Irak Oil Fields Map
Irak Oil Fields Map
Irak Oil Fields Map
q
Discovery well: Swara Tika-1 (2011) Production: EWT 5000 bopd. 30,000 bopd EPF by late 2014 with
Production Capacity: 100,000 bopd (Plan for 150,000 bopd CPF by 2014) Sidetrack tested Jurassic Sargelu 2100 bopd (15 API) Reservoirs: Jurassic/Triassic (457m gross oil column)
Tawke-17 (Deep) reached TD 4775m (Triassic). Testing ongoing phase development to 120,000 bopd by 2016. MARAGHEN
Production: 10,000 bopd EPF completed
Tawke-20 1st Cretaceous horizontal well spud Dec 2012. Production testing. Swara Tika-2 TD ~3700m. (Triassic). Spud Nov 2011.
3 additional development wells in 2013 Atrush-1 completed workover and connected to EWT
Tested 15,000 bopd (35 API) and associated gas Atrush-2 TD 1750m (Butmah)
Mateen-1(2011). Dry hole. East Swara Tika-1 planned spud Jun 2013 BONAB
Spud May 2012. RR Sept 2012. 3 DSTs conducted over BSAM
SINDI
AMEDI reservoir (Jurassic) aggregate 42,000 bopd (27 API). Additional
Mangesh-1 spud Sept 2012. Drilling tests in Butmah (1450 bopd) and Adiayah (650 bopd) heavy oil.
Gara-1 spud Nov 4 2012. Drilling. HC shows in Kurra Chine Atrush-3 spud March 25th 2013. PTD 1691m. Drilling sidetrack.
Bijeel Field (Kalegran)
March 2013 KRG exercised their 25% back-in right to PSC Discovery well: Bijeel-1 (2010)
Field Development Plan submitted May 2013 Reservoirs: Jurassic (13 API)
Resources: 2.4 billion barrels (STOIIP)
TAWKE
Peshkabir-1 TD 4092m (Triassic) DNO 55%
Production: 10,000 bopd EPF completed Q2 2013
YOLACAN Spud Sept 2011. Susp July 2012 Genel Enerji 25% TW20 TW14 TW13 Bijeel-1. commenced EWT May 2013
LELAC Jurassic Sargelu test oil/water cut (27-29 API) KRG 20 %
=^
)_
TW22 TW15 TW11
=) =)
=) =) TW17 C Deralok HPP
Rovi PSC (Chevron) Bijeel-7 spud Dec 2012. Drilling ahead at 3740m.
Water in Triassic/ Cretaceous.
#
*)
TW18
=
)=
)#
*
=
)
TW16#
*
=
) =
))
TW4 TW19
=^
_)
=
TW23 TAWKE
TW3
B SINDI AMEDI
261 MW
Rovi South-1 (2010) TD 4027m. Bijeel-2 spud Mar 2013. Drilling ahead at 1800m.
Plan FDP submission Oct 2013 TW21
=)
==
)
==
)
TW6 TW2 TW12 Perenco 41.25%
KARATCHOK WEST
¾C
TW10
Tawke
TW9
TW5
Zakho CCGT
MT1 Oryx Petroleum 33.75%
KRG 25%
BLOCK I Initial well test flowed oil and undewent EWT
Plan to spud additional commitment well Q3 2013 Bakrman-1 spud May 2012. TD 3930m Sept 2012.
FISH KHABUR Μ
PS1 5000 BOPD 1000 MW Kurra Chine tested 2616 bopd + 5.86 mmcfd. Testing ongoing
Gulak-1 spud July 2012, susp Feb 2013.TD 3641m.
ULAYYAN Q AM1
KARATCHOK #
*
37°0'0"N
Linnava-1
TEL
4100000
4100000
GHARAB Spud Apr 2012 Abandoned Dec 2012.
