20mm Thick Open-Graded Premix Carpet Using Bituminous (Penetration Grade/modified Bitumen) Binder
20mm Thick Open-Graded Premix Carpet Using Bituminous (Penetration Grade/modified Bitumen) Binder
20mm Thick Open-Graded Premix Carpet Using Bituminous (Penetration Grade/modified Bitumen) Binder
Unit = sqm
a) Labour
1.08 Mate 178.00 day 192.24
7486.20
Km : 0 / 0 - 1 / 0 Km : 1 / 0 - 2 / 0 Km : 2 / 0 - 2 / 1
0.73 Bitumen (S-65) @ 14.60 kg per 41800.00 t 30514.00 41800.00 30514.00 41800.00 30514.00
Crushed stone chipping, 13.2
13.50 mm to 5.6 mm @ 0.27 cum 745.28 cum 10061.28 749.83 10122.71 754.38 10184.13
per 10 sqm
1.00 Labour 4485.24 4485.24 4485.24 4485.24 4485.24 4485.24
Page 1 of 149
Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the
specified levels, grade and cross fall using Type A, Type B and Type C as per Technical
Specification Clause 510
Unit = sqm
a) Labour
b) Machinery 4759.70
Bitumen boiler oil fired, capacity 1000 litre fitted
2.20 160.00 hour 352.00
with spray set
2.20 Three wheel 80-100 kN static roller 371.00 hour 816.20
1168.20
Km : 0 / 0 - 1 / 0 Km : 1 / 0 - 2 / 0 Km : 2 / 0 - 2 / 1
Bitumen (S-65) @ 9.80 kg per
1.078 41800.00 t 45060.40 41800.00 45060.40 41800.00 45060.40
10 sqm
Page 2 of 149
DATA using Bituminous Emulsion
a) Labour
2463.60
c) Material Km : 0 / 0 - 1 / 0
Bitumen Emulsion @ 21.50 kg
1.94 43700.00 t 84778.00
per 10 sqm
Crushed stone chipping, 13.2
24.30 mm to 5.6 mm @ 0.27 cum 745.28 cum 18110.30
per 10 sqm
1.00 Labour #REF! #REF!
Page 3 of 149
Seal Coat
Providing and laying seal coat sealing the voids in a bituminous surface laid to the
specified levels, grade and cross fall using Type C as per Technical Specification
Clause 510
Unit = sqm
a) Labour
c) Material Km : 0 / 0 - 1 / 0
Bitumen Emulsion @ 10 kg
2.70 43700.00 t 117990.00
per 10 sqm
Page 4 of 149
TAMIL NADU RURAL EMPLOYMENT GUARANTEE SCHEME
MGNREGS 2018-19
District : Theni
Block : Aundipatti
Panchayat : Rengasamuthiram
Habitation : Rengasamuthiram
SF.No. :
The mahatma Gandhi National Rural Employment Gurantee Act 2005 was enacted to provide
for the enhancement of livelihood security of the house holders in rural area by providing at least 100 days
of guranteed employment in every finaci
The Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNRGES) is being
implemented in Tamil Nadu from 02-02-2006.
The supplementary guidelines are issued by the Director of Rural Development and Panchayat
Raj, Chennai in D.O.Lr.No. 43857/2006/tregs-1 Dt: 17-07-2006 for speedy implementation of this
programme.
1 Earth work Excavation in all clases of soils with an initial lead and lift as per SS 20B.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all
2 labour charges
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all
4 labour charges
Cost of Estimate;
The Estimate cost works out to Rs.4.50 Lakhs The Assets created under MGNREGS will be
maintained by concerned Panchayat Union / Village Panchayat
Rate Adopted:
The Estimate has been prepared based on the Rural Schedule of Rate which has been
approved in G.O.Ms. No.26 RD & Panchayat Raj (CGS-1). Dept. Dt: for the unskilled labour oriented
work exclusively for The Mahatma Gandhi National Rural Employment Gurantee Scheme and PWD of
Rates for the Year 2018-19
ABSTRACT ESTIMATE
Name of Work : Construction of Cement concrete check dam at Rengasamuthiram
supply channel near Muthumariamman kovil in Rengasamuthiram Panchayat.
TOTAL 450000
DETAILED ESTIMATE
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in
1
hard gravelly soil as per SS 20B for foundation
17.64
17.64
for 0.60-above
30.34
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all
2 materials to site and all labour charges for mixing laying and curing etc., completed for
foundation.
Centering and shuttering charges for retaining wall side work including cost and
3
conveyance of all labour charges
Ist Footing
2nd Footing
super structure
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all
4 materials to site and all labour charges for mixing laying and curing etc., completed for
foundation.
Ist Footing
2nd Footing
super structure
84.05
CC 1:2 :4 mix using 20 mm iSS metal including cost and conveyance if all materials to site
5
and all labour charges for mixing laying finishing and curing etc., completed.
2.70
Sl.No. Description of work Nos. L B D Quantity
Rough stone dry packing using rough stone,wedges, including cost and conveyance if all
6 materials to site and all labour charges for mixing laying finishing and curing etc.,
completed.
2.59
Re-filling with excavated earth and all other labour charges as per standard specification
7
etc.
13 Contingencies LS
PAGE15
6 Rough stone dry packing for aprons and revetments including cost and
conveyance and all labour charges etc complete
SI.
Quantity Details Rate Per Amount
No
loading
Sl.No Name of materials Lead in KM cost Conveyance Total
unloading
2 Cement concrete 1:2:4 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
3 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
4 Supplying and erecting centering shuttering including necessary supports for plane
surface in foundation and basement and in all floors for R C C column footing
column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild
steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country
wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and
supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre
complete complying with standard specifications and as directed by departmental
officers including conveyance of all materials to site and proper centering etc complete.
Sub Data I
Cost of MS sheets & angles for each set
Weight of MS sheet B.G 10 Gauge size 90x60cm x 3.175 mm
3.175 x 7850/1000 = 24.924 kg/m2
24.924 Kg/m2 x 0.54 m2 = 13.46 Kg.
Weight of MS angle size 25 x 25 x 3 mm
3.6 x 1.1 Kg/m = 4.00 Kg
13.46 kgs Cost of MS sheet 40.50 /kg 545.13
4 kgs Cost of MS angle 40.50 /kg 162.00
17.46 Cutting,bending,welding,etc 29.10 508.09
1215.22
Sub Data 2 PAGE19
Cost of MS sheets and angles and CW joists and casurina props - 10 Sqm
Rate per one operation for MS sheet & angle 23089.10 /40 577.23
Rate per one operation for strutting 4145.64 /5 829.13
5 Refilling the basement with excavated earth other than sand complying the
Standard specification
RATE @RS 22.20 /cum
DATA 2018-19
Furnace oil
Metal 63 -
13.2 - 6.7
Kerosene
Chainage
Chainage
Emulsion
22.4 mm
Bitumen
Starting
Ending
Diesel
mm
Metal
32159.00 29026.00 70.25 59.04 34.54 0.000 5.000 Plain 23.50 23.50
Rates for Bitumen, Emulsion, Diesel, Kerosene, Furnace oil, Steel & Cement should be authorized by Executive
Steel 41390.00 Note: Engineer as on current date
Emulsion
46926.00
Bitumen SS1
I ROADS
S.No Description of work 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00
12 Collection and spreading of gritty gravel 477.69 485.91 494.13 502.36 510.58
16 PREMIX CARPET WITH SEAL COAT(Plastic) 187.96 188.22 188.47 188.73 188.98
Sand 11 0
Metal 6 0
Gravel 6 0
2397.45
3 C.M 1:3
wmc 2463.35
1866.19
4 C.M 1:4
wmc 1932.09
1547.44
5 C.M 1:5
wmc 1613.34
1334.94
6 C.M 1:6
wmc 1400.84
4 C.C.1:2:4 3943.62
5 C.C.1:4:8 2898.82
6 C : C 1: 5: 10 2755.39
8 R.C. C 1: 2: 4 4828.64
9 R . R. MASONARY 1 : 4 3085.70
10 R . R. MASONARY 1 : 5 2977.33
………… 0
14.2
Lead
Cement
80/100
Gravel
ized by Executive
PLASTIC 35.00
0.00 0.00
574.97
574.97
1670.14 55.4
1670.14
78.47
16.11
140.26
1068.01 58.8
1027.17
145.15
1246.92
……….
