 3.00
Unskilled Labour Hrs 3.00
Allow for Solvent cement, Petrol, Blow lamp
etc.
Per L.ft
Per M
LabourCost
Excavating 1 1/2 days labour Day 1.5
Return fill in 3/4 day labour Day 0.75
Plumber Hrs 5.00
Unskilled Labour Hrs 5.00
Allow for Solvent cement, Petrol, Blow lamp
etc.
Add Over head & Profit 35%
Rate per 100.0 L.ft
Rate per L.ft
Per L.ft
Per M
LabourCost
Plumber Hrs 4.00
Unskilled Labour Hrs 4.00
Allow for Solvent cement, Petrol, Blow lamp
etc.
Per L.ft
Per M
LabourCost
Plumber Hrs 4.00
Unskilled Labour Hrs 4.00
Allow for Solvent cement, Petrol, Blow lamp
etc.
Add Over head & Profit 35%
Rate per 100.0 L.ft
Rate per L.ft
Per L.ft
Per M
GLAZIER
LabourCost
Glazier Day 0.50
Unskilled Labour Day 0.50
Per Sq.ft
Per M2
LabourCost
Glazier Day 0.50
Unskilled Labour Day 0.50
Per Sq.ft
Per M2
Cement Sand 3/4" Met 1" Met 1 1/2" Met 2" Met Rubble Brick 6mm Bar 10mm Bar 12mm Bar
Cwt Cube Cube Cube Cube Cube Cube Nos
16mm Bar 20mm Bar 25mm Bar
LABOUR RATES FOR THE YEAR 2005
AT TRINCOMALEE
EXCAVATION
Labour Cost
Consider an area of 10.00 Sqrs. i.e 5.00
Cubes of excavation
Unskilled Labour Day 10.00 650.00
Per Sqr
Per M2
Labour Cost
Unskilled Labour (1 5/8) Day 1.625 650.00
Per Cube
Per M3
Labour Cost
Unskilled Labour Day 1.00 650.00
Per Cube
Per M3
Labour Cost
Unskilled Labour Day 2.25 650.00
Per Cube
Per M3
Labour Cost
Unskilled Labour Day 3.50 650.00
Per Cube
Per M3
6 Excavation in trenches for walls column
pits in Mud/Wet soil upto a depth of 5' 0"
and depositing excavated material to a
distance not exceeding 30' 0" (Earth work
and dewatering paid for seperately)
Labour Cost
Unskilled Labour Day 3.00 650.00
Per Cube
Per M3
Labour Cost
Unskilled Labour Day 2.50 650.00
Per Cube
Per M3
Labour Cost
Skilled Labour Day 1.00 1,200.00
Unskilled Labour Day 2.00 650.00
Labour Cost
Drilling, Chipping & wedging:-
Skilled Labour Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00
Steel, Fuel & Forge - 25% of Labour Cost
Per Sq.ft
Labour Cost
Unskilled Labour Day 0.50 650.00
Per Sqr
Per M2
EARTH WORK
Labour Cost
Unskilled Labour Day 1.00 650.00
Per Cube
Per M3
Labour Cost
Unskilled Labour (Filling & Compacting) Day 1.25 650.00
Per Cube
Per M3
Labour Cost
Unskilled Labour Day 2.00 650.00
Per Cube
Per M3
Per Cube
Per M3
Labour Cost
Unskilled Labour (Laying turf rids at site) Day 2.50 650.00
Unskilled Labour (Watering for 30 days) Day 0.50 650.00
Unskilled Labour Day 1.50 650.00
Per Sqr
Per M2
Consider trench 15' 0" long 3' 0" wide and 5'
0" depth open planking to both faces.
Labour Cost
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 3.00 650.00
Per Sq.ft
17 Earth work support (Close planking) in
trenches upto a depth of 5' 0"
Consider trench 15' 0" long 3' 0" wide and 5'
0" depth open planking to both faces.
Labour Cost
Carpenter Day 2.00 1,200.00
Unskilled Labour Day 6.00 650.00
Per Sq.ft
Labour Cost
Carpenter Day 8.00 1,200.00
Unskilled Labour Day 20.00 650.00
Per Sq.ft
CONCRETE
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 8.00 650.00
Per Cube
Per M3
As in Item 1
Per Cube
Per M3
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 8.00 650.00
Rate per Cube
Per Cube
Per M3
As in Item 3
Add 25% of cost of Labour
Per Cube
Per M3
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 8.00 650.00
Rate per Cube
Per Cube
Per M3
As in Item 5
Per Cube
Per M3
Labour Cost
Mason Day 0.25 1,200.00
Labour Day 0.125 650.00
Labour Cost
Mason Day 0.25 1,200.00
Labour Day 0.125 650.00
Per L.ft
Per M
Labour Cost
Mason Day 0.09 1,200.00
Labour Day 0.09 650.00
Allow for Moulds and curing
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 1.00 650.00
Rendering
Mason Day 0.50 1,200.00
Labour Day 0.50 650.00
Allow for shuttering, baskets etc.
