20mm Thick Open-Graded Premix Carpet Using Bituminous (Penetration Grade/modified Bitumen) Binder

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 149

DATA using Packed Bitumen

20mm thick Open-Graded Premix Carpet using Bituminous (penetration


grade/modified bitumen) Binder

Providing, laying and rolling of open-graded premix carpet of 20 mm thickness


composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen
or emulsion to required line, grade and level to serve as wearing course on a
previously prepared

Unit = sqm

Taking output = 500 sqm (10 cum)

a) Labour
1.08 Mate 178.00 day 192.24

21.00 Mazdoor (Unskilled) 155.00 day 3255.00

6.00 Mazdoor (Semi-Skilled) 173.00 day 1038.00

b)  Machinery 4485.24

4.00 Mixall 6/10 t capacity 1526.05 hour 6104.20


Bitumen boiler oil fired1000
4.00 litre capacity fitted with spray 160.00 hour 640.00
set
2.00 Three wheel 80-100 kN static roller 371.00 hour 742.00

7486.20

Km : 0 / 0 - 1 / 0 Km : 1 / 0 - 2 / 0 Km : 2 / 0 - 2 / 1

0.73 Bitumen (S-65) @ 14.60 kg per 41800.00 t 30514.00 41800.00 30514.00 41800.00 30514.00
Crushed stone chipping, 13.2
13.50 mm to 5.6 mm @ 0.27 cum 745.28 cum 10061.28 749.83 10122.71 754.38 10184.13
per 10 sqm
1.00 Labour 4485.24 4485.24 4485.24 4485.24 4485.24 4485.24

1.00 Machinery 7486.20 7486.20 7486.20 7486.20 7486.20 7486.20

Overheads @ 12.5% on (a+b+c) 6568.34 6576.02 6583.70

Cost of 500 sqm = a+b+c+d 59115.06 59184.17 59253.27

Rate per sqm = (a+b+c+d)/500 118.23 118.37 118.51

Page 1 of 149
Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the
specified levels, grade and cross fall using Type A, Type B and Type C as per Technical
Specification Clause 510
Unit = sqm

Taking output = 1100 sqm

a) Labour

1.15 Mate 178.00 day 204.70

1.00 Bitumen Sprayer 107.00 day 107.00

22.00 Mazdoor (Unskilled) 155.00 day 3410.00

6.00 Mazdoor (Semi-Skilled) 173.00 day 1038.00

b) Machinery 4759.70
Bitumen boiler oil fired, capacity 1000 litre fitted
2.20 160.00 hour 352.00
with spray set
2.20 Three wheel 80-100 kN static roller 371.00 hour 816.20

1168.20

Km : 0 / 0 - 1 / 0 Km : 1 / 0 - 2 / 0 Km : 2 / 0 - 2 / 1
Bitumen (S-65) @ 9.80 kg per
1.078 41800.00 t 45060.40 41800.00 45060.40 41800.00 45060.40
10 sqm

Crushed stone chipping of 6.7


mm size 100 per cent passing
9.90 11.2 mm sieve and retained 458.95 cum 4543.61 463.50 4588.65 468.05 4633.70
on 2.36 mm sieve applied @
0.09 cum per 10 sqm

1.00 Labour 4759.70 4759.70 4759.70 4759.70 4759.70 4759.70

1.00 Machinery 1168.20 1168.20 1168.20 1168.20 1168.20 1168.20

Overheads @ 12.5% on (a+b+c) 6941.49 6947.12 6952.75

Cost of 1100 sqm = a+b+c+d 62473.40 62524.07 62574.75

Rate per sqm = (a+b+c+d)/1100 56.79 56.84 56.89

Page 2 of 149
DATA using Bituminous Emulsion

20mm thick Open-Graded Premix Carpet using Bitumen Emulsion as per


5.1 508.2
Technical Specification clause 508.2 .
Unit = sqm

Taking output = 900 sqm (24.3 cum)

a) Labour

0.80 Mate #REF! day #REF!

18.00 Mazdoor (Unskilled) #REF! day #REF!

2.00 Mazdoor (Skilled) #REF! day #REF!


b)  Machinery #REF!

6.00 Concrete Mixer 0.4/0.28 Cum capacity 188.00 hour 1128.00

3.60 Three wheel 80-100 kN static roller 371.00 hour 1335.60

2463.60

c) Material Km : 0 / 0 - 1 / 0
Bitumen Emulsion @ 21.50 kg
1.94 43700.00 t 84778.00
per 10 sqm
Crushed stone chipping, 13.2
24.30 mm to 5.6 mm @ 0.27 cum 745.28 cum 18110.30
per 10 sqm
1.00 Labour #REF! #REF!

1.00 Machinery 2463.60 2463.60

Overheads @ 12.5% on (a+b+c) #REF!

Cost of 900 sqm = a+b+c+d #REF!

Rate per sqm = (a+b+c+d)/900 #REF!

Page 3 of 149
Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the
specified levels, grade and cross fall using Type C as per Technical Specification
Clause 510
Unit = sqm

Taking output = 2700 sqm (24.3 cum)

a) Labour

0.80 Mate 178.00 day 142.40

18.00 Mazdoor (Unskilled) 155.00 day 2790.00

2.00 Mazdoor (Skilled) 173.00 day 346.00


b)  Machinery 3278.40

6.00 Concrete Mixer 0.4/0.28 Cum capacity 188.00 hour 1128.00

3.60 Three wheel 80-100 kN static roller 371.00 hour 1335.60


2463.60

c) Material Km : 0 / 0 - 1 / 0
Bitumen Emulsion @ 10 kg
2.70 43700.00 t 117990.00
per 10 sqm

Crushed stone chipping of 6.7


mm size 100 per cent passing
24.30 11.2 mm sieve and retained 458.95 cum 11152.49
on 2.36 mm sieve applied @
0.09 cum per 10 sqm

1.00 Labour 3278.40 3278.40

1.00 Machinery 2463.60 2463.60

Overheads @ 12.5% on (a+b+c) 16860.56

Cost of 2700 sqm = a+b+c+d 151745.05

Rate per sqm = (a+b+c+d)/2700 56.20

Page 4 of 149
TAMIL NADU RURAL EMPLOYMENT GUARANTEE SCHEME
MGNREGS 2018-19

Name of Block : Aundipatti

Name of Panchayat : Rengasamuthiram

Construction of Cement concrete check


dam at Rengasamuthiram supply channel
Name of Work :
near Muthumariamman kovil in
Rengasamuthiram Panchayat.

Estimate Amount : 4 50 000

Administrativ Sanction No. :

Technical Sanction No. :


THE MAHATHMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME
(MGNRGES) 2018-19

SPEICIFATION REPORT TO ACCOMPANY THE DETAILED PROJECT


Construction of Cement concrete check dam at Rengasamuthiram supply
Name of the Work
channel near Muthumariamman kovil in Rengasamuthiram Panchayat.

Estimate Amount: Rs: 4 50 000

District : Theni

Block : Aundipatti

Panchayat : Rengasamuthiram

Habitation : Rengasamuthiram

SF.No. :

The mahatma Gandhi National Rural Employment Gurantee Act 2005 was enacted to provide
for the enhancement of livelihood security of the house holders in rural area by providing at least 100 days
of guranteed employment in every finaci

The Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNRGES) is being
implemented in Tamil Nadu from 02-02-2006.

The supplementary guidelines are issued by the Director of Rural Development and Panchayat
Raj, Chennai in D.O.Lr.No. 43857/2006/tregs-1 Dt: 17-07-2006 for speedy implementation of this
programme.

Description of Work Proposed;

1 Earth work Excavation in all clases of soils with an initial lead and lift as per SS 20B.

Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all
2 labour charges

3 Centering and shuttering charges for masonry wall side work

Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all
4 labour charges

5 Provision for Citizen information Board and photographic charges.

6 Provision Labour welfare Fund @ 1%

7 Contigencies and other unforeseen items

Cost of Estimate;

The Estimate cost works out to Rs.4.50 Lakhs The Assets created under MGNREGS will be
maintained by concerned Panchayat Union / Village Panchayat
Rate Adopted:
The Estimate has been prepared based on the Rural Schedule of Rate which has been
approved in G.O.Ms. No.26 RD & Panchayat Raj (CGS-1). Dept. Dt: for the unskilled labour oriented
work exclusively for The Mahatma Gandhi National Rural Employment Gurantee Scheme and PWD of
Rates for the Year 2018-19
ABSTRACT ESTIMATE
Name of Work : Construction of Cement concrete check dam at Rengasamuthiram
supply channel near Muthumariamman kovil in Rengasamuthiram Panchayat.

Name of Scheme: MGNREGS 2018-19

Sl.No. QTY DESCRIPTION OF WORK RATE UNIT

Earth Work excavation and depositing on bank


1 with in initial lead of 10m and lift of 2m in hard
gravelly soil as per SS 20B for foundation

17.64 a)0-0.30m 213.79 Cum 3771

17.64 b)0.30-0.60m 263.91 Cum 4655

30.34 c)0.60-above 274.10 Cum 8316

Cement concrete 1:4:8 mix using 40mm ISS


metal fincluding cost and conveyance of all
2 16.82 materials to site and all labour charges for 2898.82 Cum 48758
mixing laying and curing etc., completed for
foundation.

Centering and shuttering charges for Culvert


3 160.79 side work including cost and conveyance of all 297.50 Sqm 47835
labour charges

Cement concrete 1:3:6 mix using 40mm ISS


metal fincluding cost and conveyance of all
4 84.05 materials to site and all labour charges for 3137.89 Cum 263740
mixing laying and curing etc., completed for
foundation.

CC 1:2 :4 mix using 20 mm iSS metal including


cost and conveyance if all materials to site and
5 2.70 3943.62 Cum 10648
all labour charges for mixing laying finishing
and curing etc., completed.

Rough stone dry packing using rough


stone,wedges, including cost and conveyance if
6 2.59 all materials to site and all labour charges for 1238.30 Cum 3207
mixing laying finishing and curing etc.,
completed.
Sl.No. QTY DESCRIPTION OF WORK RATE UNIT

Re-filling with excavated earth and all other


7 23.81 labour charges as per standard specification 22.20 Cum 529
etc.

8 L.S Renovation of Supply channel SUB ESTIMATE 0

9 L.S Provision for Citizen Information board L.S 4500

10 L.S Provision for GST @12% L.S 44966

11 L.S Provision for LWF @1% L.S 4500

12 L.S Provision for Photographic charges L.S 500

13 L.S Contingencies L.S 4075

TOTAL 450000
DETAILED ESTIMATE

Name of Work : Construction of Cement concrete check dam at Rengasamuthiram


supply channel near Muthumariamman kovil in Rengasamuthiram Panchayat.

Name of Scheme: MGNREGS 2018-19 Estimate Amount:Rs. 450000

Sl.No. Description of work Nos. L B D Quantity

Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in
1
hard gravelly soil as per SS 20B for foundation

for 0-0.30m depth

a Abutment,wing wall 1 x 2 9.45 1.90 0.30 10.77

D/S Stone talus Wing wall 1 x 2 2.95 1.60 0.30 2.83

Anchorage wall 1 x 2 0.33 0.90 0.30 0.18

Body wall 1 x 1 3.90 2.10 0.30 2.46

Cut off wall-1 1 x 1 3.90 0.60 0.30 0.70

Cut off wall-2 1 x 1 3.90 0.60 0.30 0.70

17.64

for 0.30-0.60m depth

b Abutment,wing wall 1 x 2 9.45 1.90 0.30 10.77

D/S Stone talus Wing wall 1 x 2 2.95 1.60 0.30 2.83

Anchorage wall 1 x 2 0.33 0.90 0.30 0.18

Body wall 1 x 1 3.90 2.10 0.30 2.46

Cut off wall-1 1 x 1 3.90 0.60 0.30 0.70

Cut off wall-2 1 x 1 3.90 0.60 0.30 0.70

17.64

for 0.60-above

c Abutment,wing wall 1 x 2 9.45 1.90 0.50 17.96


Sl.No. Description of work Nos. L B D Quantity

D/S Stone talus Wing wall 1 x 2 2.95 1.60 0.50 4.72

Anchorage wall 1 x 2 0.33 0.90 0.50 0.29

Body wall 1 x 1 3.90 2.10 0.60 4.91

Cut off wall-1 1 x 1 3.90 0.60 0.55 1.29

Cut off wall-2 1 x 1 3.90 0.60 0.50 1.17

30.34

Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all
2 materials to site and all labour charges for mixing laying and curing etc., completed for
foundation.

Abutment,wing wall 1 x 2 9.45 1.90 0.20 7.18

D/S Stone talus Wing wall 1 x 2 2.95 1.60 0.20 1.89

Anchorage wall 1 x 2 0.33 1.90 0.20 0.25

Body wall 1 x 1 3.90 2.10 0.20 1.64

Cut off wall-1 1 x 1 3.90 0.60 0.10 0.23

Cut off wall-2 1 x 1 3.90 0.60 0.10 0.23

D/S apron 1 x 1 4.50 4.00 0.30 5.40

Total Quantity 16.82

Centering and shuttering charges for retaining wall side work including cost and
3
conveyance of all labour charges

Ist Footing

Abutment,wing wall 2 x 2 9.45 0.45 17.01

D/S Stone talus Wing wall 2 x 2 2.95 0.45 5.31

Anchorage wall 2 x 2 0.43 0.45 0.77

Body wall, 1 x 2 4.10 0.45 3.69

Cut off wall-1 1 x 2 4.10 0.45 3.69


Sl.No. Description of work Nos. L B D Quantity

Cut off wall-2 1 x 2 4.10 0.45 3.69


Sl.No. Description of work Nos. L B D Quantity

2nd Footing

Abutment,wing wall 2 x 2 9.45 0.45 17.01

D/S Stone talus Wing wall 2 x 2 2.95 0.45 5.31

Anchorage wall 2 x 2 0.53 0.45 0.95

Body wall 1 x 2 4.30 0.45 3.87

Cut off wall-1 1 x 2 4.30 0.45 3.87

Cut off wall-2 1 x 2 4.30 0.45 3.87

super structure

Abutment wall 2 x 2 5.00 1.60 32.00

D/S wing wall(1.60+1.35)/2=1.475 2 x 2 4.45 1.48 26.34

D/S Stone talus Wing wall 2 x 2 2.95 1.15 13.57

Body wall 1 x 2 4.50 1.10 9.90

Anchorage wall(0.605+1.00)/2=0.8025 2 x 2 0.80 0.80 2.56

Anchorage wall(1.00+1.35)/2=1.175 2 x 2 1.18 0.80 3.78

Cut off wall-1 1 x 2 4.50 0.30 2.70

Cut off wall-2 1 x 2 4.50 0.10 0.90

Total Quantity 160.79

Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all
4 materials to site and all labour charges for mixing laying and curing etc., completed for
foundation.

Ist Footing

Abutment,wing wall 2 x 1 9.45 1.70 0.45 14.46

D/S Stone talus Wing wall 2 x 1 2.95 1.40 0.45 3.72

Anchorage wall 2 x 1 0.43 0.75 0.45 0.29


Sl.No. Description of work Nos. L B D Quantity

Body wall 1 x 1 4.10 1.90 0.45 3.51

Cut off wall-1 1 x 1 4.10 0.45 0.45 0.83

Ccut off wall-2 1 x 1 4.10 0.45 0.45 0.83

2nd Footing

Abutment,wing wall 2 x 1 9.45 1.50 0.45 12.76

D/S Stone talus Wing wall 2 x 1 2.95 1.20 0.45 3.19

Anchorage wall 2 x 1 0.53 0.75 0.45 0.35

Body wall 1 x 1 4.30 1.70 0.45 3.29

Cut off wall-1 1 x 1 4.30 0.45 0.45 0.87

Ccut off wall-2 1 x 1 4.30 0.45 0.45 0.87

super structure

Abutment wall(1.35+0.45)/2=0.90 2 x 1 5.00 0.900 1.60 14.40

D/S wing wall (1.35+0.45)/2=0.90 &


2 x 1 4.45 0.900 1.480 11.85
(1.60+1.35)/2=1.475

D/S Stone talus Wing wall


2 x 1 2.95 0.730 1.150 4.95
(1.00+0.45)/2=0.73

Body wall,(1.60+0.60)/2=1.10 1 x 1 4.50 1.10 1.10 5.45

Anchorage wall(0.605+1.00)/2=0.8025 1 x 2 0.80 0.600 0.80 0.77

Anchorage wall(1.00+1.35)/2=1.175 1 x 2 1.18 0.450 0.80 0.85

Cut off wall-1 1 x 1 4.50 0.45 0.30 0.61

Ccut off wall-2 1 x 1 4.50 0.45 0.10 0.20

84.05

CC 1:2 :4 mix using 20 mm iSS metal including cost and conveyance if all materials to site
5
and all labour charges for mixing laying finishing and curing etc., completed.

Apron 1 x 1 4.50 4.00 0.15 2.70

2.70
Sl.No. Description of work Nos. L B D Quantity

Rough stone dry packing using rough stone,wedges, including cost and conveyance if all
6 materials to site and all labour charges for mixing laying finishing and curing etc.,
completed.

Loose Talese 1 x 1 4.50 2.50 0.23 2.59

2.59

Re-filling with excavated earth and all other labour charges as per standard specification
7
etc.

Back Filling(0.70+2.50/=1.60 1 x 2 12.40 1.60 0.60 23.81

8 Renovation of Supply channel SUB ESTIMATE

9 Provision for Citizen Information Board LS

10 provision for GST @12% LS

11 provision for LWF @1% LS

12 Provision for Photographic charges LS

13 Contingencies LS
PAGE15

6 Rough stone dry packing for aprons and revetments including cost and
conveyance and all labour charges etc complete

11.00 cum Rough stone 470.72 /cum 5177.92


3.50 nos Wodders 334.28 /Each 1169.98
10.60 nos Mazdoor I class 355.00 /Each 3763.00
7.10 nos Mazdoor II class 320.00 /Each 2272.00
Add sundries 0.10
12383.00
RATE @RS 1238.30 /Sqm
DATA SHEET

G.O.(Ms)No.56 Rural Development and Panchayat Raj (CGS.1) Department Dated.17.04.2018.

SI.
Quantity Details Rate Per Amount
No

Clearing the light jungle and removed away


from the site including all cutting charges
1 Sqm 14.53 Sqm 14.53
and all labour charges as per standard
specification.

