Module IV: Design of Weirs, Barrages and Canals
पणु े
िदसंबर 2019
Government of India
Central Water Commission
National Water Academy
िडजाइन और अनस
ु ंधान
Module- IV
DESIGN OF WEIRS, BARRAGES AND CANALS
09-11 December 2019
Module Co‐ordinator
Shri S N Pande, Director (Designs)
Pune
December 2019
Module – IV
4. Stability Analysis 48
12. Cross Drainage Works – Types & Suitability Criteria and Design 164
Considerations
1.0 Introduction
Diversion of water for various purposes like irrigation, drinking, flood control etc has
been practiced from ancient times. In India before the British rule diversion / irrigation
was done generally by Inundation canals in north India and by Tanks in south India.
Many improvements were brought to this system during British period. Some of which
are summarized as below:
Diversion structures are run of the river structures and involve only incidental storage
and hence provide better sediment control, very low submergence, less ecological
problem. However these do not provide flood moderation and serve generally less
command area than storage projects.
Page 3 of 196
Barrage
Page 4 of 196
Points to be considered while selecting a barrage vis –a – vis weir
Barrage Weir
Advantages
(i) Due to low crest of under sluices and (i) Where the natural banks are high
spillway, the afflux created on the u/s enough to contain the affluxed water
by the barrage is usually small within the banks or when only low
flood protection bunds would be
necessary, a weir would be
economical
(ii) With Barrage better control over the (ii) Due to provision of gates only in the
river flow can be effected by judicious sluice bays, the operation would be
operation of the gates easier and cost of structure would be
less. Wherever needed, the pond level
could be conveniently raised by
falling shutters up to about 2 meters
Disadvantages
(i) Cost of barrage is higher than that of (i) Control over the river flow cannot be
a weir generally. had fully as in the case of barrage
(ii) Chances of silting on U/S are more
Under various sections of Working Group Report on Guidelines for Preparation of Detailed
Project Reports of Irrigation and Multipurpose Projects; Vol II Guidelines for Detailed
Project Report; Section 3 Report, guidelines have been given with respect to topographical,
geological, hydrological, sediment survey, ecological etc aspects. These will be covered by
other experts in their respective fields. However the main investigation required for planning
and design of barrages and weirs for DPR preparation as per various IS codes are given
below:-
Design of Weirs, Barrages and Canals Page 5
Page 5 of 196
From the analysis of the data obtained during preliminary investigations, the final
selection of the site for locating the diversion structure with its head regulators can be
judiciously made. For collecting the data necessary for design of structures at this site,
detailed investigations need to be carried out. These should cover: (i) Detailed topographic
survey (ii) Collection of hydrological, sediment and evaporation data(ii) Surface and sub
surface investigation including laboratory tests (iv) Diversion requirements (v) construction
material (vi) communication system (vii) other miscellaneous studies.
Page 6 of 196
1.3.2 Hydrological Investigations
For planning sediment excluding and / or ejecting devices at the headworks and in the canal
system and to evolve a suitable gate regulation for satisfactory sediment exclusion, it is
necessary to have the sediment load carried by the river for as such period as possible. It is
required especially for the flood season when the sediment carried will be more. If no data on
the sediment is available, sediment observations should be started immediately along with
gauge and discharge observations at the site to assess the quality and quantity of the sediment
carried in the river. The sediment sampling should be done as per standard practice. If the
quantity of the sediment carried by the river is excessive, the pond levels have to be fixed
carefully taking the sediment data into account. This is especially important when the
pondage is proposed to be provided to meet diurnal power fluctuations also.
Page 7 of 196
1.3.2..3 Evaporation Data
Evaporation is an important factor to be considered while working out the water requirements
of the crops and hence the diversion requirement. The available data on evaporation by pan
measurement etc. should be collected and analyzed.
1.3.3 Surface and sub surface Geotechnical Investigation including lab Tests
For Proper design of the diversion structure and its components, it is very necessary to have a
complete picture of the surface and sub surface conditions. These are required both for
deciding the type of structure to be provided and also its safety. The foundation may be of
rock or alluvium and depending upon the same, the investigation may be different. These are
discussed below:
(a) Bore holes should be driven at specifies intervals covering the entire area of the
barrage or weir and its appurtenant structures, and the location of the bore holes
should be indicated in the survey sheets. Such Plan should be appended with DPR.
Correct log charts are to be prepared clearly. The boring should be generally carried
out to hard rock level or to a depth of about 15 to 25 m below the deepest river bed
level depending upon the strata and type of the structure. The bore holes should be at
the rate of at least one in each bay proposed. If possible two bore holes in each bay,
one at the upstream cutoff and another at downstream cutoff, should be obtained.
When the presence of clay in the foundation is detected, these are however essential
so that the extent, depth and location of the clay layer could be correctly assessed. A
table showing the corresponding 'N' i.e. S.P.T. Values covering foundation of all the
major components of barrage should be appended with DPR. The grain size
distribution analysis, moisture content, voids ratio, in-situ density, submerged density,
coefficient of permeability etc. may also be determined and furnished. Shear
parameters (C-Ф values) of the foundation and backfilled material should also be
investigated and furnished.
(b) Modulus of sub-grade reaction at the proposed foundation level of the barrage. This
value to be obtained by conducting in-situ tests conforming to I.S. 1888-1982 -
Method of Load Test on Soils.
(c) If clayey strata is met, undisturbed sample of clay layers from the proposed
foundation level or up to 8m or more depth may be taken. These samples may be
analyzed for unconfined compressive strength, swelling index, consolidation
characteristics and other parameters of soil as stated above and results furnished.
(d) Values of Design Seismic Co-efficient to be adopted, in case the barrage is situated in
earthquake zone III onwards.
(e) Permeability coefficient of foundation material as well as material on banks.