Per L.ft
Per M
Per L.ft
Per M
Per L.ft
Per M
15 Lintol, cement concrete 1:2:4 (3/4" ), 12"
x 9" (Reinforcement paid for seperately)
Per L.ft
Per M
Per L.ft
Per M
Per L.ft
Per M
Per L.ft
Per M
Per Stone
LabourCost
Mason Day 1.75 1,200.00
Carpenter Day 1.00 1,200.00
Labour Day 8.50 650.00
Rendering
Mason Day 0.75 1,200.00
Labour Day 1.50 650.00
Per Sqr
Per M2
LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 4.00 81.25
Rendering
Mason Hrs 1.00 150.00
Labour Hrs 1.00 81.25
Per Sq.ft
Per M2
LabourCost
Mason Day 0.75 1,200.00
Labour Day 0.75 650.00
Per Stone
LabourCost
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25
Per Stone
LabourCost
Smith Hrs 0.50 150.00
Mason Hrs 2.00 150.00
Labour Hrs 2.00 81.25
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 6.00 650.00
Basket 0.66 75.00
Per Cube
Per M3
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 6.00 650.00
Per Cube
Per M3
27 Cement concrete as per Item 26 in 1st
floor.
As per Item 26
Labour Day 2.00 650.00
Per Cube
Per M3
As per Item 26
Labour Day 5.00 650.00
Per Cube
Per M3
Labour Cost
Mason Day 2.50 1,200.00
Labour Day 16.00 650.00
Per Cube
Per M3
As per Item 29
Labour Day 2.00 650.00
Per Cube
Per M3
As per Item 29
Labour Day 5.00 650.00
Per Cube
Per M3
Labour Cost
Carpenter Day 1.00 1,200.00
Labour Day 3.00 650.00
Per Sqr
Per M2
Per Sq.ft
Per M2
Labour Cost
Carpenter Day 1.00 1,200.00
Labour Day 1.00 650.00
Per Sq.ft
Per M2
Labour Cost
Mason Day 2.00 1,200.00
Labour Day 16.00 650.00
Basket 0.66 75.00
Per Cube
Per M3
Per Cube
Per M3
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 24.00 650.00
Per Sqr
Per M2
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 25.00 650.00
Per Sqr
Per M2
39 Drains semi circular in cement concrete
1:3:6 (1" ), 9" wide and 9" average depth,
3" thick sides and base, inclusive of 1/2"
cement rendering 1:3 with necessary
expansion joints and excavation, but
without ramp.
Labour Cost
Mason Day 1.00 1,200.00
Labour Day 1.50 650.00
Per L.ft
Per M
Per L.ft
Per M
Labour Cost
Skilled Labour Day 0.33 1,200.00
Unskilled Labour Day 2.00 650.00
Labour Cost
Skilled Labour Day 0.125 1,200.00
Unskilled Labour Day 0.25 650.00
Per Sqr
Per M2
Labour Cost
Skilled Labour Day 0.125 1,200.00
Unskilled Labour Day 0.75 650.00
Per Sqr
Per M2
Per Sqr
Per M2
Labour Cost
Vibrator operator Hrs 0.50 81.25
Mason (2 x 1/2 day) Hrs 1.00 150.00
Labour (4 x 1/2 day) Hrs 2.00 81.25
Carpenter Hrs 0.50 150.00
Rate per M3
Per Cube
Per M3
STEEL FABRICATOR
Labour Cost
Steel Fabricator Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Labour Cost
Steel Fabricator Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per Cwt.
Per kg
BRICK MASONRY
Labour Cost
Mason Day 3.00 1,200.00
Labour Day 4.00 650.00
Per Cube
Per M3
Labour Cost
Mason Day 3.00 1,200.00
Labour Day 4.00 650.00
Rate per Cube
Per Cube
Per M3
Labour Cost
Mason Day 1.50 1,200.00
Labour Day 2.00 650.00
Scaffolding ( Add 5%)
Per Sqr
Per M2
Labour Cost
Mason Day 2.25 1,200.00
Labour Day 3.75 650.00
Scaffolding ( Add 3%)
Per Sqr
Per M2
Labour Cost
Mason Day 3.50 1,200.00
Labour Day 5.50 650.00
Scaffolding ( Add 2%)
Per Sqr
Per M2
Labour Cost
Mason Day 2.25 1,200.00
Labour Day 3.00 650.00
Scaffolding ( Add 3%)
Per Sqr
Per M2
Labour Cost
Mason Day 1.50 1,200.00
Labour Day 2.00 650.00
Scaffolding ( Add 5%)
Per Sqr
Per M2
Labour Cost
Mason Day 2.25 1,200.00
Labour Day 3.75 650.00
Scaffolding ( Add 3%)
Per Sqr
Per M2
Labour Cost
Mason Day 3.75 1,200.00
Labour Day 5.50 650.00
Scaffolding ( Add 2%)
Per Sqr
Per M2
Labour Cost
Mason Day 5.00 1,200.00
Labour Day 3.50 650.00
Per Sqr
Per M2
11 3" thick floor paved in lime mortar 2:5 in
ground floor.
