Technical Proposal for Ban Khun Klang Microgrid project
TABLE OF CONTENTS
2.2 LAYERED AND DISTRIBUTED MICROGRID CONTROL & PROTECTION SYSTEM .................................................11
2 / 36
Technical Proposal for Ban Khun Klang Microgrid project
Executive Summary
This technical proposal is conducted for Microgrid project in Ban Khun Klang, Chiangmai, Thailand. This
document aims to give the main proposal on the design and equipment for the Microgrid project.
As we have only gotten limited drawings and technical data, hereby we will present a preliminary design and
proposal. All calculations and data will be as reference for tender only at this stage, adjustment will be done
after geotechnical investigation and confirmation of all other technical data needed.
1 Introduction
Thailand Ban Khun Klang Microgrid project is a pilot project which owned by EGAT, there are load from
royal project, packing and guest villa, the peak load are respectively 80kW,40kW,50kW . There are 2 sets
existing 90kW hydro generator(which will be retrofitted to be controllable by the Microgrid controller), 2 sets
existing Diesel generator(185kVA which work independently, 419kVA which will be control by the
Microgrid controller after add control interface equipment ) and will have 1 set 50kW PV system(which the
PV panel will be installed at at rooftop and car parking area), 1 set 100kW/150kWh battery storage system
that can be operated in a controlled, coordinated way either while connected to the main power network or
while islanded. With its autonomous control, protection and management, it provides multiple advantages
including higher energy utilization rate, higher power supply safety & reliability, less power transmission loss,
low environmental impact.
The Microgrid is consist of two types, namely grid-connected Microgrid and permanently islanded Microgrid.
The grid-connected Microgrid is synchronized with the external power grid. It operates in parallel with the
distribution network to realize the bidirectional energy exchange. During the external grid outage, it operates
in the islanded mode to enhance the power-supply reliability. The permanently islanded Microgrid is a stand
alone network and applied in the several villages in Ban Khun Klang area which uncovered by the large power
grids. It operates independently to meet the load demand by the DGs or ESS within Microgrids.
NR would like to provide all in one Microgrid solution including the overall system simulation, design,
equipment manufacturing for this project.
3 / 36
Technical Proposal for Ban Khun Klang Microgrid project
System Research
NR Electric is a comprehensive enterprise integrated with scientific research and analysis of steady-state,
transient-state, operating modes, control strategy and protection configuration for Microgrid. NR has also
undertaken comprehensive research in multiple domains including power system analysis, stability control,
FACTS application, AC/DC hybrid transmission system, analysis for grid applications etc. At present NR is
fully capable of providing the core technologies for Microgrid with high end system research facilities.
Core Equipment
NR covers all the high-end equipment to build your Microgrid system including Microgrid EMS, Microgrid
c ontroller, Microgrid local controller, Microgrid protection IEDs, Microgrid energy storage system, PV
inverter, reactive-power compensator. This ensures a one-stop solution for a stable and economic Microgrid
system.
System Test
NR has established RTDS test facility, RT-LAB test facility, dynamic analog simulation test facility and
synthetic test loops to simulate site application scenarios and to verify the control & protection system,
guarantee the correctness of control and protection logics, and cut down the site commissioning work.
Project Implementation
NR has the professional project management team certified by international PMP. The general contract design
convers the projects of primary electrical engineering, secondary electrical engineering, civil engineering as
well as the specialties of conventional substation, DC transmission, FACTS, new energy power generation,
etc. The manufacturing of core equipment, the purchase management of auxiliary devices and the operation
& maintenance management of operating equipment is also included in the complete Microgrid solution.
4 / 36
Technical Proposal for Ban Khun Klang Microgrid project
1.1 PV array
1.2 Grounding
material
5 / 36
Technical Proposal for Ban Khun Klang Microgrid project
1.3 BESS
1.4 INTERFACE
6 / 36
Technical Proposal for Ban Khun Klang Microgrid project
2、Electrical Secondary
2.1 HMI
workstation
Computer set 1 NR
17'LCD set 1 NR
HP-5200NPrinter set 1 NR
7 / 36
Technical Proposal for Ban Khun Klang Microgrid project
panel cubic 1 NR
le
3、Steel Structure
8 / 36
Technical Proposal for Ban Khun Klang Microgrid project
Fig 2.1.3 Operation of Microgrid during PEA outage at Royal Project Intanon
Fig 2.1.3 Operation of Microgrid during PEA outage and Dry season at Royal Project Intanon
10 / 36
Technical Proposal for Ban Khun Klang Microgrid project
NR’s Microgrid control & protection system adopts the layered and distributed design, which is divided
into local control level, coordinative control level and optimal control level.