(f) Water table data in monsoon and spring for past few years.
(g) If loose sand is met, liquefaction potential studies may be undertaken.
(h) If rocky strata is available at shallow depths, trial pits may be excavated to determine
the depth of overburden, loose deposits, depth of weathered zone and extent of joints
and fissures so that the necessary function treatment for preventing excessive seepage
loss etc., can be worked out.
Page 8 of 196
(i) Whenever the depth of overburden is large and comprises large sized boulders and it
is difficult to have ordinary boring methods, geophysical investigations needs to be
carried out to locate the rock surface.
(j) Whenever impervious layers are encountered, the direction of its boundary i.e.
horizontal or sloping up towards the downstream or upstream should be ascertained.
An impervious boundary sloping up towards the downstream will cause constriction
of seepage. This needs to be avoided by shifting the location of weir or barrage
slightly upstream.
(k) If the river bed consists of boulders or is made of stiff soil, feasibility or otherwise of
driving sheet piles to act as cut offs must be investigated properly.
(l) If the piers or abutments are to be designed with reinforced cement concrete pile
foundation, bearing capacity of piles should be determined by driving test piles before
finalizing the design of pile system, at sites where the bearing capacity of the soil is
low at shallow depths.
(m) In sandy strata, standard dynamic and static penetration tests should be done below
the position of each structure like abutments, piers, divide walls, center of each bay
etc. for estimating bearing pressure, likely settlement and necessity of settlement
joints etc. For boulder strata, plate bearing test should be done. The depth of
penetration may be at least half the bay width of the barrage or weir. The interval may
be decided depending upon strata encountered.
(n) Whenever the main floor of the structure is to be designed as an R.C.C. raft supported
on an elastic medium, in situ tests for determining the modulus of sub grade reaction
at the proposed foundation level should be conducted. If there is a wide variation in
the properties of the foundation material, the length of structure should be spilt up into
suitable sections isolated from each other by means of double piers and the modulus
of sub-grade reaction must be determined at every section.
(o) Soil samples should be collected at suitable intervals of depths and their properties
such as classification, unit weight, angle of internal friction, void ratio, specific
gravity, grain size distribution etc should be determined by sieve analysis and other
laboratory tests.
(p) Whenever clayey strata is encountered, undisturbed samples of clay layers should be
obtained, one from the proposed foundation level and another 5 m below the
foundation level for each bay. These samples should be analyzed to determine the
cohesion, unconfined compressive strength, moisture content, dry density and
sensitivity and consolidation characteristics.
(q) Whenever clayey strata is proposed to be treated by means of sand drains or stone
columns, coefficients of permeability and consolidation should be determined in
vertical as well as radial direction.
(r) Observations of water table in the vicinity of barrage or weir site should be carried
out. The effect of higher pond level leading to rise in water table with consequent
water logging in the adjacent areas and the attendant problems thereof should be
investigated.
(s) Field permeability tests should be carried out to assess the extent of seepage loss from
the pond and thereby the dewatering requirements.
Page 9 of 196
1.3.4 Diversion Requirement
The quantum of water that is required to be diverted through the barrage or weir has to be
determined. For this purpose, detailed study of the command area, crop pattern, drainage,
water requirement at the farm outlets, any supplementary source of water, evaporation losses,
percolation losses, requirements for power, drinking water supply, industrial use, riparian
rights etc. have to be made. The full supply level at the head regulator has to be worked out.
The type of structure that can be economically built at the site will depend upon the
availability of the construction material in the vicinity. Hence a detailed survey of the
materials like stone, limestone, brick, sand gravel, suitable earth etc. has to be made with
regard to both quality and quantity of the same. The lead and lifts with necessary transport
arrangement will have to be found out. Laboratory and field tests should be carried out for
determining the quality of aggregate and earth materials. For limestone, its hydraulicity,
strength and durability have to be assessed. It is preferable to prepare a map indicated the
quarries, approach roads, colonies etc., for a proper assessment of the available construction
material. Comparative estimates of the type of structure will have to be made depending upon
easy and uninterrupted supply of the required quantity of quality materials.
Some other investigations may also required as per site requirement
Page 10 of 196
1.4 Layout and Planning
A barrage or a weir normally comprises a deep pocket of under sluice portion in front of the
canal head regulator on one or both sides and the remaining river bays separated from the
under sluice bays by divide walls. In addition, guide bunds on the upstream and downstream
of the barrage or the weir and sediment excluding devices, such as excluders in the barrage
and ejectors in the canal are provided. Detailed model studies should be carried out to decide
the location and layout of the barrage appurtenant works.
1.4.2 Location
Location for a barrage or weir should be decided on considerations of suitability for the
barrage or weir proper, the under sluices and the canal head regulator. An ideal location is
that which satisfies the requirements for all the three. For irrigation purposes, the headworks
shall be so planned that full command may be obtained by a barrage or weir or reasonable
height. The combined cost of construction of the headworks and the canal from the barrage
or weir to the point where irrigation commences should be as small as is consistent with the
efficiency of the project. Sometimes a most favorable site for a barrage or a weir may have
to be discarded due to large quantity of excavation involved in the construction of the works.
These points need careful considerations while deciding the proper location of the barrage.
The river reach should as far as possible, be straight so that velocities may be uniform and
the sectional area of the stream fairly constant. The banks should be preferably high, well
defined and in-erodible. This will obviate oblique approach as well as non-uniform
distribution of flow on to the barrage. If such a site is available, it may need very small or
practically no guide bunds. In case of high banks, the country will not be submerged during
high floods and a considerable saving in the cost of flood protective embankments can be
effected. In the case of a meandering river the barrage or weir should be located at the nodal
point.
