DESCON ENGINEERING QATAR LLC

EPC SERVICES FOR THREE COMBINED SHUTDOWN PROJECTS IN QG1 AND QG3&4
Project 1: Installation of new line with isolation valves between the existing Precooling
/Defrost gas line from unit 5 and E-0801 Cold side stream at unit 8 for train 6&7 in QG3&4 assets
CONTRACT # LTC-C-EPM-3685-18
MATERIAL INSPECTION REPORT
MAINT/ALL/QA&QC
Report No. 3685-MIR-006 RFI No : 3685-RFI-027 ITP No: P-743-QM-ITP-001 -FRM-01 Rev-00

HEAT NO/
DRAWINGNO. /
SR # DESCRIPTION UNIT QTY IDENTIFICATION/ MATERIAL CERTIFICATE REMARKS
ITEM NO.
BATCH No.

8" Ball Valve A351-CF8M ASME CLASS


600 RF-SERR 316-SS-BALL & STEM L- BODY : F35368 IRN No.:
1 PATT/R-BORE R-PTFE-SEAT/FIRE-SAFE Nos 4 BONNET:F35360 A351-CF8M 190868002 As per Attached 19320059
EST-BNT/G-OP W/TRUNN THERM-RELF ADAPTER: H27424 MDR attached
LOW TEMP SERVICE

8" CHECK VALVE A351-CF8M ASME BODY :


CLASS 150 SERR-FCG WFR-LUG TP 316- BODY : 900541 2019045507 IRN No.: 01
2 Nos 2 A182-F316L As per Attached
SS-TR/SEAT-STLT DUAL-PL-SPRG-LD LOW PLATE:274306 PLATE:2018/3002 MDR attached
TEMP SERVICE 899

INSPECTION RESULTS: REMARKS: