Methodology For ATT Works
Methodology For ATT Works
Methodology For ATT Works
1-Objective- The purpose of this method statement is to give the step wise
methodology to carry out the anti termite works in planned and controlled manner with
reference to the technical specification and standards.
2-Scope- This specification covers the general requirement for pre constructional anti
termite treatment to the building to protect against attack by subterranean termite by
suitable chemical treatment measures.
3-RESPONSIBILITY
This is the responsibility of construction manager, Section in-charge, site engineer and
ultimate responsibility of Project in charge.
4-SPECIFICATION &STANDARDS
5-RESOURCE REQUIRED
A- Equipment & Tools. Spray Machine, Bucket, Measuring Jar , General tools and
equipment with Safety PPE.
B- Man Power
6-Procedure
SL Checked
Procedure Responsibility Records
NO By
A- Safety
GANNON DUNKERLEY & CO. LTD.
Quality Management System
Construction of 2x660 MW Thermal Power Plant at
Jawaharpur-Uttar Pradesh,
Date- 05.06.2018 Rev-00
B Procedure
MATERIAL
The chemicals shall be used as insecticides for the treatment shall
Imidacloprid 30.50 % SC bearing ISI certification or approved equivalent
confirming to the requirement and concentration laid down in the latest
revision of IS 6313 Part II
Chemical Preparation
INSPECTION
C
Engineer shall carry out all field
QA/QC
1 inspection and ensure the Site Engineer
Engineer
dilution and rate of spray.