Fig 2.2.2 NR’S Layered and distributed Microgrid control & protection system
11 / 36
Technical Proposal for Ban Khun Klang Microgrid project
Note: when the Microgrid capacity is smaller, the local controller is no need of being deployed and the
Microgrid controller communicates directly with DG, energy storage inverter and diesel engine.
The Local control level includes DGs, PCS, local controller and protection IEDs. Our automated local
control system with independent communication can provide fast response speed between equipment
during minor disturbances or short-circuit faults, and stabilize power-supply by the self-regulation of
converter or the fast action of protection equipment.
Coordinative control level
The coordinative control level includes the Microgrid controller, which acquires the information of DGs,
energy storage, diesel generators and important load via the control communication network. When
Microgrid operates in the islanded mode and large disturbance occurs (such as non-scheduled grid outage,
large-capacity DG trip, etc.), the Microgrid controller coordinates the operating modes of energy storage
and diesel generator as well as the output power of DGs to maintain the voltage and frequency within
the allowable ranges and guarantee the stable and safe operation of Microgrid system.
Optimal control level
The optimal control level includes the Microgrid EMS and depends on the data supplied by SCADA
system, dispatching & schedule system, load forecast system, etc. It realizes the functions of data analysis,
energy prediction, load management, optimal operation, economic dispatching for the specified
applications to maximize the comprehensive utilization rate of the DGs within Microgrid.
Features
It effectively exercises the coordination of control and protection among different layers to realize
the stable and economic operation of Microgrid.
The control-layer networks are independent, safe and reliable due to redundantly-designed layers.
The high-performance and ms-level response speed of the Microgrid controller enables the seamless
switch between different operation modes of Microgrid.
12 / 36
Technical Proposal for Ban Khun Klang Microgrid project
Note: when the microgrid capacity is smaller, the local controller is no need of being deployed and the
microgrid controller communicates directly with DG, energy storage inverter and diesel engine.
PCS-9617MG is developed based on high-performance UAPC platform with high speed control response.
This guarantees the stable and safe operation of Microgrid with seamless operation. In addition, it adopts
the advanced optimal control algorithm to ensure the highly efficient and economic operation of various
energy sources within Microgrid, such as DG, CHP, solar generation, wind generation, etc. Its control
logic can be flexibly configured according to the user’s specification. Except the advanced control
functions, it also integrates the functions of Microgrid Interface protection.
1) Control
In order to avoid the impact of large tie-line power variation and power flow of distribution network,
Microgrid controller controls the output of energy storage devices and DGs and regulates the power flow
of PCC within the predefined range. This makes the Microgrid as a controllable source/load for a friendly
grid-connected distributed Microgrid system.
Ancillary Services
Control the power of energy storage and DGs based on the dispatch center command or local
voltage/frequency to supply the grid with the frequency & voltage regulation service.
Fluctuation suppression: The randomicity and volatility of wind generation and solar generation impact
the power quality and stability of Microgrid. However, the energy storage device has the capability to
dynamically absorb or release the power depending upon grid needs. Special strategy is set in the
controller to suppress the power output fluctuation of wind generation and solar generation and realize
the smooth power output of wind generation and solar generation.
Peak shaving: When Microgrid operates in the grid-connected mode, it injects power into the
distribution system during the peak-load period and absorbs power from the distribution system during
the valley-load period. The peak-valley schedule curve function is set in the controller, which receives
the schedule curve issued by the dispatching center and controls the power output according to make the
Microgrid an excellent solution for the distribution system. A peak-valley power output curve can also
be set locally to generate power during the peak-price period and absorbs power during the valley-price
period to obtain the benefit of peak-valley price difference which ultimately enhance the economic
efficiency of the Microgrid.
In islanded mode, the power deficiency or excess may lead to the sharp variation of frequency and voltage.