Labour Cost
Mason Day 1.25 1,200.00
Labour Day 2.50 650.00
Per Sqr
Per M2
Labour Cost
Mason Day 0.50 1,200.00
Labour Day 0.50 650.00
Per L.ft
Per M
Labour Cost
Mason Day 1.75 1,200.00
Labour Day 1.25 650.00
Labour Cost
Mason Day 1.50 1,200.00
Labour Day 1.25 650.00
Per L.ft
Per M
Per Sqr
Per M2
Per Sqr
Per M2
RUBBLE MASONRY
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 6.00 650.00
Per Cube
Per M3
Labour Cost
Mason Day 2.50 1,200.00
Labour Day 7.50 650.00
Scaffolding - Add 3%.
Per Cube
Per M3
TILING
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour to polishing Day 0.50 650.00
Per Sqr
Per M2
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour for cleaning Day 0.25 650.00
Per Sqr
Per M2
Labour Cost
Mason Day 5.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour to polishing Day 0.50 650.00
Rate per Sqr
Per Sqr
Per M2
Labour Cost
Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour for cleaning Day 0.25 650.00
Per Sqr
Per M2
Labour Cost
Special Mason Day 4.00 1,200.00
Labour Day 4.00 650.00
Unskilled labour for polishing Day 0.25 650.00
Per Sqr
Per M2
ROOF PLUMBING
1 Timber frame work for calicut pattern tile
hip roof in single storey building
consisting of wall plate, beam, ridge plate,
rafters etc. ( Preservative treatment to be
measured seperately)
Labour Cost
Carpenter Day 7.00 1,200.00
Unskilled Labour Day 8.00 650.00
Per Sqr
Per M2
Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00
Per Sqr
Per M2
Labour Cost
Carpenter Day 2.50 1,200.00
Unskilled Labour Day 3.00 650.00
Rate per 3.6 Sqr
Rate per Sqr
Per Sqr
Per M2
Labour Cost
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 2.00 650.00
Per Sqr
Per M2
Labour Cost
Unskilled Labour Day 2.00 650.00
Per Sqr
Per M2
Labour Cost
Carpenter Day 0.50 1,200.00
Unskilled Labour Day 0.25 650.00
Rate per 13' 4" L.ft
Rate per L.ft
Per L.ft
Per M
Labour Cost
Mason Day 0.25 1,200.00
Unskilled Labour Day 0.25 650.00
Per L.ft
Per M
Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00
Scaffolding 5%
Per L.ft
Per M
Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00
Scaffolding 5%
Per L.ft
Per M
ROOF PLUMBING
Labour Cost
a) Fixing boarding and applying wood
preservative
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
c) Building Sides
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per L.ft
Per M
11 20 B.W.G (1.2 mm) galvernized iron
flashing 1' 6" girth overall 3 bent with
end laps not less than 6" lead solder,
turned and tucked up to not less than 6"
into chase cut in wall and pointed in
cement mortar 1:2 lower end dressed over
roof covering not less than 1' 0" wide.
Labour Cost
Cutting, bending, soldering and fixing
Tinker Day 0.50 1,200.00
Mason Day 0.125 1,200.00
Unskilled Labour Day 0.75 650.00
Per L.ft
Per M
Labour Cost
Plumber Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Scaffolding Add 5%
Per L.ft
Per M
Per No.
Labour Cost
Plumber Day 0.125 1,200.00
Unskilled Labour Day 0.125 650.00
Scaffolding Add 5%
Per No.
Labour Cost
Plumber Day 0.063 1,200.00
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%
Per No.
Per L.ft
Per M
Labour Cost
Plumber Day 0.063 1,200.00
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%
Per No.
Labour Cost
Plumber Day 0.063 1,200.00
Unskilled Labour Day 0.063 650.00
Scaffolding Add 5%
Per No.
Labour Cost
Carpenter Day 2.50 1,200.00
Mason Day 0.50 1,200.00
Unskilled Labour Day 1.50 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
Labour Cost
Carpenter Day 1.50 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
Labour Cost
Making holes, fixing joists and making good
Mason Day 1.00 1,200.00
Carpenter Day 1.00 1,200.00
Unskilled Labour Day 3.00 650.00
Ceiling boards
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 4.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
Labour Cost
Carpenter Day 3.00 1,200.00
Unskilled Labour Day 6.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
Labour Cost
Carpenter Day 5.00 1,200.00
Unskilled Labour Day 1.50 650.00
Per Sq.ft
Per M2
Labour Cost
Carpenter Day 6.00 1,200.00
Unskilled Labour Day 2.00 650.00
Per Sq.ft
Per M2
Labour Cost
Carpenter Day 0.75 1,200.00
Unskilled Labour Day 0.37 650.00
Mason (Fixing frame) Day 0.25 1,200.00
Unskilled Labour (Fixing frame) Day 0.25 650.00
Labour Cost
Carpenter Day 2.25 1,200.00
Unskilled Labour Day 1.00 650.00
Mason (Fixing frame) Day 0.75 1,200.00
Unskilled Labour (Fixing frame) Day 0.75 650.00
Per Sq.ft
Per M2
Labour Cost
Carpenter Day 6.00 1,200.00
Unskilled Labour Day 2.50 650.00
Mason (Fixing frame) Day 0.50 1,200.00
Unskilled Labour (Fixing frame) Day 0.50 650.00
Per Sq.ft
Per M2
BRASS FOUNDER
1 Bolts, Casement fasteners or stays,
removed and refixed including making
good to holes in frames and sashes
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.33 150.00
Per No.
