Risk Assessment/Management Form

Ref:
Section / Dept: civil , Contractor: Activity: Risk Assessment for Curing Location-
Work
Consequence Current control measure Risk rating

Proba

Proba
Sl Basic Job Potential Initial Additi Ri

bility

bility

ual
risk
Resid
No. Steps Hazard Risk onal sk
contro ra
l ti
P E A R P E A R
measu n
Ramp to be used for ascending and g
re
descending

Passage to be provided for the movement


of the person

Edge protected by railing/ Scaffolding pipe

While curing in column double fullbody


Serious harness shall be used with anchoring
Slip of Man 2 0 0 1 2 4
Injury/Fatality facility
1 Curing Work For ascending and descending to the
column horizontal gape must not be more
than 500 mm

Planks to be tied with binding wire to work


in staging

To follow the' Wah'Permit for working at


height

Get Before curing all area to be isolated and the


Electrical injury 2 0 0 1 2 4
Injury/Fatality same shall be ensured by the site incharge

Working on Fallof man Get Secured platform with double railing.Use of safety
2 height 2 0 0 2 2 4
Injury/Fatality harness with double lynyard.

Prepared By Approved By Reviewed By

Contractor Contractor