Program Needs: Analysis By: Reviewed by
Program Needs: Analysis By: Reviewed by
Program Needs: Analysis By: Reviewed by
DEPARTMENT: OCCUPATION :
KOP ELECTRICAL Analysis by : Ibrahim Al-
TECHNICAN Ibrahim
TASK ANALYZED: Reviewed by : Bassam
PROGRAM
CONNECT/DISCONNECT LOW NEEDS
VOLTAGE (UPTO 480V) MOTOR
ACTION TAKEN *
SKILL TRAINING
Loss Efficien RECOMMEND
Significan
PROCEDURE/ PRACTICE
t Steps (Consider Safety, Check CONTROLS
SPECIAL RULES
(Break- Health, Damage,
down Fire, Quality,
Serial No
PROCEDURE
Permit actual condition at
site, Lock out, tag
out of equipment
requirement, PPE
/Make JSA
2 Perform Tag Locking Yes Check motor tag and
out / Lock wrong motor operation lock,
PROCEDURE
out of Motor starter Stand on the side of
Breaker in Breaker the breaker and
Cubicle damage operate
located at Personal
Substation injury
3 Test from Operating Yes Check motor tag
field junction wrong switch number and
box and tripping operation tag
near by motor
Open Motor Hand injury
PROCEDURE
4
Terminal Equipment Use proper gloves/
Box at field damage / loss Yes PPE
of j.box gasket
Classification: Internal Use
OCCUPATION :
DEPARTMENT: ELECTRICAL Analysis by : Ibrahim Al-
KOP TECHNICAN Ibrahim
Reviewed by : Bassam
PROGRAM
NEEDS
TASK ANALYZED:(TASK INVENTORY
SERIAL NO. 2 )
CONNECT/DISCONNECT LOW
ACTION TAKEN *
03/12/2018
SKILL TRAINING
Loss Efficien RECOMMEND
Significan
PROCEDURE/ PRACTICE
t Steps (Consider Safety, Check CONTROLS
SPECIAL RULES
(Break- Health, Damage,
down Fire, Quality,
Serial No
PROCEDURE
motor power Electric shock PPE , Use insulated
cable, Wrong phase tools, Follow
Grounding sequence/ existing color code
cable termination & markings
cable damage
7 Pull out the Hand injury Yes Use proper gloves/
PROCEDURE
cable damage
Classification: Internal Use