At a glance
Powered by AI
The document outlines an inspection and test plan for drainage works on a construction project.

The document is an inspection and test plan that specifies the inspections and tests that will be conducted during construction to ensure quality of drainage works.

Inspections and tests listed include submittal reviews, material testing, visual inspections of work sequences and installation of drainage components.

INSPECTION & TEST PLAN (ITP) For Drainage works

Design, Construction, Completion and


Abu Dhabi General Services company PJSC
Employer MUSANADA Project Maintenance of Court at Madinate Zayed, Prepared By QA/QC Engineer
AL Dhafra Region.
PMC N/A Discipline Construction of Road Works Reviewed By Project Manager
Consolidated consultants llc ITP Ref. No. MZC-00SIT-AL-NIM-MEC-ITP 0014-00-Rev.00 Approved By Project Manager
Engineer
National innovotive general maintenance llc Date October 20, 2019 Page No. Page 1 of 1
Contractor
Works Location (This ITP reflects status of testing/ inspection in the following area/ zone within the Project)

Responsibility1
Frequency of Applicable
Acceptance Control Data / Inspection Contractor Engineer Third Party
SN Inspection / Test to be carried out Test / Specification /
Criteria Forms Method
Inspection Standard
Subcontractor Main Contractor

PRE CONSTRUCTION ACTIVITY

Project Project Doc Submittal


1 Submittal of Design & Method Statement Once Doc Submittal P R R,A
specification specification Ref… Review

Project Doc Submittal


2 Approval of Working Schedule Once Sub-contractor specification Doc Submittal P R R,A
Ref… Review

Project Project Doc Submittal


3 Approval of Layout & Detail Drawing Once Doc Submittal P R R,A
specification specification Ref… Review

Note (1): H: Hold Point, W: Witness, R: Review, S: Surveilance, Form. Ref.TMT131, Rev-1, Date : 09-Feb-17
INSPECTION & TEST PLAN (ITP) For Drainage works
Design, Construction, Completion and
Abu Dhabi General Services company PJSC
Employer MUSANADA Project Maintenance of Court at Madinate Zayed, Prepared By QA/QC Engineer
AL Dhafra Region.
PMC N/A Discipline Construction of Road Works Reviewed By Project Manager
Consolidated consultants llc ITP Ref. No. MZC-00SIT-AL-NIM-MEC-ITP 0014-00-Rev.00 Approved By Project Manager
Engineer
National innovotive general maintenance llc Date October 20, 2019 Page No. Page 1 of 1
Contractor
Works Location (This ITP reflects status of testing/ inspection in the following area/ zone within the Project)

Responsibility1
Frequency of Applicable
Acceptance Control Data / Inspection Contractor Engineer Third Party
SN Inspection / Test to be carried out Test / Specification /
Criteria Forms Method
Inspection Standard
Subcontractor Main Contractor

Material
Project Project Material
4 Approval of Materials once Submittal & P R R,A
specification specification Ref… Submittal Review
Samples

Working platform/area availability & compliance Project Project


5 all _ Visual Inspection P P,W W
with drawings specification specification Ref…

CONSTRUCTION ACTIVITY

Work sequences and fixing of the Fiberglass rigid Project Project


1 All _ Visual Inspection P P,H W
rolls specification specification Ref…

Shop Drawings
Project
2 Work sequences and fixing of the Foster 30-36 All & Project WIR Visual Inspection P W H,A
specification specification Ref…

Note (1): H: Hold Point, W: Witness, R: Review, S: Surveilance, Form. Ref.TMT131, Rev-1, Date : 09-Feb-17
INSPECTION & TEST PLAN (ITP) For Drainage works
Design, Construction, Completion and
Abu Dhabi General Services company PJSC
mployer MUSANADA Project Maintenance of Court at Madinate Zayed, Prepared By QA/QC Engineer
AL Dhafra Region.
MC N/A Discipline Construction of Road Works Reviewed By Project Manager
Consolidated consultants llc ITP Ref. No. MZC-00SIT-AL-NIM-MEC-ITP 0014-00-Rev.00 Approved By Project Manager
ngineer
National innovotive general maintenance llc Date October 20, 2019 Page No. Page 1 of 1
ontractor
Works Location (This ITP reflects status of testing/ inspection in the following area/ zone within the Project)

Responsibility1
Frequency of Applicable
Acceptance Control Data / Inspection Contractor Engineer Third Party
SN Inspection / Test to be carried out Test / Specification / Completion D
Criteria Forms Method
Inspection Standard
Subcontractor Main Contractor

PRE CONSTRUCTION ACTIVITY

Project Project Doc Submittal


1 Submittal of Design & Method Statement Once Doc Submittal P R R,A
specification specification Ref… Review

Project Doc Submittal


2 Approval of Working Schedule Once Sub-contractor specification Doc Submittal P R R,A
Ref… Review

Project Project Doc Submittal


3 Approval of Layout & Detail Drawing Once Doc Submittal P R R,A
specification specification Ref… Review

Note (1): H: Hold Point, W: Witness, R: Review, S: Surveilance, Form. Ref.TMT131, Rev-1, Date : 09-Feb-17
INSPECTION & TEST PLAN (ITP) For Drainage works
Design, Construction, Completion and
Abu Dhabi General Services company PJSC
mployer MUSANADA Project Maintenance of Court at Madinate Zayed, Prepared By QA/QC Engineer
AL Dhafra Region.
MC N/A Discipline Construction of Road Works Reviewed By Project Manager
Consolidated consultants llc ITP Ref. No. MZC-00SIT-AL-NIM-MEC-ITP 0014-00-Rev.00 Approved By Project Manager
ngineer
National innovotive general maintenance llc Date October 20, 2019 Page No. Page 1 of 1
ontractor
Works Location (This ITP reflects status of testing/ inspection in the following area/ zone within the Project)

Responsibility1
Frequency of Applicable
Acceptance Control Data / Inspection Contractor Engineer Third Party
SN Inspection / Test to be carried out Test / Specification / Completion D
Criteria Forms Method
Inspection Standard
Subcontractor Main Contractor

Material
Project Project Material
4 Approval of Materials once Submittal & P R R,A
specification specification Ref… Submittal Review
Samples

Working platform/area availability & compliance Project Project


5 all _ Visual Inspection P P,W W
with drawings specification specification Ref…

ONSTRUCTION ACTIVITY

Work sequences and fixing of the Fiberglass rigid Project Project


1 All _ Visual Inspection P P,H W
rolls specification specification Ref…

Shop Drawings
Project
2 Work sequences and fixing of the Foster 30-36 All & Project WIR Visual Inspection P W H,A
specification specification Ref…

Note (1): H: Hold Point, W: Witness, R: Review, S: Surveilance, Form. Ref.TMT131, Rev-1, Date : 09-Feb-17