No commercial flow obtained HAMZAH
37°0'0"N
CENTRAL DOHUK MN1 GA1 Sarta PSC (Chevron)
RUMAILAN
SUFAYA
Murphy 50%
Petroquest 30% _
^ SARSANG
HKN 56.25%
_
^ DN1 Sarta Central-A1 (2010) TD 2702m
KRG 20 % Marathon 18.75%
KRG 25 %
#
* Tested 1,000 bopd from the Jurassic. 2011 workover + EWT.
Plan to spud additional commitment well Q3 2013
Dohuk Discovery (DNO) Q #
*SG1 BLOCK II
Discovery well: Summail-1 (2011) = MUSHORAH Dohuk DF
500MW CDohuk CGT BER BEHR MIANDOAB
=(heavy oil)
Reservoirs: Cretaceous (gas), Jurassic B LN1 Genel Energy 40%
Gulf Keystone 40%
500 MW EST1
KRG 20 % SWARA
Resources: 102 MMBOE contingent =
) SULEVANI TIKA #
* Harir/Safeen PSCs (Marathon)
SM1 tested 11.6 mmcfd in Cretaceous Petroquest 80% BER =
) Harir-1 TD 3800m (Triassic)
Summail-1 workover and drilling 2 additional appraisal wells KRG 20 % = BB1
Q
)
BEHR ST1
= ST2
) Spud July 2012. Abandoned Dec 2012. Wet.
Negotiating gas supply Dohuk power stations SHEIKH ADI AT2
AT3 Safeen-1 spud April 2013. PTD 3155m
DOHUK Dohuk
Gulf Keystone 80%
KRG 20 % AT5 = )
)
Q
ATRUSH
# *=
Q
* AT1#
AT4 _
^ Mirawa-1 spud March 2013. PTD 3900m
DOHUK
# C
* SUMMAIL
SM3
29MW SHEIKH
#
* ATRUSH DINARTA 2D Seismic completed
SM_E1DNO 40%
Q
)
È
Genel Energy 40% #
* ) SM2 ADI
=
)
Q SA2
TAQA 39.9%
Shamaran 20.1%
Hess Middle East 64%
Sheikh Adi Discovery (Gulf Keystone) KRG 20 % È Q
=
)
Petroceltic 16%
Discovery well: Sheikh Adi-2 (2012) SM1
SA1 SH4 SH10
SHAIKAN
SH5
Marathon 15%
KRG 25 % _
^
BAKRMAN
BM1
KRG 20 %
NAOUR
Reservoirs: Jurassic (15-18 API)
KH1
AL QUSH
ExxonMobil 80% AQ È
)
Q
SHAIKAN
)
=
SH1 #
* =
)
Q
Gulf Keystone 60% Dinarta / Shakrok PSCs
SA-2 tested aggregate flow rate of 4235
bopd from 4 Jurassic zones (15-18 API) B KRG 20 % #
* SH3
*=
=
)
# SH7
SH8
Q
)
= Q
SH2 MOL (Kalegran) 16% SH6
Texas Keystone 4%
Shakrok-1 planned spud July 2013 (Ensign rig 941)
Dinarta-1 planned spud Q4 2013
= SA-3 appraisal planned spud Q4 2013. PTD 3500m AlBQ
È
)
Q=
È
)
BÈ
)Q
Q)
È
Q)
È
)
Q
È
)=
B
Q
Qush-1
È Bpreparing
Q
È
)
QB
È
)
= BBQ= BB =
È
) to spud June 2013 SM2 CShaikan CCGT KRG 20 %
B
BJ3
Dinarta 2D seismic acquistion near completion
MAHABAD
B Q)
)
È
Q
È
) Q=
È =
) JEBEL 1000 MW
AKRE-BIJEEL
MOL (Kalegran) 64%
Q SI1
=
)
SIMRIT
ROVI Gulf Keystone 16%
)
=
B _
^ SM3 Chevron 60% #
*
KRG 20 %
4050000
Shaikan-10 1st development well expected spud Q2 2013.