CHECK SLIP
1 Name of the Scheme : MGNREGS 2018 -19
2 District : Theni
3 Block : Aundipatti
5 Panchayat : Rengasamuthiram
6 Habitation : Adikampatti
7 S.F.No :
Total 290641
DETAILED ESTIMATE
Name of work : Renovation of Supply channel from Aathukadu to
Adaikampatti burial ground in Thekkampatti
Panchayat.
1905
1230
Panchayat Union:- Periyakulam QUARRY LEAD CHART
Panchayat:- JELLIPATTI Habitation:-
To Kodaikanal
Thailalaramman karadu Pattalamma
n Koil Road
1/6
1/2 G.Kallupatti
1) Cement and Steel & Bitumen from Panchayat Union Office, Vadugapatti
9.00 Km (or)
a) union office vadugapatti 3/0 - 3/4 =0.40 0/0- 3/0 = 3.00
59/6 - 63/4 =3.80, 0/0-2/0=2.00 9.00
2) All stones like rough stone, bond stone and Broken stoneand Red gravel from
KARUTHAMALA KARADU
68/0-72/8- 4.8 0/0 - 4/4 = 4.40, 68/8-64/2=7.60 0/0-2/0=2.00 18.80 Km
19.00
I BASIC COST OF 63 MM TO 45 MM METAL ( WBM Grade II ) BASIC COST OF 53 MM TO 22.4 MM METAL ( WBM Grade III )
1 0.050 M3 75 mm IRC Metal 448.00 22.40 0.025 M3 63 mm IRC Metal 581.00 14.53
2 0.450 M3 63 mm IRC Metal 581.00 261.45 0.200 M3 53 mm IRC Metal 706.00 141.20
3 0.425 M3 53 mm IRC Metal 706.00 300.05 0.725 M3 45 mm IRC Metal 948.00 687.30
4 0.050 M3 45 mm IRC Metal 948.00 47.40 0.025 M3 22.40 mm IRC Metal 1327.00 33.18
5 0.025 M3 22.40 mm IRC Metal 1327.00 33.18 0.025 M3 11.20 mm IRC Metal 835.00 20.88
Total 515.08
ROAD METAL RATE
KM 0.00 1.00 Rate per cubic metre
Convey
REACH
Cost at Stacking
Name of quarry Kind of metal Distance in KM ance Total
Quarry Charges
(Plain)
Plains Hills
WBM Gr II metal 24 0 664.48 206.86 3.15 874.49
Unit = cum
Taking output = 300 cum
a) Labour
0.48 Mate 413.00 day 198.24
2 Mazdoor (Skilled) 401.00 day 802.00
10 Mazdoor (Unskilled) 358.00 day 3580.00
b) Machinery 4580.24
12 Tractor with grader @ 25 cum per hour 380.00 hour 4560.00
Three wheel 80-100 kN static roller @
30 460.00 hour 13800.00
10 cum per hour
5 Water tanker 6 kl capacity 310.00 hour 1550.00
12 Tractor mount with Rotavator 25 cum per 380.00 hour 4560.00
24470.00
63mm to
26.5mm
126 IRC HBG 1040.21 cum 131066.46 1047.30 131959.80 1054.39 132853.14
metal
@35 %
26.5mm
to
4.75mm
162 1095.14 cum 177411.87 1102.23 178560.45 1109.32 179709.03
IRC HBG
metal@4
5%
4.75 mm
below
72 IRC HBG 758.01 cum 54576.72 765.10 55087.20 772.19 55597.68
metal@
20 %
30 Water 130.00 Kl 3900 130 3900.00 130.00 3900.00
1 Labour 3326 4580.24 3326 3326.00 3326.00 3326.00
1 Machinery 24470.00 24470.00 24470 24470.00 24470.00 24470.00
Cost for 300 cum = a+b+c 396005.29 397303.45 399855.85
Rate per cum = (a+b+c)/300 1320.02 1324.34 1332.85
Highways Department
SCHEDULE OF RATE 2018-19
Rates in
S.No. Description Unit
Rupees
IV Rates of works
VI Other Materials
1 Cement Mt 4391.00
2 Sand one cum 168.00
3 Sand for filling one cum 168.00
4 Rough stone one cum 358.00
5 Bond stone one cum 595.00
6 40mm ISS metal one cum 929.00
7 20mm ISS metal one cum 1293.00
8 Country bricks 1000 nos 5130.00
9 25mm ISS metal one cum 799.00
RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN PLAINS FOR THE YEAR 2018-19
Broken Stone
Br. Jelly, Wood
Sand
Sl.No. Distance in Kilometre work
Gravel
(one m3)
(one m3)
1 2 3 4
1 Co- efficient 1.10 1.60
2 Incidental charges
2 Labour charges for Patch work with Bituminous Premix materials for 0.625 cum of
Bituminous material.
Prmixing chips with Bitumen in the Drum mixer and laying of 0.625 m3 of metal
with 44 Kg of Bitumen
Levelling and tamping the Premix in the patches and pot holes rolling etc.,
Regulation of traffic
Regulation of traffic
2 Gravel soling
16 Seal Coat
210.01 1038.72
210.01 758.01
885.13 26.5-4.75
548.00 4.75&below
548
e (for PLAINS) 2018-19
Chamber
Country Mangalore
bricks,
Bricks Tiles
Flooring
(1000 (1000Nos,)
tiles.
Nos,)
(1000nos)
5 6 7
1.35 1.80 2.25
L.S. 1.50
L.S. 1.50
L.S. 1.50
L.S. 1.50
L.S. 1.50
L.S 3.78
L.S 3.10
15.75
L.S
L.S 4.73
L.S 2.31
L.S 2.50
L.S 1.16
L.S 2.20
L.S 5.50
L.S 2.20
L.S 2.20
L.S 0.55
Out Turn
425 Cum
425 Cum
600 Cum
650 Cum
450 Cum
950 Cum
740 Sqm
550 Sqm
450 Sqm
350 Sqm
300 Sqm
225 Sqm
225 Sqm
300 Sqm
500 Sqm
1000 Sqm
800 Sqm
550 Sqm
600 Sqm
400 Sqm
1100 Sqm
Highways Department
SCHEDULE OF RATE 2014-15
18 Water Kl 120
III
FUEL RATES
IV Rates of works
VI Other Materials
1 Cement Mt 4900.00
2 Sand one cum 176.40
3 Sand for filling one cum 176.40
4 Rough stone one cum 316.00
5 Bond stone one cum 500.50
6 40mm ISS metal one cum 816.00
7 20mm ISS metal one cum 1135.00
8 Country bricks 1000 nos 4220.00
9 25mm ISS metal one cum 638.00
VII Conveyance Table (for PLAINS) 2014-15
RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN PLAINS FOR THE YEAR 2014-15
Broken Stone
Br. Jelly, Wood
Sand
Sl.No. Distance in Kilometre work
Gravel
(one m3)
(one m3)
1 2 3 4
1 Co- efficient 1.10 1.60
2 Incidental charges
RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN HILLS FOR THE YEAR 2014 - 1
Broken Stone
Br. Jelly, Wood
Sand
Sl.No. Distance in Kilometre work
Gravel
(one m3)
(one m3)
1 2 3 4
1 Co- efficient 0.00 0.00
2 Incidental charges
2 Labour charges for Patch work with Bituminous Premix materials for 0.625 cum of Bituminous
material.
Prmixing chips with Bitumen in the Drum mixer and laying of 0.625 m3 of metal with 44 Kg
of Bitumen
Levelling and tamping the Premix in the patches and pot holes rolling etc.,
Regulation of traffic
Regulation of traffic
2 Gravel soling
16 Seal Coat
46.60 775.03
46.60 530.60
GSB iii
570.6
484
PLAINS) 2014-15
Chamber
Country Mangalore
bricks,
Bricks Tiles
Flooring
(1000 (1000Nos,)
tiles.
