Take Off Sheet Service Quarter: T Description T A. Substructure 1. Excavation & Earth Work
Take Off Sheet Service Quarter: T Description T A. Substructure 1. Excavation & Earth Work
T D S Description T D S
A. SUBSTRUCTURE
1. EXCAVATION & EARTH
WORK
0.25
4.00 1.80 F-1 1.00 0.05
1.80 2.00 0.30
1.30 16.85 m3 0.25
4.00 1.70 LF-1 1.00 0.15
1.70 5.00 0.30
1.30 15.03 m3 0.25
- 1.50 LF-2 1.00 0.38
1.50
1.30 - m
3
0.58
b. Footing column
1.00 0.90
1.00 C-1
0.90 m2
2.00 1.10
1.00 C-2
2.20 m2
5.00 1.10
1.00 C-3
5.50 m2
8.60 m2 Total to summary
C. Grade beam
1.00 0.80 GB-1
15.70
12.56 m2
1.00 0.80 GB-2
14.13
11.30 m2
1.00 0.80 GB-3
10.29
8.23 m2
T D Total Description T D Total
B. SUPER STRUCTURE
1.1 CONCRETE WORK
0.20
b. Concrete work for Beams 0.40 0.578
First floor Beam
1 13.79 FFB1 5.37
0.20
0.40 1.103 m3
1 14.13 FFB2
0.20
0.40 1.131 m3 42.54
1 8.74 FFB-3 42.54
0.20
0.40 0.699 m3
3 5.91 FFB-4
0.20 60.08
0.40 1.419 m3
60.08
1 5.14 FFB-5
0.20
0.40 0.411 m3
1 5.08 FFB6 1 2.72
0.20 1.55
0.40 0.406 m3 0.16 0.67
1 7.23 FFB3' 8 0.026
0.20 1.55 0.32
0.40 0.578 m3 1 3.20
1.65
0.16 0.84
1 3.05
5.75 m Total for first floor Beam 1.55
3
0.16 0.76
T D Total Description T D Total
1 5.14
8 0.026 0.5*0.30*0.17=0.026 0.50 2.57
1.60 0.33 m3 1 4.54
1 1.99 Landing 0.20 0.91
3.20 1 5.08
0.15 0.96 m3 0.65 3.30
1 3.40 Landing beam 1 4.18
0.20 0.20 0.84
0.40 0.27 m 3
1 7.23
0.50 3.62
4.14 m Total (Gr. To 1st floor)
3
1 6.33
0.20 1.27
53.70
1.2. form work.
1 15.70
A. Columns 0.65 10.20
Ground floor column 1 14.20
2 1.10 C-2 0.20 2.84
2.90 6.38 m 2
1 14.13
5 1.10 C-3 0.50 7.07
2.90 15.95 m 2
1 12.63
0.20 2.53
First floor column 1 8.74
2 1.10 C-2 0.65 5.68
2.48 5.46 m 2
1 8.14
5 1.10 C-3 0.20 1.63
2.48 13.64 m 2
1 5.91
0.50 2.96
m2 Total for ground& first floor column
41.43 formworks 1 5.31
0.20 1.06
B. Beams 2 5.14
First Floor Beams 0.50 5.14
1 13.79 FFB1 1 4.54
0.65 8.96 m 2
0.20 0.91
1 12.59 bottom 1 7.23
0.20 2.52 m2 0.65 4.70
1 14.13 FFB2 1 6.33
0.50 7.07 m2 0.20 1.27
1 12.93 bottom
0.20 m2
2.59 45.97
1 8.74 FFB3
0.65 5.68 m2
1 8.14 bottom
0.20 1.63 m2
2 5.91 FFB4 42.54
0.50 5.91 m2 42.54
1 5.91
0.65 3.84 m2 60.08
3 5.01 bottom 60.08
0.20 3.01 m2
102.62
T D Total Description T D Total
b. Footing Column
C-1
m3
C-2
m3
C-3
m3
m3 Total to summary
c. Grade beam
GB1
m3
GB2
m3
GB3
m3
GB4
m3
GB4'
m3
GB5
m3
GB6
m3
m3 Total to summary
GB-4
m2
GB-4'
m2
GB-5
m2
GB-6
m2
m2 Total to summary
Description
Roof Beams
RB-1
m3
RB2
m3
RB-3
m3
RB-4
m3
RB-5
m3
RB6
m3
RB3'
m3
m2
m2 Total 150mm first floor slab
Roof slab
m2
m2 Total 150mm first floor slab
Stair cases
Gr to 1st Floor
Stair soffit
m3
0.5*0.30*0.17=0.026
m3
Middle Landing
m3
Stair soffit
m3
Description
FFB5
m2
bottom
m2
FFB6
m2
bottom
m2
FFB3'
m2
bottom
m2
m2 Total for firstfloor Beams
Roof Beams
RB1