Earth work excavating and depositing on bank with initial lead of


10m and initial lift of 2m in hard stiff clay,stiff black cotton, hard
2
red earth , shales ,murram, gravel, stoney earth and earth mixed
with small size boulders and hard gravelly soil SS20B.

a) 1 Cum Upto 0.30m depth 213.79 Cum 213.79


b) 1 Cum for depth 0.30m to 0.60m 263.91 Cum 263.91
c) 1 Cum for depth above 0.60m 274.10 Cum 274.10
DATA PAGE17

Construction of Cement concrete check dam at Rengasamuthiram supply channel near


Name of work :
Muthumariamman kovil in Rengasamuthiram Panchayat.
COST OF MATERIALS AT SITE

loading
Sl.No Name of materials Lead in KM cost Conveyance Total
unloading

1 Cement 6 4391.00 36.12 0.00 4427.12


2 sand for mortar 11 168.00 104.43 0.00 272.43
3 sand for filling 11 168.00 104.43 0.00 272.43
4 Rough stone 6 413.00 57.72 0.00 470.72
5 Bond stone 6 595.00 57.72 0.00 652.72
6 40mm iss metal 6 929.00 57.72 0.00 986.72
7 20mm iss metal 6 1293.00 57.72 0.00 1350.72
8 10-12mm metal 6 1041.50 57.72 0.00 1099.22
9 steel 6 41390.00 36.12 0.00 41426.12
10 6-10mm metal 6 740.50 57.72 0.00 798.22
11 25 mm IRC metal 6 914.00 57.72 0.00 971.72
12 12 mm IRC metal 6 1231.00 57.72 0.00 1288.72
13 6 mm IRC metal 6 620.00 57.72 0.00 677.72
14 Rough stone for revetment 6 358.00 57.72 0.00 415.72
15 Cutstone roughly dressed 6 4060.00 57.72 0.00 4117.72
16 Gravel 6 188.00 57.72 0.00 245.72
17 Silveoak scantlings 0 14847.00 0.00 0.00 14847.00
18 Shell Lime 0 1248.00 0.00 0.00 1248.00
10mm metal 6 883.00 57.72 0.00 940.72
SUB DATA

CEMENT MORTAR 1:1.5


0.960 MT Cost of cement 4427.12 /MT 4250.04
1.00 cum Cost of sand 272.43 /cum 272.43
4522.47
CEMENT MORTAR 1:2
0.720 MT Cost of cement 4427.12 /MT 3187.53
1.00 cum Cost of sand 272.43 /cum 272.43
3459.96
CEMENT MORTAR 1:3
0.480 MT Cost of cement 4427.12 /MT 2125.02
1.00 cum Cost of sand 272.43 /cum 272.43
2397.45
1.00 cum Mixing charges 65.90 /cum 65.90
2463.35
CEMENT MORTAR 1:4
0.360 MT Cost of cement 4427.12 /MT 1593.76
1.00 cum Cost of sand 272.43 /cum 272.43
1866.19
1.00 cum Mixing charges 65.90 /cum 65.90
1932.09
CEMENT MORTAR 1:5
0.288 MT Cost of cement 4427.12 /MT 1275.01
1.00 cum Cost of sand 272.43 /cum 272.43
1547.44
1.00 cum Mixing charges 65.90 /cum 65.90
1613.34
CEMENT MORTAR 1:6
0.240 MT Cost of cement 4427.12 /MT 1062.51
1.00 cum Cost of sand 272.43 /cum 272.43
1334.94
1.00 cum Mixing charges 65.90 /cum 65.90
1400.84
PAGE18
DATA

Qty Items Rate Per Amount


1 Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
9.00 cum Cost of 40mm ISS metal 986.72 /cum 8880.48
4.50 cum Cost of cement mortar 1:3 2397.45 /cum 10788.53
1.80 nos Mason II class 508.00 /each 914.40
17.70 nos Mazdoor I class 355.00 /each 6283.50
14.10 nos Mazdoor II class 320.00 /each 4512.00
31378.91
RATE @ RS 3137.89 /cum

2 Cement concrete 1:2:4 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum

9.00 cum 20mm ISS metal 1350.72 /cum 12156.48


4.50 cum Cement mortar 1:2 3459.96 /cum 15569.82
1.80 nos Mason II class 508.00 /each 914.40
17.70 nos Mazdoor I class 355.00 /each 6283.50
14.10 nos Mazdoor II class 320.00 /each 4512.00
39436.20
RATE @RS 3943.62 /cum

3 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.

9.00 cum Cost of 40mm ISS metal 986.72 /cum 8880.48


4.50 cum Cost of cement mortar 1:4 1866.19 /cum 8397.86
1.80 nos Mason II class 508.00 /each 914.40
17.70 nos Mazdoor I class 355.00 /each 6283.50
14.10 nos Mazdoor II class 320.00 /each 4512.00
28988.24
RATE @ RS 2898.82 /cum

4 Supplying and erecting centering shuttering including necessary supports for plane
surface in foundation and basement and in all floors for R C C column footing
column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild
steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country
wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and
supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre
complete complying with standard specifications and as directed by departmental
officers including conveyance of all materials to site and proper centering etc complete.
Sub Data I
Cost of MS sheets & angles for each set
Weight of MS sheet B.G 10 Gauge size 90x60cm x 3.175 mm
3.175 x 7850/1000 = 24.924 kg/m2
24.924 Kg/m2 x 0.54 m2 = 13.46 Kg.
Weight of MS angle size 25 x 25 x 3 mm
3.6 x 1.1 Kg/m = 4.00 Kg
13.46 kgs Cost of MS sheet 40.50 /kg 545.13
4 kgs Cost of MS angle 40.50 /kg 162.00
17.46 Cutting,bending,welding,etc 29.10 508.09

1215.22
Sub Data 2 PAGE19
Cost of MS sheets and angles and CW joists and casurina props - 10 Sqm

19 Nos Cost of MS sheet and angle 1215.22 /each 23089.10


Cost of strutting
0.12 cum silver oak 14847.00 /cum 1781.64
98.5 Rm Casurina props 10 to 13cm dia 24.00 /Rm 2364.00
4145.64

Rate per one operation for MS sheet & angle 23089.10 /40 577.23
Rate per one operation for strutting 4145.64 /5 829.13

Main data for one use for 10 Sqm

MS sheet rate per one operation 577.23 /each 577.23


props rate per one operation 829.13 /each 829.13
3.80 nos Carpenter I class 555.00 /each 2109.00
5.40 nos Mazdoor I class 355.00 /each 1917.00
1 nos Fitter II class 467.00 /each 467.00
L.S wedges 25.00
L.S periodical cleaning and painting etc 23.60
5947.96
431.58
i] Rate for roof slab, lintel, beam 595.00 /Sqm

ii] Rate for sunshade 595.00


Add 10% above rate 59.50
RATE @RS 654.50 /Sqm

iii] Rate for column post

98.5 Nos Casurina props 10 -13 24.00 2364.00 /5 472.80


0.3 Nos Carpenter I class 555.00 /each 166.50
0.3 Nos Mazdoor I class 355.00 /each 106.50
745.80
5947.96 (-) 745.80 = 5202.16
26.22
RATE @RS 520.22 /Sqm

iv] Centering below Ground level


50% of the above rate 595.00 /2 297.50

RATE @RS 297.50 /Sqm

5 Refilling the basement with excavated earth other than sand complying the
Standard specification
RATE @RS 22.20 /cum
DATA 2018-19

Rates Length of Road Lead

Furnace oil

Metal 63 -

13.2 - 6.7
Kerosene

Chainage
Chainage
Emulsion

22.4 mm
Bitumen

Starting

Ending
Diesel

mm
Metal
32159.00 29026.00 70.25 59.04 34.54 0.000 5.000 Plain 23.50 23.50

Rates for Bitumen, Emulsion, Diesel, Kerosene, Furnace oil, Steel & Cement should be authorized by Executive
Steel 41390.00 Note: Engineer as on current date

Emulsion
46926.00
Bitumen SS1

I ROADS

S.No Description of work 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00

1 Clearing the light jungle 3.15

2 Earth work excavation SS 20A 67.80

3 WBM Grade II 1868.29 1880.01 1891.73 1903.45 1915.17

4 WBM Grade III 2178.44 2190.16 2201.88 2213.60 2225.32

5 Advance Patch work- 50mm tk 2828.15 2835.24 2842.33 2849.42 2856.51

6 Advance Patch work- 25mm tk 3111.15 3118.24 3125.33 3132.42 3139.51


Prime coat over WBM/WMM @ 7.00Kg SS-1 Bitumen
7 56.69
Emulsion
TACK COAT over Primed WBM @ 2.5 Kg of RS-1
8 10.91
Bitumen Emulsion/10 sqm
TACK COAT over BT @ 3Kg of RS-1 Bitumen
9 17.80
Emulsion/10 sqm
TACK COAT over WBM @ 4Kg of RS-1 Bitumen
10 35.45
Emulsion/10 sqm
11 Premixcarpet with Sealcoat 187.63 187.88 188.14 188.40 188.65

12 Collection and spreading of gritty gravel 477.69 485.91 494.13 502.36 510.58

13 WBM Patchwork 1429.58 1439.01 1448.44 1457.87 1467.30

14 GSB Gr. I 1320.02 1324.34 1332.85 1345.54 1354.05

15 GSB Gr. III 1279.19 1287.69 1296.20 1304.71 1313.22

16 PREMIX CARPET WITH SEAL COAT(Plastic) 187.96 188.22 188.47 188.73 188.98

17 PREMIX CARPET WITH SEAL COAT(Paver) 176.30


PREMIX CARPET WITH SEAL COAT(paver with
18 176.63
plastic)
19 WBM Grade I 1647.32 1663.10 1674.72 1686.35 1697.98

20 Wet Mix Macadam (250mm thick) 1760.96

21 Bituminous Macadam (50mm thick) 6155.11


Semi Dense Bituminous Semi Dense Bituminous
24 7632.16 7659.44
Macadam /1cum Macadam /1cum(Plastic)
Bituminous concrete
Bituminous concrete 40mm
28 40mm thick/1 cum 7859.96 7888.54
thick/1 cum
(Plastic)
32 DBM 50mm thick/cum 7347.53
II CD WORKS

Materials Plain Hills

Cement & Steel 6 0

Sand 11 0

Metal 6 0

Gravel 6 0

S.No Description of work Rates

1 C.M 1:1.5 4522.47

2 C.M 1:2 3459.96

2397.45
3 C.M 1:3
wmc 2463.35

1866.19
4 C.M 1:4
wmc 1932.09

1547.44
5 C.M 1:5
wmc 1613.34

1334.94
6 C.M 1:6
wmc 1400.84

1 Earth work SS 20 B 127.20


2 C.C.1:3:6 20mm 3465.49

3 C.C.1:3:6 40mm 3137.89

4 C.C.1:2:4 3943.62

5 C.C.1:4:8 2898.82

6 C : C 1: 5: 10 2755.39

7 R.C. C 1: 1 1/2: 3 5305.45

8 R.C. C 1: 2: 4 4828.64

9 R . R. MASONARY 1 : 4 3085.70

10 R . R. MASONARY 1 : 5 2977.33

11 Fabrication of STEEL 59111.12

12 Steel Centring 595.00

13 Steel Shuttering 297.50

14 Plastering CM 1:3- 10mm Tk 161.25

15 Plastering CM 1:3- 12mm Tk 149.81

16 Plastering CM 1:5 - 12mm Tk 137.91

17 Plastering CM 1:5- 20mm Tk 280.38

18 Gravel Filling 270.97


19 Well Gravel Filling 179.25

20 Refilling with excavated Earth 22.20

21 Sand Filling 291.93

22 Wearing Coat 422.32

23 Dry stone masonry 1422.04

24 Pointing RR Masonry with C.M 1:3 156.40

25 White washing 19.42

26 Colour washing 29.12

27 pavement M30 3803.27


………………………………………….

………… 0
14.2

Lead

Cement

80/100
Gravel

23.50 4391.00 50900.00

ized by Executive

PLASTIC 35.00

0.00 0.00

574.97

574.97

1670.14 55.4

1670.14
78.47

16.11

140.26

1068.01 58.8

1027.17

145.15

1246.92
……….
CHECK SLIP
1 Name of the Scheme : MGNREGS 2018 -19

2 District : Theni

3 Block : Aundipatti

Construction of Cement concrete


check dam and renovation of Supply
4 Name of work : channel from Aathukadu to
Adaikampatti burial ground in
Thekkampatti Panchayat.

5 Panchayat : Rengasamuthiram

6 Habitation : Adikampatti

7 S.F.No :

8 Length of Bund / Channel / Road : 500.00 m

Collectors Proceeding No.1477


9 Administrative Sanction details : /2017/D7(Concrete check Dam)
Date:30.07.2018

10 Estimate Amount : Rs. 6.70 Lakhs

11 Technical sanction No & Date :

12 Whether Route Map is enclosed : yes

13 Whether FM sketch is enclosed : yes

14 Components of works taken up : 1 Clearing the light jungle

: 2. Earth work for Top soil

: 3.Earth work for Hard soil

: 4. Name board and photo charges

Total No. of Mandays to be


15 : Nos
generated

16 Materials Component Amount :

17 Total Amount : Rs. 6.70 Lakhs


ABSTRACT ESTIMATE

Renovation of Supply channel from Aathukadu to Adaikampatti


burial ground in Thekkampatti Panchayat.
Name of work :

Name of Panchayat : Thekkampatti


Estimate Amount : Rs. 6.70 Lakhs
SI.
Quantity Details Rate Per Amount
No

1905 Clearing the light jungle and removed


away from the site including all cutting
1 14.53 Sqm 27680
charges and all labour charges as per
standard specification.
Sqm

Earth work excavating and depositing


on bank with initial lead of 10m and
initial lift of 2m in hard stiff clay,stiff
black cotton, hard red earth ,
2
shales ,murram, gravel, stoney earth
and earth mixed with small size
boulders and hard gravelly soil as per
SS20B etc.,

1230 For 0 m to 0.30m 213.79 Cum 262962


a)
Cum

Total 290641
DETAILED ESTIMATE
Name of work : Renovation of Supply channel from Aathukadu to
Adaikampatti burial ground in Thekkampatti
Panchayat.

Name of Panchayat : Rengasamuthiram


Estimate Amount : Rs. 6.70 Lakhs
SI. Mesurements
Details No. Contents
No L B D
1 x 1 200.00 3.20 - 640

1 x 1 200.00 3.50 700


Clearing the light jungle and 1 x 1 250.00 3.00 - 750
removed away from the site
1 including all cutting charges and all 1 x 1 350.00 3.10 1085
labour charges as per standard
specification. - 3175

Deduct 40% voids - 1270

1905

Earth work excavating and


depositing on bank with initial lead
of 10m and initial lift of 2m in hard
stiff clay,stiff black cotton, hard red
earth , shales ,murram, gravel,
stoney earth and earth mixed with
2 small size boulders and hard gravelly
soil as per SS20B etc.,

For 0 m to 0.30m 1 x 2 500.00 4.10 0.30 1230

1230
Panchayat Union:- Periyakulam QUARRY LEAD CHART
Panchayat:- JELLIPATTI Habitation:-
To Kodaikanal
Thailalaramman karadu Pattalamma
n Koil Road
1/6
1/2 G.Kallupatti

0/6 0/2 10/0 7/0


Endapuli
Periyakulam 58/2 57/0 55/0 54/4 51/6 48/ 48/2 46/8 0/0 41/6 To Dindigul
0/0 0/00/0 Devadanapatti
3/6
3/0 P.U. Office 0/0 1/0
2/0
0/0 1/2
3/0 3/4 Vadugapatti Alagarnayakanpatt 1/0 13/0
59/6 0/0 4/6 Melmangalam D.Vadipatti0/0 Erumalainaickenpatti
63/4 0/0
Jallipatti 11/2 Silvarpatti 1/0
1/0 2/0
Saruthupatti
Bomminaic Renganatha
64/2 Lakshimipuram 8/4 0/0 3/2 kenpatti puram
Jeyamangalam 0/0 0/0 0/0 4/0 0/0
7/0 3/0
5/2 0/0 A.Vadipatti
3/8 3/2 Gullapuam
66/8 0/0 Vadaputhupatti
2/0 vadaveern 4/2
68/8 5/6
ayakan 8/8
4/4 patti
7/6
0/0 0/0 Mudalakkampatti
6/6
Theni 6/4 0/0 5/2
kunnur 72/8 k.velaku
(68/0)
Andipatti to madurai

Road Distance Road Distance

1) Cement and Steel & Bitumen from Panchayat Union Office, Vadugapatti
9.00 Km (or)
a) union office vadugapatti 3/0 - 3/4 =0.40 0/0- 3/0 = 3.00
59/6 - 63/4 =3.80, 0/0-2/0=2.00 9.00
2) All stones like rough stone, bond stone and Broken stoneand Red gravel from
KARUTHAMALA KARADU
68/0-72/8- 4.8 0/0 - 4/4 = 4.40, 68/8-64/2=7.60 0/0-2/0=2.00 18.80 Km

19.00

3) sand from Vadaveeranayakkanpatti


0/0 - 1/0 = 1.00, 72/8 - 75/8 =3.00, 0/0 - 4/4 = 4.40, 68/2-64/2=4.60 0/0-
13
2/0=2.00 15.00
4) country Bricks From Vadugapatti
9.00 Km
0/0- 3/0 = 3.00 59/6 - 63/4 =3.80, 0/0-2/0=2.00
9.00
5) Pressed tiles from periyakulam
58/2 - 63/4 = 5.20 0/0-2/0=2.00
6.00 Km 7
Certified that all lead particulars furnished above are shortest to the work site from the approved quarries through my best knowledge.
ROAD METAL RATE
Name of work 0

I BASIC COST OF 63 MM TO 45 MM METAL ( WBM Grade II ) BASIC COST OF 53 MM TO 22.4 MM METAL ( WBM Grade III )

1 0.050 M3 75 mm IRC Metal 448.00 22.40 0.025 M3 63 mm IRC Metal 581.00 14.53

2 0.450 M3 63 mm IRC Metal 581.00 261.45 0.200 M3 53 mm IRC Metal 706.00 141.20

3 0.425 M3 53 mm IRC Metal 706.00 300.05 0.725 M3 45 mm IRC Metal 948.00 687.30

4 0.050 M3 45 mm IRC Metal 948.00 47.40 0.025 M3 22.40 mm IRC Metal 1327.00 33.18

5 0.025 M3 22.40 mm IRC Metal 1327.00 33.18 0.025 M3 11.20 mm IRC Metal 835.00 20.88

Total 664.48 Total 897.09

BASIC COST OF 90 MM TO 45 MM METAL ( WBM Grade I )

1 0.05 m3 125mm metal 402.00 20.10

2 0.525 m3 90mm metal 402.00 211.05

3 0.35 m3 63mm metal 581.00 203.35

4 0.05 m3 45mm metal 948.00 47.40

5 0.025 m3 22.40mm metal 1327.00 33.18

Total 515.08
ROAD METAL RATE
KM 0.00 1.00 Rate per cubic metre

Convey
REACH

Cost at Stacking
Name of quarry Kind of metal Distance in KM ance Total
Quarry Charges
(Plain)

Plains Hills
WBM Gr II metal 24 0 664.48 206.86 3.15 874.49

WBM Gr III metal 24 0 897.09 206.86 3.15 1107.10

45mm IRC metal 24 0 948.00 206.86 3.15 1158.01


1.00

13.2mm IRC metal 24 0 1231.00 206.86 3.15 1441.01 1437.86

11.2mm IRC metal 24 0 835.00 206.86 3.15 1045.01 1041.86

6.7mm IRC metal 24 0 620.00 206.86 3.15 830.01 826.86


-

Gravel 24 0 188.00 206.86 3.05 397.91


0.00

Packed bitumen 0 0 32159.00 0.00 0.00 32159.00

Emulsion 0 0 29026.00 0.00 0.00 29026.00

WBM Gr I 24 0 515.08 206.86 0.00 721.94


Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @
20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and
1
compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per
approved plans or as directed by the Engineer as per (Mix -in - place method) .

Unit = cum
Taking output = 300 cum
a) Labour
0.48 Mate 413.00 day 198.24
2 Mazdoor (Skilled) 401.00 day 802.00
10 Mazdoor (Unskilled) 358.00 day 3580.00
b) Machinery 4580.24
12 Tractor with grader @ 25 cum per hour 380.00 hour 4560.00
Three wheel 80-100 kN static roller @
30 460.00 hour 13800.00
10 cum per hour
5 Water tanker 6 kl capacity 310.00 hour 1550.00
12 Tractor mount with Rotavator 25 cum per 380.00 hour 4560.00

24470.00

GSB Material as per Table


c) Km : 0 / 0 - 1 / 0 Km : 1 / 0 - 2 / 0 Km : 2 / 0 - 3 / 0
400.1

63mm to
26.5mm
126 IRC HBG 1040.21 cum 131066.46 1047.30 131959.80 1054.39 132853.14
metal
@35 %
26.5mm
to
4.75mm
162 1095.14 cum 177411.87 1102.23 178560.45 1109.32 179709.03
IRC HBG
metal@4
5%
4.75 mm
below
72 IRC HBG 758.01 cum 54576.72 765.10 55087.20 772.19 55597.68
metal@
20 %
30 Water 130.00 Kl 3900 130 3900.00 130.00 3900.00
1 Labour 3326 4580.24 3326 3326.00 3326.00 3326.00
1 Machinery 24470.00 24470.00 24470 24470.00 24470.00 24470.00
Cost for 300 cum = a+b+c 396005.29 397303.45 399855.85
Rate per cum = (a+b+c)/300 1320.02 1324.34 1332.85
Highways Department
SCHEDULE OF RATE 2018-19

I Rates for Labour

Rates in
S.No. Description Unit
Rupees

1 Mazdoor Grade I Day 401


2 Mazdoor Grade II Day 358
3 Head Mazdoor Day 413
4 Biutumen Heat master operator Day 484
5 Bitumen sprayer Man Day 465
6 Bitumen raker Man Day 484
7 Mini Hot Mix plant Operator Day 484
8 Gunnuting plant Operator Day 405
9 Gunnuting gun Operator Day 441

IV Rates of works

1 Scrub jungle Sqm 3.15


2 Light jungle Sqm 3.45
3 Earth work SS 20 A Cum 67.80
4 Earth work SS 20B Cum 63.60
5 Earth work SDR not requiring blasting Cum 94.70
6 Medium rock not requiring blasting Cum 166.30
7 Hard rock req blasting Cum 450.00
8 Addl one lead over 10m Cum 7.80
9 Addl one lift over 2m Cum 6.20
10 Refilling excavated earth Cum 22.20
11 Refilling excavated sand Cum 19.50
12 Spreading gravel (labour only) Cum 8.02
13 Stacking metal Cum 3.15

14 Stacking gravel Cum 3.05

15 Stacking sand Cum 3.05

16 Kilometre stone each 407.00


17 Hectametre stone .75x.23x.1m each 208.00
18 Hectametre stone .9x.15x.15 each 204.00

V RATES OF MATERIALS 2018-19

Sl.No. Description Unit Rates

I Hard Broken Stone IRC Standard : Hand Broken / Machine Crushed

i 90mm size one cum 402


ii 75mm size one cum 448
iii 63mm size one cum 581
iv 53mm size one cum 706
v 46.5mm size one cum 948
vi 45mm size one cum 948
vii 37.5mm size one cum 968
viii 26.5mm size one cum 914
ix 25mm size one cum 914
x 22.4mm size one cum 1327
xi 13.2mm size one cum 1231
xii 11.2mm size one cum 835
xiii 6.7mm size one cum 620
xiv 6mm size one cum 620
xv 5.6mm size one cum 620
xvi 4.75mm size & below one cum 548
xvii Gravel one cum 188.00
xviii Wellgravel one cum 154.00
xix Sand for filling one cum 168.00

VI Other Materials

1 Cement Mt 4391.00
2 Sand one cum 168.00
3 Sand for filling one cum 168.00
4 Rough stone one cum 358.00
5 Bond stone one cum 595.00
6 40mm ISS metal one cum 929.00
7 20mm ISS metal one cum 1293.00
8 Country bricks 1000 nos 5130.00
9 25mm ISS metal one cum 799.00

VII Revised Conveyance Table (for PLAINS) 2018-19

RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN PLAINS FOR THE YEAR 2018-19

Broken Stone
Br. Jelly, Wood
Sand
Sl.No. Distance in Kilometre work
Gravel
(one m3)
(one m3)

1 2 3 4
1 Co- efficient 1.10 1.60

2 Incidental charges

3 Add for every extra 1 km or part thereof

a 0 - 10 Kms. 6.02 6.60 9.62


b 10 - 20 Kms. 5.15 5.66 8.23
c 20 - 40 Kms. 4.43 4.87 7.09
d 40 - 80 Kms. 3.82 4.21 6.65
e Above 80 Kms. 3.49 3.84 5.58
4 Loading Charges 92.00 43.90 30.10
5 Unloading Charges 92.00 43.90 30.10
An Adhoc extra for inter
6
state works 19.30 21.20 30.90

IX. Lumpsum Rates As per Highways Data

1 Hire and labour charges for WBM Gr.II & III


a) Forming edge bunds

b) Maintaining berms for traffic barricading, providing danger lights

c) Watering and keeping the surface moist for 15days

d) Rent for tools including baskets, sherpining, pick axes


e) Sundries such as rope, waterpots

2 Labour charges for Patch work with Bituminous Premix materials for 0.625 cum of
Bituminous material.

Brushing and cleaning the surface

Spreading the Bitumen for Tack coat

Prmixing chips with Bitumen in the Drum mixer and laying of 0.625 m3 of metal
with 44 Kg of Bitumen

Levelling and tamping the Premix in the patches and pot holes rolling etc.,

Special tools such as wire brush

Regulation of traffic

Sundries such as barricading arrangements,

3 Labour charges for WBM patch work - 1 cum


Brushing and cleaning the surface

Levelling the materials in the patches and pot holes

and tamping after blinding with water

Special tools such as wire brush

Regulation of traffic

Sundries such as barricading arrangements,

conveying water etc,.


80/100 KN Road Roller Out Turn

Sl.no Type of Consolidation/Compaction

1 Earth work Compaction

2 Gravel soling

3 Soling with 150mm cube stones

4 Soling with hard gravel stones 150mm Thick

5 Sand-Gravel mix soling

6 Sand-Gravel mix 150mm Thick

7 Water bound macadam 40mm to 50mm Thick

8 Water bound macadam 50mm to 75mm Thick

9 Water bound macadam 75mm Thick

10 Water bound macadam 100mm Thick

11 Bituminuous macadam 50mm Thick

12 Bituminuous macadam 75mm Thick

13 Bult-up spray grout 75mm Thick

14 Asphaltic concrete 40mm Thick

15 Premix Carpet 20mm Thick

16 Seal Coat

17 Single coat Surface dressing

18 Two coats of Surface dressing

19 Mix seal surfacing

20 Semi dense Carpet

21 Blacktop chipping carpet with hard metal


Road inspector (Degree) 467
210.01 1224.21

210.01 1038.72

210.01 758.01

GSB III GSB I

881.00 830.20 63-26.5

885.13 26.5-4.75

548.00 4.75&below

548
e (for PLAINS) 2018-19

AD IN PLAINS FOR THE YEAR 2018-19

Chamber
Country Mangalore
bricks,
Bricks Tiles
Flooring
(1000 (1000Nos,)
tiles.
Nos,)
(1000nos)
5 6 7
1.35 1.80 2.25

8.12 10.82 13.52

6.95 9.27 11.58

5.97 7.97 9.96

5.15 6.86 8.60

4.71 6.27 7.84

43.20 43.20 43.20

43.20 43.20 43.20

26.00 34.70 43.50

L.S. 1.50
L.S. 1.50
L.S. 1.50
L.S. 1.50
L.S. 1.50

remix materials for 0.625 cum of

L.S 3.78
L.S 3.10

15.75
L.S

L.S 4.73
L.S 2.31
L.S 2.50
L.S 1.16

L.S 2.20
L.S 5.50

L.S 2.20
L.S 2.20
L.S 0.55
Out Turn

425 Cum

425 Cum

600 Cum

650 Cum

450 Cum

950 Cum

740 Sqm

550 Sqm

450 Sqm

350 Sqm

300 Sqm

225 Sqm

225 Sqm

300 Sqm

500 Sqm

1000 Sqm

800 Sqm

550 Sqm

600 Sqm

400 Sqm

1100 Sqm
Highways Department
SCHEDULE OF RATE 2014-15

I Rates for Labour

S.No. Description Unit Rates in Rupees

1 Mazdoor Grade I Day 291


2 Mazdoor Grade II Day 260
3 Head Mazdoor Day 300
4 Heat master operator Day 352
5 Bitumen sprayer Man Day 338
6 Bitumen raker Man Day 352
7 Mini Hot Mix plant Operator Day 352
8 Gunnuting plant Operator Day 294
9 Gunnuting gun Operator Day 321

II Hire Charges for Machineries

1 Power roller/Road Roller Day 828

2 Tipper Trucks 10 Tonne Day 1094

3 Loader Day 1205

4 Paver Finisher Day 2447

5 Vibratory Roller 8-10 Tonnes Day 5428

6 Mini Hot Mix Plant 6/10 Day 1674

7 Water sprinkler Day 1159

8 Wet mix plant 75 Tonne Day 8933

9 Electric Generating set 125 KVA Day 5179

10 Water Tank 6KL capacity (GSB) Day 2005

11 Motor Grader 110HP Day 13533

12 Tractor - Rotovator Day 2824

13 Water Tanker (WMM) Day 855

14 Base Mix Plant(Pug Mill) Day 6679

15 Central Hot Mix Plant Day 9696

16 Bitumen Boiler Day 202

17 Bitumen Sprayer 10 Sq.m 15

18 Water Kl 120

III
FUEL RATES

1 Diesel (Local Rate) Litre 62.68


2 Furnace Oil Litre 50.00
3 Kerosene Litre 61.20

IV Rates of works

1 Scrub jungle Sqm 2.35


2 Jungle clearance Sqm 2.35
3 Earth work SS 20 A Cum 49.00
4 Earth work SS 20B Cum 46.00
5 Earth work SDR not rg blas Cum 68.50
6 Medium rock not req blasting Cum 120.75
7 Hard rock req blasting Cum 334.00
8 Addl one lead over 10m Cum 5.75
9 Addl one lift over 2m Cum 4.60
10 Refilling excavated earth Cum 16.15
11 Refilling excavated sand Cum 14.25
12 Spreading gravel (labour only) Cum 5.82
13 Stacking metal Cum 3.15
14 Stacking gravel Cum 3.05
15 Stacking sand Cum 3.05
16 Kilometre stone each 360.00
17 Hectametre stone each 185.00
18 Hectametre stone each 181.00
V RATES OF MATERIALS 2014-15

Sl.No. Description Unit Rates

I Hard Broken Stone IRC Standard : Hand Broken / Machine Crushed

i 90mm size one cum 353.00


ii 75mm size one cum 395.00
iii 63mm size one cum 511.00
iv 53mm size one cum 621.00
v 46.5mm size one cum 832.00
vi 45mm size one cum 832.00
vii 37.5mm size one cum 850.00
viii 26.5mm size one cum 803.00
ix 25mm size one cum 803.00
x 22.4mm size one cum 1165.00
xi 13.2mm size one cum 1081.00
xii 11.2mm size one cum 734.00
xiii 6.7mm size one cum 545.00
xiv 6mm size one cum 545.00
xv 5.6mm size one cum 545.00
xvi 4.75mm size & below one cum 484.00
xvii Gravel one cum 143.00
xviii Wellgravel one cum 118.00
xix Sand for filling one cum 176.40

VI Other Materials

1 Cement Mt 4900.00
2 Sand one cum 176.40
3 Sand for filling one cum 176.40
4 Rough stone one cum 316.00
5 Bond stone one cum 500.50
6 40mm ISS metal one cum 816.00
7 20mm ISS metal one cum 1135.00
8 Country bricks 1000 nos 4220.00
9 25mm ISS metal one cum 638.00
VII Conveyance Table (for PLAINS) 2014-15

RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN PLAINS FOR THE YEAR 2014-15

Broken Stone
Br. Jelly, Wood
Sand
Sl.No. Distance in Kilometre work
Gravel
(one m3)
(one m3)

1 2 3 4
1 Co- efficient 1.10 1.60

2 Incidental charges

3 Add for every extra 1 km or part thereof

a 0 - 10 Kms. 5.43 5.97 8.69

b 10 - 20 Kms. 4.65 5.12 7.44

c 20 - 40 Kms. 4.00 4.40 6.40

d 40 - 80 Kms. 3.45 3.80 6.00

e Above 80 Kms. 3.15 3.47 5.04

4 Loading Charges 80.40 38.40 26.30


5 Unloading Charges 80.40 38.40 26.30

An Adhoc extra for inter


6 16.00 17.60 25.60
state works

VIII Conveyance Table (for HILLS)

RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN HILLS FOR THE YEAR 2014 - 1

Broken Stone
Br. Jelly, Wood
Sand
Sl.No. Distance in Kilometre work
Gravel
(one m3)
(one m3)

1 2 3 4
1 Co- efficient 0.00 0.00

2 Incidental charges

3 Add for every extra 1 km or part thereof

a 0 - 10 Kms. 10.86 11.94 17.38

b 10 - 20 Kms. 9.30 10.24 14.88

c 20 - 40 Kms. 8.00 8.80 12.80

d 40 - 80 Kms. 6.90 7.60 12.00

e Above 80 Kms. 6.30 6.94 10.08

IX. Lumpsum Rates As per Highways Data (11.08.14)

1 Hire and labour charges for WBM Gr.II & III


a) Forming edge bunds

b) Maintaining berms for traffic barricading, providing danger lights

c) Watering and keeping the surface moist for 15days

d) Rent for tools including baskets, sherpining, pick axes


e) Sundries such as rope, waterpots

2 Labour charges for Patch work with Bituminous Premix materials for 0.625 cum of Bituminous
material.

Brushing and cleaning the surface

Spreading the Bitumen for Tack coat

Prmixing chips with Bitumen in the Drum mixer and laying of 0.625 m3 of metal with 44 Kg
of Bitumen

Levelling and tamping the Premix in the patches and pot holes rolling etc.,

Special tools such as wire brush

Regulation of traffic

Sundries such as barricading arrangements,

3 Labour charges for WBM patch work - 1 cum


Brushing and cleaning the surface

Levelling the materials in the patches and pot holes

and tamping after blinding with water

Special tools such as wire brush

Regulation of traffic

Sundries such as barricading arrangements,

conveying water etc,.


80/100 KN Road Roller Out Turn

Sl.no Type of Consolidation/Compaction

1 Earth work Compaction

2 Gravel soling

3 Soling with 150mm cube stones

4 Soling with hard gravel stones 150mm Thick

5 Sand-Gravel mix soling

6 Sand-Gravel mix 150mm Thick

7 Water bound macadam 40mm to 50mm Thick

8 Water bound macadam 50mm to 75mm Thick

9 Water bound macadam 75mm Thick

10 Water bound macadam 100mm Thick

11 Bituminuous macadam 50mm Thick

12 Bituminuous macadam 75mm Thick


13 Bult-up spray grout 75mm Thick

14 Asphaltic concrete 40mm Thick

15 Premix Carpet 20mm Thick

16 Seal Coat

17 Single coat Surface dressing

18 Two coats of Surface dressing

19 Mix seal surfacing

20 Semi dense Carpet

21 Blacktop chipping carpet with hard metal


678.5
46.60 937.20

46.60 775.03

46.60 530.60

GSB iii

570.6

484
PLAINS) 2014-15

IN PLAINS FOR THE YEAR 2014-15

Chamber
Country Mangalore
bricks,
Bricks Tiles
Flooring
(1000 (1000Nos,)
tiles.
Nos,)
(1000nos)
5 6 7
1.35 1.80 2.25

7.33 9.77 12.22

6.28 8.37 10.46

5.40 7.20 9.00

4.65 6.20 7.76

4.25 5.67 7.09

37.75 37.75 37.75


37.75 37.75 37.75

21.55 28.75 36.00

Table (for HILLS)

ROAD IN HILLS FOR THE YEAR 2014 - 15

Country Mangalore
Bricks Tiles Chamber
Bitumen
(1000 (1000Nos,) bricks
Nos,)

5 6 7 8
0.00 0.00 0.00 0.00

14.66 19.54 24.44 0.00

12.56 16.74 20.92 0.00

10.80 14.40 18.00 0.00

9.30 12.40 15.52 0.00

8.50 11.34 14.18 0.00


L.S. 1.50
L.S. 1.50
L.S. 1.50
L.S. 1.50
L.S. 1.50

materials for 0.625 cum of Bituminous

L.S 3.78
L.S 3.10

15.75
L.S

L.S 4.73
L.S 2.31
L.S 2.50
L.S 1.16

L.S 2.20
L.S 5.50

L.S 2.20
L.S 2.20
L.S 0.55
Out Turn

425 Cum

425 Cum

600 Cum

650 Cum

450 Cum

950 Cum

740 Sqm

550 Sqm

450 Sqm

350 Sqm

300 Sqm

225 Sqm
225 Sqm

300 Sqm

500 Sqm

1000 Sqm

800 Sqm

550 Sqm

600 Sqm

400 Sqm

1100 Sqm
Name of work :

Starting Ending
Scheme :
Year : 2018-19
KM 0.000 5.000

Working Metal
From To Bitumen Gravel Sand
milage 63-22.4 13.2-6.7
0.00 28.50 28.50 5.00 28.50 54.20
or or or or
KM 0.00 - 0.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.00
0.50 28.00 28.00 4.50 28.00 53.70
or or or or
KM 4.00 - 5.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 28.00 28.00 5.00 28.00 54.00
Total 28.00 28.00 5.00 28.00 54.00
0.50 27.00 27.00 3.50 27.00 52.70
or or or or
KM 3.00 - 4.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 27.00 27.00 4.00 27.00 53.00
Total 27.00 27.00 4.00 27.00 53.00
0.50 26.00 26.00 2.50 26.00 51.70
or or or or
KM 2.00 - 3.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 26.00 26.00 3.00 26.00 52.00
Total 26.00 26.00 3.00 26.00 52.00
0.50 25.00 25.00 1.50 25.00 50.70
or or or or
KM 1.00 - 2.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 25.00 25.00 2.00 25.00 51.00
Total 25.00 25.00 2.00 25.00 51.00
0.50 24.00 24.00 0.50 24.00 49.70
or or or or
KM 0.00 - 1.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 24.00 24.00 1.00 24.00 50.00
Total 24.00 24.00 1.00 24.00 50.00

HILLS 0.00 0.00 0.00 0.00 0.00

PLAINS 23.50 23.50 0.00 23.50 49.20

63-22.4 13.2-6.7 Bitumen Gravel Sand

Metal Metal
Name of work : 0
0

Name of Quarry

63 - 22.4 Metal :

13.2 - 6.7 Metal :

Bitumen :

Emulsion :

Gravel :

Sand :

I do hereby certified that

1.The distance noted herein are correct and shortest to the best of
my knowledge
2.The quarry mentioned are correct
3.The rates adopted are as per S.O.R 2014-15
4.the materials can be easily carried.
5.the discription of variety of materials is correct.