Nos,)
(1000nos)
5 6 7
1.35 1.80 2.25
Country Mangalore
Bricks Tiles Chamber
Bitumen
(1000 (1000Nos,) bricks
Nos,)
5 6 7 8
0.00 0.00 0.00 0.00
L.S 3.78
L.S 3.10
15.75
L.S
L.S 4.73
L.S 2.31
L.S 2.50
L.S 1.16
L.S 2.20
L.S 5.50
L.S 2.20
L.S 2.20
L.S 0.55
Out Turn
425 Cum
425 Cum
600 Cum
650 Cum
450 Cum
950 Cum
740 Sqm
550 Sqm
450 Sqm
350 Sqm
300 Sqm
225 Sqm
225 Sqm
300 Sqm
500 Sqm
1000 Sqm
800 Sqm
550 Sqm
600 Sqm
400 Sqm
1100 Sqm
Name of work :
Starting Ending
Scheme :
Year : 2018-19
KM 0.000 5.000
Working Metal
From To Bitumen Gravel Sand
milage 63-22.4 13.2-6.7
0.00 28.50 28.50 5.00 28.50 54.20
or or or or
KM 0.00 - 0.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 0.00 0.00 0.00 0.00 0.00
Total 0.00 0.00 0.00 0.00 0.00
0.50 28.00 28.00 4.50 28.00 53.70
or or or or
KM 4.00 - 5.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 28.00 28.00 5.00 28.00 54.00
Total 28.00 28.00 5.00 28.00 54.00
0.50 27.00 27.00 3.50 27.00 52.70
or or or or
KM 3.00 - 4.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 27.00 27.00 4.00 27.00 53.00
Total 27.00 27.00 4.00 27.00 53.00
0.50 26.00 26.00 2.50 26.00 51.70
or or or or
KM 2.00 - 3.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 26.00 26.00 3.00 26.00 52.00
Total 26.00 26.00 3.00 26.00 52.00
0.50 25.00 25.00 1.50 25.00 50.70
or or or or
KM 1.00 - 2.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 25.00 25.00 2.00 25.00 51.00
Total 25.00 25.00 2.00 25.00 51.00
0.50 24.00 24.00 0.50 24.00 49.70
or or or or
KM 0.00 - 1.00 Hills 0.00 0.00 0.00 0.00 0.00
Plain 24.00 24.00 1.00 24.00 50.00
Total 24.00 24.00 1.00 24.00 50.00
Metal Metal
Name of work : 0
0
Name of Quarry
63 - 22.4 Metal :
Bitumen :
Emulsion :
Gravel :
Sand :
1.The distance noted herein are correct and shortest to the best of
my knowledge
2.The quarry mentioned are correct
3.The rates adopted are as per S.O.R 2014-15
4.the materials can be easily carried.
5.the discription of variety of materials is correct.
* For Gravel, if it is procured locally from near by site, a specific certificate should
NOTE be given by the Executuve Engineer stating that
1. Certified that the Gravel is procured from locally available site.
2. There will not be any dispute arised from that locally available site till the
completion of the work.
ROAD METAL RATE
Name of work : 0
I BASIC COST OF B MM TO 45 MM METAL ( WBM Grade II ) BASIC COST OF 63 MM TO 45 MM METAL ( WBM Grade III )
KM 0.00 - 1.00
Nature of
REACH
Convey 20%
route for Cost at Convey Stacking
Name of quarry Kind of metal Distance in KM
Quarry ance (Plain)
ance
Charges
Extra Total
conveyance (Hills) (Labour)
metalled or
Plains Hills unmetalled
WBM Gr II metal 24 0 662.18 206.86 0.00 3.15 0.00 872.19
0
--do-- WBM Gr III metal 24 0 897.09 206.86 0.00 3.15 0.00 1107.10
--do-- 45mm IRC metal 24 0 948.00 206.86 0.00 3.15 0.00 1158.01
1.00
--do-- 13.2mm IRC metal 24 0 1231.00 206.86 0.00 3.15 0.00 1441.01
--do-- 11.2mm IRC metal 24 0 835.00 206.86 0.00 3.15 0.00 1045.01
--do-- 6.7mm IRC metal 24 0 620.00 206.86 0.00 3.15 0.00 830.01
-
Name of work: 0
0
--do-- WBM Gr III metal 25 0 897.09 213.95 0.00 3.15 0.00 1114.19
--do-- 45mm IRC metal 25 0 948.00 213.95 0.00 3.15 0.00 1165.10
2.00
--do-- 13.2mm IRC metal 25 0 1231.00 213.95 0.00 3.15 0.00 1448.10
--do-- 11.2mm IRC metal 25 0 835.00 213.95 0.00 3.15 0.00 1052.10
--do-- 6.7mm IRC metal 25 0 620.00 213.95 0.00 3.15 0.00 837.10
-
Name of work: 0
0
--do-- WBM Gr III metal 26 0 897.09 221.04 0.00 3.15 0.00 1121.28
--do-- 45mm IRC metal 26 0 948.00 221.04 0.00 3.15 0.00 1172.19
3.00
--do-- 13.2mm IRC metal 26 0 1231.00 221.04 0.00 3.15 0.00 1455.19
--do-- 11.2mm IRC metal 26 0 835.00 221.04 0.00 3.15 0.00 1059.19
--do-- 6.7mm IRC metal 26 0 620.00 221.04 0.00 3.15 0.00 844.19
-
Name of work: 0
0
--do-- WBM Gr III metal 27 0 897.09 228.13 0.00 3.15 0.00 1128.37
--do-- 45mm IRC metal 27 0 948.00 228.13 0.00 3.15 0.00 1179.28
4.00
--do-- 13.2mm IRC metal 27 0 1231.00 228.13 0.00 3.15 0.00 1462.28
--do-- 11.2mm IRC metal 27 0 835.00 228.13 0.00 3.15 0.00 1066.28
--do-- 6.7mm IRC metal 27 0 620.00 228.13 0.00 3.15 0.00 851.28
-
Name of work: 0
0
--do-- WBM Gr III metal 28 0 897.09 235.22 0.00 3.15 0.00 1135.46
--do-- 45mm IRC metal 28 0 948.00 235.22 0.00 3.15 0.00 1186.37
5.00
--do-- 13.2mm IRC metal 28 0 1231.00 235.22 0.00 3.15 0.00 1469.37
--do-- 11.2mm IRC metal 28 0 835.00 235.22 0.00 3.15 0.00 1073.37
--do-- 6.7mm IRC metal 28 0 620.00 235.22 0.00 3.15 0.00 858.37
-
Name of work: 0
0
--do-- WBM Gr III metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00
--do-- 45mm IRC metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00
0.00
--do-- 13.2mm IRC metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00
--do-- 11.2mm IRC metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00
--do-- 6.7mm IRC metal 0 0 0.00 0.00 0.00 0.00 0.00 0.00
-
Rough
Country M.Tiles &
Cement / Steel Sand stone, & Brickjelly Lime stone Shell lime
Bricks Pressed Tiles
Metal
Plain 0 0 0 0 0 0 0 0
xxx PWD Rates SCHEDULE OF RATE FOR 2018-19 xxx Highways sh. rates
xxx Collector's appd rates xxx Local Rates
4 Fitter II class 458 467 2 Shell lime 1248.00 3 Medium rock blasting
17 Mazdoor I cl. For roads 401.00 6 Palmyrah rafter 47.15 3 Gravelly soil SS 20 b
Mason II class(stone work) 508.00 8 Casu. poles 10-13 24.00 5 MR & DMR
a Bricks and Tile product 10 Casu. poles 5-8 16.70 7 EW addl. Lift 1mts
1 Country bricks ( 2 3/4" ) 5130.00 11 Silver oak scantlings 14847 8 Refilling ( Sand )
4 Pressed Tiles.(20x20) 10400.00 e Metal and Iron works 11 Stacking metal /m3
9 Ceiling tiles 20x20x2 5.97 5 Plain GI sheet 0.8 mm/1Sqm 338.00 2 300 to 600mm dia
10 Country bricks ( 2 1/4" ) 4035.00 6 Iron works ( lab) 29.10 3 up to 300 mm dia
11 G.MChamber Bricks (II class) 6100.00 f RCC Hume Pipes & coller n Labour wrought put up Door/W
b Stone and Road materials 3 600 mm dia 2.5m 170 V Miscellaneous (Local Rates)
4 Stoneslab (3 face 2 ln) ab 1.2 m 4760.00 2 Scrub jungle 3.15 5 Wood primer paint
13 6mm metal 598.00 7 Chipping concrete 20.90 23/m2 15 Ceramic tiles 0.20x0.20
19 Cuddapah slab 50mm 390.00 1 Light & Fan Pt(21) /pt 21 Water proofing compound
20 Cuddapah slab 38/40 376.00 2 Plug point /pt VI Steel Doors & Ventilators
21 Cuddapah slab 20/30 346.00 3 16 amp DPIC /pt 1 Two leaf 'W' 0.90x1.20m
22 Granite slab (jet black) 1615.70 4 Meter board /pt 2 Steel Gate 1.20x1.80