Labour Cost
Carpenter Hrs 0.33 150.00
Per No.
Per No.
Labour Cost
Carpenter Hrs 0.33 150.00
Per No.
Labour Cost
Carpenter Hrs 0.33 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Rate per No.
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
18 Casement fasteners, brass, with morruce
oblate, polished heavy quality supplied
and fixed with brass screws.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Rate per No.
Per No.
Labour Cost
Carpenter Hrs 0.25 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
25 Hat Hooks, brass, supplied and fixed with
brass screws.
Labour Cost
Carpenter Hrs 0.50 150.00
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
Per No.
Labour Cost
Carpenter Hrs 1.00 150.00
Labour Hrs 1.00 81.25
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Per No.
Labour Cost
Carpenter Hrs 0.75 150.00
Labour Hrs 0.75 81.25
Rate per No.
Per No.
Labour Cost
Carpenter Hrs 1.50 150.00
Per No.
Labour Cost
Carpenter Hrs 1.50 150.00
Per No.
Labour Cost
Carpenter Hrs 1.50 150.00
Per No.
38 Locks, rim 5" single lever of best quality
Local Manufacture, supplied and fixed.
Labour Cost
Carpenter Hrs 1.50 150.00
Per No.
Labour Cost
Carpenter Hrs 2.00 150.00
Per No.
Labour Cost
Carpenter Day 0.50 1,200.00
Per No.
Labour Cost
Carpenter Day 1.00 1,200.00
Rate per No.
Per No.
Labour Cost
Carpenter Day 0.50 1,200.00
Per No.
Labour Cost
Carpenter Day 1.00 1,200.00
Per No.
PLASTERING
LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.75 650.00
Scaffolding - Add 3%
LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.50 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 2.50 1,200.00
Unskilled Labour Day 2.50 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.25 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Mason Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
7 1/2" thick rendering in cement and sand
1:3 finished smooth.
LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour (Curing) Day 1.50 650.00
Per Sqr
Per M2
LabourCost
Mason Day 1.00 1,200.00
Unskilled Labour Day 1.50 650.00
Unskilled Labour (Curing) Day 0.25 650.00
Per Sqr
Per M2
LabourCost
Mason Day 1.25 1,200.00
Unskilled Labour Day 2.00 650.00
Unskilled Labour (Curing) Day 0.25 650.00
LabourCost
Mason Day 1.25 1,200.00
Unskilled Labour Day 2.00 650.00
Unskilled Labour (Curing) Day 0.25 650.00
Per Sqr
Per M2
LabourCost
Mason Day 1.25 1,200.00
Unskilled Labour Day 2.00 650.00
Unskilled Labour (Curing) Day 0.25 650.00
Per Sqr
Per M2
LabourCost
Mason Day 0.375 1,200.00
Unskilled Labour Day 0.312 650.00
Per L.ft
Per M
LabourCost
Painter Day 0.75 1,200.00
Unskilled Labour Day 0.50 650.00
Per Sqr
Per M2
LabourCost
Painter Day 1.50 1,200.00
Unskilled Labour Day 1.50 650.00
Per Sqr
Per M2
3 Apply one coat of anti-corrosive primer
and two coats of enamel paint on already
shop primed and erected steel roof truss.
LabourCost
Painter Day 2.50 1,200.00
Unskilled Labour Day 1.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 0.50 1,200.00
Unskilled Labour Day 0.75 650.00
Per Sqr
Per M2
LabourCost
Painter Day 1.50 1,200.00
LabourCost
Painter Day 0.50 1,200.00
Per Sqr
Per M2
LabourCost
Painter Day 1.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per Sqr
Per M2
LabourCost
Painter Day 2.50 1,200.00
Unskilled Labour Day 2.50 650.00
Scaffolding - Add 3%
Rate per 10.0 Sqr
Rate per Sqr
Per Sqr
Per M2
LabourCost
Painter Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 1.25 1,200.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 0.75 1,200.00
Scaffolding - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 1.75 1,200.00
Scaffolding - Add 3%
Per Sqr
Per M2
Per Sqr
Per M2
LabourCost
Unskilled Labour Hrs 3.00 81.25
Per Sqr
Per M2
LabourCost
Painter Day 1.25 1,200.00
Scaffoldings - Add 3%
Per Sqr
Per M2
LabourCost
Painter Day 1.25 1,200.00
Scaffoldings - Add 3%
Per Sqr
Per M2
LabourCost
Laying Concrete Bedding
Unskilled Labour Day 1.50 650.00
Laying and testing pipes
Plumber Day 2.00 1,200.00
Unskilled Labour Day 2.00 650.00
Back filling
Unskilled Labour Day 2.50 650.00
Per L.ft
Per M
Per L.ft
Per M
LabourCost
Plumber Day 0.25 1,200.00
Unskilled Labour Day 0.25 650.00
Scaffolding - Add 5%
Per L.ft
Per M
Labour Cost
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Rate per No.