A slight curvature at site may be advantageous from the point of view of off-taking channel,
which when located on the downstream end of the outer curvature will have the advantage of
drawing less sediment. However, cross currents may be produced due to curvature and may
endanger the foundation. Moreover, if canals take-off from both the banks, the canal taking
off on the inner side of the curve will draw comparatively more sediment. Therefore, proper
judgments should be exercised while deciding the location in a curved reach of the river
The under sluices should be sited in the deep channel in order to ensure adequate supply to
the canal head at all times, when canals take-of from both sides, a site with deep channels on
both banks and low water in the centre is the most suitable.
While deciding the layout, due consideration should be given for all possible locations of the
sediment ejector and availability of levels for effective functioning of the escape channel
Page 11 of 196
1.4. 3 River diversion Scheme
While deciding the location and layout of the barrages due consideration should be given to
the river diversion and flood handling scheme during construction. At times the hydraulic
requirement may have to be compromised to obtain a workable diversion scheme or the
barrage constructed in a spill of the river and the river diverted on to it by providing suitable
river training works. Such decision should be supported by adequate model studies.
The alignment of a barrage or weir should be such as to ensure normal and uniform flow
through all the barrage or weir bays as far as possible. A barrage or weir aligned at right
angles to the river course will have the minimum length and normal flow thereby
minimizing the chances of shoal formation and oblique flow a skew alignment should be
avoided unless otherwise necessitated by site conditions. The alignment should as far as
possible be finalized after hydraulic model studies.
The upstream abutment of the head regulator should be set back from the line at right angles
to the barrage axis. The head regulator is usually aligned at an angle of 90 degree to 110
degree to the barrage axis for minimizing sediment entry into the canal.
The upstream crest floor levels in the under sluice bays may be kept at the general lowest
bed level of the deep channel of the river subject to the cost of foundations and the difficulty
in construction dewatering.
The upstream floor level of the remaining bays should be kept normally 0.5 to 1.0m above
the upstream floor level of the under sluice bays or the general river bed level.
A divide wall is constructed at right angles to the axis of the barrage or weir to separate
under sluice bays from the barrage or weir bays. Under adverse flow conditions additional
divide walls may be required in the weir or barrage bays.
The main function of the divide wall on the upstream side is to provide a comparatively still
pocket in front of the canal head regulator resulting in deposition of sediment in the pocket
and entry of clear water into the canal.
A divide wall of one-half to two-thirds the width of the head regulator normally gives
satisfactory flow conditions when only one canal takes off from a barrage or a wire. In the
case of more than one canal on the same bank, the divide wall should be taken up to the
uppermost head regulator. Model studies are advised to determine the position and length of
upstream divide wall for most effective action.
It is necessary to continue the divide wall on the downstream side to ensure adequacy of
tail water depth in the under sluice bays for the formation of jump and to avoid cross flow in
the close vicinity of the structure which may result in objectionable scours. The divide wall
is generally extended to the end of impervious floor or to the end of loose apron on the
Design of Weirs, Barrages and Canals Page 12
Page 12 of 196
downstream side. The exact length required may be determined on the basis of model
studies.
A second pocket of river sluice, adjoining the under sluices has been found to improve the
flow conditions considerably where the river curvature is not favorable to silt free entry of
water into the canal by inducing convex curvature opposite the head regulator. The
provision of the second pocket can also be adopted in case a wide river to guide the river to
flow centrally minimize cross flow and inhibit formation of shoals near the head regulator.
The location and layout of the river sluice should be decided by model studies for
satisfactory performance.
River training works are required to check the out-flanking of the structure and to guide the
river to flow axially through the barrage or weir. The guide banks are necessary to arrest
the meandering tendency, obliquity of flow and to maintain deep channel through the under
sluice bay adjacent to the canal off-take.
Proper alignment of guide bunds is essential to ensure satisfactory flow conditions on to the
barrage. The most effective alignment, length and shape of guide bunds should be decided
by model studies.
In case of wide alluvial banks the length and curvature of the head of guide bunds should be
kept such that the worst meander loop is well away from either the canal embankment or the
approach embankment. If the alluvial bank is close to the barrage, the guide bunds may be
tied to it by providing suitable curvature, if necessary. If there are any out-crops of hard
strata on the banks it is advisable to tie the guide bunds to such control points.
After preliminary selection of site, these investigations shall be carried out in much
greater detail with a view to collecting data for the design of the main structure and its
appurtenant works for the site chosen. These should include the following:
Page 13 of 196
• Detailed Topographical Survey
The following data should be collected for estimating the maximum anticipated flood :
Page 14 of 196
• Sediment Studies
Bore holes should be driven at specified intervals covering the barrage or weir area and
appurtenant structures. The locations of borings shall be correctly marked and
numbered on the survey sheets. These borings should be carried to hard rock level or to
a depth of 15 to 25 m below the deepest river bed level depending on the strata and the
structure (pier, abutments, floor etc).
Trial pits may be excavated to determine the depth of overburden and loose deposits,
if shallow. In case of large depths of overburden comprising large size boulders
where ordinary boring methods may prove inadequate, geophysical method may be
employed to locate the rock surface. The following investigations should be carried out in
alluvial foundations:
a) Borings at suitable locations should be made in the barrage or weir area and
detailed borelogs prepared giving details of various strata encountered in
accordance with 18:4464-1967*. The spacing of bore holes should be planned in
a manner so as to cover the foundations of various structures.
b) For sandy foundations, dynamic and static penetration tests should be performed
below each structure (abutments, piers, etc) and in each bay to estimate bearing
pressures, likely settlement and necessity of settlement joints. For boulder strata,
plate bearing tests shall be required.
c) Soil classification, unit weight of soil, angle of internal friction of soil, void ratio
and specific gravity up to foundation level.
d) In case of clayey and silty foundations undisturbed sampling should be done and tests
conducted for determination of unconfined compressive strength and
consolidation characteristics.
e) Modulus of subgrade reaction in case of raft foundation.
