Part A: Ground Enbankment: Percentage Boq
Part A: Ground Enbankment: Percentage Boq
Part A: Ground Enbankment: Percentage Boq
Name of Work: Construction of boundry wall & Embankment work at D.T.O. Office Kekri
Contract No:
Name of the
Bidder/ Bidding
Firm / Company :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder i
Bidders are allowed to enter the Bidder Name and Values only )
1 2 4 5 6 53
1.00
PART A : GROUND
ENBANKMENT
2.00 Clearing and grubbing road land including uprooting 1.072 P.Hect. 12000.00 #VALUE!
rank vegetation, grass, bush, shrubs, saplings and
trees of girth upto 300mm, removal of stumps,
disposal of unserviceable material and stacking of
serviceable material upto 1000 m from road boundry
as per MoRTH Specification : 201 In area of thorny
jungle
3.00 Earth work in excavation including stacking/ disposal 4695.000 P.Cum 39.00 #VALUE!
of surplus earth with all lifts and lead upto 1000
meters exclusive of compensation of earth (MoRTH
specification Clause 301 to 305). In hard soil
mechanically using bull dozer, F.E. loader and carriage
upto 1 km
by tipper/dumper.
4.00 Earth work in embankement construction, side slopes 4695.000 P.Cum 16.00 #VALUE!
etc. from already excavated earth in stockpiles
including breaking of clods and dressing with all lead
and lift but excluding watering and
rolling. by mechanical means using motor grader etc
5.00 Extra for watering the earth to bring the earth upto 4695.000 P.Cum 8.50 #VALUE!
required O.M. Cexcluding rolling
6.00 Extra for rolling to specification with power roller 8-10 4695.000 P.Cum 6.00 #VALUE!
tonne when earth is at suitable moisture content with
desired density excluding watering. Field density not
less than 95% of maximum dry density (Ordinary
Proctor test)
11.00 Centering and Shuttering with plywood or steel sheets 6.000 #VALUE!
including strutting, propping bracing both ways and
removal of formwork for foundation in basements
rafts, footings, straps beams, bases of columns etc. up P.Sqm 115.00
to plinth level.
13.00 Supplying, fitting and placing TMT bar reinforcement 0.110 #VALUE!
(Fe 415) in substructrue complete as per drawings and
technical specification Clauses 1002, 1005, 1010 & P.M.T 53698.00
1202
14.00 Finishingwallwithwaterproofingcementpaintofapprove 675.000 #VALUE!
dbrandandmanufactureandorrequiredshadetogive an
even shade including all scaffolding: P.Sqm 53.00
TEXT #
TOTAL AMOUNT
In Words
55
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
ALUE!
Please Enable Macros to View BoQ information
Q information