FOUNDATIONS ON BLACK COTTON SOIL
at least 1.5 m.
3. To provide reinforced concrete ties or bands all around the
main walls of the building. The R.C.C ties or bands which may
be 10 cm to 15 cm deep should be placed at plinth level, lintel
level and eaves level. In case of flat roof, R.C.C slab it self acts
as a tie and as such no extra band needed to be provide near the
roof in such cases.
5
4. If the depth of the black cotton soil at a given site is only
1 to 1.5 m, the entire black cotton soil above the hard bed
may be completely removed and the foundation may be laid
on the hard bed below.
6
5. The swelling of soil in direct contact with the foundation
material causes maximum damage. Hence it is necessary to
prevent the direct contact of black cotton soil with masonry
work below ground level. These can be achieved by making
wider trenches for foundation and filling spaces on the either
side of the foundation masonry with sand or gravel.
7
6. The bed of foundation trench should be made firm or hard
by ramming it well. On the rammed bed a 30 cm layer of
good hard moorum should be spread in layers of 15 cm, each
layer being well watered and rammed before laying the next
layer. On this layer either stone or sand bed should be
provided to the desire height to place the foundation concrete
bed block upon it.
8
7. In case of ordinary buildings, the foundation should be
taken at least 30 cm deeper than the depth where the crack
stop.