)
=
B
Hunt 60%
Afren 20% #
* RV2 SC2
BJ5
#
* HR1
Bina Bawi Discovery (OMV)
GUSAIR KRG 20 % #
* B Discovery well: Bina Bawi-1
Reservoirs: Mus, Upper Butmah (Jurassic)
JS1 Resources: 500-1000 mmboe contingent
ML1 #
* Production: BB-3 EWT commenced Mar 2013 (5000 bopd)
Simrit Discovery (Hunt) _ #
^ * ML2
SARTA SCA1
Q
)
=
Chevron 60% SARTA
BB-3 2 Jurassic tests aggregate flow 4000bopd + 15mmcfd
BB-4 spud June 2012. TD 4800m (Permian). Testing.
Maqlub-1 spud May 2013.
Discovery well: Simrit-1 (2011)
Reservoir: Cretaceous/Jurassic/Triassic =
)
B Cretaceous/Jurassic/Triassic targets BA BARDA
BR4
_
^
BARDA RASH
Afren 60%
BR1 Komet 20%
OMV 15% CENTRAL
KRG 25%
HARIR MR1
Marathon 45% _
^ BB-5 spud Oct 2012. TD 3600m (Triassic). Testing.
Resources: 42 MMBOE contingent + 227 MMBOE prospective (June 2011) ¾ =
)
B #
* =)
)
RASH = KRG 20 %
Total 35%
KRG 20 %
3D seismic acquisition commenced Q2 2013
B
Production: Simrit-2 EWT (Jurassic) about to commence. Trucking to local markets ALAN
) BR3
=
=
)
B aggregate flow rate19,641 bopd.
Simrit-2 : Cret/Jurassic/Triassic Bashiqa-1 preparing to spud June 2013 _
^ BR5
BETWATA
ExxonMobil 80% HINDREN
Declaration of commerciality submitted March 2013, FDP to be submitted 2H 2013.
Iran
KRG 20 %
Simrit-3 spud Sept 2012. TD 3750m. Testing underway
BASHIQA
SASAN ExxonMobil 80% Taq Taq Field (TTOPCO)
KRG 20 %
Q
È
)
BENENAN ERBIL BS3 Discovered: 1961
Barda Rash Field (Afren) ER1 Q
È)
) =
ER2 DNO 40% #
*BS1A Reservoirs: Pilaspi (26 API) , Shiranish/Kometan/U Qamchuqa (46 API)
Discovery well: Barda Rash-1 (2009) B AS1
_
^ BN1 #
*
Gas Plus Erbil 40%
=
)
BASTORA
PIRMAM
ExxonMobil 80% SF1 SK1 Resources: 647 mmboe (2P)
Reservoir: Cretaceous and Jurassic (Mus/Adaiyah) B BN4
KRG 20 %
_
^ BS2
KRG 20 %
_
^ #
* Production Capacity: 120,000 bopd. Projected 200,000 bopd by 2014.
Resources: 190 B mmbbls (2P) + 1243 mmbbls contingent
ATSHAN
MOSEL Kalak
100000 BOPD
SHAKROK Domestic and trucked exports to Turkey.
Production: ~2500 bopd (Nov 2012) Hess Middle East 64% TT-18 completed and test flowed at 13,000 bopd
Phase II drilling program 2 + 2 wells commenced ¾ SAFEEN
Petroceltic 16%
KRG 20 % TT-22 (deep) spud Mar 2013. PTD 5400m (Triassic).