In case of rock foundations at shallow depth, drill holes should be carried out to ascertain
the depth of weathered zone, extent of joints and fissures and to determine the necessity or
otherwise of grouting to avoid excessive seepage losses. Depth of impervious layer
should be located in the entire barrage and head regulator area. Detailed foundation
investigation comprising penetration tests should be conducted in the barrage and
appurtenant structure area to mark out soft foundation area, if any, for special treatment or
examining the possibility of avoiding it by suitably changing the layout.
Some other factors which influence the layout and planning are as follows:
Page 15 of 196
• Availability of Construction Material • Foundation Conditions
• Nature of the River Silt • Suitability of Site for Under sluices
• Slope of the River • Head Reaches of the Canal
• Condition of Banks • Quantity of Floating Debris
• Width of the River Bed
• Confluence of Tributaries
1.4.8 Alignment
1.4.8.1 Alignment with reference to the course of the river
The alignment can be fixed in two ways with respect to direction of current viz, (i) at
right angles to the course of current and (ii) Oblique to the current. Each one has got
its own advantages and disadvantages
Generally the diversion structures are aligned at right angles to the general flow of the
river. The advantages over such an alignment are:
The alignment of the diversion structure can be arranged in three ways, viz. (i)
Straight along a single line (ii) Curved (iii) Straight or curved along two or more
lines.
i) Straight Alignment in Single Line
This is the alignment generally followed in many of the diversion structures. The flow
lines on the downstream of the structure would be parallel to the banks
ii) Curved Alignment
The curved alignment of the diversion structure can be had with concavity upstream
or convexity upstream both as viewed from the downstream side (See Figure 4.1) The
alignment with the concavity upstream is suitable when the location of the structure is
proposed at a point where the river after having widened is narrowing down to normal
course. The flow would converge to the center.The alignment with convexity
upstream is not recommended as it diverges the current towards the banks exposing
them to scour. Moreover, this type of arrangement is also weak structurally.
This type of alignment is only a combination and modified version of the other two
alignments. In this case also concavity upstream is preferable.
While some of the minor diversion structures can be located and aligned at a suitable
site after considering the merits and demerits of some selected sites and also by
experience, in the case of major diversion structures, recourse is generally taken to
select a good and exact location in the vicinity of some selected reach and also to
determine the satisfactory alignment at that particular location through the help of 3-D
Hydraulic model studies. It is always difficult to select an ideal site for the location of
the diversion structure and its regulators satisfying all the requirements discussed in
the earlier paras. Hence it often becomes necessary to select a site satisfying most of
the requirements and for the rest, some corrective measures will have to be
incorporated in the layout and designs. These include properly designed guide bunds,
spurs, flood protection embankments, pilot channels, silt excluding devices etc.
Design of diversion structure comprises of two parts, namely hydraulic and structural
design. In hydraulic design overall dimensions and profile of the main structure and a
few of the components are calculated to get the satisfactory hydraulic performance of the
structure. Structural design is carried to get the different sectional and reinforcement
details. Fixed dimensions and layout obtained from hydraulic design is tested by model
studies and the recommendations of model study are incorporated in structural design.
In hydraulic design the diversion structure has to be properly designed for both the
surface and sub-surface flow condition. The design for surface flows will include the
fixing of waterway, top profile of various components, energy dissipation arrangements,
protection works, scour values, length and protection of divide walls, alignment, and
levels and protection of guide bunds, afflux bund, etc. The design for sub surface flows
will include fixing of the depth and section of cut-off, uplift pressure calculation, exit
gradient, etc.
2.1.3 Afflux
The width of the barrage/weir is governed by the value of afflux (at the design flood) to
be permitted and the proposed crest levels. It is also important for the design of
downstream cistern, flood protection and river training works, loose protections and cut-
offs. The maximum permissible value of afflux has to be carefully evaluated depending
Silt free water flowing down the diversion structure causes degradation or retrogression
of downstream bed. The lowering of bed levels affect the exit gradient and energy
dissipation. If the retrogression of downstream bed is not duly allowed for in designs, it
may result in failure of the structure. A value of 1.25 to 2.25 m may be adopted at lower
river stages and 0.3 to 0.5 m at the design flood. For intermediate discharges, the effect
of retrogression may be obtained by plotting the retrogressed high flood levels on log –
log graph.
Maximum depth of scour hole along the structure at various points depends on the grade
of bed material. Silt grade and silt load also influence the design of silt extractor near the
canal head regulator. It also gives an indication about the looseness factor to be provided.
The floatation gradient or critical exit gradient is a function of specific gravity. For most
of the permeable soils the specific gravity lies in between 2.6 to 2.7. The critical gradient
for different soils is given in table of article 5.4.
Permeability is generally used to find the loss of water in the form of seepage. Depth of
permeable strata decides what kin of cut-offs to be provided. If the depth of permeable
strata is less than the scour depth requirement, a positive cut-off is provided with
The waterway includes that of under sluice, spillway and river sluice bay, if any. In deep
and confined rivers with stable banks the overall waterway between the abutments would
normally be adjusted to the actual width of river at design flood level. For shallow and
meandering alluvial rivers for minimizing the shoal formation, the following looseness
factor shall be applied to Lacey’s waterway for determining the primary value of the
waterway.
Adequacy of waterway is checked for passing Design flood which is found by the
following formula:
Q = CLH 3 / 2
Where,
Q = Discharge in cumecs,
C = Coefficient of discharge,
L = clear waterway of the barrage or weir in m, and
H = total head causing flow in m.