* For Gravel, if it is procured locally from near by site, a specific certificate should
NOTE be given by the Executuve Engineer stating that
1. Certified that the Gravel is procured from locally available site.
2. There will not be any dispute arised from that locally available site till the
completion of the work.
ROAD METAL RATE
Name of work : 0

I BASIC COST OF B MM TO 45 MM METAL ( WBM Grade II ) BASIC COST OF 63 MM TO 45 MM METAL ( WBM Grade III )

1 0.050 M3 90 mm IRC Me 402.00 20.10 0.025 M3 63 mm IRC Metal 581.00 14.53


2 0.450 M 3
63 mm IRC Me 581.00 261.45 0.200 M 3
53 mm IRC Metal 706.00 141.20
3 0.425 M3 53 mm IRC Me 706.00 300.05 0.725 M3 45 mm IRC Metal 948.00 687.30
4 0.050 M3 45 mm IRC Me 948.00 47.40 0.025 M3 22.40 mm IRC Metal 1327.00 33.18
5 0.025 M 3
22.40 mm IRC Met 1327.00 33.18 0.025 M 3
11.20 mm IRC Metal 835.00 20.88
Total 662.18 s Total 897.09

KM 0.00 - 1.00
Nature of
REACH

Convey 20%
route for Cost at Convey Stacking
Name of quarry Kind of metal Distance in KM
Quarry ance (Plain)
ance
Charges
Extra Total
conveyance (Hills) (Labour)
metalled or
Plains Hills unmetalled
WBM Gr II metal 24 0 662.18 206.86 0.00 3.15 0.00 872.19
0

--do-- WBM Gr III metal 24 0 897.09 206.86 0.00 3.15 0.00 1107.10

--do-- 45mm IRC metal 24 0 948.00 206.86 0.00 3.15 0.00 1158.01
1.00

--do-- 13.2mm IRC metal 24 0 1231.00 206.86 0.00 3.15 0.00 1441.01

--do-- 11.2mm IRC metal 24 0 835.00 206.86 0.00 3.15 0.00 1045.01

--do-- 6.7mm IRC metal 24 0 620.00 206.86 0.00 3.15 0.00 830.01
-

0 Gravel 24 0 188.00 206.86 0.00 3.05 0.00 397.91

0 Sand for filling 50 0 168.00 386.80 0.00 3.05 0.00 557.85


0.00

0 Packed bitumen 0 0 32159.00 0.00 0.00 0.00 0.00 32159.00

--do-- Emulsion 0 0 29026.00 0.00 0.00 0.00 0.00 29026.00


WMM 24 0 0.00 206.86 0.00 3.15 0.00 210.01

ROAD METAL RATE

Name of work: 0
0

KM 1.00 - 2.00 Rate per cubic metre


Nature of
REACH

route for Convey 20%


Cost at Convey Stacking
Name of quarry Kind of metal Distance in KM conveyance Quarry ance (Plain)
ance
Charges
Extra Total
metalled or (Hills) (Labour)
unmetalled
Plains Hills

WBM Gr II metal 25 0 662.18 213.95 0.00 3.15 0.00 879.28


0

--do-- WBM Gr III metal 25 0 897.09 213.95 0.00 3.15 0.00 1114.19

--do-- 45mm IRC metal 25 0 948.00 213.95 0.00 3.15 0.00 1165.10
2.00

--do-- 13.2mm IRC metal 25 0 1231.00 213.95 0.00 3.15 0.00 1448.10

--do-- 11.2mm IRC metal 25 0 835.00 213.95 0.00 3.15 0.00 1052.10

--do-- 6.7mm IRC metal 25 0 620.00 213.95 0.00 3.15 0.00 837.10
-

0 Gravel 13 0 188.00 120.89 0.00 3.05 0.00 311.94

0 Sand for filling 51 0 168.00 393.45 0.00 3.05 0.00 564.50


1.00

0 Packed bitumen 0 0 32159.00 0.00 0.00 0.00 0.00 32159.00

--do-- Emulsion 0 0 29026.00 0.00 0.00 0.00 0.00 29026.00


WMM 25 0 737.40 213.95 0.00 3.15 0.00 954.50
ROAD METAL RATE

Name of work: 0
0

KM 2.00 - 3.00 Rate per cubic metre


Nature of
REACH

route for Convey 20%


Cost at Convey Stacking
Name of quarry Kind of metal Distance in KM conveyance Quarry ance (Plain)
ance
Charges
Extra Total
metalled or (Hills) (Labour)
unmetalled
Plains Hills

WBM Gr II metal 26 0 662.18 221.04 0.00 3.15 0.00 886.37


0

--do-- WBM Gr III metal 26 0 897.09 221.04 0.00 3.15 0.00 1121.28

--do-- 45mm IRC metal 26 0 948.00 221.04 0.00 3.15 0.00 1172.19
3.00

--do-- 13.2mm IRC metal 26 0 1231.00 221.04 0.00 3.15 0.00 1455.19

--do-- 11.2mm IRC metal 26 0 835.00 221.04 0.00 3.15 0.00 1059.19

--do-- 6.7mm IRC metal 26 0 620.00 221.04 0.00 3.15 0.00 844.19
-

0 Gravel 26 0 188.00 221.04 0.00 3.05 0.00 412.09

0 Sand for filling 52 0 168.00 400.10 0.00 3.05 0.00 571.15


2.00

0 Packed bitumen 0 0 32159.00 0.00 0.00 0.00 0.00 32159.00

--do-- Emulsion 0 0 29026.00 0.00 0.00 0.00 0.00 29026.00

WMM 26 0 737.40 221.04 0.00 3.15 0.00 961.59


ROAD METAL RATE

Name of work: 0
0

KM 3.00 - 4.00 Rate per cubic metre


Nature of
REACH

route for Convey 20%


Cost at Convey Stacking
Name of quarry Kind of metal Distance in KM conveyance Quarry ance (Plain)
ance
Charges
Extra Total
metalled or (Hills) (Labour)
unmetalled
Plains Hills

WBM Gr II metal 27 0 662.18 228.13 0.00 3.15 0.00 893.46


0

--do-- WBM Gr III metal 27 0 897.09 228.13 0.00 3.15 0.00 1128.37

--do-- 45mm IRC metal 27 0 948.00 228.13 0.00 3.15 0.00 1179.28
4.00

--do-- 13.2mm IRC metal 27 0 1231.00 228.13 0.00 3.15 0.00 1462.28

--do-- 11.2mm IRC metal 27 0 835.00 228.13 0.00 3.15 0.00 1066.28

--do-- 6.7mm IRC metal 27 0 620.00 228.13 0.00 3.15 0.00 851.28
-

0 Gravel 27 0 188.00 228.13 0.00 3.05 0.00 419.18

0 Sand for filling 53 0 168.00 406.75 0.00 3.05 0.00 577.80


3.00

0 Packed bitumen 0 0 #REF! 0.00 0.00 0.00 0.00 #REF!

--do-- Emulsion 0 0 #REF! 0.00 0.00 0.00 0.00 #REF!


WMM 27 0 737.40 228.13 0.00 3.15 0.00 968.68

ROAD METAL RATE

Name of work: 0
0

KM 4.00 - 5.00 Rate per cubic metre


Nature of
REACH

route for Convey 20%


Cost at Convey Stacking
Name of quarry Kind of metal Distance in KM conveyance Quarry ance (Plain)
ance
Charges
Extra Total
metalled or (Hills) (Labour)
unmetalled
Plains Hills

WBM Gr II metal 28 0 662.18 235.22 0.00 3.15 0.00 900.55


0

--do-- WBM Gr III metal 28 0 897.09 235.22 0.00 3.15 0.00 1135.46

--do-- 45mm IRC metal 28 0 948.00 235.22 0.00 3.15 0.00 1186.37
5.00

--do-- 13.2mm IRC metal 28 0 1231.00 235.22 0.00 3.15 0.00 1469.37

--do-- 11.2mm IRC metal 28 0 835.00 235.22 0.00 3.15 0.00 1073.37

--do-- 6.7mm IRC metal 28 0 620.00 235.22 0.00 3.15 0.00 858.37
-

0 Gravel 28 0 188.00 235.22 0.00 3.05 0.00 426.27

0 Sand for filling 54 0 168.00 413.40 0.00 3.05 0.00 584.45


4.00

0 Packed bitumen 0 0 32159.00 0.00 0.00 0.00 0.00 32159.00

--do-- Emulsion 0 0 29026.00 0.00 0.00 0.00 0.00 29026.00


WMM 28 0 737.40 235.22 0.00 3.15 0.00 975.77
ROAD METAL RATE

Name of work: 0
0

KM 0.00 - 0.00 Rate per cubic metre


Nature of
REACH

route for Convey 20%


Cost at Convey Stacking
Name of quarry Kind of metal Distance in KM conveyance Quarry ance (Plain)
ance
Charges
Extra Total
metalled or (Hills) (Labour)
unmetalled
Plains Hills

WBM Gr II metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00


0

--do-- WBM Gr III metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00

--do-- 45mm IRC metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00
0.00

--do-- 13.2mm IRC metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00

--do-- 11.2mm IRC metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00

--do-- 6.7mm IRC metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00
-

0 Gravel 0 0 0.00 0.00 0.00 0.00 0.00 0.00

0 Sand for filling 0 0 0.00 0.00 0.00 0.00 0.00 0.00


0.00

0 Packed bitumen 0 0 32159.00 0.00 0.00 0.00 0.00 0.00


--do-- Emulsion 0 0 29026.00 0.00 0.00 0.00 0.00 0.00
LEAD STATEMENT ( Kms)

Rough
Country M.Tiles &
Cement / Steel Sand stone, & Brickjelly Lime stone Shell lime
Bricks Pressed Tiles
Metal

Plain 0 0 0 0 0 0 0 0

xxx PWD Rates SCHEDULE OF RATE FOR 2018-19 xxx Highways sh. rates
xxx Collector's appd rates xxx Local Rates

I Rates of Labour II Rates of Material ( contd..) III Rates of works ( Contd..)

1 Carpenter I class 555.00 c Lime and cement c Quarrying and blasting

2 Carpenter II class 508.00 1 Hard rock blasting & Stack

3 Fitter I class 493 501 1 Cement 4391.00 2 Wedging hard rock

4 Fitter II class 458 467 2 Shell lime 1248.00 3 Medium rock blasting

5 Floor polisher 437.00 3 Lime stone 919.00 4 Drilling holes 50mm

6 Mason I class for BW 567.00 4 Grinding mortor 160.40 5 Drilling holes 40 mm

7 Mason II class for BW 508.00 5 Mixing mortor 65.90

8 Mazdoor I class 355.00 Concrete Vibrators Lift Gharges Gr. Floor

9 Mazdoor II class 320.00 1 PCC 39.70 1 Concrete 68.00


10 Painter I Class 454.00 2 RCC 53.50 2 Brk/stone masny 44.80
1.5m-
11 Painter II Class 421.00 d Timber and Roofing materials Below GL 4.5m

12 Plumber I class 493.00 1 CW scantling < 4m 32751.00 1 Concrete 67.00


13 Plumber II class 458.00 2 CW scantling (raft) 34498.00 2 Brk/stone masny 45.00
14 Stone Cutter I class 436.00 3 CW planks 37555.00 d Earth work

15 Stone Cutter II class 403.00 4 CW reepers-50x25 33.00 1 Ordinary soil 20b

16 Wodder 367.00 5 CW reepers-50x12 23.80 2 Gravelly soil SS 20 A

17 Mazdoor I cl. For roads 401.00 6 Palmyrah rafter 47.15 3 Gravelly soil SS 20 b

18 Mason I class(stone work) 567.00 7 Casu. poles 13-15 31.50 4 SDR

Mason II class(stone work) 508.00 8 Casu. poles 10-13 24.00 5 MR & DMR

II Rates of Material 9 Casu. poles 8-10 18.30 6 EW addl. Lead 10mts

a Bricks and Tile product 10 Casu. poles 5-8 16.70 7 EW addl. Lift 1mts

1 Country bricks ( 2 3/4" ) 5130.00 11 Silver oak scantlings 14847 8 Refilling ( Sand )

2 Brick Jelly- 40 mm 635.00 9 Refilling ( Earth )

3 --do-- 20mm 707.00 10 Spreading gravel /sqm

4 Pressed Tiles.(20x20) 10400.00 e Metal and Iron works 11 Stacking metal /m3

5 --do-- (23x23) 14750.00 1 Steel rods MT 41390.00 12 Stacking gravel /m3

6 Mang. Tiles class AA 9.90 2 MS plate kg 40.50 Stacking sand /m3

7 Mosaic (Grey)25x25 10900.00 3 MS Angle kg 40.50 Laying of RCC pipes

8 Mosaic (Grey)20x20 6970.00 4 Binding wire Mt 43.00 1 600 to 900mm dia

9 Ceiling tiles 20x20x2 5.97 5 Plain GI sheet 0.8 mm/1Sqm 338.00 2 300 to 600mm dia

10 Country bricks ( 2 1/4" ) 4035.00 6 Iron works ( lab) 29.10 3 up to 300 mm dia

11 G.MChamber Bricks (II class) 6100.00 f RCC Hume Pipes & coller n Labour wrought put up Door/W

1900 mm dia 2.5m 200 1 Frames/cum

2 900 mm dia 1.0m 2 Shutters/sqm

b Stone and Road materials 3 600 mm dia 2.5m 170 V Miscellaneous (Local Rates)

4 600 mm dia 1.0m 1 Rural sanitay pan

1 Roughstone (masonry) 413.00 III Rates of works 2 Indian water closet

2 Roughstone ( revet ) 358.00 a Clearing the site 3 Wash basin 550x400 mm

3 Bond stones 595.00 1 Lightjungle 3.45 4 Paint/lit

4 Stoneslab (3 face 2 ln) ab 1.2 m 4760.00 2 Scrub jungle 3.15 5 Wood primer paint

5 Km stone1.65 x 0.45 x 0.15m 407.00 6 Red oxide paint

6 Hm stone 0.75 x0.23 x0.10m 208.00 b Dismanling 7 Cement paint


7 Guard stone 0.23x0.23 151.00 8 Plastic emulsion

8 Cut stone roughly dressed 4060.00 1 Brick/stone in clay 39.00 9 Distember/kg

ISS Metal 2 Brick/stone in lime 119.50 10 White / Clr cement (kg)

9 40mm metal 929.00 3 Brick/stone in cement 146.80 11 AC Sheet/sqm

10 20mm metal 1293.00 4 Lime concrete 184.00 12 Crude oil/kg

11 12mm metal 1200.00 5 Cement concrete 252.00 13 Glazed tiles 0.15x0.15

12 10mm metal 883.00 6 RCC 3820.00 14 --do-- 0.3x0.2x.06

13 6mm metal 598.00 7 Chipping concrete 20.90 23/m2 15 Ceramic tiles 0.20x0.20

14 Gravel 188.00 8 Pres.tiles & Weath.Co 23.80 23/m 2


16 --do-- 0.305x0.305

15 Well gravel 154.00 17 --do-- 0.400x0.400

16 Sand for mortar 168.00 IV Pres.tiles 12.12 18 Hollow block 16"x4"x8"

17 Sand for filling 168.00 19 Hollow block 16"x6"x8"

18 Clay for puddle & masonry 35.00 20 Hollow block 16"x8"x8"

19 Cuddapah slab 50mm 390.00 1 Light & Fan Pt(21) /pt 21 Water proofing compound

20 Cuddapah slab 38/40 376.00 2 Plug point /pt VI Steel Doors & Ventilators

21 Cuddapah slab 20/30 346.00 3 16 amp DPIC /pt 1 Two leaf 'W' 0.90x1.20m

22 Granite slab (jet black) 1615.70 4 Meter board /pt 2 Steel Gate 1.20x1.80

23 25mm Iss metal 799.00 5 GI serv. Pipe /m 3 Single leaf 'D' 0.90x2.00m

IRC Metal 6 Serv.main /m 4 Two leaf 'D' 1.10x2.00m

1 45 mm metal 948.00 7 Arial Fuse /pt 5 Two leaf 'W' 0.90x1.20m

2 25 mm metal 914.00 8 4x40W tube /no 6 Zinc door 0.75x1.80m

3 11.2 mm metal 835.00 9 Ceiling.Fan /no 7 Ventilator 0.90x0.45m

4 6 mm metal 620.00 10 BH Fitting /no 8 TV Shutter 0.90x0.75

5 12mm metal 11 40W bulb /no 9 PD shop count 0.45x0.60

CONVEYANCE TABLE FOR THE YEAR 2017-18 (REVISED)FOR PLAINS


Lime stone,
Rough stone, Metal,
brick jelly, M.Tiles(1000), Brick I & II class,
Sl.No. Distance in Km Cement 1 M.T Steel 1.00MT sand, gravel,surki, Country bricks
woodwork pressed tiles(2000) Chamber bricks
earth (1Cum)
(1Cum)

1 2 3 4 5 6 7 8 9

1 Co-efficient 1.00 1.00 1.10 1.60 1.35 1.80 2.25

2 Incidental charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3 Add for every extra 1 km & part there of

a 0 -10 Kms 6.02 6.02 6.60 9.62 8.12 10.82 13.52

b 10 - 20 Kms 5.15 5.15 5.66 8.23 6.95 9.27 11.58

c 20 - 40 Kms 4.43 4.43 4.87 7.09 5.97 7.97 9.96

d 40 - 80 Kms 3.82 3.82 4.21 6.65 5.15 6.86 8.60

e above 80 Kms 3.49 3.49 3.84 5.58 4.71 6.27 7.84

4 Loading charges 92.00 92.00 43.90 30.10 43.20 43.20 43.20

5 Unloading charges 92.00 92.00 43.90 30.10 43.20 43.20 43.20

6 Add above extra for 19.30 19.30 21.20 30.90 26.00 34.70 43.50

inter state works

CONVEYANCE TABLE 2017-18 (REVISED)


KM 0-10 KM 10-20 KM 20-40 KM 40-80

KM I.C KM rate amt KM rate amt KM rate amt KM rate amt

I Buildings

1 Cement 6 0.00 6 6.02 36.12 0 5.15 0.00 0 4.43 0.00 0 3.82 0.00

2 Rough stone 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

3 Bond stone 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

4 40mm iss metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

5 20mm iss metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
6 10-12mm metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

7 6-10mm metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

8 sand for mortar 11 0.00 10 9.62 96.20 1 8.23 8.23 0 7.09 0.00 0 6.65 0.00

9 sand for filling 11 0.00 10 9.62 96.20 1 8.23 8.23 0 7.09 0.00 0 6.65 0.00

10 steel 6 0.00 6 6.02 36.12 0 5.15 0.00 0 4.43 0.00 0 3.82 0.00

11 country bricks 0 0.00 0 8.12 0.00 0 6.95 0.00 0 5.97 0.00 0 5.15 0.00

12 brick jelly 20 mm 0 0.00 0 6.60 0.00 0 5.66 0.00 0 4.87 0.00 0 4.21 0.00

13 shell lime 0 0.00 0 6.60 0.00 0 5.66 0.00 0 4.87 0.00 0 4.21 0.00

14 Lime stone 0 0.00 0 6.60 0.00 0 5.66 0.00 0 4.87 0.00 0 4.21 0.00

15 pressed tiles 0 0.00 0 10.82 0.00 0 9.27 0.00 0 7.97 0.00 0 6.86 0.00

16 CW planks 0 0.00 0 6.60 0.00 0 5.66 0.00 0 4.87 0.00 0 4.21 0.00

17 CW scantlings 0 0.00 0 6.60 0.00 0 5.66 0.00 0 4.87 0.00 0 4.21 0.00

18 Gravel 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

19 cutstone rougly dres 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

20 25mm IRC metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

21 11.2mm IRC metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

22 6mm IRC metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

23 45mm IRC metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00

24 Chamber Bricks 0 0.00 0 13.52 0.00 0 11.58 0.00 0 9.96 0.00 0 8.60 0.00

CONVEYANCE FOR THE YEAR 2015-16 FOR HILLS

Lime stone,
brick jelly, Rough stone, Metal,
woodwork sand, gravel,surki, M.Tiles(1000), Brick I & II class,
Sl.No. Distance in Km Cement 1 M.T Steel 1.00MT (1Cum) earth (1Cum) Country bricks pressed tiles(2000) Chamber bricks

