Sewer Pumpstation Design Calculations For Alqi

This document contains calculations for sewer pumpstation design for the Alqi zone. It details pump discharge tests for two pumps that found individual capacities of 3.24 cubic meters per hour and 5.76 cubic meters per hour. Accounting for peak factors and infiltration, the total required capacity for the Alsahefieen area was calculated to be 456.12 cubic meters per day. Adding the maximum flow from Masefen of 28,352 cubic meters per day, the total required capacity is 28,808.12 cubic meters per day or 1200.338 cubic meters per hour. To meet this, it is recommended to add three new pumps each with a capacity of 600 cubic meters per hour and a head of 7 meters

Uploaded by

TahirJabbar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views

Sewer Pumpstation Design Calculations For Alqi

This document contains calculations for sewer pumpstation design for the Alqi zone. It details pump discharge tests for two pumps that found individual capacities of 3.24 cubic meters per hour and 5.76 cubic meters per hour. Accounting for peak factors and infiltration, the total required capacity for the Alsahefieen area was calculated to be 456.12 cubic meters per day. Adding the maximum flow from Masefen of 28,352 cubic meters per day, the total required capacity is 28,808.12 cubic meters per day or 1200.338 cubic meters per hour. To meet this, it is recommended to add three new pumps each with a capacity of 600 cubic meters per hour and a head of 7 meters

Uploaded by

TahirJabbar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Sewer Pumpstation Design Calculations For Alqi

ZONE
PUMPSTATION DIMENSIONS

NOTES:
PUMP DISCHARGE TEST
WELL LENGTH= 4
WELL WIDTH= 3
WELL AREA= 12
DRAWDOWN TEST T 10 MIN
DISTANCE TRAVEL= 0.27 M
SO V FOR ONE PUMP= 3.24 M3
Q= 19.44 M3/HR
THE BOLD NET WORK Q TEST
WELL LENGTH= 4
WELL WIDTH= 3
WELL AREA= 12
RISING TIME 10 MIN
DISTANCE TRAVEL= 0.08 M
V= 0.96 M3
Q= 5.76 M3/HR= 138.24
Q PEAK= Q* P.F= 414.72 M3/DAY
ADD INFILTERATION =10%QMAX=41.5 M3/DAY

TOTAL ALSAHAFIEEN AREA Q= 456.12 M3/DAY


= 19.005 M3/HR
AND MASFEN TOTAL SEWAGE MAX=28352M3/DAY

TOTAL= 28808.12 M3/DAY= 1200.338 M3/HR


SO MUST ADD NEW PUMPS

USE 3 PUMP EACH PUM Q=600 WITH HEAD 7 M


FROM DATA SHEET OF PUMP POWER =75 KW
NO NEED NEW GENERATOR OR TRANSFORMER BECAUSE AVILBE ONE IS 165 KVA AS GENERATOR AND 250 KVA F
GENERATOR AND 250 KVA FOR TRANSFORMER