The coefficient of discharge C depends on many factors including the head over
the sill, shape and width of the sill, its height over the upstream floor, roughness of its
Substituting the value of C,L and H, the value of discharge that can be passed through
the structure can be worked out. This should be greater than the design discharge if not
so process is repeated to get the near value.
From the above, it will be clear that the waterway, crest levels and afflux are all inter-
linked and hence various combinations of these can be had for passing the same design
discharge. The final features to be adopted in tthe
he design should be in consistent with
economy and safety.
Hydraulic jump results when there is a conflict between upstream and downstream
controls which influence the same reach of channel. For example, if the upstream control
causes a supercritical flow while the downstream control dictates a sub critical flow, then
Design of Weirs, Barrages and Canals Page 22
Page 22 of 196
there is a conflict which can be resolved only if there is some means for the flow to pass
from one flow regime to the other. The phenomenon of jumping of water from super-
critical flow to sub-critical flow is known as Hydraulic jump(HJ). Hydraulic jump is
generally accompanied by large scale turbulence, dissipating most of the kinetic energy
of super critical flow which has got detrimental effect on the surface.
For a structure to be safe, the formation of jump should be confined to the sloping
glacis and not allowed to be formed on the cistern level beyond the toe of glacis. The
cistern level and its length are to be worked out for various set of condition imposed on
the structure on the basis of the gate regulation proposed. The most critical condition
gives the lowest cistern level and its length. These are generally determined by the use of
curves available for various discharge intensities and water depths or by analytical
method.
The different parameters of the HJ are shown in figure 2. The main unknown parameters
of the HJ are the conjugate depths linked by the following formulae
2
y1 y 2 ( y1 + y 2 ) = 2q ..................(1) and
g
( y1 − y 2 ) 3
HL = ..........................(2)
4 y1 y 2
q2
E f 1 = y1 + ...........................(3)
2 gy12
q2
E f 2 = y 21 + ...........................(4)
2 gy 22
where y1 and y2 are pre and post jump depths, q is the intensity of discharge, HL is the
head loss in the jump, Ef1 and Ef2 are the specific energies before and after the jump.
In a hydraulic jump, there are six independent variables viz., y1, y2, Ef1, Ef2 , q and HL,
which are interrelated by 4 equation. If any two variables are known, the remaining four
can be determined. In actual design of irrigation structures, generally the discharge
intensity (q) and the loss of energy HL are known. The solutions for the cubical equations
are given below.
Various steps involved in the determination of cistern level by analytical method are as
follows:
i) Estimate the d/s total energy line (D/S TEL) = d/s retrogressed water level
+velocity head
ii) Then u/s total energy line (U/S TEL) = D/S TEL + afflux
The velocity head can be worked out as, hva = q/R
Where, R = 1.35 (q2/f)1/3 for looseness factor <1, and
R = 0.475(Q/f)1/3 for looseness factor >1
iii) Assume an arbitrary cistern level for the particular discharge.
iv) then, Ef1 = U/S TEL – Assumed cistern level
v) from the known values of Ef1 and q with concentration, y1 can be calculated from
the relationship,
Repeat the steps i) to x) for various discharge conditions and gate regulations. Then take the
lowest value of step viii) is taken as the cistern level and the highest value of the step x) is
taken as the cistern length. The above process of solving the cubical equation for y1 is
cumbersome because it involves trial and error. To simplify the laborious process the help of
curves can be taken.
BASIC PARAMETERS OF HYDRAULIC JUMP
U/S TEL
U/S HFL
HL
H
PREJUMP PROFILE
D/S TEL
CREST LEVEL
D/S HFL
POSTJUMP
ELEVATION
PROFILE
START OF D/S GLACIS
Ef1
y2
Ef2
y1
POINT OF JUMP FORMATION
START OF CISTER
CISTERN LEVEL
4.05
22.50 M
DISTANCE
Dividing the equations (1) and (2) an either side by yc3 and rearranging the terms gives
dimensionless equations as follows.
Solution process
q2 1 3
i) The critical depth is obtained from y c = ( )
g
ii) Head loss HL = (U/S TEL) - D/S TEL.
iii) Work out the actual value of HL/Yc , and read the value of Y1 and Y2 from
the curve earlier prepared.
iv) Then y1 = yc Y1 and y2 = yc Y2
then rest of procedure for determining cistern level and length is same as
analytical method.
For the determination of cistern levels, a set of curves known as Blench Curves and
Montague curves are generally used. For different cases and their discharge values the
procedure for determining the HJ parameters is as follows.
i) The procedure is same as above analytical method except the finding of Ef2 and y1, y2.
From the known values of the intensity of discharge with concentration and the head
loss, using Blench curve (fig. 4), the values of Ef2 (energy of flow d/s of the jump
formation) can be obtained for different discharges. Ef1, i.e., energy of flow just upstream
of the point of the jump formation is found by adding HL. From the known values Ef1 and
the intensity of discharge, using Montague Curves (fig.4), the values of y1 and y2 i.e.,
the hypercritical and sub-critical depths of water before and after the hydraulic jump can
be read out.
Fig 3. HL/yc vs y1/yc Curve
0.800
0.700
0.600
0.500
y1 / yc
0.400
0.300
0.200
0.100
0.000
0 1 2 3 4 5 6 7 8 9 10 11
HL/yc
Comparison in determining the conjugate depths and stilling basin parameters is given in
the below table for the following data.
u/s TEL is +323.00, d/s TEL is +321.00, intensity of discharge with concentration, q is
22 m3/s/m and d/s retrogressed water level is +320.80.
From the a above comparison it can be concluded that for preliminary designs Blench
and Montague curves can suitable used but for accurate values analytical method or
HL/yc table are appropriate.
The failure of hydraulic structures due to sub-surface flow were introduced by Bligh on
the basis of experiments and the research work conducted after the failure of Khanki
Weir, which was designed on experience and intuition.