23 25mm Iss metal 799.00 5 GI serv. Pipe /m 3 Single leaf 'D' 0.90x2.00m
1 2 3 4 5 6 7 8 9
6 Add above extra for 19.30 19.30 21.20 30.90 26.00 34.70 43.50
I Buildings
1 Cement 6 0.00 6 6.02 36.12 0 5.15 0.00 0 4.43 0.00 0 3.82 0.00
2 Rough stone 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
3 Bond stone 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
4 40mm iss metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
5 20mm iss metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
6 10-12mm metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
7 6-10mm metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
8 sand for mortar 11 0.00 10 9.62 96.20 1 8.23 8.23 0 7.09 0.00 0 6.65 0.00
9 sand for filling 11 0.00 10 9.62 96.20 1 8.23 8.23 0 7.09 0.00 0 6.65 0.00
10 steel 6 0.00 6 6.02 36.12 0 5.15 0.00 0 4.43 0.00 0 3.82 0.00
11 country bricks 0 0.00 0 8.12 0.00 0 6.95 0.00 0 5.97 0.00 0 5.15 0.00
12 brick jelly 20 mm 0 0.00 0 6.60 0.00 0 5.66 0.00 0 4.87 0.00 0 4.21 0.00
13 shell lime 0 0.00 0 6.60 0.00 0 5.66 0.00 0 4.87 0.00 0 4.21 0.00
14 Lime stone 0 0.00 0 6.60 0.00 0 5.66 0.00 0 4.87 0.00 0 4.21 0.00
15 pressed tiles 0 0.00 0 10.82 0.00 0 9.27 0.00 0 7.97 0.00 0 6.86 0.00
16 CW planks 0 0.00 0 6.60 0.00 0 5.66 0.00 0 4.87 0.00 0 4.21 0.00
17 CW scantlings 0 0.00 0 6.60 0.00 0 5.66 0.00 0 4.87 0.00 0 4.21 0.00
18 Gravel 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
19 cutstone rougly dres 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
20 25mm IRC metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
21 11.2mm IRC metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
22 6mm IRC metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
23 45mm IRC metal 6 0.00 6 9.62 57.72 0 8.23 0.00 0 7.09 0.00 0 6.65 0.00
24 Chamber Bricks 0 0.00 0 13.52 0.00 0 11.58 0.00 0 9.96 0.00 0 8.60 0.00
Lime stone,
brick jelly, Rough stone, Metal,
woodwork sand, gravel,surki, M.Tiles(1000), Brick I & II class,
Sl.No. Distance in Km Cement 1 M.T Steel 1.00MT (1Cum) earth (1Cum) Country bricks pressed tiles(2000) Chamber bricks
1 2 3 4 5 6 7 8 9
0 0 0
450.00
903.00
230.00
203.00
144.70
Addl. Floor
134.00
90.30
4.5m-
9.00m
134.4 `
90.30
42.50
67.80
63.60
94.70
166.30
7.80
6.20
19.50
22.20
8.02
3.15
3.05
3.05
put up Door/W
30
1119.00
1550.00
211.00
136.50
126.70
46.20
274.00
68.30
22.00 25.4 36
175.50
15.00
10.50
28.30 colour printed p.no 51 ,sor 16-17
19.80
45.00
64.00 Cotton 9.70 38
HM stone
0.9x0.15x0.
15 204.00 17
39.60 36
/Sqm
/Sqm
/Sqm
/Sqm
/Sqm
/Sqm
/Sqm
/Sqm
/Sqm
Brick I & II class,
Chamber bricks
KM above 80
9
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement,
20 thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30
(Grade), coarse an
Unit = cum
Taking output = 75 cum (172.50 t),(100 x 3.75 x 0.200)
a Labour
7.00 Mate 367.00 day 2569.00
5.00 Mason (1st class) 567.00 day 2835.00
5.00 Mason (2nd class) 508.00 day 2540.00
129.00 Mazdoor (Unskilled) 320.00 day 41280.00
6.00 Mazdoor (Skilled) 355.00 day 2130.00
2.00 Surveyor 467.00 day 934.00
6.00 Mazdoor (Semi-Skilled) 320.00 day 1920.00
14.00 Bhisti 320.00 day 4480.00
58688.00
b Concrete
Machinerymixer 0.28 / 0.4
cum capacity (6 mixers) with
36.00 233.00 hour 8388.00
weigh batcher and suitable
9.00 Needle vibrator
capacity calibrated water tank 116.00 hour 1044.00
5.00 Water tanker 6 kl capacity 310.00 hour 1550.00
Air Compressor (1 hour initial
2.00 319.00 hour 638.00
+ 1 hour final)
11620.00
c Material Km 0/0-1/0 Km 1/0-2/0 Km 2/0-3/0
40.50 20 mm aggregate 1350.72 cum 54704.16 1490.30 60357.15 1496.30 60600.15
27.00 10 mm aggregate 940.72 cum 25399.44 1130.30 30518.10 1136.30 30680.10
33.75 Coarse sand 272.43 cum 9194.51 376.10 12693.38 382.50 12909.38
26.25 Cement 4427.12 MT 116211.90 5658.95 148547.44 5663.60 148669.50
412.50 Polythene sheet 125 micron 15.00 Sqm 6187.50 15.00 6187.50 15.00 6187.50
18.00 Water for curing 130.00 Kl 2340.00 130.00 2340.00 130.00 2340.00
Joint filler board 20 mm thick
3.00 300.00 Sqm 900.00 300.00 900.00 300.00 900.00
as per IS:1838
1 Labour 58688.00 58688.00 58688.00 58688.00 58688.00 58688.00
1 Machinery 11620.00 11620.00 11620.00 11620.00 11620.00 11620.00
d Formwork @ 3% of (a+b+c) 9955.55 9977.84
e Overheads @ 12.5% on (a+b+c+d) 42725.89 42821.56
Cost for 75 cum = a+b+c+d+e 285245.51 384533.01 385394.03
Rate per cum = (a+b+c+d+e)/75 3803.27 5127.11 5138.59
Highways Department Schedule of Rates
Year 2018-19
S.N Description Unit Rates in Rupees
Bituminous work Labour
1 Bitumen sprayer Man Day 465
2 Bitumen raker Man Day 484
3 Heat master operator Day 484
4 Mini Hot Mix plant Operator Day 484
5 Gunnuting plant Operator Day 405
6 Gunnuting gun Operator Day 441
7 Road Mazdoor Grade I Day 401
8 Road Mazdoor Grade II Day 358
9 Head Mazdoor Day 413
Total hire charges and Labour charges (i)+(ii) Rate per Sq.m 204.59
* Spreading Gravel and consolidation with power roller rolling excluding cost of Gravel
Total hire charges and Labour charges per Cum (i)+(ii)+(iii) 16.11
* Forming embankment with earth work excavation from borrow pits and
compaction by power roller
* Forming embankment with earth work excavation from borrow pits and
compaction by power roller
* Hire charges and labour charges for WBM Gr.II & III
Hire charges for Machinery
Water sprinkler
Hire charges excluding fuel charges/day 1103.81
Fuel charges / day 3.50 litres 70.25 8 1967.00
Total hire charges / day 3070.81
Daily out turn 450 Sq.m of 75mm thick
Hire charges per 10Sq.m 3070.81 /450x10 68.24
Power roller
Hire charges excluding fuel charges/day 788.57
Fuel charges / day 2.5 litres 70.25 / litre 8 1405.00
Total hire charges / day 2193.57
Daily out turn 450 Sq.m of 75mm thick
Hire charges per 10Sq.m 2193.57 /450x10 48.75
(ii) Hire charges for Bitumen Sprayer per 10 sqm L.S. 15.00
Total Hire & fuel charges for PC 20mm thick -10 sqm (i)+(ii)+(iii)
(i) Mini Hot mix plant 155.96 /10 sqm
(ii) Roller 43.87 /10 sqm
(iii) Bitumen Boiler 24.36 /10 sqm
224.19 /10 sqm 224.19
Labour charges per 10 sqm
0.75 No. Mazdoor I class 401.00 300.75
Total Hire & fuel charges for Sealcoat type "B" -10 sqm (i)+(ii)+(iii)
(i) Bitumen Boiler 11.36 /10 sqm
(ii) Mini Hot mix plant 42.28 /10 sqm
(iii) Roller 21.94 /10 sqm
75.58 /10 sqm 75.58
Labour charges
0.25 No Mazdoor I class 401.00 100.25
Hire and Labour charges Rate / 10 Sq.m 700.77
Labour charges for Patch work with Bituminous Premix materials for 0.625 cum of
*
Bituminous material.
