Curing
Curing
Curing
Ref:
Section / Dept: civil , Contractor: Activity: Risk Assessment for Curing Location-
Work
Consequence Current control measure Risk rating
Proba
Proba
Sl Basic Job Potential Initial Additi Ri
bility
bility
ual
risk
Resid
No. Steps Hazard Risk onal sk
contro ra
l ti
P E A R P E A R
measu n
Ramp to be used for ascending and g
re
descending
Working on Fallof man Get Secured platform with double railing.Use of safety
2 height 2 0 0 2 2 4
Injury/Fatality harness with double lynyard.
Contractor Contractor
1of1