1 2 3 4 5 6 7 8 9

1 Co-efficient 1.00 1.00 1.10 1.60 1.35 1.80 2.25

2 Incidental charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3 Add for every extra 1 km & part there of


a 0 -10 Kms 10.86 10.86 11.94 17.38 14.66 19.54 24.44

b 10 - 20 Kms 9.30 9.30 10.24 14.88 12.56 16.74 20.92

c 20 - 40 Kms 8.00 8.00 8.80 12.80 10.80 14.40 18.00

d 40 - 80 Kms 6.90 6.90 7.60 12.00 9.30 12.40 15.52

e above 80 Kms 6.30 6.30 6.94 10.08 8.50 11.34 14.18


Chamber
Wood Gravel
Bricks

0 0 0

450.00
903.00
230.00
203.00
144.70

Addl. Floor

134.00
90.30
4.5m-
9.00m

134.4 `

90.30
42.50
67.80
63.60
94.70
166.30
7.80
6.20
19.50
22.20
8.02

3.15

3.05

3.05

put up Door/W

30

160.00 local rate

1119.00
1550.00
211.00
136.50
126.70
46.20
274.00
68.30
22.00 25.4 36

175.50
15.00

10.50
28.30 colour printed p.no 51 ,sor 16-17

19.80
45.00
64.00 Cotton 9.70 38
HM stone
0.9x0.15x0.
15 204.00 17

39.60 36

/Sqm

/Sqm

/Sqm

/Sqm

/Sqm

/Sqm

/Sqm

/Sqm

/Sqm
Brick I & II class,
Chamber bricks

KM above 80

KM rate amt TOTAL L &UL

0 3.49 0.00 36.12 0.00

0 5.58 0.00 57.72 0.00


0 5.58 0.00 57.72 0.00

0 5.58 0.00 57.72 0.00

0 5.58 0.00 57.72 0.00


0 5.58 0.00 57.72 0.00

0 5.58 0.00 57.72 0.00

0 5.58 0.00 104.43 0.00

0 5.58 0.00 104.43 0.00

0 3.49 0.00 36.12 0.00

0 4.71 0.00 0.00 0.00

0 3.84 0.00 0.00 0.00

0 3.84 0.00 0.00 0.00

0 3.84 0.00 0.00 0.00

0 6.27 0.00 0.00 0.00

0 3.84 0.00 0.00 0.00

0 3.84 0.00 0.00 0.00

0 5.58 0.00 57.72 0.00

0 5.58 0.00 57.72 0.00

0 5.58 0.00 57.72 0.00

0 5.58 0.00 57.72 0.00

0 5.58 0.00 57.72 0.00

0 5.58 0.00 57.72 0.00

0 7.84 0.00 0.00

Brick I & II class,


Chamber bricks

9
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement,
20 thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30
(Grade), coarse an
Unit = cum
Taking output = 75 cum (172.50 t),(100 x 3.75 x 0.200)
a Labour
7.00 Mate 367.00 day 2569.00
5.00 Mason (1st class) 567.00 day 2835.00
5.00 Mason (2nd class) 508.00 day 2540.00
129.00 Mazdoor (Unskilled) 320.00 day 41280.00
6.00 Mazdoor (Skilled) 355.00 day 2130.00
2.00 Surveyor 467.00 day 934.00
6.00 Mazdoor (Semi-Skilled) 320.00 day 1920.00
14.00 Bhisti 320.00 day 4480.00
58688.00
b Concrete
Machinerymixer 0.28 / 0.4
cum capacity (6 mixers) with
36.00 233.00 hour 8388.00
weigh batcher and suitable
9.00 Needle vibrator
capacity calibrated water tank 116.00 hour 1044.00
5.00 Water tanker 6 kl capacity 310.00 hour 1550.00
Air Compressor (1 hour initial
2.00 319.00 hour 638.00
+ 1 hour final)
11620.00
c Material Km 0/0-1/0 Km 1/0-2/0 Km 2/0-3/0
40.50 20 mm aggregate 1350.72 cum 54704.16 1490.30 60357.15 1496.30 60600.15
27.00 10 mm aggregate 940.72 cum 25399.44 1130.30 30518.10 1136.30 30680.10
33.75 Coarse sand 272.43 cum 9194.51 376.10 12693.38 382.50 12909.38
26.25 Cement 4427.12 MT 116211.90 5658.95 148547.44 5663.60 148669.50
412.50 Polythene sheet 125 micron 15.00 Sqm 6187.50 15.00 6187.50 15.00 6187.50
18.00 Water for curing 130.00 Kl 2340.00 130.00 2340.00 130.00 2340.00
Joint filler board 20 mm thick
3.00 300.00 Sqm 900.00 300.00 900.00 300.00 900.00
as per IS:1838
1 Labour 58688.00 58688.00 58688.00 58688.00 58688.00 58688.00
1 Machinery 11620.00 11620.00 11620.00 11620.00 11620.00 11620.00
d Formwork @ 3% of (a+b+c) 9955.55 9977.84
e Overheads @ 12.5% on (a+b+c+d) 42725.89 42821.56
Cost for 75 cum = a+b+c+d+e 285245.51 384533.01 385394.03
Rate per cum = (a+b+c+d+e)/75 3803.27 5127.11 5138.59
Highways Department Schedule of Rates
Year 2018-19
S.N Description Unit Rates in Rupees
Bituminous work Labour
1 Bitumen sprayer Man Day 465
2 Bitumen raker Man Day 484
3 Heat master operator Day 484
4 Mini Hot Mix plant Operator Day 484
5 Gunnuting plant Operator Day 405
6 Gunnuting gun Operator Day 441
7 Road Mazdoor Grade I Day 401
8 Road Mazdoor Grade II Day 358
9 Head Mazdoor Day 413

Hire Charges for Machineries


1 Power roller 8 - 10 ton per Hour 460.00 Power roller 8 - 10 to Day 828.00
1 Tractor with Trolley per Hour 363.00 Bitumen Boiler withoutDay 202.00
2a Tractor with Rotovator per Hour 380.00 Central Mixing Plant Day 9696.00
2b Tractor with Grader per Hour 380.00 Vibratory Roller Day 5428.00
3 Truck 10 T Capacity per Hour 310.00 Paver Finisher Day 2447.00
4 Hydraulic Excavator of 1 Cum Bucket per Hour 1302.00 Tipper Trucks Day 1094.00
5 Tipper 5 Cum per Hour 310.00 Water Kl 60.00
6 Dozer D-50 per Hour 2206.00 Hydraulic Broom hour 357.00
7 Motor Grader per Hour 2395 Air Compressor 210 c hour 319.00
8 Water Tanker 6 KL (Truck mounted) per Hour 310.00 Loader Day 1205.00
9 Hydraulic Broom @ 1250 Sqm / Hour per Hour 357.00 Water Tanker Day 855.00
10 Air Compressor @ 210 Cfm per Hour 319.00 Motor Grader Day 13533.00
Bitumen Pressure Distributor per Hour 1073.00 Base Mix plant Pug milDay 6679.00
11 Emulsion Pressure Distributor per Hour 800.00 Electric Generating s Day 5179.00
12 Tractor Rotovator Day 2824.00
13 Mix All 6/10 T capacity per Hour 2744.00 Tractor hour 363.00
14 Bitumen Boiler 1000 Litre / 200 Lit per Hour 172.00 Tipper Trucks/Tonne Tonne 2.00
15 Batching & Mixing Plant 15-20 Cum per Hour 1860.00### Fuel for water tanker Day 25.00
16 Paver Finisher per Hour 2674.00### Rotovator hour 17.00
17 Concrete Mixer 0.40 / 0.28 Cum per Hour 233.00 Wet Mix Plant 75 Ton Day 8933.00
18 Needle Vibrator per Hour 116.00 Bitumen Emulsion spr10 Sq.m 15.00
19 Plate vibrator per Hour 116.00 Pneumatic tyred rollerhour 1243.00
20 Screed Vibrator per Hour 116.00 Water Tank 6 KL capa Day 2005.00
21 3 Wheeled 8-10T Static Roller per Hour 460.00 Mini Hot Mix Plant Day 1674
22 Vibratory Roller per Hour 1541.00###
23 Smooth wheeled 80 - 100 KN Tandom per Hour
24 Wet Mix Palnt per Hour 1204.00
25 Tandom road Roller per Hour 1144.00
26 Stone Crusher( Integrated) 200 TPH per Hour 18228.00
27 Hydraulic Self Propelled Chips Spread per Hour 2635.00
28 Water sprinkler Day 1159.00
29 Electric Generator 125KV per Hour 698.00
Diesel (Local Rate) Litre 70.25
Furnace Oil Litre 34.54
Water KL 130.00
AC Pipe 100mm dia Rm 48.47
0.4
Stacking Metal 3.15
Stacking Gravel 3.05
Stacking Sand 3.05
103.5 460 Power roller 8 - 10 ton
25.25 363 Tractor with Trolley
1212 363 Tractor with Rotovator
678.5 363 Tractor with Grader
305.875 310 Truck 10 T Capacity
136.75 1302 Hydraulic Excavator of 1 Cum Bucket
310 Tipper 5 Cum
2206 Dozer D-50
2395 Motor Grader
150.625 386 Water Tanker 6 KL (Truck mounted)
106.875 357 Hydraulic Broom @ 1250 Sqm / Hour
1691.625 319 Air Compressor @ 210 Cfm
834.875 1073 Bitumen Pressure Distributor
647.375 800 Emulsion Pressure Distributor
353 2625 Emulsion Sprayer with Tractor
3272 Mix All 6/10 T capacity
198 Bitumen Boiler 1000 Litre / 200 Lit
3.125 1585 Batching & Mixing Plant 15-20 Cum
305.875 Paver Finisher
1116.625 233 Concrete Mixer 0.40 / 0.28 Cum
120 Needle Vibrator
125 Plate vibrator
250.625 130 Screed Vibrator
209.25 460 3 Wheeled 8-10T Static Roller
678.5Vibratory Roller
460 Smooth wheeled 80 - 100 KN Tandom Roller
1204 Wet Mix Palnt
1144 Tandom road Roller
18228 Stone Crusher( Integrated) 200 TPH
2635 Hydraulic Self Propelled Chips Spreader
1159 Water sprinkler
698 Electric Generator 125KV
55.62 Diesel (Local Rate)
29.66 Furnace Oil
120 Water
44.45 AC Pipe 100mm dia
* Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m

Mazdoor class I =1/4 x 1.08 Nos 401.00 108.27


Rate / Sq.m 10.83

* Soling with 150mm cube stones - 10Sq.m


(i)Labour charges
Mazdoor II for preparing 1/6 No 358.00 59.67
Mazdoor II for watering 1 No 358.00 358.00
Mazdoor I for packing 3 No 401.00 1203.00
Mazdoor II for blinding gravel 1/6 No 358.00 59.67
1680.34
Rate per 10Sq.m 168.03
(ii)Hire Charges
Taking out put = 600 Sq.m
Hire charges for power roller per day 788.57
Fuel charges/da 2.5 litres x 8 Hours x 70.25 1405.00
2193.57
Total hire charges including fuel 2193.57 /600x10 = 36.56

Total hire charges and Labour charges (i)+(ii) Rate per Sq.m 204.59

* Spreading Gravel and consolidation with power roller rolling excluding cost of Gravel

(i) Hire charges for Machineries

Water sprinkler including fuel charges 1103.81


Fuel charges / day 3.25 litres 70.25 / litre 8 lit 1826.50
2930.31
Daily out turn 1000 cum
Hire charges for per cum 2.93
(ii) Power roller 8-10 ton capacity

Hire charges for per day 788.57


Fuel charges / day 20 litres 70.25 per litre 1405.00
2193.57
Daily out turn 425 cum
Hire charges for per cum 5.16
(iii) Labour charges for spreading 100cum of gravel
Mazdoor class I 2 Nos. 401.00 802.00
Labour charges per Cum 8.02

Total hire charges and Labour charges per Cum (i)+(ii)+(iii) 16.11

* Laying well gravel


Labour Charges for the area of 100 cum.
Mazdoor I class 2 Nos. 401.00 802.00
Rate per Cu.m 8.02
* Laying U.S. Gravel
Labour Charges for the area of 100 cum.
Mazdoor I class 2 Nos. 401.00 802.00
Rate per Cu.m 8.02

* Labour charges for WBM patch work - 1 cum


Picking the metal surface 2" to 3" deep
In patches and cutting Maz I 1.08x1/6 401.00 72.18
Removal of picked up stuff and
collection of metal & gravel an Maz I 1.08x1/8 401.00 54.14
conveying the same to site
Brushing and cleaning the surface L.S 3.78
Levelling the materials in the patches and pot holes L.S 4.73
and tamping after blinding with water
Special tools such as wire brush L.S 2.31
Regulation of traffic L.S 2.31
Sundries such as barricading arrangements, L.S 0.81
conveying water etc,.
Rate per Cu.m 140.26

* Forming embankment with earth work excavation from borrow pits and
compaction by power roller

(i) Hire charges and labour charges for earthwork compaction

Hire charges for Machinery


(i) Water sprinkler
Hire charges excluding fuel charges/day 1103.81
Fuel charges / day 3.25 litres 70.25 / litre 8 1826.50
Total hire charges / day 2930.31
Daily out turn 1000 cum
Hire charges per cum 2.93
(ii) Power roller
Hire charges excluding fuel charges/day 788.57
Fuel charges / day 2.5 litres 70.25 / litre 8 1405.00
Total hire charges / day 2193.57
Daily out turn 425 cum
Hire charges per cum 2193.57 /425 5.16

Total hire charges for Machine (i)+(ii) 2.93 + 5.16 8.09

(iii) Labour charges for 100 cum


Mazdoor I class 2 Nos 401.00 802.00
Labour charges per cum 8.02
Hire and Labour charges per M3 (i)+(ii)
+(iii) 8.09 + 8.02 16.11

* Forming embankment with earth work excavation from borrow pits and
compaction by power roller

Hire charges and labour charges for earthwork compaction


Hire charges for Machinery
(i) Water sprinkler
Hire charges excluding fuel charges/day 1103.81
Fuel charges / day 3.25 litres 70.25 / litre 8 1826.50
Total hire charges / day 2930.31
Daily out turn 1000 cum
Hire charges per cum 2.93
(ii) Power roller
Hire charges excluding fuel charges/day 788.57
Fuel charges / day 2.5 litres 70.25 / litre 8 1405.00
Total hire charges / day 2193.57
Daily out turn 500 cum
Hire charges per cum 4.39
Total hire charges for Machinery (i)+(ii) 2.93 + 4.39 7.32

(iii) Labour charges for 100 cum


Mazdoor I class 2 Nos 401.00 802.00
Labour charges per cum 8.02

Hire and Labour charges / M3 (i)+(ii)+


(iii) 7.32 + 8.02 15.34

* Providing and laying Granular sub-base compaction 100mm thick


by power roller - Hire charges and labour charges for GSB -10 Sq.m

(i) Hire charges for Machinery


Water sprinkler
Hire charges excluding fuel charges/day 1103.81
Fuel charges / day 3.25 litres 70.25 / litre 8 1826.50
Total hire charges / day 2930.31
Daily out turn 1000 cum
Hire charges per 10Sq.m 2930.31 /1000 2.93
(ii) Power roller
Hire charges excluding fuel charges/day 788.57
Fuel charges / day 2.5 litres 70.25 / litre 8 1405.00
Total hire charges / day 2193.57
Daily out turn 950 Sq.m of 100mm thick
Hire charges per 10 Sq.m 2193.57 /950x10 23.09

Total hire charges for Machinery/10 sqm 2.93 + 23.09 26.02


(iii) Labour charges (for mixing 950 Sq.m)
Mazdoor I class 6 Nos 401.00 2406.00
Mazdoor II class 24 Nos 358.00 8592.00
10998.00
Labour charges per 10 Sq.m 10998.00 /950x10 115.77

For spreading 100cum


Mazdoor I class 4 Nos 401.00 1604.00
Labour charges for spreading Per 1 Cum or 10 Sq.m 16.04

Total Labour charges for 10 Sq.m 115.77 + 16.04 131.81

Hire charges for Machinery and Labour charges


10 Sq.m of 100mm tk (i)+(ii) 26.02 + 131.81 157.83

* Hire charges and labour charges for WBM Gr.II & III
Hire charges for Machinery
Water sprinkler
Hire charges excluding fuel charges/day 1103.81
Fuel charges / day 3.50 litres 70.25 8 1967.00
Total hire charges / day 3070.81
Daily out turn 450 Sq.m of 75mm thick
Hire charges per 10Sq.m 3070.81 /450x10 68.24
Power roller
Hire charges excluding fuel charges/day 788.57
Fuel charges / day 2.5 litres 70.25 / litre 8 1405.00
Total hire charges / day 2193.57
Daily out turn 450 Sq.m of 75mm thick
Hire charges per 10Sq.m 2193.57 /450x10 48.75

Total hire charges for Machinery / 10M2 68.24 + 48.75 116.99

Labour charges (for spreading 10sq.m 75mm thick)


1.08x3/16 Nos Mazdoor I class 401.00 81.20
1.08x1/4 Nos Mazdoor II class 358.00 96.66
1.08x1/3 Nos Mazdoor III class 358.00 128.88
a) Forming edge bunds L.S. 1.50
b) Maintaining berms for traffic barricading, providing danger lights L.S. 1.50
c) Watering and keeping the surface moist for 15days L.S. 1.50
d) Rent for tools including baskets, sherpining, pick axes L.S. 1.50
e) Sundries such as rope, waterpots L.S. 1.50
Labour charges per 10 Sq.m 314.24

Hire charges for Machinery and Labour charges


10 Sq.m of 75mm tk (i)+(ii) 116.99 + 314.24 431.23
* Applying Tack coat over WBM surface at 4Kg / 10 sq.m

Labour charges for 500 Sq.m


For preparing the surface
10 Nos Mazdoor I class 401.00 4010.00
16 Nos Mazdoor II class 358.00 5728.00
For preparing Tack coat
4 Nos Mazdoor II class 358.00 1432.00
11170.00
(i) Labour charges per 10 Sq.m 11170.00 /500x10 223.40

(ii) Hire charges for Bitumen Sprayer per 10 sqm L.S. 15.00

Rate for Labour and Machinery per 1


Sq.m (i)+(ii)/10= 23.84

* Applying Prime coat over Un primed WBM surface at 7Kg / 10 sq.m

Labour charges for 500 Sq.m


For preparing the surface
10 Nos Mazdoor I class 401.00 4010.00
16 Nos Mazdoor II class 358.00 5728.00
For Applying Prime coat
4 Nos Mazdoor II class 358.00 1432.00
11170.00
(i) Labour charges per 10 Sq.m 11170.00 /500x10 223.40
(ii) Hire charges for Bitumen Sprayer L.S. 15.00