Per No.
Labour Cost
Mason Day 1.50 1,200.00
Unskilled Labour Day 2.50 650.00
Per No.
Labour Cost
Mason Day 0.50 1,200.00
Unskilled Labour Day 1.00 650.00
Labour Cost
Mason Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per No.
Labour Cost
Mason Day 0.25 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per No.
Labour Cost
Mason Day 0.50 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per No.
Labour Cost
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per No.
Labour Cost
Mason Day 0.25 1,200.00
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per No.
LabourCost
Plumber Hrs 1.00 150.00
Unskilled Labour Hrs 1.00 81.25
Per L.ft
Per M
LabourCost
Plumber Hrs 1.00 150.00
Unskilled Labour Hrs 1.00 81.25
Per L.ft
Per M
LabourCost
Plumber Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per L.ft
Per M
Per L.ft
Per M
LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00
Per L.ft
Per M
LabourCost
Plumber Day 0.75 1,200.00
Unskilled Labour Day 0.75 650.00
Per L.ft
Per M
LabourCost
Plumber Day 1.00 1,200.00
Unskilled Labour Day 1.00 650.00
Per L.ft
Per M
LabourCost
Unskilled Labour Day 2.25 650.00
Per L.ft
Per M
LabourCost
Mason Day 3.00 1,200.00
Unskilled Labour Day 3.00 650.00
Per L.ft
Per M
10 Chasing brick work for laying 1 1/2" to 3"
dia. PVC pipes in ground or floor and
making good average depth 3" (Pipes and
specials paid seperately)
LabourCost
Mason Day 3.50 1,200.00
Unskilled Labour Day 3.50 650.00
Per L.ft
Per M
Labour Cost
Plumber Hrs 2.00 150.00
Per No.
Labour Cost
Plumber Hrs 2.00 150.00
Per No.
13 1" dia. PVC specials viz - elbows, bends,
sockets (Type 1000)
Labour Cost
Plumber Hrs 2.00 150.00
Per No.
Labour Cost
Plumber Hrs 2.00 150.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Labour Cost
Plumber Day 0.50 1,200.00
Per No.
Per No.
Labour Cost
Plumber Day 1.00 1,200.00
Per No.
Labour Cost
Plumber Day 1.50 1,200.00
Per No.
Labour Cost
Plumber Day 1.50 1,200.00
LabourCost
Plumber Hrs 1.50 150.00
Unskilled Labour Hrs 1.50 81.25
Per L.ft
Per M
LabourCost
Plumber Hrs 1.50 150.00
Unskilled Labour Hrs 1.50 81.25
Per L.ft
Per M
LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25
Rate per 100.0 L.ft
Rate per L.ft
Per L.ft
Per M
LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25
Per L.ft
Per M
LabourCost
Plumber Hrs 2.00 150.00
Unskilled Labour Hrs 2.00 81.25
Per L.ft
Per M
LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 650.00
Plumber Hrs 3.00 150.00
Unskilled Labour Hrs 3.00 81.25
Per L.ft
Per M
LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 1.00 81.25
Per L.ft
Per M
LabourCost
Excavating 1 1/2 days labour Day 1.5 650.00
Return fill in 3/4 day labour Day 0.75 650.00
Plumber Hrs 3.00 150.00
Unskilled Labour Hrs 3.00 81.25
Per L.ft
Per M
Per L.ft
Per M
LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 4.00 81.25
Per L.ft
Per M
LabourCost
Plumber Hrs 4.00 150.00
Unskilled Labour Hrs 4.00 81.25
Per L.ft
Per M
GLAZIER
LabourCost
Glazier Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per Sq.ft
Per M2
LabourCost
Glazier Day 0.50 1,200.00
Unskilled Labour Day 0.50 650.00
Per Sq.ft
Per M2
2005
6,500.00
6,500.00
6,500.00
650.00
650.00
70.00
1,056.25
1,056.25
1,056.25
1,056.00
373.00
650.00
650.00
650.00
650.00
230.00
1,462.50
1,462.50
1,462.50
1,463.00
517.00
2,275.00
2,275.00
2,275.00
2,275.00
804.00
1,950.00
1,950.00
1,950.00
1,950.00
689.00
1,625.00
1,625.00
1,625.00
1,625.00
574.00
1,200.00
1,300.00
2,500.00
2,500.00
2,500.00
883.00
1,800.00
975.00