m2
bottom
m2
RB2
m2
bottom
m2
RB3
m2
bottom
m2
RB4
m2
bottom
m2
RB5
m2
bottom
m2
RB3'
m2
bottom
m2
m2
m2 Total 150mm first floor slab
Roof Slab
m2
m2 Total roof slab
DIAMTER OF BAR
Location Ref. Dia. No. of Length
mm bars m 6 8.00 10 12 14 16
Mesh
changed to
equivalent Area 8 49 5.400 264.60
8 22 12.000 264.00
First Floor Slab
1 10 26 1.557 40.482
2 10 35 6.270 219.45
3 10 11 3.000 33
4 8 10 3.660 36.60
5 10 23 3.000 69
6 8 21 5.660 118.86
7 8 23 5.600 128.80
8 10 39 2.400 93.6
9 8 26 6.500 169.00
10 10 37 2.500 92.5
11 10 18 3.200 57.6
12 8 10 10.000 100.00
13 10 12 2.400 28.8
14 12 14 2.400 33.6
Roof Slab
1 10 26 1.557 40.482
2 10 35 6.270 219.45
3 8 10 3.660 36.60
4 10 11 2.400 26.4
5 8 21 5.660 118.86
6 10 26 3.000 78
7 10 34 2.400 81.6
8 8 27 6.500 175.50
9 10 26 3.000 78
10 8 12 4.400 52.80
11 12 31 2.400 74.4
12 8 12 6.000 72.00
Stair Bar
STB1 16 4 4.300 17.2
16 4 4.000 16
st 8 42 1.200 50.40
DIAMETER OF BAR
Total weight = 5908.81 kg.
Total weight with #REF!crease for wastage= #REF! kg.
20 24 Remark
160
8
8
8
18
202.00 0.00
2.467 3.553
498.37 0
20 24
Bill of Quantity for Service Quarter
Item no Executed
Description Unit Quantity Rate
A. SUBSTRUCTURE
1.EXCAVATION AND EARTH WORK
1.01 Clear of the site to remove top soil to an average depth
of 20cm. m2 0.00 23
1.05 Pit excavation in soft rock to a depth greater than
150cm but not excedding 250cm
m3 110
1.05 Pit excavation in Hard rock to a depth greater than
150cm but not excedding 250cm
m3 31.88 550
1.09 Fill around foundation with selected granular material
imported from out side and compacted in layers but
under hard core
m3 23.93 395
1.12 Cart away m3 0.00 101
1.11 supply and pack 25cm thick hard core bedding to semi
basement slab in basaltic or equivalent stone approved
by the consultant hard-core well rolled consolidated
and blinded with crushed stones.
m2 64.24 300
Carried to summary
3. CONCRETE WORK
3.01 5cm thick lean concrete C-5, 150kg cement per meter
cube of concrete under
a) Footing pads m2 16.28 137
3.02 Concrete quality C-25 with min. cement content of
360kg /m3 of concrete filled in to formwork and
vibrated around reinforcements, formwork and
reinforcements shall be measured separately.
Carried to summary
B. SUPER STRUCTURE
1.CONCRETE WORK
1.01 Concrete quality C-25 with min. cement content of
360kg /m3 of concrete filled in to formwork and
vibrated around reinforcements, formwork and
reinforcements shall be measured separately.
17,531.80
9,451.17
-
19,272.00
46,254.97
-
-
2,230.36
-
19,024.00
1,667.50
22,854.61
19,272.00
6,731.20
2,408.00
17,657.92
91,845.59
7,435.89
16,666.42
15,558.85
46,179.00
12,019.92
12,013.54
15,571.84
13,332.07
6,673.18
29,759.80
-
47,595.38
27,150.24
45,227.22
13,854.42
71,769.46
18,938.06
399,745.29
537,845.84