Iraq
MO1 3 additional 2013 development wells
IBRAHIM MALA
OMAR B
BB5
_
^ Marathon 45%
Total 35%
Harir ICE
4000000
=
)
B
QALIAN B-2H to follow: horizontal sidetrack into Bekhme
KNOC 15%
KRG 20 %
Erbil
29MW
C
Koya ICE
OMV 36%
Genel Energy 44%
KRG 20 %
250 MW
Demir Dagh Discovery (Oryx)
=
C Khurmala
1000 MW
CCGT
SHORISH Kewa Chirmila-1 TD 2,836m Shiranish (2009)
Kewa Chirmila-2 TD Pila Spi (2012)
Discovery well: Demir Dagh-1 (1960) TAQ TAQ
Reservoir: Cretaceous/Jurassic #
*ZG2 Shorish-1 TD 2722m L Sarmord (2010) TTOPCO* 80%
Genel Enerji 44%
Qaiyarah and Najmah Fields (Sonangol) = 252 mmbbls (2P) + 307 mmbbls (2C)
36°0'0"N
36°0'0"N
Pirdawd DF
TT12)
=
Production: projected 230,000 bopd by 2017. 60000 BOPD 500 bopd L Qamchuqa, water in U Qamchuqa
B
Cretaceous tested 6700bopd (21 API) B 1312MW TT11
=
QASAB Demir Dagh-3 to spud Q3 2013 C ==
)
=
)
TAQ
_
^ Q)
=
)
)TAQ= TT8 ¾
)
)
È
B Q
=
) = TT5
Μ =
)
B =
)
TT10z
TT4 )
=TT13
TT9 )
= SW1
KHURMALA
= TT7
= TT16
) #
*
)
=
B = = QUSH
JAWAN È Kurdistan
) KHURMALA DOME
TAPPA
C Miran Field (Genel Energy)
)
= NOC 100% Dokan HPP Discovery well: Miran West-1 (2009)
Khurmala Field (Kar Oil and Gas)
= KRG % QT1 KC2
400MW
Reservoirs: U Cret (15-18 API), L Cret/Jurassic (wet gas)
= =KHURMALA Q Q
KHALAKAN
Resources: 3.75 TCF and 161 mmboe liquids (recoverable)
B
QAIYARAH Reservoirs: Eocene, Shiranish/Kometan Gas Plus Khalakan* 80%
KRG 20 % Production: 30,000 bopd EPF by end 2014
NAJMAH
and Qamchuqa (34 API)
DOME Gas development by end 2015.
Production Capacity: 150,000 bopd + 100 mmcfd.
=
C
Mosul
)
=
B Under going W/O of 19 wells. = Taq Taq HPP
270 MW KEWA CHIRMILA BLOCK V
M-1 EWT commenced Dec 2012. Currently producing
750 MW = Genel Enerji 44%
C Addax Petroleum 36% 2-3,000 bopd. M-3 EWT late 2013.
)
=
B =Qayarah =
KRG 20 % PIRAMAGRUN Miran-4 TD 4850m (Jurassic) (2012) Currently testing
Repsol 80% Miran-5 TD 1905m (U Cretaceous) (2012)
¾ 16000 BOPD
TaqTaq -> Khurmala oil pipeline
Completed in early 2013 (150,000 bopd) .
=
B
== Dibis ICE
KRG 20 %
Tested 1350 bopd (16-18 API) from horizontal section.