693.75
3,468.75
3,468.75
346.88
347.00
325.00
325.00
325.00
325.00
35.00
650.00
650.00
650.00
650.00
230.00
812.50
812.50
812.50
813.00
287.00
1,300.00
1,300.00
1,300.00
1,300.00
459.00
1,300.00
1,300.00
1,300.00
1,300.00
459.00
1,625.00
325.00
975.00
2,925.00
2,925.00
2,925.00
315.00
1,200.00
1,950.00
3,150.00
3,150.00
21.00
21.00
2,400.00
3,900.00
6,300.00
6,300.00
42.00
42.00
9,600.00
13,000.00
22,600.00
22,600.00
50.22
50.00
1,200.00
5,200.00
6,400.00
6,400.00
2,261.00
6,400.00
1,600.00
8,000.00
8,000.00
8,000.00
2,827.00
1,200.00
5,200.00
6,400.00
6,400.00
2,261.00
6,400.00
1,600.00
8,000.00
8,000.00
8,000.00
2,827.00
1,200.00
5,200.00
6,400.00
6,400.00
2,261.00
6,400.00
1,600.00
8,000.00
8,000.00
8,000.00
2,827.00
300.00
81.25
381.25
381.25
38.13
38.00
125.00
300.00
81.25
381.25
381.25
38.13
38.00
125.00
108.00
58.50
166.50
166.50
1,200.00
650.00
1,850.00
1,850.00
185.00
185.00
607.00
600.00
650.00
600.00
325.00
2,175.00
2,175.00
217.50
218.00
715.00
300.00
162.50
300.00
162.50
925.00
925.00
92.50
93.00
305.00
300.00
162.50
300.00
162.50
925.00
925.00
92.50
93.00
305.00
450.00
243.75
600.00
650.00
1,943.75
1,943.75
129.58
130.00
427.00
600.00
325.00
600.00
650.00
2,175.00
2,175.00
145.00
145.00
476.00
600.00
325.00
600.00
650.00
2,175.00
2,175.00
145.00
145.00
476.00
600.00
325.00
750.00
812.50
2,487.50
2,487.50
165.83
166.00
545.00
900.00
487.50
1,200.00
1,300.00
3,887.50
3,887.50
194.38
194.00
637.00
300.00
162.50
462.50
462.50
115.63
116.00
2,100.00
1,200.00
5,525.00
900.00
975.00
10,700.00
10,700.00
10,700.00
1,152.00
300.00
325.00
150.00
81.25
856.25
856.25
57.08
57.00
614.00
900.00
487.50
1,387.50
1,387.50
138.75
139.00
300.00
162.50
462.50
462.50
46.25
46.00
75.00
300.00
162.50
537.50
537.50
1,200.00
3,900.00
49.50
5,149.50
5,149.50
5,150.00
1,820.00
1,200.00
3,900.00
5,100.00
5,100.00
1,802.00
5,100.00
1,300.00
6,400.00
6,400.00
6,400.00
2,261.00
5,100.00
3,250.00
8,350.00
8,350.00
8,350.00
2,951.00
3,000.00
10,400.00
13,400.00
13,400.00
6,700.00
6,700.00
2,367.00
6,700.00
1,300.00
8,000.00
2,800.00
10,800.00
10,800.00
3,816.00
6,700.00
3,250.00
9,950.00
9,950.00
9,950.00
3,516.00
1,200.00
1,950.00
3,150.00
3,150.00
3,150.00
339.00
450.00
243.75
693.75
693.75
57.81
58.00
624.00
1,200.00
650.00
1,850.00
1,850.00
23.13
23.00
248.00
2,400.00
10,400.00
49.50
12,849.50
12,849.50
12,850.00
4,541.00
12,849.50
1,300.00
14,149.50
4,952.33
19,101.83
19,102.00
6,750.00
4,800.00
15,600.00
20,400.00
20,400.00
2,550.00
2,550.00
274.00
4,800.00
16,250.00
21,050.00
21,050.00
2,631.25
2,631.00
283.00
1,200.00
975.00
2,175.00
2,175.00
217.50
218.00
715.00
Amount
2,175.00
2,175.00
2,175.00
217.50
218.00
715.00
396.00
1,300.00
1,696.00
1,696.00
1,696.00
599.00
150.00
162.50
312.50
312.50
313.00
34.00
150.00
487.50
637.50
637.50
638.00
69.00
300.00
487.50
787.50
787.50
788.00
85.00
40.63
150.00
162.50
75.00
428.13
428.13
1,211.00
428.00
1,200.00
650.00
1,850.00
1,850.00
1,850.00
37.00
1,200.00
650.00
1,850.00
1,850.00
1,850.00
37.00
3,600.00
2,600.00
6,200.00
6,200.00
6,200.00
2,191.00
3,600.00
2,600.00
6,200.00
6,200.00
6,200.00
2,191.00
1,800.00
1,300.00
155.00
3,255.00
3,255.00
3,255.00
350.00
2,700.00
2,437.50
154.13
5,291.63
5,291.63
5,292.00
570.00
4,200.00
3,575.00
155.50
7,930.50
7,930.50
7,931.00
854.00
2,700.00
1,950.00
139.50
4,789.50
4,789.50
4,790.00
516.00
1,800.00
1,300.00
155.00
3,255.00
3,255.00
3,255.00
350.00
2,700.00
2,437.50
154.13
5,291.63
5,291.63
5,292.00
570.00
4,500.00
3,575.00