10 Applying Tack coat over WBM surface at 4Kg / 10 sq.m 23.84 / Sq.m.
11 Applying Tack coat over BT surface at 3Kg / 10 sq.m 9.09 / Sq.m.
12 Premix carpet with seal coat type A 663.47 / 10 Sq.m
12b Premix carpet with seal coat type B 700.77 / 10 Sq.m
13 Premix Carpet 524.94 / 10 Sq.m
14 Seal coat - Type 'A' 138.53 / 10 Sq.m
15 Applying Prime coat over Un primed WBM surface at 7Kg / 10 sq.m 23.84 / 10 Sq.m
16 Applying Tack coat over Primed WBM surface at 2.50 Kg / 10 sq.m 3.65 / 10 Sq.m
14b Seal coat - Type 'B' 175.83 / 10 Sq.m
15 Labour charges for Bituminous Premix Patch work 255.14 / cum
16 Premix carpet with seal coat type A (Paver) 592.50 / 10 Sq.m
17 Providing WMM Grade 250 mm thick 421.32 / 10 Sq.m
18 Providing BM Grade 50 mm thick 1194.44 / 10 Sq.m
19 Providing DBM Grade 50 mm thick 1196.64 / 10 Sq.m
20 Providing SDBC 623.75 / 10 Sq.m
PREMIX CARPET WITH SEAL COAT Type - A using C
= 9234.29
9234.29 /8hrs = 1154.29
30lrxdieselrate 2107.50
25lrxF.Oil rate 863.50
170lrxF.oil rate 5871.80
= 9997.09
= 788.57
2.5lrx8xdiesel rate 1405.00
= 2193.57
= 500.00 sqm of 20 mm thick.
2193.57 x 10 = 43.87
500
1000.00 sqm
2193.57 x 10 = 21.94
1000
= 2330.48
2330.48/8hrs = 291.31
6lrxdiesel rate 421.50
712.81
952/8hrs = 130.24
3.25lrxdiesel rate 228.31
= 358.55
358.55 x 6 x 10 = 66.19
325 461.53
19 = 461.53/10sqm
Rs 461.53/ 10 Sqm.
/No = 13233.00
/No = 8950.00
/No = 4010.00
= 26193.00
Unit Amount
Cum 258.8148
Cum 93.7674
Cum 74.4174
MT 784.6796
10 Sqm 592.50
Rate per 10 Sqm 1804.18
Rate per Sqm 180.42
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day. = 9234.29
Hire charges per day = 9234.29 /8hrs = 1154.29
Fuel Charges For running the Plant 30lrxdieselrate 2107.50
For heating the Bitumen (Furnace Oil) = 25lrxF.Oil rate 863.50
For heating the Aggregate (Furnace Oil) = 170lrxF.oil rate 5871.80
Hire Charges including Fuel charges / Hour. = 9997.09
Out turn of CMP per hour for PCSC = 325.00 Sqm
Hire Charges of CMP per 10M2 = 9997.08625 x 10 Sqm/ 307.60
BITUMEN BOILER.
separate bitumen Boiler is not necessary.
POWER ROLLER 80 - 100 KN.
Hire charges excluding fuel charges per day. = 788.57
Fuel charges.(Diesel) per day = 2.5lrx8xdiesel rate 1405.00
Hire charges including fuel Charges per day = 2193.57
Daily out turn of Power Roller per day for Premix carpert = 500.00 sqm of 20 mm thick.
Hire charges of power roller per 10M2 = 2193.57 x 10 = 43.87
500
Daily out turn of Power Roller per day for Seal coat = 1000.00 sqm
Hire charges of power roller per 10M2 = 2193.57 x 10 = 21.94
1000
VIBRATORY ROLLER
Hire charges excluding fuel charges per Hour. = 646.19
Fuel charges.(Diesel) per Hour = 2.5lrxdiesel rate 175.63
Hire charges including fuel Charges per day = 821.82
Daily out turn of Power Roller per day for Premix carpert = 500.00 sqm of 20 mm thick.
Hire charges of power roller per 10M2 = 821.82 x 10 = 16.44
500
Daily out turn of Power Roller per day for Seal coat = 1000.00 sqm
Hire charges of power roller per 10M2 = 821.82 x 10 = 8.22
1000
PAVER FINISHER
Hire charges excluding fuel charges per day. = 2330.48
Hire charges per hour = 2330.48/8hrs = 291.31
Fuel Charges per hour = 6lrxdiesel rate 421.50
Hire charges including Fuel charges per hour 712.81
Daily out turn of Paver finisher per 10 Sqm = 325.00 Sqm
Hire Charges of Paver finisher per 10M2 = 712.81 x 10 / 325 = 21.93
TIPPER TRUCKS.
Hire charges excluding fuel charges per hour 1094/8 130.24
Fuel charges.(Diesel) per day = 3.25lrxdiesel rate 228.31
Total Hire charges per day = 358.55
Out turn of Tipper per hour = 325.00 Sqm
Number of Tippers required per CMP unit = 6 Trucks.
Hire charges of Tipper per 10M2 = 358.55 x 6 x 10 = 66.19
325 461.53
Total Hire charges of Machinery per 10 sqm
Using Power Roller =307.6+43.87+21.94+21.93+66.19 = 461.53/10sqm
Rs 461.53/ 10 Sqm.
Usin Vibratory roller = 420.38
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 401.00 /No = 13233.00
25 Mazdoor Grade II 358.00 /No = 8950.00
For attending Paver Finisher.
10 Mazdoor Grade I 401.00 /No = 4010.00
²
Total Labour Charges for 2000.00 M = 26193.00
20 mm thick.
Total Hire charges of Machinery per 10 sqm
Using Power Roller =266.59+38.81+19.4+19.68+58.62 = 403.1/10sqm
Rs 403.1/ 10 Sqm.
Usin Vibratory roller = 369.42
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 350 /No =
25 Mazdoor Grade II 314 /No =
For attending Paver Finisher.
11550
7850
3500
22900
114.5
517.6
483.92
Amount
233.982
85.761
68.751
1349.7836
483.92
2222.1976
222.21976
WATER BOUND MACADAM GRADE-I
roller,water sprinkler and all other tools and plant employed, barricading etc.,completed.