According to Bligh’s theory, the percolating water follows the outline of the base of the
foundation of the hydraulic structure. The length of water thus traversed by water is
called the creep length. He assumed in his theory that the loss of head is proportional to
the length of the creep. If HL is the total head loss between u/s and d/s, and L is length of
the creep, then the loss of head per unit of creep length (i.e. HL/L) is called the hydraulic
gradient. Bligh made no distinction between horizontal and vertical creep.
Water will seep along the bottom contour as shown by arrows. It starts percolating at
A and come out at B.
SUBSIOL HGL
b d
Safety against uplift pressure: The ordinate of HGL above the bottom of floor gives the
residual uplift at that point. If h in meter is the ordinate measured from the base of the
floor then water pressure equal to h will act at that point and has to be counterbalanced
by the weight of floor of thickness, t.
i) Bligh,s theory gives same weightage to the horizontal and vertical creep. But
actually the vertical creep is more effective than the horizontal creep.
ii) The theory assumes that the head loss variation is linear, but it is nonlinear.
iii) The theory does not emphasis the importance of the d/s cut off without which
piping failure occurs.
iv) The theory does not give any theoretical or practical method for the
determination of the creep coefficient C. it has to be determined from experience
or from actual observation. Because of the above limitations, Bligh,s theory is not
used for the design of important irrigation structures. However it can be used for
the preliminary designs.
Based on the statistical analysis of observed data at the then existing barrages, Lanes
concluded that horizontal creep is less effective in dissipating uplift than the vertical
creep. He therefore, suggested a weightage factor of 1/3 for the horizontal creep, against
1.0 for the vertical creep. Thus for the example cited before Lane;s creep length is given
by
Ll = 1/3(b) +2 d
To ensure safety against piping, according to this theory, the creep length Ll must not be
less than C1HL , where HL is the head causing flow and C1 is Lane’s co-efficient.
Table given below shows the Lane’s Safe hydraulic gradient:
Many of the important structures such as weirs and barrages were designed on the basis
Bligh’s theory between the periods of 1910 to 1925. In 1926-27, the Upper Chenab canal
Siphons, designed on Bligh’s theory, started posing undermining troubles. Investigation
started and which ultimately led to Khosla’s theory.
Khosla propounded that seeping water does not flow through the bottom contour of
pucca floor as suggested by Bligh but this moves along a set of stream-lines. Every
particle entering the soil at a given point upstream of the structure will come out by its
own path and will represent a streamline. Khosla’s theory of flow nets made it very clear
that the loss of head does not take place uniformly in direct proportion to creep length as
stated by Bligh. It depends upon the whole geometry of the structure, i.e. the shape of
foundations, depth of impervious boundary and levels of u/s and d/s beds. He stated that
safety against piping can not be obtained by providing sufficient floor length, as stated
by Bligh, but can be obtained by keeping the exit gradient well below the critical value.
He further stated that undermining starts only when the exit gradient is unsafe for the soil
on which it is founded and it is necessary to have a deeper d/s cut-off to prevent
undermining. The depth of d/s cut-off is determined by 1). Maximum depth of scour
2). Safe exit gradient.
While designing a weir, d/s cut-off from the maximum scoured depth consideration is
first taken and checked for exit gradient. If a safe value of exit gradient is not found then
the depth of cut-off is increased. Barrage might also fail due to surface flow (i.e. when
flood water flows) may cause scour, dynamic action; and in addition, will cause suction
pressures in jump trough. These uplift pressures must be checked for different condition
of flow. The maximum uplift due to this dynamic action (i.e. for surface flow); should be
compared with the maximum uplift under steady seepage (i.e. subsurface flow); and the
maximum of the two chosen for designing the aprons and the floor of the Barrages.
Khosla and his associate gave the mathematical solution of the Lapace equation for different
types of structures on the permeable foundation.
∂ 2φ ∂ 2φ
Lapace equation + = 0 , where φ = − kh
∂x 2 ∂y 2
The solution of the equation for a simple structure with an impervious horizontal floor as
shown in fig 7. gives that if the depth of permeable strata is infinite the flow lines
become confocal ellipses and the equipotentioal lines become confocal hyperbolas. The
residual pressure or uplift pressure at any point x is given by
H
P = Cos −1 ( 2 x b) , where H is head causing flow, b is length of
π
impervious floor and x is measured from the center of the floor (+ve d/s and –ve u/s).
The uplift pressure distribution is shown in fig 7. it may be noted from the fig that i). In
the d/s half of the floor, the Bligh theory under-estimates the uplift pressure and hence it
is unsafe, ii). The actual uplift pressure distribution is a cosine curve and not a linear, as
assumed by Bligh and iii). The hydraulic gradient at d/s exit is theoretically infinite
which absolutely necessitates a pile at d/s end to prevent failure against piping.
To know the behavior of seepage flow for a given boundary conditions, it is required to
plot flow net. For that we need to solve the flow net either by electrical analogy method
or mathematical solution of Laplacian equations. These are complicated method and for
this Khosla suggested a simple, quick and accurate method of Independent Variables.
In this method, a complex profile like that of barrage is divided into a number of simple
profiles, each of which can be solved mathematically. He presented the solution of flow
nets for these simple standard profiles in the form of curves that can be used for finding
out percentage pressures at different key points. The simple profiles which are most
useful are:
i) A straight horizontal floor of negligible thickness with a sheet pile line on the u/s
or d/s end (Fig.8 a and b) .
ii) A straight horizontal floor depressed below the bed but without any cut-
off(Fig.8c)
iii) A straight horizontal floor of negligible floor thickness with a sheet pile line at
some intermediate point. (Fig. 8 d)
The key points are the junction of the floor and the pile lines on either side, and the
bottom point of the pile line, and the bottom corners in the case of a depressed floor. The
percentage pressure at these key points for the simple forms into which the complex
profile has been broken is valid for the complex profile itself, if corrected for
(a) Correction for the Mutual Interference of Piles. The correction C to be applied as the
percentage of head due to this effect, is given by
d + D D
C = ±19 '
b b
Where b’ is the distance between the two pile lines, D is the depth of the pile line, the
influence of which has to be determined on the neighboring pile of depth d. D is to be
measured below the level at which interference is desired, d is the depth of the pile line
on which the effect is considered and b is the total floor length.
