S/N Cobany Submitted Observation Recommendation 1 A Oil Producing Limited. XXX
S/N Cobany Submitted Observation Recommendation 1 A Oil Producing Limited. XXX
S/N Cobany Submitted Observation Recommendation 1 A Oil Producing Limited. XXX
Submitted
1 A Oil Producing BHP A total of 12 reservoirs and 21 wells from To maximise
Limited. report three different fields was submitted. Two recovery and for
xxx reservoirs from Roberkiri field met the proper reservoir
criteria for the initiation of pressure management, the
maintenance. The first reservoir with two reservoirs
reference ID F-01/RB-01 had 11% pressure should be
decline, remaining reserves of 5.51MMB and considered for
fractional recovery of 8%. This reservoir was pressure
shut in due to HBSW. maintenance.