1 Design Code: Loading Considerations SR No Description

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Loading Considerations

Sr No Description
1 Design Code

2 Minimum Thickness of primary member

Minimum Thickness of secondory


3
member

4 Dead Load -

5 Live load
6 Wind Speed

7 Seismic loads

8 Grade of Base Concrete

9 Additional Loads on Roof Sheets

Additional co-lateral load on roof due to


10 suspend service lines to be suspended
from the Purlines at any point

Additional co-lateral load on roof due to


suspend service lines to be suspended
11
from the rafters (excluding above load on
purlin) at any point

12 Suspended gird

13 EOT
14 Assumed data for Crane

15 Open condition
Brackets & beam (Cable tray Support)
16
along central & peripheral column

Approximate Length of Cable Tray


17
Supporting Structure

Bracktes on Column (450mm) Projected


18 to Support the Fire Hydrant -- load of
250NB water pipe

19 load of Bus Bar with tray Arrangement

20 Rain fall intensity for Gutter calculations

21 load on mezzanine

Chimeny Exhaust FO & Support from


22 Foundry & machine shop
23 Future Expansion
24 Design Approval
Loading Considerations
Descritpion
IS 800 :2007 or As per latest
( PEB to Quote to options with & without Chapetr 12)

5 mm

2 mm ( Any purline should not be designed as tie member


to structure)

Self weight

As per design
As per IS

As per IS

M20

Solar panel (25 KG/SQM)

45 Kg/Sqm

300 Kg/Rmt

i. The Supendors required to be taken from Rafters in


machine shop mezzanine ( canteen Area) J-K- 6- 10
ii. The load on Strutre shoulde be 30Kg /sqm
iii. In addition to point "ii" above Also load on this
structure should be Suitable for men movement
iv. Holes & necesary stiffeners in rafter for supendors
required to provide in this phase only

Yes in Foundry Shop 3 MT cpoapcity EOT in central bay


Electromech

i.PEB vendor required to Design for critical condition


ii. Note that 15 % of area may be remain open in any time
i.. 900 mm extent on both sides with load carrying
capacity of 180 KG / rmt each side
ii. This should not be designed as a tie member to
structure

as mentioned in repsective shop specs

i. Projected to Support the Fire Hydrant -- load of 250NB


water pipe
ii. This should not be designed as a tie member to
structure

150mm/hr

1. All mezzanines shall be Desinged for LL of 750 kg/ Sqm


2. The concrete thickness above crest of deck will be 150mm
3. peripheral brickworks of 230mm thivk upto heigth of 4m on
mezaanine beams
4. internal walls will be shwon in Approval drawings
5. There will be sunk of 250mm filled with brick bats in
mezzanine having canteen ( Approx area = 225mm)

NA
from IIT is in scope of PEB vendor