640 MW Miran-6 projected spud Q1 2013
CHEMCHEMAL
= =
)
ISMAIL = == C Pearl Petroleum* 100%
Crescent Petroleum 40%
Miran-Deep projected spud Q3 2013
= = Dana Gas 40%
B
Q
)
È =
MOL (Kalegran) 10%
KC1z
BZ2 #
* BZ1
= OMV 10%
Q
3950000
3950000
= BAZIAN
=
AVANAH M4 PENJWIN
)
=
=DOME
=
)
=
#
* ^ _ MIRAN
)
=
= Bazian
¾^
_QM5 MR7
M2
Genel Energy 75%
KRG 25% Sangaw North-1 TD 4190m Kurra Chine (2011)
= =
KIRKUK Tasluja ICE
BAI
== CHEMCHEMAL
34000 BOPD
ÈM1
)
Q
=
)
M3 51MW Jurassic/Triassic tested uncommercial rates of gas
=
HASSAN = MIRAN
C + water. (high H2S)
)=
= = =
=
) Kirkuk
Chemchemal DF WEST #
* MR6
1000MW BAZIAN
Bai Hassan Field (North Oil Co) )
=150000 BOPD
C KNOC Bazian* 80%
Discovered: 1953
QARA
=
) =¾
) = QARA HANJEER
KRG 20%
Reservoirs: Oligocene, Shiranish/Kometan and Qamchuqa = SULAYMANIYAH Sangaw South-1 TD 3820m Sarki fm (2011)
CHAUQ == ExxonMobil 80%
Q
È
Q
È C
=)=
B
Resources: 1700 mmbbls + 8.9 TCF recoverable remaining B KRG 20 %
Production: 198,000 bopd, projected 240,000 bopd by 2014 =)=
=
Rizgari
ARBAT EAST
))
== =
)=
) 29MW
=
) =)=
)
= == =
) ExxonMobil 80%
=)
KHABBAZ KRG 20 %
) =)
È
) = ==
) ARBAT
= )
) =)
)= = =
B
=
Kirkuk Field - Baba and Avanah domes (North Oil Co)
Discovered: 1927
= B==
) Qara Dagh-1 TD 3908m Kometan (2011)
KIRKUK
Reservoirs: Oligocene,Jaddala, Shiranish/Kometan and Qamchuqa =
)
Q Tests in Shiranish and Tanjero produced oil
Resources: 10,800 mmbbls + 2.7 TCF recoverable remaining Mullah Abdullah CGT
402MW
==
)=
BABA (43-46 API) at non-commercial rates.
Production: 180,000 bopd. BP in talks over service contract DOME
to enhance production to 600,000 bopd by 2017 CKirkuk
27000 BOPD =
= ¾ C Saidsadq ICE
)
= Khabbaz Field (North Oil Co) Chemchemal Field 200 MW
MAKHUL Discovered: 1976 Discovered: 1930
Reservoirs: Jeribe, Oligocene, Kometan and Qamchuqa Reservoir: Pila Spi (43 API) Condensate SANGAW
KHANUQAH Resources: 2000 mmbbls + 3 TCF recoverable remaining Resources: 2.07 TCF recoverable NORTH
Production: 29,000 bopd
CTaza=CGT BARANAN
Total 80%
330MW KRG 20 %
= == = KOR MOR
3900000
3900000
Pearl Petroleum* 100% B
SN1
Crescent Petroleum 40%
== Dana Gas 40%
= =
) MOL (Kalegran) 10% QARA
È
= =
OMV 10% TOPKHANA SS1 Q
=
)
DAGH HALABJA
Jambur Field (North Oil Co)
JAMBUR
Talisman 60% Q QARA DAGH
Gazprom Neft 80%
B Discovered: 1929 UNASSIGNED 20%
SANGAW SOUTH Chevron 80%
KRG 20 %
)
= Reservoirs: Jeribe, Euphrates, Eocene, Shiranish and Qamchuqa
KRG 20 %
KNOC 30% KRG 20 %
Resources: 3000 mmbbls + 9.0 TCF recoverable remaining = È UNASSIGNED 50%
North Salah ad Din (Sonoro Energy) È
= KOR MOR
ÈÈ KRG 20 %
Resources: 140 mmbbls recoverable Production: 50,000 bopd + 120 mmcfd, projected 80,000 bopd by 2014 =
) ÈÈ
B
Target: Jeribe asphalt
= =
)=)=
B= BÈÈ TOPKHANA Darbandikhan HPP
=
) = KM9 249MW
C
Drilling program to has been deferred due to permitting issues
Kor Mor Field (Dana/Crescent) == Q TP1
È
B Discovery well: Kor Mor-1 (1928)
KURDAMIR
K3
Baiji North Resources: 1.8 TCF recoverable S.E KOR
_
^ Q
)
È KURDAMIR Baranan PSC
170000 BOPD = Production: 340 mmcfd + 15,000 bpd condensate
MOR K1 Talisman 40%
Total awarded
35°0'0"N
¾ = Negotiating increase to 600 mmscfd, but
WesternZagros 40%
KRG 20 % block by KRG April 2013
TAZA
dispute between Dana/Crescent and the KRG over payments.