Rate for Labour and Machinery per 1 Sq.m (i)+(ii)/10= 23.84

* Applying Tack coat over Primed WBM surface at 2.50 Kg / 10 sq.m

For Applying Tack coat - 500 sqm


3 Nos Mazdoor IIclass 358.00 1074.00

(i) Labour charges per 10 Sq.m 1074.00 /500x10 21.48


(ii) Hire charges for Bitumen Sprayer L.S. 15.00

Rate for Labour and Machinery per 1 Sq.m (i)+(ii)/10= 3.65

* Applying Tack coat over BT surface at 3Kg / 10 sq.m

Labour charges for 500 Sq.m


For preparing the surface
5 Nos Mazdoor I class 401.00 2005.00
For preparing Tack coat
5 Nos Mazdoor II class 358.00 1790.00
3795.00
(i) Labour charges per 10 Sq.m 3795.00 /500x10 75.90
(ii) Hire charges for Bitumen Sprayer L.S. 15.00
Rate for Labour and Machinery per 1 Sq.m (i)+(ii)/10= 9.09
* Premix carpet with seal coat
Premix Carpet
(i) Mini Hot mix plant
Hire charges excluding fuel charges/Hour 1594.29 / 8 199.29
Fuel charges for running plant 15 lit / Hour 1.00 70.25 1053.75
For heating the aggregate
(Furnace oil) 45 lit / Hour 1.00 34.54 1554.30
Outturn/hour - 180sqm 2807.34

Hire charges for 10 Sq.m 2807.34 / 180x10 155.96


(ii) Power roller
Hire charges excluding fuel charges/day of 8Hour 788.57
Fuel charges -Diesel oil 2.5 lit / Hour 8.00 70.25 1405.00
Daily out turn for PC = 500 Sq.m 2193.57
Hire charges for 10 Sq.m 2193.57 x10/500 43.87

(iii) Bitumen Boiler


Hire charges for bitumen boiler including fuel (Kerosene) / day
192.38 59.04 1668.38
Hire charges / hour 1668.38 / 8 208.55
Out turn per Hour = 125Kg
Hire charges per kg of bitumen 208.55 125 kg 1.668
Bitumen for PC per 10 sqm 14.60 Kg x 1.668 24.36

Total Hire & fuel charges for PC 20mm thick -10 sqm (i)+(ii)+(iii)
(i) Mini Hot mix plant 155.96 /10 sqm
(ii) Roller 43.87 /10 sqm
(iii) Bitumen Boiler 24.36 /10 sqm
224.19 /10 sqm 224.19
Labour charges per 10 sqm
0.75 No. Mazdoor I class 401.00 300.75

Hire and Labour charges Rate / 10 Sq.m 224.19 + 300.75 524.94

Seal coat - Type 'A'


Machinery
(i) Power roller Hire charges excluding fuel charges/day of 8Hour 788.57
Fuel charges -Diesel oil 2.5 lit / Hour 8.00 70.25 1405.00
Power roller including fuel charges per day 2193.57
Daily out turn for seal coat = 1000 Sq.m
Hire charges for 10 Sq.m 2193.57 x10/1000 21.94
(ii) Bitumen Boiler
192.38 + 25 lit x 59.04
Hire charges for bitumen boiler including fuel (Kerosene) / day 1668.38
Hire charges / hour 1668.38 / 8 208.55
Out turn per Hour = 125Kg
Hire charges per kg of bitumen 208.55 / 125kg 1.668
Bitumen for Seal coat Type A 9.80 Kg / 10 Sq.m 16.35
Total Hire & fuel charges for Sealcoat type "A" -10 sqm (i)+(ii)
(i) Roller 21.94 /10 sqm
(ii) Bitumen Boiler 16.35 /10 sqm
38.28 /10 sqm 38.28
Labour charges
0.25 No Mazdoor I class 401.00 100.25
Hire and Labour charges Rate / 10 Sq.m 663.47 663.47
Seal coat - Type 'B'
Machinery
(i) Bitumen Boiler
192.38 + 25 lit x 59.04
Hire charges for bitumen boiler including fuel (Kerosene) / day 1668.38
Hire charges / hour 1668.38 / 8 208.55
Out turn per Hour = 125Kg
Hire charges per kg of bitumen 208.55 / 125kg 1.670
Bitumen for Seal coat Type B 6.80 Kg / 10 Sq.m 11.36
(ii) Mini Hot mix plant
Hire charges excluding fuel charges/Hour 1594.29 / 8 199.29
Fuel charges for running plant 15 lit / Hour 1.00 70.25 1053.75
For heating the aggregate (oil 45 lit / Hour 1.00 34.54 1554.30
Outturn/hour - 664 sqm 2807.34

Hire charges for 10 Sq.m 2807.34 / 664x10 42.28


(iii) Power roller Hire charges excluding fuel charges/day of 8Hour 788.57
Fuel charges -Diesel oil 2.5 lit / Hour 8.00 70.25 1405.00
Power roller including fuel charges per day 2193.57
Daily out turn for seal coat = 1000 Sq.m
Hire charges for 10 Sq.m 2193.57 x10/1000 21.94

Total Hire & fuel charges for Sealcoat type "B" -10 sqm (i)+(ii)+(iii)
(i) Bitumen Boiler 11.36 /10 sqm
(ii) Mini Hot mix plant 42.28 /10 sqm
(iii) Roller 21.94 /10 sqm
75.58 /10 sqm 75.58
Labour charges
0.25 No Mazdoor I class 401.00 100.25
Hire and Labour charges Rate / 10 Sq.m 700.77

Labour charges for Patch work with Bituminous Premix materials for 0.625 cum of
*
Bituminous material.

Picking the road surface 2" to 3" deep


In patches and cutting Mazd I 1.08 x 1/6 401.00 72.18
Removal of picked up sMazd I 1.08 x 1/8 401.00 54.14
Brushing and cleaning the surface L.S 3.78
Spreading the Bitumen for Tack coat L.S 3.10
Prmixing chips with Bitumen in the Drum mixer and laying of
0.625 m3 of metal with 56 Kg of Bitumen L.S 15.75
Levelling and tamping the Premix in the patches and pot holes rolling etc., 4.73
Special tools such as wire brush L.S 2.31
Regulation of traffic L.S 2.31
Sundries such as barricading arrangements, L.S 1.16
Labour charges for laying 0.625 m of Bituminous Material
3
159.46
Labour charges for laying 1.00 m3 of Bituminous material 159.46 / 0.625 255.14
Hire and Labour Charges 2015-16 Rate Unit
1 Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m 10.83 / Sq.m
2 Soling with 150mm cube stones - 10Sq.m 204.59 / Sq.m
Spreading Gravel and consolidation with power roller rolling excluding
3 16.11 /cum
cost of Gravel
4 Laying well gravel 8.02 / cum
5 Laying U.S. Gravel 8.02 / cum
6 Labour charges for WBM patch work 140.26 / cum
7a. Forming embankment with earth work 100 % Compaction 16.11 /cum
7b. Forming embankment with earth work 97 % Compaction 15.34 /cum
Providing and laying Granular sub-base compaction by power roller -
8 157.83 / 10 Sq.m
100 mm thick
9 Providing WBM Grade II & Grade III 75mm thick 431.23 / 10 Sq.m

Providing WBM Grade I 100mm thick 567.02 / 10 Sq.m

10 Applying Tack coat over WBM surface at 4Kg / 10 sq.m 23.84 / Sq.m.
11 Applying Tack coat over BT surface at 3Kg / 10 sq.m 9.09 / Sq.m.
12 Premix carpet with seal coat type A 663.47 / 10 Sq.m
12b Premix carpet with seal coat type B 700.77 / 10 Sq.m
13 Premix Carpet 524.94 / 10 Sq.m
14 Seal coat - Type 'A' 138.53 / 10 Sq.m
15 Applying Prime coat over Un primed WBM surface at 7Kg / 10 sq.m 23.84 / 10 Sq.m
16 Applying Tack coat over Primed WBM surface at 2.50 Kg / 10 sq.m 3.65 / 10 Sq.m
14b Seal coat - Type 'B' 175.83 / 10 Sq.m
15 Labour charges for Bituminous Premix Patch work 255.14 / cum
16 Premix carpet with seal coat type A (Paver) 592.50 / 10 Sq.m
17 Providing WMM Grade 250 mm thick 421.32 / 10 Sq.m
18 Providing BM Grade 50 mm thick 1194.44 / 10 Sq.m
19 Providing DBM Grade 50 mm thick 1196.64 / 10 Sq.m
20 Providing SDBC 623.75 / 10 Sq.m
PREMIX CARPET WITH SEAL COAT Type - A using C

HIRE CHARGES FOR MACHINERIES .


CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day.
Hire charges per day = 9234
Fuel Charges For running the Plant 3
For heating the Bitumen (Furnace Oil) = 2
For heating the Aggregate (Furnace Oil) = 17
Hire Charges including Fuel charges / Hour.
Out turn of CMP per hour for PCSC = 325.00 Sqm
Hire Charges of CMP per 10M2 = 9997.08625 x 10 Sqm/325 =
BITUMEN BOILER.
necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day.
Fuel charges.(Diesel) per day = 2.5lrx
Hire charges including fuel Charges per day
Daily out turn of Power Roller per day for Premix carpert = 500.00 sqm of 20 mm thick.
Hire charges of power roller per 10M2 = 2193.57 x 10 =
500
Daily out turn of Power Roller per day for Seal coat = 1000.00 sqm
Hire charges of power roller per 10M2 = 2193.57 x 10 =
1000
PAVER FINISHER
Hire charges excluding fuel charges per day.
Hire charges per hour = 233
Fuel Charges per hour = 6
Hire charges including Fuel charges per hour
Daily out turn of Paver finisher per 10 Sqm = 325.00 Sqm
Hire Charges of Paver finisher per 10M2 = 712.81 x
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour
Fuel charges.(Diesel) per day = 3.25
Total Hire charges per day
Out turn of Tipper per hour = 325.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 358.55

Total Hire charges of Machinery per 10 sqm


Using Power Roller =307.6+43.87+21.94+21.93+66.19 = 461.53/10sqm
Rs 461.5
LABOUR CHARGES
For loading materials to CMP.
33.00 Nos Mazdoor Grade I 401.00
25.00 Nos Mazdoor Grade II 358.00
For attending Paver Finisher.
10.00 Nos Mazdoor Grade I 401.00
²
Total Labour Charges for 2000.00 M

Labour Charges for 10sqm = 26193

Total Hire Charges and Labour charges.


Using Power Roller. = 461.53 + 130.97

Quantity Description of item Rate


0.18 cum Cost of 13.2 mm metal 1437.86
0.09 cum Cost of 11.2 mm metal 1041.86
0.09 cum Cost of 6.7 mm metal 826.86
24.4 Kg Cost of 60/70 grade bitumen 32159.00
10 Sqm Hire and labour charges 592.50
Rat
L COAT Type - A using CMP

= 9234.29
9234.29 /8hrs = 1154.29
30lrxdieselrate 2107.50
25lrxF.Oil rate 863.50
170lrxF.oil rate 5871.80
= 9997.09

97.08625 x 10 Sqm/325 = 307.60

= 788.57
2.5lrx8xdiesel rate 1405.00
= 2193.57
= 500.00 sqm of 20 mm thick.
2193.57 x 10 = 43.87
500
1000.00 sqm
2193.57 x 10 = 21.94
1000

= 2330.48
2330.48/8hrs = 291.31
6lrxdiesel rate 421.50
712.81

712.81 x 10 / 325 = 21.93

952/8hrs = 130.24
3.25lrxdiesel rate 228.31
= 358.55

358.55 x 6 x 10 = 66.19
325 461.53

19 = 461.53/10sqm
Rs 461.53/ 10 Sqm.
/No = 13233.00
/No = 8950.00

/No = 4010.00

= 26193.00

26193 x 10 Sqm = 130.97


2000
and Labour charges.
461.53 + 130.97 = 592.50

Unit Amount
Cum 258.8148
Cum 93.7674
Cum 74.4174
MT 784.6796
10 Sqm 592.50
Rate per 10 Sqm 1804.18
Rate per Sqm 180.42
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. = 9234.29
Hire charges per day = 9234.29 /8hrs = 1154.29
Fuel Charges For running the Plant 30lrxdieselrate 2107.50
For heating the Bitumen (Furnace Oil) = 25lrxF.Oil rate 863.50
For heating the Aggregate (Furnace Oil) = 170lrxF.oil rate 5871.80
Hire Charges including Fuel charges / Hour. = 9997.09
Out turn of CMP per hour for PCSC = 325.00 Sqm
Hire Charges of CMP per 10M2 = 9997.08625 x 10 Sqm/ 307.60
BITUMEN BOILER.
separate bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 788.57
Fuel charges.(Diesel) per day = 2.5lrx8xdiesel rate 1405.00
Hire charges including fuel Charges per day = 2193.57
Daily out turn of Power Roller per day for Premix carpert = 500.00 sqm of 20 mm thick.
Hire charges of power roller per 10M2 = 2193.57 x 10 = 43.87
500
Daily out turn of Power Roller per day for Seal coat = 1000.00 sqm
Hire charges of power roller per 10M2 = 2193.57 x 10 = 21.94
1000

VIBRATORY ROLLER
Hire charges excluding fuel charges per Hour. = 646.19
Fuel charges.(Diesel) per Hour = 2.5lrxdiesel rate 175.63
Hire charges including fuel Charges per day = 821.82
Daily out turn of Power Roller per day for Premix carpert = 500.00 sqm of 20 mm thick.
Hire charges of power roller per 10M2 = 821.82 x 10 = 16.44
500
Daily out turn of Power Roller per day for Seal coat = 1000.00 sqm
Hire charges of power roller per 10M2 = 821.82 x 10 = 8.22
1000

PAVER FINISHER
Hire charges excluding fuel charges per day. = 2330.48
Hire charges per hour = 2330.48/8hrs = 291.31
Fuel Charges per hour = 6lrxdiesel rate 421.50
Hire charges including Fuel charges per hour 712.81
Daily out turn of Paver finisher per 10 Sqm = 325.00 Sqm
Hire Charges of Paver finisher per 10M2 = 712.81 x 10 / 325 = 21.93
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 1094/8 130.24
Fuel charges.(Diesel) per day = 3.25lrxdiesel rate 228.31
Total Hire charges per day = 358.55
Out turn of Tipper per hour = 325.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 358.55 x 6 x 10 = 66.19
325 461.53
Total Hire charges of Machinery per 10 sqm
Using Power Roller =307.6+43.87+21.94+21.93+66.19 = 461.53/10sqm
Rs 461.53/ 10 Sqm.
Usin Vibratory roller = 420.38

LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 401.00 /No = 13233.00
25 Mazdoor Grade II 358.00 /No = 8950.00
For attending Paver Finisher.
10 Mazdoor Grade I 401.00 /No = 4010.00
²
Total Labour Charges for 2000.00 M = 26193.00

Labour Charges for 10sqm = 26193 x 10 Sqm = 130.97


2000
Total Hire Charges and Labour charges.
Using Power Roller. = 461.53 + 130.97 = 592.50
Using Vibratory Roller. = 420.38 130.97 551.35

Quantity Description of item Rate Unit Amount

cum Cost of 13.2 mm metal 1437.86 Cum 258.8148


0.2

cum Cost of 11.2 mm metal 1041.86 Cum 93.7674


0.1

cum Cost of 6.7 mm metal 826.86 Cum 74.4174


0.1
24 Kg Cost of 60/70 grade bitumen 32159.00 MT 784.6796
Sq
Hire and labour charges 551.35 10 Sqm 551.35
10 m
Rate per 10 Sqm 1763.03
Rate per Sqm 176.30
20 mm thick.

20 mm thick.
Total Hire charges of Machinery per 10 sqm
Using Power Roller =266.59+38.81+19.4+19.68+58.62 = 403.1/10sqm
Rs 403.1/ 10 Sqm.
Usin Vibratory roller = 369.42

LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 350 /No =
25 Mazdoor Grade II 314 /No =
For attending Paver Finisher.

10 Mazdoor Grade I 350 /No =


Total Labour Charges for 2000.00 M² =

Labour Charges for 22900 x 10 Sqm =


2000
Total Hire Charges and Labour charges.
Using Power Roller. 403.1 + 114.5 =
Using Vibratory Roller. 369.42 114.5

Quantity Description of item Rate Unit

0.18 cum Cost of 13.2 mm meta 1299.9 Cum

0.09 cum Cost of 11.2 mm meta 952.9 Cum


0.09 cum Cost of 6.7 mm metal 763.9 Cum

24.4 Kg Cost of 60/70 grade 55319 MT


10 Sqm Hire and labour charg 483.92 10 Sqm
Rate per 10 Sqm
Rate per Sqm
62 = 403.1/10sqm

11550
7850

3500
22900

114.5

517.6
483.92

Amount

233.982

85.761
68.751

1349.7836
483.92
2222.1976
222.21976
WATER BOUND MACADAM GRADE-I
roller,water sprinkler and all other tools and plant employed, barricading etc.,completed.
POWER ROLLER
Hire Charges excluding fuel charges /Day
Hire Charges fuel charges /Day 2.5 70.25
Total Hire Charges /Day
(Daily out turn 350 sqm of 100mm thick)
Hire charges of power roller per 10m2 2193.57 10
350
Water Sprinkler
Hire Charges excluding fuel charges /Day
Hire Charges fuel charges /Day 3.5 70.25
Total Hire Charges /Day
Daily outtern 450 sqm of 100mm thick
Hire charges of power roller per 10m2 3070.81 10
350
Total Hire Charges for Machinery (A+B = C)
LABOUR CHARGES FOR SPREADING
10 SQM OF 100MM THICK
1.44 0.188 Mazdoor-I
1.44 0.25 Mazdoor-II
1.44 0.333 Mazdoor-III
Forming edge bunds
Maintaining berms from traffic barricading providing
danger lights
Watering ant keeping the surface most for 15days
Rent for tools
Sundries such as rope waterpots
Total labour charges for 10 m2
Total Hire & labour Charges (E= C+D)
, barricading etc.,completed.

Rs. 788.57
8 Rs. 1405.00
Rs. 2193.57
Rs. 2193.57
(A) 62.67

Rs. 1103.81
8 Rs. 1967.00
Rs. 3070.81

(B) 87.74

150.41

401.00 Each 108.56


358.00 Each 128.88
358.00 Each 171.67
L.S 1.5

L.S 1.5
L.S 1.5
L.S 1.5
L.S 1.5
(D) 416.61
416.61 150.41 567.02
WET MIX MACADAM - DATA

Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)
specification including premixing the material with water at OMC in machanical mix plant carriage of mixed
material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well
prepared surface and compacting with vibratory roller to achieve the desired density including cost of
material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.

0/0-1/0
Qty Details
Rate Amt.

