LEIPZIG 2 0 11
Power Supply AC 25 kV 50 Hz
Empfohlen wird auf dem Titel der Einsatz eines vollflächigen
HintergrundbildesAirport
(Format: 25,4 xRail Link Bangkok
19,05 cm):
• Bild auf Master platzieren (JPG, RGB, 144dpi)
• Bild in den Hintergrund legen Schutz-Vermerk /©Copyright-Vermerk
Siemens AG 2011
Content
Turnkey-Project overview
Project organisation
Operation experience
© Siemens AG 2011
Page 2/17 Mar-10 I MO CT Industry Sector, Mobility Division
Basic line data 1/3
© Siemens AG 2011
Page 3/17 Mar-10 I MO CT Industry Sector, Mobility Division
Basic line data 2/3
Total track length approx. 28.8 km
Total line length (between station centers):
SA Express (MAS – SA Terminal) approx. 25.7 km
SA City Line (Phaya Thai – SA Terminal) approx. 28.5 km
Maximum speed:
Main Line 160 km/h
Depot Area 25 km/h
Number of stations:
SA Express 2
SA City Line 8
© Siemens AG 2011
Page 4/17 Mar-10 I MO CT Industry Sector, Mobility Division
Basic line data 3/3
© Siemens AG 2011
Page 5/17 Mar-10 I MO CT Industry Sector, Mobility Division
Turnkey project overview
Main lots
Civil work
Trackwork
Rolling Stock
Signalling
Communication
Depot-equipment
Electrification
Schedule
Order income 01/2005
Taking Over Certificate 03/2010
Start of Revenue Service 08/2010
End of Defects Liability Period 03/2012
Volume
Total approx. 500 Mio. EUR
SIEMENS approx. 200 Mio EUR
Electrification approx. 20 Mio EUR
© Siemens AG 2011
Page 6/17 Mar-10 I MO CT Industry Sector, Mobility Division
Project organisation 1/3
Consortium members
B. Grimm International (Consortium Leader, PM and Financial Services)
B. Grimm MBM Hong Kong Ltd. (PM and Financial Services)
Siemens AG (Design, Supply, PM)
Siemens Ltd. (Supply, PM)
Sino Thai Engineering and Construction Public Company Ltd. (Civil Works)
Consultant
Construction Supervision Consultant (CSC) consists of 7 companies
© Siemens AG 2011
Page 7/17 Mar-10 I MO CT Industry Sector, Mobility Division
Project organisation 2/3
Employer Level
State Railway of Thailand
(SRT)
SRT’s Consultants
Consortium Level
Consortium Principal
Consortium Steering
Committee
(Consortium Leader, E&M
Group, Civil Works Group)
Consortium Project Management
Project Director (E&M–Group)
Project Director (Civil Work Group)
Commercial
Contract Management Management and
Administration
© Siemens AG 2011
Page 8/17 Mar-10 I MO CT Industry Sector, Mobility Division
Project organisation 3/3
Building Construction
Elevated Structure &
Engineering Planning Casting Yard - Structural Work
At Grade Works
REL and Coordination Management - Architectural Work
SIG COM AFC Construction
Traction Power Supply RST - Building Services
Signalling & Train Communications and Automatic Fare
& Overhead Catenary Rolling Stock Collection
Control SCADA
Line
© Siemens AG 2011
Page 9/17 Mar-10 I MO CT Industry Sector, Mobility Division
System design studies Electrification
MEA Interconnection
High Voltage (69 kV) Switchgear
Traction Transformer
Medium Voltage (25 kV) Switchgear
Control and Protection System
TPS Station Auxiliary Power Supply
Power Cables for OCS supply and Traction Current Return
© Siemens AG 2011
Page 11/17 Mar-10 I MO CT Industry Sector, Mobility Division
Scope of work Electrification 2/4
Substation
km 8.078
Neutral Section
km 9.340
© Siemens AG 2011
Page 12/17 Mar-10 I MO CT Industry Sector, Mobility Division
Scope of work Electrification 3/4
© Siemens AG 2011
Page 13/17 Mar-10 I MO CT Industry Sector, Mobility Division
Scope of work Electrification 4/4
© Siemens AG 2011
Page 14/17 Mar-10 I MO CT Industry Sector, Mobility Division
Operation experience
© Siemens AG 2011
Page 15/17 Mar-10 I MO CT Industry Sector, Mobility Division
Future traffic plan for Bangkok
© Siemens AG 2011
Page 16/17 Mar-10 I MO CT Industry Sector, Mobility Division
Thank you for your attention!