POWER ROLLER
Hire Charges excluding fuel charges /Day
Hire Charges fuel charges /Day 2.5 70.25
Total Hire Charges /Day
(Daily out turn 350 sqm of 100mm thick)
Hire charges of power roller per 10m2 2193.57 10
350
Water Sprinkler
Hire Charges excluding fuel charges /Day
Hire Charges fuel charges /Day 3.5 70.25
Total Hire Charges /Day
Daily outtern 450 sqm of 100mm thick
Hire charges of power roller per 10m2 3070.81 10
350
Total Hire Charges for Machinery (A+B = C)
LABOUR CHARGES FOR SPREADING
10 SQM OF 100MM THICK
1.44 0.188 Mazdoor-I
1.44 0.25 Mazdoor-II
1.44 0.333 Mazdoor-III
Forming edge bunds
Maintaining berms from traffic barricading providing
danger lights
Watering ant keeping the surface most for 15days
Rent for tools
Sundries such as rope waterpots
Total labour charges for 10 m2
Total Hire & labour Charges (E= C+D)
, barricading etc.,completed.
Rs. 788.57
8 Rs. 1405.00
Rs. 2193.57
Rs. 2193.57
(A) 62.67
Rs. 1103.81
8 Rs. 1967.00
Rs. 3070.81
(B) 87.74
150.41
L.S 1.5
L.S 1.5
L.S 1.5
L.S 1.5
(D) 416.61
416.61 150.41 567.02
WET MIX MACADAM - DATA
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM)
specification including premixing the material with water at OMC in machanical mix plant carriage of mixed
material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well
prepared surface and compacting with vibratory roller to achieve the desired density including cost of
material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
0/0-1/0
Qty Details
Rate Amt.
1094
1284.4
2378.4
297.3
855
1235
2090
261.25
HIRE CHARGES AND LABOUR CHARGES FOR WET MIX MACADAM 300 mm thick
Machineries
1.Loader 5 cum capacity 17-18
Hire and running charges per day 1147.62
Fuel charges 80 litres per day 80 litres/day 70.25 per/ltr 5620.00
Total hire charges including fuel per day 6767.62
Total hire charges including fuel per hour 845.95
2.Tipper
Hire and running charges per day 1041.90
Fuel charges 3.25 litres per hour 26 litres/day 70.25 per/ltr 1826.50
Total hire charges including fuel per day 2868.40
Total hire charges including fuel per hour 358.55
3.Water tanker
Hire and running charges per day 814.29
Fuel charges 25 litres per day 25 litres/day 70.25 per/ltr 1756.25
Total hire charges including fuel per day 2570.54
Total hire charges including fuel per hour 321.32
BITUMINOUS MACADAM 50 MM THICK
HIRE CHARGES FOR MACHINERIES .
CENTRAL HOT MIX PLANT.
Rs 976.16/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 401.00 /No = 13233.00
25 Mazdoor Grade II 358.00 /No = 8950.00
For attending Paver Finisher.
10 Mazdoor Grade I 401.00 /No = 4010.00
Total Labour Charges for 1200.00 M² = 26193.00
Labour Charges for 10sqm = 26193 x 10 Sqm = 218.28
1200
Total Hire Charges and Labour charges.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1
for 10sqm for preparatory to another bituminous construction over it including cost of material, labour
charges, rentals for machinery, fuel and all other incidental charges etc.,
For aplying Tack coat 3.00 No Mazdoor II class 358.00 / each 1074.00
Data
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and
conveyance of bituminous binder including labour charges for preparing the surface and applying the required
For preparing the surface 5.00 No Mazdoor I class 401.00 / each 2005.00
For aplying Tack coat 5.00 No Mazdoor II class 358.00 / each 1790.00
Data
Providing and laying Semi Dense Bituminous Concrete based on job mix formula mixed in hot
mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen
60/70 penetration grade as per IS 73 and aggregates conforming to grading
Providing and laying Semi Dense Bituminous Concrete based on job mix formula mixed in hot
mix plant of drum type in one layer for overlay as shown in drawing using paving Bitumen
60/70 penetration grade as per IS 73 and aggregates conforming to grading
Hourly out turn of CMP for 25mm thick of sdbc= 270 sqm
2. BITUMEN BOILER
10 PREMIX CARPET WITH SEAL COAT TYPE ' A '
-for Km
Conveyance 131.00
Total 868.40
22.4 to 2.36 mm metal average rate.
531.00
Main data
Qty Main Data Rate Amount Rate
###
740.52
788.57
1405.00
2193.57
73.12
5169.52
646.19
175.63
821.82
25.68
2330.48
291.31
421.50
712.81
52.80
130.24
228.31
358.55
159.36
2+52.8+159.36=
/M2
8+52.8+159.36=
/M2
13233.00
8950.00
4010.00
26193.00
218.28
1244.08
1196.64
Amount
1533.86
1533.86
Amount
635.53
294.40
929.93
Amount
754.86
754.86
Amount
536.85
195.29
105.68
1591.87
1244.08
3673.77
7347.53
7347.5344
BITUMINOUS CONCRETE 40 MM THICK
HIRE CHARGES FOR MACHIN
CENTRAL HOT MIX PLANT.
Hire charges excluding fuel charges per day = 9234.29
Hire charges per day 9234.29 /8hrs = 1154.29
Fuel Charges For running the Plant 30LITRXDIESEL RATE 2107.50
For heating the Bitumen (Furnac 25litrxF.O 863.50
For heating the Aggregate (Furn 170litxF.O 5871.80
Hire Charges including Fuel charges / Hour = 9997.09
Out turn of CMP per hour for 170.00 Sqm
Hire Charges of CMP per 10M2 = 9997.08625 x 10 Sqm/170 = 588.06
BITUMEN BOILER.
bitumen Boiler is not necessary.
POWER ROLLER 80 - 100
Hire charges excluding fuel charges per day = 788.57
Fuel charges.(Diesel) per day 2.5x8xdiesel rate 1405.00
Hire charges including fuel Charges per da = 2193.57
Daily out turn of Power Roller per day for BC = 300.00 sqm of 40 mm thick.
Hire charges of power roller per 10M2 = 2193.57 x 10 = 73.12
300
VIBRATORY ROLLER.
Hire charges excluding fuel charges per day = 5169.52
Hire charges per hour 5169.52/8 = 646.19
Fuel charges.(Diesel) per hour 2.5x8xdiesel rate 175.63
Hire charges per hour = 821.82
Hourly out turn of Vibrator Roller for BM = 400.00 sqm of 40 mm thick.
Hire charges of Vibratory roller per 10M2 = 821.82 x 10 = 20.55
400
PAVER FINISHER
Hire charges excluding fuel charges per day = 2330.48
Hire charges per hour 2330.48/8hrs = 291.31
Fuel Charges per hour 6litrxdiesel rate 421.50
Hire charges including Fuel charges per hour 712.81
Daily out turn of Paver finisher per 10 Sqm = 170.00 Sqm
Hire Charges of Paver finisher per 10M2 = 712.81 x 10 / 170 = 41.93
TIPPER TRUCKS.
Hire charges excluding fuel c 1094/8hrs = 130.24
Fuel charges.(Diesel) per day 3.25litrxdiesel rate 228.31
Total Hire charges per day = 358.55
Out turn of Tipper per hour = 170.00 Sqm
Number of Tippers required pe6 Trucks.
Hire charges of Tipper per 10M2 = 358.55 x 6 x 10 = 126.55
170
Total Hire charges of Machinery per 10 sqm
Using Power Roller = 588.06+73.12+41.93+126.55=
= 829.66 /M2
Rs 829.66/ 10 Sqm.
Using Vibratory Roller = 588.06+20.55+41.93+126.55=
= 777.09 /M2
Rs 777.09/ 10 Sqm.
LABOUR CHARGES
For loading materials to CMP.
33 Mazdoor Grade I 401.00 /No = 13233.00
25 Mazdoor Grade II 358.00 /No = 8950.00
For attending Paver Finisher.
10 Mazdoor Grade I 401.00 /No = 4010.00
²
Total Labour Charges for 1200.00 M = 26193.00
Labour Charges for 10sqm = 26193 x 10 Sqm = 218.28
1200
Total Hire Charges and Labour charges.
