Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Day Lab Report

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

SHIFT DAY

CEMENT MILL – 1 MIN MAX


AMBIENT TEMP.
28.8 38.6

R/Hrs Prod Clinker Gyp Fly ash Pondash ( MT)

SILO-I (PPC) 0.00 0 0 0 0 0


TPH 0.0
SILO-2 (OPC) 0.00 0 0 0 0 0
TPH 0.0
Grand Total 0.00 0 0 0 0 0

HRS. freq. MILL STOPPAGE DE


24.00 1 Sufficient silo level (misc.) (12.00mn-6.20am)

MILL FEED CUT DE

24.00 1 TOTAL
CEMENT MILL – 2

R/Hrs Prod Clinker Gyp Fly ash Pondash Mt

SILO-I(PPC) 17.40 4491 2373 207 1091 820


TPH 254.2
SILO-2 (OPC) 0.00 0 0 0 0 0.00
TPH
Grand Total 17.40 4491 2373 207 1091 820

Hrs. Freq MILL STOPPAGE DE


0.20 1 mill changover from Cm-1 to cm-2 (misc.) (12.00mn-12.20am)
5.45 1 Sufficient silo level (misc.) (7.40-1.25pm)
MILL FEED CUT DE
0.15 1 Cyclone-3750 (561 CY-2) discharge jam draft zero (10.30-10.45pm)
6.20 3 TOTAL

TOTAL PRODUCTION

CEMENT SILO STOCK CEMENT MILL-1 CEMENT MILL-2 TOTAL


SILO I (PPC) 0 4491 4491
SILO II (OPC) 0 0 0
DISPATCH

SILO NO. TOTAL P/A P/A % PACKER


PPC PACKER-1 PACKER-2
0.00 0 0.00
OPC 0.00 20.56

Clinker Silo Level (101 CS 1 ) 24.7


Clinker Silo-2 Level (102 CS 1 ) 10.5
Fly Ash Silo Level (202 SB 1) 27.1
Fly Ash Silo Level( 203SB 1 ) 17.6
Cement Silo -1 SHREE CEMENT(PPC) 29.2
Cement Silo -2 BANGUR CEMENT(OPC) 27.3
CLILKER EXT. 102 CSI 695
CLILKER FEED. 102 CS1 907
DATE- 14/08/2019

Marbal Slurry +PA % (


%Gyp %FA POND ASH/TN (571 WF-1)
571 WF-1 ) ( MT )
0 0.00 0.00

0 0.00 0.00

0 0 0.00
#DIV/0!
#DIV/0!
MILL STOPPAGE DETAILS 0

MILL FEED CUT DETAILS

Marbal Slurry+ Pond


%Gyp %FA POND ASH/TN (541 WF-4)
Ash ( mt )

0.00 4.60 24.30

0 0.00 0.00
0

0 0.00 0.00

CF 1.892
MILL STOPPAGE DETAILS

#REF!
MILL FEED CUT DETAILS 0.73

Grand Total

4491

PACKER RUN HOURS


PACKER-3 PACKER-4
21.08 13.12

You might also like