0.396 45-22.40 mm metal 1221.06 483.54

0.528 22.40-2.36 mm metal 1035.57 546.78

0.396 2.36 mm & Below 754.86 298.92

0.08 Cost of water 130.00 10.4

1 Labour & Hire Charges 421.32 421.32

Rate /cum 1760.96


HIRE CHARGES AND LABOUR CHARGES FOR WET MIX MACADAM 300 mm thick
Machineries
1.Loader 5 cum capacity 13-14 13-14
Hire and running charges per day 1147.62 1147.62
Fuel charges 80 litres per day 80 litres/day 54.15 per/ltr 4332.00 4332.00
Total hire charges including fuel per day 5479.62 5479.62
Total hire charges including fuel per hour 684.95 684.95
2.Tipper
Hire and running charges per day 1041.90 1041.90
Fuel charges 3.25 litres per hour 26 litres/day 54.15 per/ltr 1407.90 1407.90
Total hire charges including fuel per day 2449.80 2449.80
Total hire charges including fuel per hour 306.23 306.23
3.Water tanker
Hire and running charges per day 1909.52 814.29
Fuel charges 25 litres per day 25 litres/day 54.15 per/ltr 1353.75 1353.75
Total hire charges including fuel per day 3263.27 2168.04
Total hire charges including fuel per hour 407.91 271.01
12-13
1205
3952.00
5157.00
644.63

1094
1284.4
2378.4
297.3

855
1235
2090
261.25
HIRE CHARGES AND LABOUR CHARGES FOR WET MIX MACADAM 300 mm thick

Machineries
1.Loader 5 cum capacity 17-18
Hire and running charges per day 1147.62
Fuel charges 80 litres per day 80 litres/day 70.25 per/ltr 5620.00
Total hire charges including fuel per day 6767.62
Total hire charges including fuel per hour 845.95
2.Tipper
Hire and running charges per day 1041.90
Fuel charges 3.25 litres per hour 26 litres/day 70.25 per/ltr 1826.50
Total hire charges including fuel per day 2868.40
Total hire charges including fuel per hour 358.55
3.Water tanker
Hire and running charges per day 814.29
Fuel charges 25 litres per day 25 litres/day 70.25 per/ltr 1756.25
Total hire charges including fuel per day 2570.54
Total hire charges including fuel per hour 321.32
BITUMINOUS MACADAM 50 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.

Hire charges excluding fuel charges per day. = 9234.29


Hire charges per day = 9234.29 /8hrs = 1154.29
Fuel Charges For running the Plant 30 lit of Diesel x 54.15= 2107.50
For heating the Bitumen (Furnace Oil) = 25x50.00 863.50
For heating the Aggregate (Furnace Oil) = 170x50.00 5871.80
Hire Charges including Fuel charges / Hour. = 9997.09
Out turn of CMP per hour for BM = 135.00 Sqm
Hire Charges of CMP per 10M2 = 9997.08625 x 10 Sqm/135 = 740.52
BITUMEN BOILER.
bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 788.57
Fuel charges.(Diesel) per day = 62.3x2.5x8 1405.00
Hire charges including fuel Charges per day = 2193.57
Daily out turn of Power Roller per day for BM = 300.00 sqm of 50 mm thick.
Hire charges of power roller per 10M2 = 2193.57 x 10 = 73.12
300
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day. = 5169.52
Hire charges per hour = 5169.52/8 = 646.19
Fuel charges.(Diesel) per hour = 2.5x62.3 175.63
Hire charges per hour = 821.82
Hourly out turn of Vibrator Roller for BM = 350.00 sqm of 50 mm thick.
Hire charges of Vibratory roller per 10M2 = 821.82 x 10 = 23.48
350
PAVER FINISHER
Hire charges excluding fuel charges per day. = 2330.48
Hire charges per hour = 2330.48/8hrs = 291.31
Fuel Charges per hour = 6x8x62.3 421.50
Hire charges including Fuel charges per hour 712.81
Daily out turn of Paver finisher per 10 Sqm = 135.00 Sqm
Hire Charges of Paver finisher per 10M2 = 712.81 x 10 / 135 = 52.80
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 1094/8hrs = 130.24
Fuel charges.(Diesel) per day = 3.25x62.3 228.31
Total Hire charges per day = 358.55
Out turn of Tipper per hour = 135.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 358.55 x 6 x 10 = 159.36
135
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 740.52+73.12+52.8+159.36=
= 1025.80 /M2
Rs 1025.8/ 10 Sqm.
Using Vibratory Roller = 740.52+23.48+52.8+159.36=
= 976.16 /M2

Rs 976.16/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 401.00 /No = 13233.00
25 Mazdoor Grade II 358.00 /No = 8950.00
For attending Paver Finisher.
10 Mazdoor Grade I 401.00 /No = 4010.00
Total Labour Charges for 1200.00 M² = 26193.00
Labour Charges for 10sqm = 26193 x 10 Sqm = 218.28
1200
Total Hire Charges and Labour charges.

Using Power Roller. = 1025.8 + 218.28 = 1244.08


1244.08.00/10 Sqm
Using Vibratory Roller. = 976.16 + 218.28 = 1194.44
1194.44/10 Sqm
Working out Metal Rate.( 26.5 - 13.2 mm metal )
Quantity Description Rate Unit per Amount
0.18 M3 Cost of25 & 22.4mm metal 1120.50 M3 201.69
0.82 M3 Cost of 13.2 mm metal 1231.00 M3 1009.42
Rate per M3 = 1211.11
Working out Metal Rate.( 13.2 - 2.36 mm metal )
Quantity Description Rate Unit per Amount
0.57 M 3
Cost of 11.2,6.7,6,5.6&4.75 mm metal 648.60 M3 369.70
0.43 M3 Cost of 2.36 mm metal 548.00 M3 235.64
Rate per M3 = 605.34
Working out Metal Rate.( 2.36 mm & below metal )
Quantity Description Rate Unit per Amount
1.00 M3 Cost of 2.36 mm metal 548.00 M3 548.00
Rate per M3 = 548.00

Bituminous Macadam 50 MM thick.


Quantity Description Rate Unit per Amount
0.20 M3 Cost of 26.5 - 13.2 mm graded metal 1417.97 M3 283.59
0.43 M3 Cost of 13.2 - 2.36 mm graded metal 812.20 M3 349.25
0.08 M3 Cost of 2.36 mm & below size metal 754.86 M3 60.39
37.00 Kgs Cost of Bitumen ( % of weight of mi 32159.00 MT 1189.88
10.0 M2 Hire & Labour Charges 1194.44 M2 1194.44
Rate for 10 Sqm of 50 mm thick = 3077.55
Rate per M3 = / 10 X 0.050) = 6155.11
6155.10532
1624.5
Conveyanc 206.86 1417.97

Conveyanc 206.86 812.20

Conveyanc 206.86 754.86


PRIME COAT OVER WMM SURFACE

Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM

surface preparatory to another bituminous construction over it.


Labour charges for 500 Sqm
For preparing the surface 10.00 Nos Mazdoor I class 401.00 / each 4010.00
16.00 Nos Mazdoor II class 358.00 / each 5728.00
For aplying primer 4.00 Nos Mazdoor II class 358.00 / each 1432.00
Total Labour for 500 Sqm 11170.00
Labour for 10 Sqm = 11170.00
x 10 = 223.4
500
Data
7.00 Kgs Cost of Bitumen Emulsion - SS1 46926.00 1 MT 328.48
10.00 Sqm Labour charges 223.4 10 Sqm 223.4
L S Hire for Bitumen sprayer 15.00 10 Sqm 15.00
Rate for Prime coat/10 sqm 566.88
Rate for 1 Sqm 56.69
TACK COAT OVER PRIMED SURFACE

Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1

for 10sqm for preparatory to another bituminous construction over it including cost of material, labour

charges, rentals for machinery, fuel and all other incidental charges etc.,

Labour charges for 500 Sqm

For aplying Tack coat 3.00 No Mazdoor II class 358.00 / each 1074.00

Total Labour for 500 Sqm 1074.00

Labour for 10 Sqm = 1074.00


x 10 = 21.48
500

Data

2.50 Kgs Cost of Bitumen Grade60/70 29026.00 1 MT 72.57

10.00 Sqm Labour charges 21.48 10 Sqm 21.48

10.00 Sqm Hire for Bitumen sprayer 15.00 10 Sqm 15.00

Rate for Prime coat / 10 sqm 109.05

Rate for 1 Sqm 10.91


TACK COAT OVER BT SURFACE

Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and

conveyance of bituminous binder including labour charges for preparing the surface and applying the required

quantity of bitumen as tack coat by b

Labour charges for 500 Sqm

For preparing the surface 5.00 No Mazdoor I class 401.00 / each 2005.00

For aplying Tack coat 5.00 No Mazdoor II class 358.00 / each 1790.00

Total Labour for 500 Sqm 3795.00

Labour for 10 Sqm = 3795.00


x 10 = 75.90
500

Data

3.00 Kgs Cost of Bitumen Grade 60/70 29026.00 1 MT 87.08

10.00 Sqm Labour charges 75.90 10 Sqm 75.9

10.00 Sqm Hire for Bitumen sprayer 15.00 10 Sqm 15.00

Rate for Prime coat / 10 sqm 177.98

Rate for 1 Sqm 17.8


SEMI DENSE BITUMINOUS MACADAM - DATA

Providing and laying Semi Dense Bituminous Concrete based on job mix formula mixed in hot
mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen
60/70 penetration grade as per IS 73 and aggregates conforming to grading

Quantity Description of work Unit Rate Amount

0.10 Cum Cost of 11.2mm Metal Cum 1041.86 104.19

0.16 Cum Cost of 6.7mm Metal Cum 826.86 132.30

0.11 Cum Cost of 2.80mm metal Cum 754.86 83.03

30.00 kg Cost of Bitumen 60/70 grade MT 32159.00 964.77

10.00 Sqm Hire and Labour Charges 10Sqm 623.75 623.75

Rate Per 10 Sqm. Total 1908.04

Rate Per 1 Sqm. Total 190.80

Rate Per 1 Cum. 7632.16


SEMI DENSE BITUMINOUS MACADAM - DATA

Providing and laying Semi Dense Bituminous Concrete based on job mix formula mixed in hot
mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen
60/70 penetration grade as per IS 73 and aggregates conforming to grading

Quantity Description of work Unit Rate Amount

0.10 Cum Cost of 11.2mm Metal Cum 1041.86 104.19

0.16 Cum Cost of 6.7mm Metal Cum 826.86 132.30

0.11 Cum Cost of 2.80mm metal Cum 754.86 83.03

27.60 kg Cost of Bitumen 60/70 grade MT 32159.00 887.59 2.24

2.40 Kg Plastic wastage Kg 35.00 84.00

10.00 Sqm Hire and Labour Charges 10Sqm 623.75 623.75

Rate Per 10 Sqm. Total 1914.86

Rate Per 1 Sqm. 191.49


Rate Per 1 cum. 7659.44
Hire charges for Machinery and Labour charges for SDBC 25mm thick

Hire charges for machinery:

1. CENTRAL HOT MIX PLANT

Hire and running charges 9696/day of 8 hours : 1154.29 Per Hour


Fuel running the CMP @ 30 lit @ 62.3/lit/Hour : 2107.50 Per Hour
Fuel for leading Bitumen 25 lit. furnace oil @50.00/lit : 863.50 Per Hour
For heating aggregate 170 litres of furnace oil @ 50.00/litres : 5871.80 Per Hour
Total Hire and Fuel running charges : 9997.09 Per Hour

Hourly out turn of CMP for 25mm thick of sdbc= 270 sqm

Rate per 10 m2 (12831 x 10/270) : 370.26 (A)

2. BITUMEN BOILER
10 PREMIX CARPET WITH SEAL COAT TYPE ' A '
-for Km

0.18 Cum 13.2mm IRC metal 1025.00 /cum 184.5


0.09 Cum 11.2 mm IRC metal 739.00 /cum 66.51
0.09 Cum 6.7 mm IRC metal 582.00 /cum 52.38
24.40 Kgs Bitumen 60/70 50000.00 /Mt 1220.00
10.00 Sqm Hire & fuel charges for P.C /10sqm
10.00 Sqm Hire & fuel charges for SC /10sqm
492.70 492.70
10.00 Sqm Labour charges for P.C /10sqm
10.00 Sqm Labour charges for S.C /10sqm
2016.09

Rate per sqm Rs 201.61


Data for WMM
45 to 22.4 metal average rate.

1.00 45.00 mm Metal 689.00 689.00

1.00 37.50 mm Metal 703.00 703.00

1.00 26.50 mm Metal 665.00 665.00

1.00 25.00 mm Metal 665.00 665.00

1.00 22.40 mm Metal 965.00 965.00

Total for 5 cum 3687.00

Average rate per cum 737.40

Basic cost 737.40

Conveyance 131.00

Total 868.40
22.4 to 2.36 mm metal average rate.

1.00 22.40 mm Metal 965.00 965.00

1.00 13.20 mm Metal 894.00 894.00

1.00 11.20 mm Metal 608.00 608.00

1.00 6.70 mm Metal 451.00 451.00

1.00 6.00 mm Metal 451.00 451.00

1.00 5.60 mm Metal 451.00 451.00

1.00 4.75 & below 400.00 400.00

Total for 8 cum 4220.00

Average rate per cum 602.86

Basic cost 602.86


Conveyance to plant 131.00
Total 733.86

2.36 mm and below metal average


rate.

Basic Cost 400.00

Conveyance to plant 131.00

531.00
Main data
Qty Main Data Rate Amount Rate
###

0.396 45 to 22.4 868.40 343.89

0.528 22.4--2.36 733.86 387.48

0.396 2.36 and below 531.00 210.28

1 Labour and Hire charges 313.45 313.45

Rate for1 cum 1255.10


DENSE BITUMINOUS MACADAM 50 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. =
Hire charges per day = 9234.29 /8hrs =
Fuel Charges For running the Plant 30litxDiesel rate
For heating the Bitumen (Furnace Oil) = 25litxF.O rate
For heating the Aggregate (Furnace Oil) = 170ltrxF.O rate
Hire Charges including Fuel charges / Hour. =
Out turn of CMP per hour for DBM = 135.00 Sqm
Hire Charges of CMP per 10M2 = 9997.08625 x 10 Sqm/135
BITUMEN BOILER.
Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. =
Fuel charges.(Diesel) per day = 2.5litrxdieselratex8 hrs
Hire charges including fuel Charges per day =
Daily out turn of Power Roller per day for DBM = 300.00 sqm of 50 mm thick.
Hire charges of power roller per 10M2 = 2193.57 x 10 =
300
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day. =
Hire charges per hour = 5169.52/8 =
Fuel charges.(Diesel) per hour = 2.5litrxdieselrate
Hire charges per hour =
Hourly out turn of Vibrator Roller for DBM = 320.00 sqm of 50 mm thick.
Hire charges of Vibratory roller per 10M2 = 821.82 x 10 =
320
PAVER FINISHER
Hire charges excluding fuel charges per day. =
Hire charges per hour = 2330.48/8hrs =
Fuel Charges per hour = 6litrxdiesel rate
Hire charges including Fuel charges per hour
Daily out turn of Paver finisher per 10 Sqm = 135.00 Sqm
Hire Charges of Paver finisher per 10M2 = 712.81 x 10 / 135 =
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 1094/8hrs =
Fuel charges.(Diesel) per day = 3.25litrxdiesel rate
Total Hire charges per day =
Out turn of Tipper per hour = 135.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 358.55 x 6 x 10 =
135
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 740.52+73.12+52.8+159.36=
= 1025.80
Rs 1025.8/ 10 Sqm.
Using Vibratory Roller = 740.52+25.68+52.8+159.36=
= 978.36
Rs 978.36/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 401.00 /No =
25 Mazdoor Grade II 358.00 /No =
For attending Paver Finisher.
10 Mazdoor Grade I 401.00 /No =
Total Labour Charges for 1200.00 M² =
Labour Charges for 10sqm = 26193 x 10 Sqm =
1200

Total Hire Charges and Labour charges.

Using Power Roller. = 1025.8 + 218.28 =


1244.08.00/10 Sqm
Using Vibratory Roller. = 978.36 + 218.28 =
1196.64/10 Sqm

Working out Metal Rate.( 26.5 - 13.2 mm metal )


Quantity Description Rate Unit per
1.00 M3 Cost of 22.4mm metal 1533.86 M3
Rate per M3 =
Working out Metal Rate.( 13.2 - 2.36 mm metal )
Quantity Description Rate Unit per
0.61 M3 Cost of 11.2 mm metal 1041.86 M3
0.39 M3 Cost of 2.36 mm metal 754.86 M3
Rate per M3 =
Working out Metal Rate.( 2.36 mm & below metal )
Quantity Description Rate Unit per
1.00 M3 Cost of 2.36 mm metal 754.86 M3
Rate per M3 =

Dense Bituminous Macadam 50 MM thick.


Quantity Description Rate Unit per
0.35 M3 Cost of 26.5 - 13.2 mm graded metal 1533.86 M3
0.21 M3 Cost of 13.2 - 2.36mm graded metal 929.93 M3
0.14 M Cost of 2.36 mm & below size metal
3
754.86 M3
49.50 Kgs Cost of Bitumen 32159.00 MT
10.0 M2 Hire & Labour Charges 1244.08 M2
Rate for 10 Sqm of 50 mm thick =
Rate per M3 = = / 10 X 0.050) =
9234.29
1154.29
2107.50
863.50
5871.80
9997.09

740.52

788.57
1405.00
2193.57

73.12

5169.52
646.19
175.63
821.82

25.68

2330.48
291.31
421.50
712.81

52.80

130.24
228.31
358.55

159.36

2+52.8+159.36=
/M2

8+52.8+159.36=
/M2

13233.00
8950.00

4010.00
26193.00
218.28

1244.08

1196.64

Amount
1533.86
1533.86

Amount
635.53
294.40
929.93

Amount
754.86
754.86

Amount
536.85
195.29
105.68
1591.87
1244.08
3673.77
7347.53
7347.5344
BITUMINOUS CONCRETE 40 MM THICK
HIRE CHARGES FOR MACHIN
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day = 9234.29
Hire charges per day 9234.29 /8hrs = 1154.29
Fuel Charges For running the Plant 30LITRXDIESEL RATE 2107.50
For heating the Bitumen (Furnac 25litrxF.O 863.50
For heating the Aggregate (Furn 170litxF.O 5871.80
Hire Charges including Fuel charges / Hour = 9997.09
Out turn of CMP per hour for 170.00 Sqm
Hire Charges of CMP per 10M2 = 9997.08625 x 10 Sqm/170 = 588.06
BITUMEN BOILER.
bitumen Boiler is not necessary.
POWER ROLLER 80 - 100
Hire charges excluding fuel charges per day = 788.57
Fuel charges.(Diesel) per day 2.5x8xdiesel rate 1405.00
Hire charges including fuel Charges per da = 2193.57
Daily out turn of Power Roller per day for BC = 300.00 sqm of 40 mm thick.
Hire charges of power roller per 10M2 = 2193.57 x 10 = 73.12
300
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day = 5169.52
Hire charges per hour 5169.52/8 = 646.19
Fuel charges.(Diesel) per hour 2.5x8xdiesel rate 175.63
Hire charges per hour = 821.82
Hourly out turn of Vibrator Roller for BM = 400.00 sqm of 40 mm thick.
Hire charges of Vibratory roller per 10M2 = 821.82 x 10 = 20.55
400
PAVER FINISHER
Hire charges excluding fuel charges per day = 2330.48
Hire charges per hour 2330.48/8hrs = 291.31
Fuel Charges per hour 6litrxdiesel rate 421.50
Hire charges including Fuel charges per hour 712.81
Daily out turn of Paver finisher per 10 Sqm = 170.00 Sqm
Hire Charges of Paver finisher per 10M2 = 712.81 x 10 / 170 = 41.93
TIPPER TRUCKS.
Hire charges excluding fuel c 1094/8hrs = 130.24
Fuel charges.(Diesel) per day 3.25litrxdiesel rate 228.31
Total Hire charges per day = 358.55
Out turn of Tipper per hour = 170.00 Sqm
Number of Tippers required pe6 Trucks.
Hire charges of Tipper per 10M2 = 358.55 x 6 x 10 = 126.55
170
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 588.06+73.12+41.93+126.55=
= 829.66 /M2
Rs 829.66/ 10 Sqm.
Using Vibratory Roller = 588.06+20.55+41.93+126.55=
= 777.09 /M2
Rs 777.09/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 401.00 /No = 13233.00
25 Mazdoor Grade II 358.00 /No = 8950.00
For attending Paver Finisher.
10 Mazdoor Grade I 401.00 /No = 4010.00
²
Total Labour Charges for 1200.00 M = 26193.00
Labour Charges for 10sqm = 26193 x 10 Sqm = 218.28
1200
Total Hire Charges and Labour charges.
Using Power Roller. 829.66 + 218.28 = 1047.94
1047.94.00/10 Sqm
Using Vibratory Roller. 777.09 + 218.28 = 995.37
995.37/10 Sqm