This correction is positive for the points in the rear or back water and subtractive for the
points forward in the direction of flow.
In the standard form profile it is assumed that the floor has negligible thickness. So
percentage pressure calculated by Khosla’s graphs shall pertain to the top levels of the
floor. But actual junction point E and C (Fig. 6) are at the bottom of the floor. So the
pressures at the actual points are calculated by assuming a straight line pressure
variation. Since the corrected pressure at E1 should be less than the calculated pressure at
E’1, the correction to be applied for the point E1 shall be –ve. Similarly, the pressure
calculated at C’1 is less than the corrected pressure at C1, and so. The correction to be
applied at point C1 is +ve.
SUBSIOL HGL
SUBSIOL HGL
H H
E C E1
C1
b d d
b
D1
D
SUBSIOL HGL
SUBSIOL HGL
H
H
E C
D1 D
b1 d
d
b D
b D
A correction is applied for a sloping floor, and is taken as +ve for the down and –ve for
the up slopes following the direction of floor. Correction factor to be applied for slope is
tabulated below:
Slope Correction
Horizontal:Vertical factor
1:1 11.2
2:1 6.5
3:1 4.5
4:1 3.3
5:1 2.8
6:1 2.5
7:1 2.3
8:1 2.0
The correction factor is multiplied by the horizontal length of the slope and divided by
the distance between the two pile lines between which the slope is located.
For a floor of length b with a vertical cut-off of depth, the exit gradient at its downstream
end is given by :
Type of Soil Safe exit gradient
Khosla’s theory of seepage flow assumes that depth of permeable strata is infinite. In real
problem, infinite depth of alluvium never exists. But extensive electrical analogy model
studies have shown that the infinite depth of pervious strata will give practically the
same results as those obtained by assuming the pervious strata depth equal to five times
the depth of cut-off or two and half times the length of barrage, whichever is larger. If
the above condition is not satisfied the Khosla’s theory gives erroneous values. In that
case the problem of seepage flow is solved by mathematical modeling or physical
modeling.
Solved example
Page 34 of 196
Crest level of spillway = 35.00
Qt = Qus + Qspl
Page 35 of 196
= 4435+ 12273
= 16708 >12172 design discharge
2.0 Energy Dissipation and Design of Hydraulic Jump Type Stilling Basin
Table 1Tail water Rating curve(G-D Curve) at 200m d/s of Barrage site
Solving the head loss and discharge relations with conjugate depths,
∴ F =2.01
Page 36 of 196
Cistern length = 5x(D2-D1)
= 5x(9.38-3.93) = 27.30m
Required cistern level = D/s retrogressed level - D2
D/s Retrogressed W.L. = 43.3 m
Hence,
Required cistern level = 33.91
Similarly for different discharges with partial gate opening, the cistern parameter are
tabulated as below
Design discharge with HFL condition and for different discharges with partial gate
opening, the cistern parameter are tabulated as below
Page 37 of 196
Table 3: Under sluice cistern parameters
Page 38 of 196
Taking the scour factor as 1.25 for downstream (clause 17of IS: 6966(part1):1989
1.25 R =18.12m =R1
D/s Retrogressed W.L. = 43.30
Bottom level of d/s cutoff = d/s retrogressed W.L. – R1
= 25.18
Provide the d/s cutoff up to EL 24.00
3.1.3 Check of d/s cut-off against exit gradient
Given safe exit gradient for the particular type of soil at site =0.19
Exit gradient Ge is given by:
H 1
GE = x
d π λ
1+ 1+α 2
b
λ = α =
Where 2 and d
Page 39 of 196
= 28.49
Provide u/s cut-off up to EL 27.50
1+ 1+α 2
b
λ = α =
Where 2 and d
Page 40 of 196
1/3
R = 1.35 (q2 / f ) for Looseness factor <1
(as per clause 19 of IS: 6966-1989)
q=12273/374.4 =32.78cumec/m
Silt factor f =1.25
Depth of scour below floor level, D =32.50-17.63 (end sill level – deepest scour)
= 14.87m
Length of block protection required is 1.5D = 22.30m
Page 41 of 196
= 5 x 1.575 + 0.075 = 7.95m
(iv) Curtain wall-2 =1m
Total length provided =24.20m ,Hence O.K.
Page 42 of 196
4.2.2.0 D/S protection works
Depth of scour below floor level, D=31.75-15.11 (end sill level – deepest scour)
= 16.64m
Length of block protection required is 1.5D = 24.96m
Page 43 of 196
(3) Structural Design of components of Barrage
After the hydraulic design of barrage, the model studies are conducted and if
satisfactory hydraulic conditions are observed then structural design of
barrage is taken up. This is the detailed engineering stage and whatever
design assumptions were made at the time of planning stage must conform to
the actual site conditions and the.