161.50
8,236.50
8,236.50
8,237.00
887.00
6,000.00
2,275.00
8,275.00
8,275.00
8,275.00
891.00
1,500.00
1,625.00
3,125.00
3,125.00
3,125.00
336.00
600.00
325.00
925.00
925.00
92.50
93.00
305.00
2,100.00
812.50
2,912.50
2,912.50
291.25
291.00
955.00
1,800.00
812.50
2,612.50
2,612.50
261.25
261.00
856.00
1,800.00
1,625.00
102.75
3,527.75
3,527.75
3,528.00
380.00
1,200.00
1,300.00
125.00
2,625.00
2,625.00
2,625.00
283.00
4,800.00
3,900.00
8,700.00
8,700.00
8,700.00
3,074.00
3,000.00
4,875.00
236.25
8,111.25
8,111.25
8,111.00
2,866.00
4,800.00
2,600.00
325.00
7,725.00
7,725.00
7,725.00
832.00
4,800.00
2,600.00
162.50
7,562.50
7,562.50
7,563.00
814.00
6,000.00
2,600.00
325.00
8,925.00
8,925.00
8,925.00
961.00
4,800.00
2,600.00
162.50
7,562.50
7,562.50
7,563.00
814.00
4,800.00
2,600.00
162.50
7,562.50
7,562.50
7,563.00
814.00
8,400.00
5,200.00
13,600.00
13,600.00
2,266.67
2,267.00
244.00
3,600.00
1,950.00
5,550.00
5,550.00
925.00
925.00
100.00
3,000.00
1,950.00
4,950.00
4,950.00
1,375.00
1,375.00
148.00
1,200.00
1,300.00
2,500.00
2,500.00
694.44
694.00
75.00
1,300.00
1,300.00
1,300.00
1,300.00
140.00
600.00
162.50
762.50
762.50
57.20
57.00
187.00
300.00
162.50
462.50
462.50
38.54
39.00
128.00
3,600.00
1,950.00
277.50
5,827.50
5,827.50
58.28
58.00
190.00
3,600.00
1,950.00
277.50
5,827.50
5,827.50
58.28
58.00
190.00
1,200.00
650.00
600.00
325.00
600.00
325.00
3,700.00
3,700.00
246.67
247.00
810.00
600.00
150.00
487.50
1,237.50
1,237.50
82.50
83.00
272.00
600.00
325.00
46.25
971.25
971.25
40.47
40.00
131.00
150.00
81.25
11.56
242.81
242.81
243.00
150.00
81.25
11.56
242.81
242.81
243.00
75.60
40.95
5.83
122.38
122.38
122.00
396.00
214.50
30.53
641.03
641.03
26.71
27.00
89.00
75.60
40.95
5.83
122.38
122.38
122.00
75.60
40.95
5.83
122.38
122.38
122.00
3,000.00
600.00
975.00
137.25
4,712.25
4,712.25
2,416.54
2,417.00
260.00
1,800.00
1,300.00
93.00
3,193.00
3,193.00
1,637.44
1,637.00
176.00
1,200.00
1,200.00
1,950.00
3,600.00
2,600.00
186.00
10,736.00
10,736.00
5,505.64
5,506.00
593.00
3,600.00
3,900.00
225.00
7,725.00
7,725.00
4,291.67
4,292.00
462.00
6,000.00
975.00
6,975.00
6,975.00
306.59
307.00
3,305.00
7,200.00
1,300.00
8,500.00
8,500.00
303.57
304.00
3,272.00
900.00
240.50
300.00
162.50
1,603.00
1,603.00
73.70
74.00
797.00
2,700.00
650.00
900.00
487.50
4,737.50
4,737.50
291.54
292.00
3,143.00
7,200.00
1,625.00
600.00
325.00
9,750.00
9,750.00
348.21
348.00
3,746.00
75.00
75.00
75.00
75.00
49.50
49.50
49.50
50.00
49.50
49.50
49.50
50.00
49.50
49.50
49.50
50.00
49.50
49.50
49.50
50.00
49.50
49.50
49.50
50.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
112.50
112.50
112.50
113.00
37.50
37.50
37.50
38.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
112.50
60.94
173.44
173.44
173.00
112.50
60.94
173.44
173.44
173.00
112.50
60.94
173.44
173.44
173.00
112.50
60.94
173.44
173.44
173.00
112.50
60.94
173.44
173.44
173.00
150.00
81.25
231.25
231.25
231.00
150.00
81.25
231.25
231.25
231.00
112.50
60.94
173.44
173.44
173.00
112.50
60.94
173.44
173.44
173.00
225.00
225.00
225.00
225.00
225.00
225.00
225.00
225.00
225.00
225.00
225.00
225.00
225.00
225.00
225.00
225.00
300.00
300.00
300.00
300.00
600.00
600.00
600.00
600.00
1,200.00
1,200.00
1,200.00
1,200.00
600.00
600.00
600.00
600.00
1,200.00
1,200.00
1,200.00
1,200.00
1,200.00
1,137.50
70.13
2,407.63
2,407.63
2,408.00
259.00
1,200.00
975.00
65.25
2,240.25
2,240.25
2,240.00
241.00
3,000.00
1,625.00
138.75
4,763.75
4,763.75
4,764.00
513.00
2,400.00
1,300.00
111.00