This severely impacts the normal operation of loads within Microgrid and causes the system breakdown.
The frequency & voltage emergency control is set to balance the power demand within Microgrid and to
recover the voltage and frequency within the allowable operating ranges by the energy storage output
control, fast load shedding and DG disconnection.
In order to avoid the automatic shutdown or damage of generator (diesel generator, gas engine) due to
its too low power output, the PV power output is limited by the automatic control to raise the power
output of generator up to an allowable range.
Switchover from grid-connected mode to islanded mode: When the grid is de-energized due to fault,
overhaul, etc., the controller quickly detects the islanded condition, trips the circuit-breaker of PCC and
sends the islanded signal to the energy storage and DGs for the switching between Microgrid two
operating modes.
Synchronous grid-connection
Switchover from islanded mode to grid-connected mode: The controller provides automatic
synchronous switching-on function for a safe and reliable grid inter-connection of Microgrid.
2) Protection
All the major protections according to grid need including over-current protection, under/over voltage
protection and under/over frequency protection.
14 / 36
Technical Proposal for Ban Khun Klang Microgrid project
a) Voltage, current, frequency, active power, reactive power, power factor and kilowatt-hour at PCC
c) Up to 64 fault & action logs, 64 fault wave records, 1024 self-check reports and 1024 COS logs
d) The synch interface supports several GPS synchronization modes, including IRIG-B, SNTP, etc., as
well as IEEE1588 V2 high-precision net synchronization mode
4) Communication
a) Up to 6 10/100Mbps electronic Ethernet ports, one 1000Mbps electronic Ethernet port and 6 RS-
485/RS-232 serial ports are equipped for communicating with DGs and SCADA system. Additionally, it
supports IEC60870-5-103, IEC60870-5-104, DNP3.0 and MODBUS (Master and Slave).
b) Up to 8 100Base-FX optical Ethernet ports are equipped for the fast communication with PCSs and
supportsIEC`61850-8-1 GOOSE.
c) Hundreds of communication protocols are supported for communicating with subordinate DGs and
other intelligent devices. The configuration mode is convenient and the protocol module configuration
is flexible and expandable.
Features of Microgrid Controller
It is developed based on the unified control & protection platform (UAPC), with relay-level
response speed and reliability, capable of seamless switchover between different Microgrid
operating modes.
The control logic can be flexibly configured, conducive to the specified logic development by user.
Sufficient communication ports and protocols to realize the communication access of converters
with different equipment and different manufacturers.
The communication card and I/O module can be flexibly and optionally configured to meet the
requirements of different Microgrid capacities.
1) The real-time control subsystem includes the data acquisition & supervisory control (SCADA),
voltage & reactive-power control, and black-start control.
The data acquisition & supervisory control is the basis of MEMS. It acquires the data of source,
network and load within Microgrid and carries out the supervisory control. It also integrates the
meteorological data to provide the basis for the optimal dispatching of Microgrid.
The automatic generation control realizes the tie-line active-power control in the grid-connected
15 / 36
Technical Proposal for Ban Khun Klang Microgrid project
mode and the frequency control in the islanded mode. It eliminates the negative influence of the
output power uncertainty for renewable energy sources and guarantees the stability of Microgrid
active-power and frequency.
The voltage & reactive power control exploits the reactive-power control capability of the control
equipment and DGs within Microgrid and carries out the coordinated reactive-power control to
realize the fast and continuous regulation of Microgrid voltage.
When the Microgrid enters into complete black-out condition, the black-start control starts up only
the micro-sources within Microgrid to gradually expand the recovery scope of system for realizing
the efficient and stable recovery of Microgrid.
MEMS integrates data of different subsystems seamlessly to provide a unified interface for easy
realization of the flexible interaction among different application functions.
There are various built-in DG models in MEMS to support the quick access and participation in the
optimal dispatching management for different DG.
MEMS senses in the real time situation of Microgrid and responses quickly to the variation of source,
network and load. This ensures the Microgrid to be an effective, economic, safe and reliable
operating condition at any time.
Peak shaving: Promote the application of renewable energy in Microgrid, increase the penetration
rate of DG accommodation and lessen the impact on Microgrid
Frequency & voltage regulation: Participate in the frequency & voltage regulation of Microgrid and
provide active and reactive-power support, which enhances the stability of Microgrid operation.