Using Power Roller. 829.66 + 218.28 = 1047.94
1047.94.00/10 Sqm
Using Vibratory Roller. 777.09 + 218.28 = 995.37
995.37/10 Sqm
Bituminousconcrete 40 MM thick.
Quantity Description Rate Unit per Amount
0.13 M 3
Cost of 19 - 9.5 mm graded meta 1136.90 M3 147.80
0.17 M3 Cost of 9.5 - 2.36 mm graded met 790.50 M3 134.39
0.26 M3 Cost of 2.36 mm& below 754.86 M3 196.26
50.30 Kgs Cost of Bitumen 32159.00 MT 1617.60
10.0 M2 Hire & Labour Charges 1047.94 M2 1047.94
Rate for 10 Sqm = 3143.98
Rate per cum = 7859.96
3155.42
10518.05
1 Kanchipuram
2 Tiruvallur
1 Gummidipoondi TN2043 2012-2013 A.N.Kuppam
Road 1 Maintenanc
2 Gummidipoondi TN2043 2012-2013 G.M.Road -Road 1 Maintenanc
3 Minjur TN2040 2012-2013 MKT - Oor Road 3 Maintenanc
4 Sholavaram TN2041 2012-2013 MP Road - Road 3 Maintenanc
5 Sholavaram TN2041 2012-2013 Vichoor - Road 2.5 Maintenanc
6 Sholavaram TN2042 2012-2013 MP Road - Road 4.2 Maintenanc
3 Perambalur
1 Alathur TN11110 2016-2017 L031-Z.Athu
Road 1.765 In Progres
2 Alathur TN11110 2016-2017 L055-Siruv Road 3.02 In Progres
3 Alathur TN11113 2016-2017 L053-Karai Road 1.2 In Progres
4 Perambalur TN11115 2016-2017 L029-NochiLSB 41.68 In Progres
5 Alathur TN11117 2016-2017 L055-Siruv LSB 62.52 In Progres
4 Karur
1 Krishnarayapuram TN0735 2012-2013 KanakapillaiRoad 1.091 Maintenanc
2 Krishnarayapuram TN0736 2012-2013 KM34 of Ir Road 3.874 Maintenanc
3 Thanthoni TN768 2016-2017 L093-K.Pit Road 1.025 In Progres
4 Thogamalai TN770 2016-2017 L129-KaranRoad 1.71 In Progres
5 Krishnarayapuram TN775 2016-2017 L113-KuppaRoad 1.2 In Progres
5 Coimbatore
1 Karamadai TN0289 2012-2013 Karamadai Road 0.8 Maintenanc
2 Karamadai TN0290 2012-2013 Karamadai Road 5.95 Maintenanc
3 Karamadai TN296 2016-2017 L108-kurumRoad 0.855 In Progres
4 Thondamuthur TN297 2016-2017 L042-Km Road 0.88 In Progres
5 Karamadai TN2100 2016-2017 L126-Kalaam
LSB 37.7 In Progres
6 Karamadai TN2103 2016-2017 L127-Bujank
LSB 47.66 In Progres
7 Karamadai TN293 2016-2017 L126-KalaaRoad 2.325 In Progres
6 Nagapattinam
1 Kollidam TN9182 2016-2017 L037-RathaRoad 0.88 Completed
2 Kollidam TN9183 2016-2017 L022-PulliyRoad 2.4 In Progres
3 Sirkali TN9215 2016-2017 L134-Thill Road 2.02 In Progres
4 Sirkali TN9215 2016-2017 L132-Path Road 1.267 In Progres
5 Mayiladuthurai TN9189 2016-2017 L097-MudikRoad 2.768 In Progres
6 Sirkali TN9212 2016-2017 L135-Andi Road 1.5 In Progres
7 Sirkali TN9212 2016-2017 L098-AmmaRoad 0.97 In Progres
8 Mayiladuthurai TN9188 2016-2017 L078-Thiru Road 1.3 In Progres
9 Sirkali TN9213 2016-2017 L124-KondaRoad 0.83 In Progres
7 Tiruvarur
1 Nannilam TN2183 2016-2017 L113-KumaRoad 2.62 In Progres
2 Valangaiman TN2187 2016-2017 L023-Sitha Road 3.92 In Progres
3 Valangaiman TN2188 2016-2017 L049-PoontRoad 1.75 In Progres
4 Thiruthuraipoondi TN21101 2016-2017 L062-varamRoad 0.95 In Progres
5 Muthupettai TN21105 2016-2017 L031-KunnaRoad 5.02 In Progres
6 Thiruthuraipoondi TN21111 2016-2017 L090-Manma
LSB 34.12 In Progres
7 Kottur TN2196 2016-2017 L031-AkkarRoad 2.16 In Progres
8 Thiruthuraipoondi TN21113 2016-2017 L075-RayanLSB 27.3 In Progres
8 Tiruchirappalli
1 Manachanallur TN2256 2012-2013 Inamkalpal Road 1 Maintenanc
2 Thuraiyur TN2257 2012-2013 NarasingapRoad 2.9 Maintenanc
3 Marungapuri TN2268 2016-2017 L048-TMM R
r oad 2.6 In Progres
4 Marungapuri TN2269 2016-2017 L061-Manpan
Road 1.63 In Progres
5 Uppiliyapuram TN2270 2016-2017 L052-Vairi Road 3.11 In Progres
6 T.Pet TN2281 2016-2017 L070-T.pet Road 5.08 In Progres
7 Thiruverambur TN2279 2016-2017 L038-Pudukk
Road 2 In Progres
8 Musiri TN2278 2016-2017 L061-Sitha Road 1.6 In Progres
9 Thuraiyur TN2276 2016-2017 L055-Devara
Road 1.6 Completed
10 Thottiam TN2282 2016-2017 L026-KolakRoad 1.81 In Progres
9 Thanjavur
1 Orathanadu TN1772 2012-2013 ParuthikkottRoad 4.4 Maintenanc
2 Sethubavachatram TN1765 2012-2013 Thengadu -LSB 22.26 Maintenan
3 Ammapet TN1776 2016-2017 L031-AmmaRoad 1.887 In Progres
4 Ammapet TN1777 2016-2017 L090-MelatRoad 3.912 In Progres
5 Ammapet TN1778 2016-2017 L065-ArunmRoad 1.711 In Progres
6 Ammapet TN1778 2016-2017 L070-PirantRoad 0.894 In Progres
7 Ammapet TN1779 2016-2017 L073-Kovil Road 0.987 In Progres
10 Tuticorin
1 Vilathikulam TN2542 2012-2013 SH44 - T.PRoad 1.9 Maintenanc
2 Ottapidaram TN2569 2016-2017 L051-Otta Road 5.742 In Progres
3 Ottapidaram TN2572 2016-2017 L054-Nagam
Road 2.581 In Progres
4 Ottapidaram TN2573 2016-2017 L072-AkkanRoad 3.112 In Progres
11 Virudunagar
1 Aruppukottai TN2850 2012-2013 Melamadai Road 0.8 Maintenanc
2 Sattur TN2831 2012-2013 Madurai KaRoad 1.4 Maintenanc
3 Sattur TN2843 2012-2013 Madurai-KaRoad 2.03 Maintenanc
4 Srivilliputhur TN2837 2012-2013 Srivilliput Road 2 Maintenanc
5 Virudhunagar TN2850 2012-2013 K.Pudur - SRoad 1.7 Maintenanc
6 Watrap TN2837 2012-2013 Watrab-AlaRoad 2.2 Maintenanc
7 Watrap TN2837 2012-2013 Watrap - MRoad 5 Maintenanc
8 Watrap TN2837 2012-2013 Tenkasi-ThRoad 1.2 Maintenanc
9 Watrap TN2851 2012-2013 Watrap-MahRoad 4.6 Maintenanc
10 Vembakottai TN2862 2016-2017 L039-Sattu Road 1.05 In Progres
11 Vembakottai TN2862 2016-2017 L028-Sattu Road 0.882 In Progres
12 Vembakottai TN2862 2016-2017 L049-Sevalp
Road 1.364 In Progres
12 Vellore
1 Nemili TN2695 2012-2013 BS road(miRoad 3 Maintenanc
2 Nemili TN26104 2014-2015 Panapakkam