3,811.00
3,811.00
3,811.00
410.00
1,200.00
812.50
60.38
2,072.88
2,072.88
2,073.00
223.00
1,800.00
975.00
83.25
2,858.25
2,858.25
2,858.00
308.00
1,200.00
975.00
2,175.00
2,175.00
2,175.00
234.00
1,200.00
975.00
162.50
2,337.50
2,337.50
2,338.00
252.00
1,500.00
1,300.00
162.50
2,962.50
2,962.50
2,963.00
319.00
1,500.00
1,300.00
162.50
2,962.50
2,962.50
2,963.00
319.00
1,500.00
1,300.00
162.50
2,962.50
2,962.50
2,963.00
319.00
450.00
202.80
652.80
652.80
65.28
65.00
213.00
900.00
325.00
1,225.00
1,225.00
1,225.00
132.00
1,800.00
975.00
2,775.00
2,775.00
2,775.00
299.00
3,000.00
650.00
109.50
3,759.50
3,759.50
3,760.00
405.00
600.00
487.50
1,087.50
1,087.50
2,175.00
234.00
1,800.00
1,800.00
1,800.00
1,800.00
194.00
600.00
600.00
600.00
600.00
65.00
1,800.00
325.00
2,125.00
2,125.00
2,125.00
229.00
3,000.00
1,625.00
138.75
4,763.75
4,763.75
476.38
476.00
51.00
600.00
325.00
27.75
952.75
952.75
95.28
95.00
10.00
1,500.00
45.00
1,545.00
1,545.00
1,545.00
166.00
2,400.00
1,300.00
111.00
3,811.00
3,811.00
381.10
381.00
41.00
900.00
27.00
927.00
927.00
927.00
100.00
2,100.00
63.00
2,163.00
2,163.00
2,163.00
233.00
600.00
325.00
925.00
925.00
925.00
100.00
243.75
243.75
243.75
244.00
26.00
1,500.00
45.00
1,545.00
1,545.00
1,545.00
166.00
1,500.00
45.00
1,545.00
1,545.00
1,545.00
166.00
975.00
2,400.00
1,300.00
1,625.00
6,300.00
6,300.00
63.00
63.00
207.00
300.00
162.50
23.13
485.63
485.63
80.94
81.00
266.00
300.00
162.50
23.13
485.63
485.63
80.94
81.00
266.00
600.00
325.00
925.00
925.00
925.00
1,800.00
1,625.00
3,425.00
3,425.00
3,425.00
600.00
650.00
1,250.00
1,250.00
1,250.00
600.00
325.00
925.00
925.00
925.00
300.00
1,200.00
650.00
2,150.00
2,150.00
2,150.00
600.00
1,200.00
650.00
2,450.00
2,450.00
2,450.00
1,200.00
650.00
1,850.00
1,850.00
1,850.00
300.00
1,200.00
650.00
2,150.00
2,150.00
2,150.00
150.00
81.25
231.25
231.25
23.13
23.00
75.00
150.00
81.25
231.25
231.25
23.13
23.00
75.00
600.00
325.00
925.00
925.00
9.25
9.00
30.00
900.00
487.50
1,387.50
1,387.50
13.88
14.00
46.00
900.00
487.50
1,387.50
1,387.50
13.88
14.00
46.00
900.00
487.50
1,387.50
1,387.50
13.88
14.00
46.00
1,200.00
650.00
1,850.00
1,850.00
18.50
19.00
62.00
1,462.50
1,462.50
1,462.50
14.63
15.00
49.00
3,600.00
1,950.00
5,550.00
5,550.00
55.50
56.00
184.00
4,200.00
2,275.00
6,475.00
6,475.00
64.75
65.00
213.00
300.00
300.00
300.00
30.00
30.00
300.00
300.00
300.00
30.00
30.00
300.00
300.00
300.00
30.00
30.00
300.00
300.00
300.00
30.00
30.00
600.00
600.00
600.00
60.00
60.00
600.00
600.00
600.00
60.00
60.00
600.00
600.00
600.00
60.00
60.00
600.00
600.00
600.00
60.00
60.00
600.00
600.00
600.00
60.00
60.00
600.00
600.00
600.00
60.00
60.00
600.00
600.00
600.00
60.00
60.00
600.00
600.00
600.00
60.00
60.00
1,200.00
1,200.00
1,200.00
120.00
120.00
1,200.00
1,200.00
1,200.00
120.00
120.00
1,800.00
1,800.00
1,800.00
180.00
180.00
1,800.00
1,800.00
1,800.00
180.00
180.00
225.00
121.88
346.88
346.88
3.47
3.00
10.00
225.00
121.88
346.88
346.88
3.47
3.00
10.00
300.00
162.50
462.50
462.50
4.63
5.00
16.00
300.00
162.50
462.50
462.50
4.63
5.00
16.00
300.00
162.50
462.50
462.50
4.63
5.00
16.00
450.00
243.75
693.75
693.75
6.94
7.00
23.00
600.00
81.25
681.25
681.25
6.81
7.00
23.00
450.00
243.75
693.75
693.75
6.94
7.00
23.00
750.00
406.25
1,156.25
1,156.25
11.56
12.00
39.00
600.00
325.00
925.00
925.00
9.25
9.00
30.00
600.00
325.00
925.00
925.00
9.25
9.00
30.00
600.00
325.00
925.00
925.00
102.78
103.00
1,109.00
600.00
325.00
925.00
925.00
102.78
103.00
1,109.00