Backup power-supply: Maintain the voltage and frequency of Microgrid during its outage, which
ensures the continuous power-supply for important devices to reduce the economic loss due to the
outage.
Black start: Used as the black-start power source of the islanded Microgrid to set up the base voltage
and frequency of Microgrid to ensure its stable startup.
16 / 36
Technical Proposal for Ban Khun Klang Microgrid project
PCS is the interface between grid and storage system, which can store the electrical energy from grid
into the energy storage device as well as release the energy into the grid from the storage.
PCS-9567 PCS supports various operating modes to meet the requirements of different Microgrid
application scenarios for Peak shaving, frequency & voltage regulation, etc. By the mode selection, it
can operate in either grid-connected mode or islanded mode. The advanced virtual synchronous generator
(VSG) control strategy is applied to realize the fast and seamless switchover between grid-connected
mode and islanded mode for avoiding the impact of suddenly changed voltage and current due to the
operation mode switchover.
PQ decoupling mode: The decoupled control of active and reactive powers in the grid-connection
condition, suitable for the Peak shaving & valley-filling and the frequency & voltage regulation.
VF control mode: The frequency & voltage control in the island condition, suitable for the
operation in islanded mode.
Droop control mode: It has active-frequency and reactive-voltage droop controls, suitable for
frequency & voltage regulation.
VSG mode: Simulating the external characteristic of synchronous generator, suitable for the
seamless switchover between grid-connected mode and islanded mode.
Black start: Establish and stabilize the grid voltage and frequency, suitable for the black-start
application in the island condition.
17 / 36
Technical Proposal for Ban Khun Klang Microgrid project
This part shall consist of almost all the solar generation system, such as PV modules, power electronics, PV
combiners and protection & control systems etc. In addition, NR Electric has a vast pool of procurement
sources to optimally allocate equipment suiting to our customer’s needs. The main compositions in the solar
power generation part supplied by NR Electric are as follows.
(1). PV module
(2). Panel mounting bracket
(3). DC combiner Box
(4). Cable
(5). Protection, Control and Monitoring System
Where:
L: length of inclined plane;
D: distance between two rows of arrays;
β: dip of array;
φ: local latitude.
Based on the calculation of above formula and in consideration of construction errors and actual project
experience, D takes 0.9 m.
PV Module design
Due to the characteristics of sufficient production, mature manufacturing technology, stable performance,
long service life and relatively high photoelectric conversion efficiency, crystalline silicon solar panels are
widely used in large-scale grid-connected photovoltaic power plant projects.
All PV modules will be produced strictly according to the specifications, data sheets, certifications offered by
the manufacturer. The modules will be safely packed for the international truck and sea transportation before
each shipment.
The detail technical specification is as follow.
19 / 36
Technical Proposal for Ban Khun Klang Microgrid project
Weight 21.5kg
• Double pole
• Strong strength
• Be suitable to the ground power plant
• Be fit to sandy, loam and clay, etc
• Foundation bolt is pre-installed in the cement base
PV panel grounding
All frames of PV modules and supporters should be safely grounding to ensure electrical safe.
20 / 36
Technical Proposal for Ban Khun Klang Microgrid project
3.2 PV Inverter
Input Data
Output (AC)
ITHD <3%
Efficiency
Protection Devices
21 / 36
Technical Proposal for Ban Khun Klang Microgrid project
General Data
Weight 60kg
Topology Transformerless
Features
DC connection H4/MC4(opt)
Display LCD
22 / 36
Technical Proposal for Ban Khun Klang Microgrid project
Input(DC)
Output(AC)
General Data
Communication 485/Ethernet
23 / 36
Technical Proposal for Ban Khun Klang Microgrid project
This proposal proceeds based on the design ideal of science and safety, environmental friendly
protection, intensive land use, intending to narrow down clients construction cycle and prompt the
development of environment friendly. The system chooses modular layout, which is easier to be installed,
transported, maintained and systematically extended. The batteries system is comprised of LFP battery
unit with serials and parallel connection which has features of higher level energy, lower cost, safety and
non-pollution, and also functioning together with advanced flexible, reliable, and easily extended
batteries management system.
