cp1 2011
cp1 2011
cp1 2011
Details of the structural, geotechnical and foundation systems are to be designed by Qualified Persons.
100 50
13 x 50 APPROVED SELF
GAP TO BE FILLED EXPANDING CORK
UP WITH CEMENT MORTAR (1: 3) JOINT-SEALER
EQ
1:40
100
THICKNESS OF
50
20
GEOTEXTILE COMPLYING
BASE OR WALL
EQ
WITH TABLE SHOWN IN
DRAWING NO . 3
HANDPITCHED HARDCORE
MASS CONCRETE
ALONG THE WHOLE LENGTH
TOP WIDTH OF DRAIN BOTTOM WIDTH OF D.W.F. DEPTH OF D.W.F.
BENCHING OF THE DRAIN MASS CONCRETE
2 ALL PRECAST UNITS SHALL BE LAID CLOSE. THE MAXIMUM ALLOWABLE GAP IS 50mm.
ALL GAPS SHALL BE FILLED WITH 1:3 MIX CEMENT MORTAR.
ROLLED &
CLOSE-TURFED
3 ALL PRECAST AND REINFORCED CONCRETE SHALL BE GRADE 30 OR HIGHER GRADES.
1:40 1:40
4 ALL MASS CONCRETE SHALL BE GRADE 25 OR HIGHER GRADES.
100
5 ALL LEAN CONCRETE SHALL BE GRADE 15.
REINFORCED CONCRETE 65 DIA P.V.C. WEEPHOLES AT
1.5m C/C STAGGERED. 6 MILD STEEL AND HIGH TENSILE STEEL REINFORCEMENTS SHALL CONFORM TO SS2
LEAN CONCRETE
12 IN THE DESIGN OF TRAPEZOIDAL DRAINS, STABILITY OF THE SLOPE AND UPHEAVE MUST BE
CONSIDERED. A LIVE LOAD SURCHARGE OF 10 kN/m2 ON THE BANKS SHALL BE TAKEN INTO ACCOUNT.
HARDCORE BLINDED WITH SAND
LEAN CONCRETE 13 FOR DRAINS THAT ARE ADJACENT TO ROADS AND ARE AFFECTED BY VEHICULAR LOADING, A LIVE LOAD
(PILING AND FOUNDATION DETAILS TO BE DESIGNED BY QP.) 2
SURCHARGE OF 20 kN/m SHALL BE TAKEN INTO CONSIDERATION IN THE DESIGN OF DRAINS.