Working out Metal Rate.( 19 - 9.5 mm metal )


Quantity Description Rate Unit per Amount
0.24 M3 Cost of 13.2 mm metal 1437.86 M3 345.09
0.76 M3 Cost of 11.2 mm metal 1041.86 M3 791.81
Rate per M3 = 1136.90
Working out Metal Rate.( 9.5 - 2.36 mm metal )
Quantity Description Rate Unit per Amount
0.66 M3 Cost of 6.7,6,5.6&4.75 mm metal 808.86 M3 533.85
0.34 M3 Cost of 2.36 mm metal 754.86 M3 256.65
Rate per M3 = 790.50

Bituminousconcrete 40 MM thick.
Quantity Description Rate Unit per Amount
0.13 M 3
Cost of 19 - 9.5 mm graded meta 1136.90 M3 147.80
0.17 M3 Cost of 9.5 - 2.36 mm graded met 790.50 M3 134.39
0.26 M3 Cost of 2.36 mm& below 754.86 M3 196.26
50.30 Kgs Cost of Bitumen 32159.00 MT 1617.60
10.0 M2 Hire & Labour Charges 1047.94 M2 1047.94
Rate for 10 Sqm = 3143.98
Rate per cum = 7859.96

Bituminousconcrete 40 MM thick.using plastic


Quantity Description Rate Unit per Amount
0.13 M3 Cost of 19 - 9.5 mm graded meta 1136.90 M3 147.80
0.17 M3 Cost of 9.5 - 2.36 mm graded met 790.50 M3 134.39
0.26 M 3
Cost of 2.36 mm& below 754.86 M3 196.26
46.28 Kgs Cost of Bitumen 32159.00 MT 1488.19
10 M2 Hire & Labour Charges 1047.94 M2 1047.94
4.02 Plastic wastage 35.00 140.84
Rate for 10 Sqm = 3155.42
Rate per cum = 7888.54
602

3155.42
10518.05
1 Kanchipuram

1 Acharapakkam TN188 2014-2015 VedanthangRoad 3.05 Completed

2 Chithamur TN181 2014-2015 L073-CW RRoad 2.8 Maintenanc

3 Kattankolathur TN157 2014-2015 L083-DasarRoad 1.6 In Progres

4 Madurantakam TN168 2014-2015 L050-MC Ro


Road 2.7 In Progres

5 Thiruporur TN0153 2012-2013 C.T. Road Road 2.475 Maintenanc

6 Thiruporur TN159 2014-2015 L056-Seng Road 1.765 Completed

7 Thiruporur TN160 2014-2015 L071-EchurRoad 2.9 Completed

8 Thomas Malai TN0148 2012-2013 Agaramthe Road 2 Maintenanc

9 Uthiramerur TN177 2014-2015 L047-Kavi Road 1.85 In Progres

2 Tiruvallur
1 Gummidipoondi TN2043 2012-2013 A.N.Kuppam
Road 1 Maintenanc
2 Gummidipoondi TN2043 2012-2013 G.M.Road -Road 1 Maintenanc
3 Minjur TN2040 2012-2013 MKT - Oor Road 3 Maintenanc
4 Sholavaram TN2041 2012-2013 MP Road - Road 3 Maintenanc
5 Sholavaram TN2041 2012-2013 Vichoor - Road 2.5 Maintenanc
6 Sholavaram TN2042 2012-2013 MP Road - Road 4.2 Maintenanc
3 Perambalur
1 Alathur TN11110 2016-2017 L031-Z.Athu
Road 1.765 In Progres
2 Alathur TN11110 2016-2017 L055-Siruv Road 3.02 In Progres
3 Alathur TN11113 2016-2017 L053-Karai Road 1.2 In Progres
4 Perambalur TN11115 2016-2017 L029-NochiLSB 41.68 In Progres
5 Alathur TN11117 2016-2017 L055-Siruv LSB 62.52 In Progres
4 Karur
1 Krishnarayapuram TN0735 2012-2013 KanakapillaiRoad 1.091 Maintenanc
2 Krishnarayapuram TN0736 2012-2013 KM34 of Ir Road 3.874 Maintenanc
3 Thanthoni TN768 2016-2017 L093-K.Pit Road 1.025 In Progres
4 Thogamalai TN770 2016-2017 L129-KaranRoad 1.71 In Progres
5 Krishnarayapuram TN775 2016-2017 L113-KuppaRoad 1.2 In Progres
5 Coimbatore
1 Karamadai TN0289 2012-2013 Karamadai Road 0.8 Maintenanc
2 Karamadai TN0290 2012-2013 Karamadai Road 5.95 Maintenanc
3 Karamadai TN296 2016-2017 L108-kurumRoad 0.855 In Progres
4 Thondamuthur TN297 2016-2017 L042-Km Road 0.88 In Progres
5 Karamadai TN2100 2016-2017 L126-Kalaam
LSB 37.7 In Progres
6 Karamadai TN2103 2016-2017 L127-Bujank
LSB 47.66 In Progres
7 Karamadai TN293 2016-2017 L126-KalaaRoad 2.325 In Progres
6 Nagapattinam
1 Kollidam TN9182 2016-2017 L037-RathaRoad 0.88 Completed
2 Kollidam TN9183 2016-2017 L022-PulliyRoad 2.4 In Progres
3 Sirkali TN9215 2016-2017 L134-Thill Road 2.02 In Progres
4 Sirkali TN9215 2016-2017 L132-Path Road 1.267 In Progres
5 Mayiladuthurai TN9189 2016-2017 L097-MudikRoad 2.768 In Progres
6 Sirkali TN9212 2016-2017 L135-Andi Road 1.5 In Progres
7 Sirkali TN9212 2016-2017 L098-AmmaRoad 0.97 In Progres
8 Mayiladuthurai TN9188 2016-2017 L078-Thiru Road 1.3 In Progres
9 Sirkali TN9213 2016-2017 L124-KondaRoad 0.83 In Progres
7 Tiruvarur
1 Nannilam TN2183 2016-2017 L113-KumaRoad 2.62 In Progres
2 Valangaiman TN2187 2016-2017 L023-Sitha Road 3.92 In Progres
3 Valangaiman TN2188 2016-2017 L049-PoontRoad 1.75 In Progres
4 Thiruthuraipoondi TN21101 2016-2017 L062-varamRoad 0.95 In Progres
5 Muthupettai TN21105 2016-2017 L031-KunnaRoad 5.02 In Progres
6 Thiruthuraipoondi TN21111 2016-2017 L090-Manma
LSB 34.12 In Progres
7 Kottur TN2196 2016-2017 L031-AkkarRoad 2.16 In Progres
8 Thiruthuraipoondi TN21113 2016-2017 L075-RayanLSB 27.3 In Progres
8 Tiruchirappalli
1 Manachanallur TN2256 2012-2013 Inamkalpal Road 1 Maintenanc
2 Thuraiyur TN2257 2012-2013 NarasingapRoad 2.9 Maintenanc
3 Marungapuri TN2268 2016-2017 L048-TMM R
r oad 2.6 In Progres
4 Marungapuri TN2269 2016-2017 L061-Manpan
Road 1.63 In Progres
5 Uppiliyapuram TN2270 2016-2017 L052-Vairi Road 3.11 In Progres
6 T.Pet TN2281 2016-2017 L070-T.pet Road 5.08 In Progres
7 Thiruverambur TN2279 2016-2017 L038-Pudukk
Road 2 In Progres
8 Musiri TN2278 2016-2017 L061-Sitha Road 1.6 In Progres
9 Thuraiyur TN2276 2016-2017 L055-Devara
Road 1.6 Completed
10 Thottiam TN2282 2016-2017 L026-KolakRoad 1.81 In Progres
9 Thanjavur
1 Orathanadu TN1772 2012-2013 ParuthikkottRoad 4.4 Maintenanc
2 Sethubavachatram TN1765 2012-2013 Thengadu -LSB 22.26 Maintenan
3 Ammapet TN1776 2016-2017 L031-AmmaRoad 1.887 In Progres
4 Ammapet TN1777 2016-2017 L090-MelatRoad 3.912 In Progres
5 Ammapet TN1778 2016-2017 L065-ArunmRoad 1.711 In Progres
6 Ammapet TN1778 2016-2017 L070-PirantRoad 0.894 In Progres
7 Ammapet TN1779 2016-2017 L073-Kovil Road 0.987 In Progres
10 Tuticorin
1 Vilathikulam TN2542 2012-2013 SH44 - T.PRoad 1.9 Maintenanc
2 Ottapidaram TN2569 2016-2017 L051-Otta Road 5.742 In Progres
3 Ottapidaram TN2572 2016-2017 L054-Nagam
Road 2.581 In Progres
4 Ottapidaram TN2573 2016-2017 L072-AkkanRoad 3.112 In Progres
11 Virudunagar
1 Aruppukottai TN2850 2012-2013 Melamadai Road 0.8 Maintenanc
2 Sattur TN2831 2012-2013 Madurai KaRoad 1.4 Maintenanc
3 Sattur TN2843 2012-2013 Madurai-KaRoad 2.03 Maintenanc
4 Srivilliputhur TN2837 2012-2013 Srivilliput Road 2 Maintenanc
5 Virudhunagar TN2850 2012-2013 K.Pudur - SRoad 1.7 Maintenanc
6 Watrap TN2837 2012-2013 Watrab-AlaRoad 2.2 Maintenanc
7 Watrap TN2837 2012-2013 Watrap - MRoad 5 Maintenanc
8 Watrap TN2837 2012-2013 Tenkasi-ThRoad 1.2 Maintenanc
9 Watrap TN2851 2012-2013 Watrap-MahRoad 4.6 Maintenanc
10 Vembakottai TN2862 2016-2017 L039-Sattu Road 1.05 In Progres
11 Vembakottai TN2862 2016-2017 L028-Sattu Road 0.882 In Progres
12 Vembakottai TN2862 2016-2017 L049-Sevalp
Road 1.364 In Progres
12 Vellore
1 Nemili TN2695 2012-2013 BS road(miRoad 3 Maintenanc
2 Nemili TN26104 2014-2015 Panapakkam
Road 5.08 Completed
3 Arakonam TN26105 2016-2017 L031-Puliy Road 1.018 In Progres
4 Nemili TN26106 2016-2017 L082-AO Ro
Road 3.145 In Progres
5 Arcot TN26109 2016-2017 L042-Piller Road 2.604 In Progres
6 K.V. Kuppam TN26110 2016-2017 L048-Vadu Road 1.57 In Progres
7 Pernambet TN26112 2016-2017 L024-T K VRoad 0.931 Completed
8 Kandhili TN26113 2016-2017 L071-S T VRoad 2.806 Completed
13 Villupuram
1 Melmalayanur TN27163 2016-2017 L027-Km 60Road 1.993 In Progres
2 Melmalayanur TN27163 2016-2017 L048-Km 2.6
Road 2.015 Completed
3 Merkanam TN27165 2016-2017 L060-132.8Road 1.325 In Progres
4 Mugaiyur TN27158 2016-2017 L046-VilandRoad 3.372 In Progres
5 Mugaiyur TN27155 2016-2017 L034-vpm-TRoad 4.462 Completed
6 Olakkur TN27173 2016-2017 L021-KM 10Road 0.966 In Progres
7 Thirunavalur TN27175 2016-2017 L026-Easwa
Road 2.2 In Progres
8 Vanur TN27156 2016-2017 L052-KMm Road
4 2.952 In Progres
9 Chinnasalem TN27160 2016-2017 L031-NattaRoad 1.719 Completed
10 Chinnasalem TN27160 2016-2017 L040-CVS Road 0.997 Completed
14 Ramanadhapuram
1 Bogalur TN14129 2014-2015 L026-BogalRoad 2.28 Completed
2 Kadaladi TN14147 2016-2017 L066-ErwadRoad 1.93 In Progres
3 Kadaladi TN14147 2016-2017 L065-ChinnRoad 1.61 In Progres
4 Nainarkoil TN14150 2016-2017 T02-Ariyan Road 8.6 Completed
5 Mudukulathur TN14152 2016-2017 L070-Abira Road 2 Completed
6 Nainarkoil TN14153 2016-2017 L039-RamnRoad 2 Completed
7 Kamuthi TN14152 2016-2017 T06-KamutRoad 3.2 Completed
15 Sivagangai
1 Ilayangudi TN1665 2016-2017 L023-SooraRoad 3.5 In Progres
2 Kalaiyarkoil TN1663 2016-2017 L041-KalayRoad 2.65 In Progres
16 Salem
1 Gangavalli TN15104 2016-2017 L028-T T roRoad 4.88 In Progres
2 Thalaivasal TN15105 2016-2017 L031-GovinRoad 2.64 In Progres
3 Salem TN15111 2016-2017 L035-Ariya Road 0.855 In Progres
4 Yercaud TN15113 2016-2017 L033-VanioRoad 4.95 In Progres
5 Panamarathupatti TN15114 2016-2017 L037-VaniyRoad 1 In Progres
6 Mecheri TN15117 2016-2017 L094-SolapRoad 1.74 In Progres
7 Kolathur TN15118 2016-2017 L051-KathirRoad 1.3 In Progres
8 Thalaivasal TN15106 2016-2017 L069-TV roRoad 1.61 In Progres
17 Dindigul
1 Guziliamparai TN0546 2012-2013 Kottanatha Road 2.675 Maintenanc
2 Palani TN0550 2012-2013 Kanakkanpat
Road 4.4 Maintenanc
3 Dindigul TN575 2016-2017 L033-SiluvaRoad 2 In Progres
4 Shanarpatti TN573 2016-2017 L080-Raman
Road 1.8 In Progres
5 Palani TN577 2016-2017 L054-KarikaRoad 2.1 In Progres
6 Guziliamparai TN570 2016-2017 L116-RP PilRoad 2.55 In Progres
18 Tiruppur
1 Uthukuli TN31106 2016-2017 L070-MoratRoad 1.49 In Progres
2 Dharapuram TN31101 2016-2017 L046-PonnaRoad 5.85 In Progres
3 Dharapuram TN31102 2016-2017 L076-Gobi Road 2.86 In Progres
4 Pongalur TN31104 2016-2017 L047-KoduvRoad 0.76 In Progres
5 Palladam TN31104 2016-2017 L048-K A r Road 1.69 In Progres
19 Erode
1 Anthiyur TN12103 2014-2015 ThamaraikaRoad 2 Completed
2 Anthiyur TN12104 2014-2015 ThamaraikaRoad 2.35 Completed
3 Modakkuruchi TN12105 2016-2017 L059-Ganap
Road 1.53 Completed
4 Modakkuruchi TN12106 2016-2017 L049-Km 0 Road 1.886 Completed
5 Perundurai TN12107 2016-2017 L026-ErodeRoad 1.2 In Progres
6 Ammapet TN12110 2016-2017 L025-Kitta Road 3.45 In Progres
7 Anthiyur TN12111 2016-2017 L021-Eratt Road 2.83 Completed
8 Anthiyur TN12112 2016-2017 L072-KC roRoad 2.2 In Progres
9 Nambiyur TN12113 2016-2017 L027-CheyuRoad 2.3 In Progres
10 T.N. Palayam TN12115 2016-2017 L051-SAB rRoad 2.24 In Progres
20 Namakkal
1 Kabilarmalai TN1067 2014-2015 L036-Sellu Road 0.815 Maintenanc
2 Kabilarmalai TN1067 2014-2015 L050-Vettu Road 1.2 Maintenanc
3 Paramathy TN1067 2014-2015 Cheyyampal
Road 0.66 Maintenanc
4 Paramathy TN1067 2014-2015 TiruchengoRoad 0.725 Maintenanc
5 Mallasamudram TN1069 2014-2015 Pillanatha Road 2.6 In Progres
6 Erumapatty TN1083 2016-2017 L052-ReddRoad 1.17 In Progres
No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I


No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I


No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I


No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Completed PMGSY I

No SQC Completed PMGSY I

No SQC Completed PMGSY I

No SQC Completed PMGSY I

No SQM Completed PMGSY I

No SQC Completed PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I


No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I

No SQC Forwarded PMGSY I


District allotted EE contact SQM contact
Sl.No. Name of SQM
No No
H.
1 9444380967 Namakkal 9444380967
Balasubramanian
7373704573
Coimbatore
1 K.Durairaj 7373704591 9842499396
The Nilgiris

7373704576
Kancheepuram
2 C.Duraisamy 7373704562 9442560254
Tiruvallur

7373704574
Thanjavur
3 R.Elangovan 7373704575 9443984817
Nagapattinam

Vellore 7373704599
4 M.K.Ganesan 9786297171
Tiruvannamlai 7373704566

Tiruppur 7373704572
5 V.Inbaarasu 9843929344
Sivagangai 7373704587

Kanniyakumari 73737045
6 A.Inbamani 9443384942
Tirunelveli 7373704588

7373704576
Tiruvarur
7 S.Jeyaraj 7373704585 9443994040
Ramanathapuram

Cuddalore 7373704581
8 M.Muthuvalliappan 9443179854
Villupuram 7373704582
7373704563
Pudukottai
9 S.Ramasamy 7373704564 9894777773
Madurai

Dharmapuri 7373704569
10 T.Selvaraj 9443210183
Krshnagiri 7373704570

Theni 7373704583
11 D.Thangaraj 9443255585
Dindigul 7373704584

Ariyalur 7373704579
12 C. Tiruppathy 9444363397
Perambalir 7373704580
7373704589
Thoothukudi
13 M.Sangarappan 7373704586 9600840940
Virudhunagar
Ariyalur 7373704579
12 C. Tiruppathy 9444363397
Perambalir 7373704580
7373704589
Thoothukudi
13 M.Sangarappan 7373704586 9600840940
Virudhunagar
SQM contact
No

9444380967

9842499396

9442560254

9443984817

9786297171

9843929344

9443384942

9443994040

9443179854

9894777773

9443210183

9443255585

9444363397

9600840940
9444363397

9600840940
1 H. Balasubramanian 9444380967 Dharmapuri

2 K.Durairaj 9842499396 Dindigul

3 C.Duraisamy 9442560254 Salem

4 R.Elangovan 9443984817 Virudhunagar

5 V.Inbaarasu 9843929344 Thoothukkudi

6 A.Inbamani 9443384942 Villupuram

7 S.Jeyaraj 9443994040 Kancheepuram

8 M.Muthuvalliappan 9443179854 Coimbatore

9 S.Ramasamy 9894777773 Thanjavur

10 T.Selvaraj 9443210183 Ariyalur

11 D.Thangaraj 9443255585 Cuddalore

12 C. Tiruppathy 9444363397 Pudukkottai

13 M.Sangarappan 9600840940 Erode


Krishnagiri Ramanathapuram

Theni Tirunelveli

Namakkal Tiruppur

Madurai Tiruvarur

Kanniyakumari Vellore

Tiruvannamalai

Tiruvallur

Nilgiris

Tiruchirappalli

Perambalur

Nagapattinam
Myladudhurai

Sivagangai

Karur
96

273600

You might also like