1、Autonomous learning SOC / SOH evaluation algorithm:there is a cumulative error problem with
conventional SOC estimation and battery system capacity estimation, making it difficult to achieve
calibration accuracy of the available capacity and SOC of the battery system. The described system uses
the unique SOC patented technology for autonomous learning, independent correction according to the
system real-time state, which effectively eliminates cumulative error and improves SOC / SOH
calibration accuracy
2、Lossless equalization technology: through real-time monitoring the running status of each cell,
the use of efficient equalization technology ensures uniformity among batteries, which extends system
life.
3、High-precision information acquisition technology: the higher the battery information collection
accuracy, the higher the reliability, consistency and SOC accuracy. By using Sunwoda BMS system, the
collection accuracy is industry-leading.
24 / 36
Technical Proposal for Ban Khun Klang Microgrid project
System Parameters
The nominal power of the proposed ESS is required to be 100kw, storage capacity 150kWh,.
See system parameters below:(We do not provide PCS, all the parameters of PCS is based on NR-
9567-100kW.)
Rated voltage-
5 output voltage range
15%/+10%
45Hz~55Hz/
On-grid pattern
7 Frequency range 55Hz~65Hz
When On-grid
pattern,rated
9 current harmonic <3% power、voltage
distortion ratio <
1%
25 / 36
Technical Proposal for Ban Khun Klang Microgrid project
Without
16 Relative working humidity 0~95%
condensation
Without
17 storage working humidity 0~95%
condensation
18 attitude ≤2000m
19 noise <70dB
charging/discharging round-trip
23 >2500 times
times
Notes: parameters above is our company’s standard allocation, you may need modify based on concrete
project.
26 / 36
Technical Proposal for Ban Khun Klang Microgrid project
Monomer Cell
Adopting 136Ah/3.2V monomer cells, with features of high level energy, more than 4000 times cycle life,
low cost, safety and non-pollution, has been widely applied to ESS.Parameters refer to chart 4.2.2:
Proposed discharging
6 136
current (A)
27 / 36
Technical Proposal for Ban Khun Klang Microgrid project
(%/year)
auto-discharging current
11 5 @ SOC 25%
(%/2years)
measurement ( W*D*H
12 173.9*48.0*174.3
mm)
13 weight(kg) <2.9kg
14 Distortion(mm) 0.1~0.2
17 humidity(%) ≤95%
18 certificate UN38.3/UL1642/IEC62133
Battery Cases
Battery packs consist of two parallels and 8 serials,50kg weight, storage power capacity of
6.963kWh, each battery needs a BMU, cell voltage collection and temperature parameters.
1 Battery amount(pcs) 16
Serials-parallel connection
2 2P8S
type
3 BMU NUM.(pcs) 1
8 weight(Kg) About 50
28 / 36
Technical Proposal for Ban Khun Klang Microgrid project
A BMU fixed box installed inside the front panel of battery pack, set up the BMU and
communication transferring panel inside the BUM fixed box from the front side of the front panel.
Battery Racks
In this project, every battery rack is comprised of one battery string which consists of 25 battery
pack with serials connection. Inside the rack, batteries serials output to ESS transformer by mainly
managing case, parameter of battery pack as form 4.2.4 showing:
3 BMU NUM.(pcs) 25
29 / 36
Technical Proposal for Ban Khun Klang Microgrid project
150KWh Li-ion battery system consists of 25 battery boxes and one main management box with
tandem connection,details as below:
136Ah/3.2V LFP monomer cell,efficient management and full application to cells by proper
allocation and package, meeting the needs of PCS DC-outputting voltage with serials and
parallel connection
a 150kWh battery system consists of a battery string configured with a main management
case
30 / 36
Technical Proposal for Ban Khun Klang Microgrid project
WEIGHT
RATED RATED STORAGE
UNIT ESTIMATE
NO ITEM VOLTAGE CAPACITY POWER REMARKS
TOPOLOGY D
(V) (Ah) (kWh)
(Kg)
16PCS CELL
BATTERY 8SERIALS 2
2 BOX 25.6 272 6.963 50 PARALLEL
constitute 1
battery pack
25 pcs battery
packs and
Battery
1main control
3 SYSTEM 640 272 175 1500
case c
constitute a
battery rack
Main Features
Three-level management systems
Overall detection of battery operation status including voltage, current and temperature, etc.