Road 5.08 Completed
3 Arakonam TN26105 2016-2017 L031-Puliy Road 1.018 In Progres
4 Nemili TN26106 2016-2017 L082-AO Ro
Road 3.145 In Progres
5 Arcot TN26109 2016-2017 L042-Piller Road 2.604 In Progres
6 K.V. Kuppam TN26110 2016-2017 L048-Vadu Road 1.57 In Progres
7 Pernambet TN26112 2016-2017 L024-T K VRoad 0.931 Completed
8 Kandhili TN26113 2016-2017 L071-S T VRoad 2.806 Completed
13 Villupuram
1 Melmalayanur TN27163 2016-2017 L027-Km 60Road 1.993 In Progres
2 Melmalayanur TN27163 2016-2017 L048-Km 2.6
Road 2.015 Completed
3 Merkanam TN27165 2016-2017 L060-132.8Road 1.325 In Progres
4 Mugaiyur TN27158 2016-2017 L046-VilandRoad 3.372 In Progres
5 Mugaiyur TN27155 2016-2017 L034-vpm-TRoad 4.462 Completed
6 Olakkur TN27173 2016-2017 L021-KM 10Road 0.966 In Progres
7 Thirunavalur TN27175 2016-2017 L026-Easwa
Road 2.2 In Progres
8 Vanur TN27156 2016-2017 L052-KMm Road
4 2.952 In Progres
9 Chinnasalem TN27160 2016-2017 L031-NattaRoad 1.719 Completed
10 Chinnasalem TN27160 2016-2017 L040-CVS Road 0.997 Completed
14 Ramanadhapuram
1 Bogalur TN14129 2014-2015 L026-BogalRoad 2.28 Completed
2 Kadaladi TN14147 2016-2017 L066-ErwadRoad 1.93 In Progres
3 Kadaladi TN14147 2016-2017 L065-ChinnRoad 1.61 In Progres
4 Nainarkoil TN14150 2016-2017 T02-Ariyan Road 8.6 Completed
5 Mudukulathur TN14152 2016-2017 L070-Abira Road 2 Completed
6 Nainarkoil TN14153 2016-2017 L039-RamnRoad 2 Completed
7 Kamuthi TN14152 2016-2017 T06-KamutRoad 3.2 Completed
15 Sivagangai
1 Ilayangudi TN1665 2016-2017 L023-SooraRoad 3.5 In Progres
2 Kalaiyarkoil TN1663 2016-2017 L041-KalayRoad 2.65 In Progres
16 Salem
1 Gangavalli TN15104 2016-2017 L028-T T roRoad 4.88 In Progres
2 Thalaivasal TN15105 2016-2017 L031-GovinRoad 2.64 In Progres
3 Salem TN15111 2016-2017 L035-Ariya Road 0.855 In Progres
4 Yercaud TN15113 2016-2017 L033-VanioRoad 4.95 In Progres
5 Panamarathupatti TN15114 2016-2017 L037-VaniyRoad 1 In Progres
6 Mecheri TN15117 2016-2017 L094-SolapRoad 1.74 In Progres
7 Kolathur TN15118 2016-2017 L051-KathirRoad 1.3 In Progres
8 Thalaivasal TN15106 2016-2017 L069-TV roRoad 1.61 In Progres
17 Dindigul
1 Guziliamparai TN0546 2012-2013 Kottanatha Road 2.675 Maintenanc
2 Palani TN0550 2012-2013 Kanakkanpat
Road 4.4 Maintenanc
3 Dindigul TN575 2016-2017 L033-SiluvaRoad 2 In Progres
4 Shanarpatti TN573 2016-2017 L080-Raman
Road 1.8 In Progres
5 Palani TN577 2016-2017 L054-KarikaRoad 2.1 In Progres
6 Guziliamparai TN570 2016-2017 L116-RP PilRoad 2.55 In Progres
18 Tiruppur
1 Uthukuli TN31106 2016-2017 L070-MoratRoad 1.49 In Progres
2 Dharapuram TN31101 2016-2017 L046-PonnaRoad 5.85 In Progres
3 Dharapuram TN31102 2016-2017 L076-Gobi Road 2.86 In Progres
4 Pongalur TN31104 2016-2017 L047-KoduvRoad 0.76 In Progres
5 Palladam TN31104 2016-2017 L048-K A r Road 1.69 In Progres
19 Erode
1 Anthiyur TN12103 2014-2015 ThamaraikaRoad 2 Completed
2 Anthiyur TN12104 2014-2015 ThamaraikaRoad 2.35 Completed
3 Modakkuruchi TN12105 2016-2017 L059-Ganap
Road 1.53 Completed
4 Modakkuruchi TN12106 2016-2017 L049-Km 0 Road 1.886 Completed
5 Perundurai TN12107 2016-2017 L026-ErodeRoad 1.2 In Progres
6 Ammapet TN12110 2016-2017 L025-Kitta Road 3.45 In Progres
7 Anthiyur TN12111 2016-2017 L021-Eratt Road 2.83 Completed
8 Anthiyur TN12112 2016-2017 L072-KC roRoad 2.2 In Progres
9 Nambiyur TN12113 2016-2017 L027-CheyuRoad 2.3 In Progres
10 T.N. Palayam TN12115 2016-2017 L051-SAB rRoad 2.24 In Progres
20 Namakkal
1 Kabilarmalai TN1067 2014-2015 L036-Sellu Road 0.815 Maintenanc
2 Kabilarmalai TN1067 2014-2015 L050-Vettu Road 1.2 Maintenanc
3 Paramathy TN1067 2014-2015 Cheyyampal
Road 0.66 Maintenanc
4 Paramathy TN1067 2014-2015 TiruchengoRoad 0.725 Maintenanc
5 Mallasamudram TN1069 2014-2015 Pillanatha Road 2.6 In Progres
6 Erumapatty TN1083 2016-2017 L052-ReddRoad 1.17 In Progres
No SQC Forwarded PMGSY I
7373704576
Kancheepuram
2 C.Duraisamy 7373704562 9442560254
Tiruvallur
7373704574
Thanjavur
3 R.Elangovan 7373704575 9443984817
Nagapattinam
Vellore 7373704599
4 M.K.Ganesan 9786297171
Tiruvannamlai 7373704566
Tiruppur 7373704572
5 V.Inbaarasu 9843929344
Sivagangai 7373704587
Kanniyakumari 73737045
6 A.Inbamani 9443384942
Tirunelveli 7373704588
7373704576
Tiruvarur
7 S.Jeyaraj 7373704585 9443994040
Ramanathapuram
Cuddalore 7373704581
8 M.Muthuvalliappan 9443179854
Villupuram 7373704582
7373704563
Pudukottai
9 S.Ramasamy 7373704564 9894777773
Madurai
Dharmapuri 7373704569
10 T.Selvaraj 9443210183
Krshnagiri 7373704570
Theni 7373704583
11 D.Thangaraj 9443255585
Dindigul 7373704584
Ariyalur 7373704579
12 C. Tiruppathy 9444363397
Perambalir 7373704580
7373704589
Thoothukudi
13 M.Sangarappan 7373704586 9600840940
Virudhunagar
Ariyalur 7373704579
12 C. Tiruppathy 9444363397
Perambalir 7373704580
7373704589
Thoothukudi
13 M.Sangarappan 7373704586 9600840940
Virudhunagar
SQM contact
No
9444380967
9842499396
9442560254
9443984817
9786297171
9843929344
9443384942
9443994040
9443179854
9894777773
9443210183
9443255585
9444363397
9600840940
9444363397
9600840940
1 H. Balasubramanian 9444380967 Dharmapuri
Theni Tirunelveli
Namakkal Tiruppur
Madurai Tiruvarur
Kanniyakumari Vellore
Tiruvannamalai
Tiruvallur
Nilgiris
Tiruchirappalli
Perambalur
Nagapattinam
Myladudhurai
Sivagangai
Karur
96
273600