= _
^ TZ1 #
* B1
TAZA
Oilsearch 60%
Total 20%
K-2 (Siniyah) =
)
È = KRG 20 % Kurdamir Field (Talisman)
Baiji Salahedden Discovery well: Kurdamir-1 (2010)
¾
20000 BOPD
¾ 140000 BOPD =
)
Q
JUDAIDA
Reservoirs: Oligocene and Eocene
= Taza-1 (Romfor 101)
CKalar CCGT Resources: 643 mmbbls contingent + 1465 mmbbls prospective
= B
== = == Kurdamir-2 TD 4000m (Shiranish)
= Spud July 2012. TD 3351m (Jaddala) 1000 MW
Q
) Tested 200-250 bpd oil/water in Jeribe/Dhiban.
Spud Oct 2011. RR Jan 2013
= = )
AJEEL
==
È )
= PULKHANA Oligocene test 3450 bopd. Completed as an Oligocene producer
= HAMRIN Sidetrack 2 continues testing 150m section including the GARMIAN
WesternZagros 40% Kurdamir-3 (KCA T-80 2000hp) spud 22 Feb 2013. Drilling ahead
= Q=
È
) Euphrates. Up to 1100 bopd + 2900 bwd Gazprom Neft 40%
= == KRG 20 % through Oligocene reservoir.
= )
=
BB PU9 Kurdamir-Topkhana 3D seismic ongoing
Ajeel Field (North Oil Co) Q
= PU8
)
3850000
3850000
Discovered :1961
Q
=
)
Reservoirs: Jeribe and Euphrates
= BBB
Resources: 500 mmbbls + 496 BCF recoverable remaining Topkhana-1 TD 3140m Jaddala (2011) PULKHANA
SARQALA
Production: 23,500 bopd, projected 35,000 bopd by 2014 Tested gas/condensate (61-62 API) from Oligocene =
)S1
Topkhana-2 projected spud Q3 2013. Target: Oligocene SHAKAL MIL MQUB1 _
^ H1
Baram-1 projected spud July 2013. Target: Oligocene
Kurdamir-Topkhana 3D seismic ongoing
Talisman to farm out working interest in Topkhana/Kurdamir. Q SK1
)
= QASIM _
^
Q
=
)
MQ1 3D Seismic acquisition planned Q3 2013
CHIA
Hamrin Field (North Oil Co) SURKH
Discovered :1961 SHAKAL
B
Q
ÈB CS11
CS10
Reservoirs: Jeribe, Euphrates/Serikagni and Oilgocene Pulkhana Field Gazprom Neft 80%
KRG 20 %
)
=
B
=
)
B)
=^
BQ _ Chia Surkh Field (Genel Energy)
Resources: 1,800 mmbbls + 750 BCF recoverable remaining Discovery well: Pulkhana-5 (1956) CHIA SURKH Discovered 1903
Production: Projected 60,000 bopd and 60 mmcfd by 2014 = and Balambo
Reservoirs: Euphrates, Jaddala, Shiranish Genel Energy 60%
Petoil 20%
Reservoirs: Fars, Jeribe, Oligocene
Resources: 38-328 mmbbls, P50 113 mmbbls recoverable KRG 20 % Resources: 306 mmboe prospective
TIKRIT Pulkana-9 (2011) tested limited oil (30-33 API) from Shiranish/Balambo Chia Surkh-10 spud October 2012 (TD 1696m).
= Pulkana-8 (2010) tested 2,650 bopd (31.6 API) Shiranish.