High precision detection of cell voltage: ±2mV, ensuring reliability of data analysis
Multi-point temperature monitoring, avoiding battery heat runaway and ensuring system safety
Various balancing methods and extended battery life
Modular design and strong scalability
Reliable battery protection functions
GPRS data acquisition and wireless transmission
Trouble-shooting guidance, events and operation record
Strong ability of battery operation data analysis and perfect report function
Optimizing load control linkage, close cooperation between PCS and dispatch system, higher system
efficiency.
31 / 36
Technical Proposal for Ban Khun Klang Microgrid project
BMS Topology
BMS consists of three levels, BMU, MBMS, and BAMS. See BMS communication topology as
below:
BMU Parameters
BMU is responsible for battery string management. It has functions of battery voltage acquisition,
multipoint temperature acquisition, battery balance control and abnormal alarm, etc. It can also battery
active balancing.
SN Item Parameter
1 Model PW3303-BMU
Number 12 cells
Temperature Accuracy ±2℃
3
detection
Range -40℃~105℃
Number 12 cells
Range 0VDC~5VDC
32 / 36
Technical Proposal for Ban Khun Klang Microgrid project
Communication
7 CAN
interface
Power supply
8 12VDC
voltage
Max. cell
10 30 PCS
management
Main board
158.4mm*125mm*20mm
(W*D*H)
11 Dimension
Balancing board
83.7mm*125mm*20mm
(W*D*H)
MBMS Parameters
MBMS (Main Battery Management System) is responsible for the management of all BMU
in a battery string, capable of battery string current acquisition, total voltage acquisition, and
leakage detection. It drives the high voltage power contactor open in abnormal battery state to
stop battery string operation so as to protect the battery from getting damaged. At the same time,
it completes the capacity calibration and SOC calibration independently under BMS. Through
its own algorithm, it obtains the latest battery system capacity and SOC calibration value, as a
basis for follow-up battery charge/ discharge management. The resulting SOC value error is
small and SOC error amplification will be avoided in the long time accumulation process.
SN Item Parameter
1 Model PWMBMS
Current detection
5 1%
accuracy
Communication
6 RS485*2,CAN*2
interface
Power supply
7 12VDC
voltage
33 / 36
Technical Proposal for Ban Khun Klang Microgrid project
8 Power dissipation 5W
Max.BMU 30 PCS
9
management
10 Dimension (W*H*D)185mm*135mm*32.5mm
BAMS Parameters
Battery Array Management System (BAMS) is made up of the BAMS host and industrial
touch screen, responsible for the management of all the batteries in a Container. BAMS can
manage the corresponding number of MBMS.
SN Item Description
1 Model PWSG-BAMS
Communication
2 RS485*2,CAN*1,Ethernet 0/100M*2,RS232*2
interface
Power supply
6 24VDC
voltage
Max. BAMS
8 30 PCS
managed units
9 Dimension (W*H*D)238mm*181mm*177mm
Human-machine
10 10.4 " TFT LCD touch screen 800*600
interface
Human-machine
11 (W*H*D)272mm*221mm*47mm
interface dimension
34 / 36
Technical Proposal for Royal Microgrid project
5 Project Management
In order to improve the project quality, speed up the project progress, strengthen the site
management, scientifically arrange the site production, organize and guarantee timely supple of the
various materials and do a good job in coordination work, this company extremely stresses the
Project and accredits the company staff with rich site management and construction experiences to
set up the Project Management; establishes the post-responsibility system in the project
management so as to enable everyone to do his job well.
The main contents of the project implementation management include the following parts.
• Scope management
• Time management
• Cost management
• Quality management
• Communication management
• Risk management
• Procurement management
However the process of project management can be divided into 9 Stages, as the following diagram.
Technical Proposal for Ban Khun Klang Microgrid project
NR has analyzed the proposed installation program and believes that we are able to offer an
accelerated delivery program. The official start date is the date that a commercially and technically
correct order is approved and accepted. This date is not to be assumed to be the contract award
date. The following is a high level schedule (critical path) for the project execution:
36 / 36