QAMAR
Mio-Oligocene tested up to 11,950 bopd (41 API) + 15 mmscfd.
TIKRIT
= Miocene tested up to 3200 bopd (38 API) + 8.4 mmscfd
=
)
È Chia Surkh-11 spud April 2013. PTD 3000m
=
GILABAT
)
B
Shakal Discovery (GasProm Neft)
Discovery well: Shakal-1 (2009)
Reservoir: Jaddala, Aaliji
Resources: 45 mmbbls )
È
B
3 Test Aggregate max of 2,450 bopd (35 API) BBB
INJANA
Preparing to start 3D seismic program Q3 2013
B
3800000
Tested: 2200 bopd (42 API); GOR 4000 KHANAQIN Discovery well: Sarqala-1RE (June 2011)
Not Producing Khanaqin/Alwand
Reservoir: Jeribe
Mil Qasim Discovery (WesternZagros)
Discovery well: Mil Qasim-1 (2011)
¾ 20000 BOPD Resources: 24 mmbbls (contingent), 198 mmbbls (prospective)
Production Capacity: 5-6000 bopd
Reservior: Upper Fars S-1RE initial Flow test: 9444 bopd (40 API)
)
È
B MQ1 tested an aggregate of ~850 bopd (43-44 API) =
) Hasira-1 (GWD rig 83) spud June 2013. Target: Oligocene
Haditha HPP Shallow well project targeting Upper Bakhtiari formation =
È 3D Seismic acquisition completion mid Apr 2013
660MW JARIA
commenced 1st well 19 May 2013. Preparing for testing
PIKA
C Samarra HPP
NAU
=
DOMAN
)
=
B 75MW MANSURIYAH
=
)
Q
C
Samarra =
250000 300000 350000 400000 450000 500000 550000 600000
42°0'0"E 43°0'0"E 44°0'0"E 45°0'0"E 46°0'0"E
=È
=
Abbreviations
mmbbls Million barrels (oil)
Well Status Fields Facility - Active Kurdistan Blocks TCF Trillion cubic feet (gas)
Μ
BCF Billion cubic feet (gas)
#
*
_
^
Planned
Drilling/Testing
Oil Field/Discovery
Gas/Condensate Field/Discovery
C
Metering Station
Power Station
Awarded
Open
bopd
mmcfd
EWT
EPF
Barrels of oil per day
Million cubic feet gas per day
Extended well test
Early production facility (temporary)
0 5 10 20 30
Kilometers
40 50 Kurdistan & Northern Iraq
Q
B
Suspended
Facility - Constructing
Study
Kurdamir PSC
CPF
OIP
PSC
MW
Central production facility (permenant)
Oil in place
Production Sharing Contract
Mega watts
No Copying or Distribution without
Operator Activity Map
= Location
Hydrocarbons
Gas, Proposed
Oil, Active
C
¾
Power Station
Refinery
Garmian PSC
Mountain Front
HPP
ICE
CGT
CCGT
Hydro Power Plant
Internal Combustion (Heavy Fuel Oil)
Single Cycle Gas Turbine
Combined Cycle Gas Turbine
permission of WesternZagros June 2013
DF Dual fuel (Gas + Fuel Oil) Data shown is to the best knowledge of WesternZagros at time of printing, however we cannot be Projection: WGS 84 UTM38N
=
) Oil Oil, Construction Facility - Proposed
Country Boundaries held responsible for outdated or incorrect information. To inform us of any discrepancies, please contact:
È
) Oil and Gas Oil, Proposed ¾ Refinery
Urban Areas
Text box information investorrelations@westernzagros.com
Date printed: 05 June, 2013
Red text indicates recently updated information Date last saved: 05 June, 2013
È Gas/Condensate Product, Active C Power Station Blue text indicates unpublished or unconfirmed information
File location: I:\appdata\ArcGIS\Maps\Activity Maps\130604_operator_activity_EXTERNAL.mxd