Stability Analysis
One bay of the barrage is analyzed for stability and all the forces acting on the
one bay e.g. raft, pier, road bridge, gate bridge, uplift, hydrodynamic forces,
water pressures (both from u/s and d/s), boxed sand, inertia forces are
summarized as vertical downward force (N) and horizontal force (H)
Pier
In barrages, piers are generally constructed as RCC structure and
constructed monolithically with the raft. The thickness of pier generally varies
from 1.5m to 2.5m and is dependent on the loads and moments being
transferred to the raft. The height of pier on the u/s of gate is generally kept
above the pond level or HFL. Below the road bridge, care shall be taken that
bearings are not submerged and on the d/s side the height of pier is provided
for the consideration of counteracting the uplift requirement. Differential head
moment between the adjacent bays is a major moment to be considered. In
the block-out portion the minimum thickness of pier (apart from block-out
thickness ) shall be 600mm. A double pier is provided to separate one type of
foundation strata from another type (e.g. sandy and rocky) or to provide
expansion joint after a particular length of raft. After analyzing various
downward forces (V) and moments (M) eccentricity is calculated and the
reinforcement is calculated in the pier as per the allowable permissible
stresses in the steel and concrete as per working stress method. For a
sample calculation of pier CBIP manual of design of barrages on permeable
foundation may be referred.
Page 44 of 196
RCC Raft
1. Gravity type where the uplift pressure is balanced by the self weight of the
floor only considering unit length of the floor.
2. Reinforced cement concrete raft type where the uplift pressure is balanced by
the weight of the floor, piers and other super-imposed dead loads considering
a span as single unit.
The design of Reinforced cement concrete raft may generally be done as per the
theory of beams on elastic foundation. The design will depend on the value of
modulus of subgrade reaction (K), span length, total length of raft etc.
However, for small spans upto 6 m, the floor shall be designed as a
continuous beam resting on a homogenous foundation. The abutment, if
necessary, may be made independent by providing a joint in the raft with
suitable water seals. The raft shall be designed for the moments caused by
worst combination of the following forces:
a) Uplift
b) Soil reaction
c) Moments transferred from the abutments and piers
d) Seismic forces, if any
For the purpose of analysis, the entire width of the raft may be divided into different
sections, depending on the loads and moments anticipated to act over the
different sections, such as upstream section (including glacis), downstream
glacis and downstream cistern sections.
The unit load/moment acting at a particular location (at abutment, pier, etc.)
generates moments at various points in the raft is given by the following
equations:
i. = (− ) ..Unit load acting on the extreme end Abutment
ii. =
− 2 +
| | ..Unit load acting on an intermediate Pier
iii. = .unit .Moment acting on the extreme end Abutment
Where,
=
4
Page 45 of 196
=
+ 2
= +
= sin !
= cos !
After calculating the moments generated in the raft due to various individual
loads/moments, algebraic summation of all the moments is done and
moments due to differential head & uplift forces are also accounted for.
Cut -Off
They are the barriers provided below the floor of the structure and extend
from abutment to abutment both in the u/s and d/s. Cut off is provided all
along the pucca floor and also below the wing wall return wall and flank wall.
Cut – off may be provided either as a sheet pile or as an RCC Cut-off.
Generally sheet pile is preferred because of ease in construction but in
bouldary, gravelly and rocky strata the sheet pile cannot be driven and in that
case an RCC Cut off also called a diaphragm is provided.
The depth of cut-off is governed by the scour and exit gradient considerations
A factor of safety shall be applied to the scour depth. While calculating the
safe exit gradient, care shall be taken to take the downstream retrogressed
bed level.
In the design of cutoff, the foundation strata on one side of the cut off is
assumed to be scoured or eroded and on the other side the active earth
pressure is acting. Moment is calculated and thickness and reinforcement is
provided. In sheet pile a minimum grip length below the scoured level is
provided and the earth pressure is assumed to vary from active earth
pressure to passive earth pressure in this region. Based on the section
modulus the section of ztype sheet pile (most commonly used) is provided.
Generally the abutment is constructed monolithically with the raft. In that case
the moment due to earth pressure behind the abutment are transferred to the
raft. Flank wall is designed as a cantilever type of retaining wall. Two loading
Page 46 of 196
conditions are considered i.e. pond level and construction stage. In the
construction stage laoding condition, the backfill is considered as dry and no
or minimum uplift force is considered as acting on the wall footing. In the pond
level design loading condition, the backfill is saturated and full uplift is taken in
the design.Conventional method of analysis is used in analyzing the structure
and calculating the bearing pressure at heel and toe. Reinforcement in stem,
heel and toe is provided as per the moments and are also checked for shear
failure which is critical.Care shall be taken such that the safe bearing capacity
of the foundation soil is not exceeded below the footing. Flared out wall is
designed as a gravity wall with its river side face gradually merging into the
guide bund slope.
Page 47 of 196
Chapter - 3
Stability Analysis
3.0 Introduction
Stability analysis is an important part of planning and design of any diversion structure
(Barrage or Weir). Before the individual components of diversion structure are designed
structurally for various design conditions, its stability as a whole is checked.
1. Sliding
2. Overturning
3. Floatation
The design conditions and forces are dependent upon the configuration of the diversion
structure i.e. whether it is:
For independent pier with gravity floor type structure, each pier and abutment is
structurally separate from the floor through PVC seals. The loads from Pier do not get
transferred to floor. Therefore stability of every Pier / Abutment is checked
independently. The floor resists the uplift force, its own weight along with water
sediment etc placed directly over it. Stability analysis for such structures is very
important. Sizes and thickness of various components are determined to resist the
loading.
For Raft type structure, the piers and / or abutments are monolithic with floor and floor
also participates in resisting the forces by slab / beam action. Raft structures are more
stable against sliding or overturning. However floatation condition is checked for raft
structures.
Sometimes, due to design considerations, the raft and gravity both type of components
are provided. Under such case, the stability of all individual component is checked.
Cl 41.1 of IS 6512 “Criteria for design of Soid Gravity Dam” provides for some Load
combinations which are as follows:
A. Construction Stage:
During construction there are many conditions when stability of the structure may be
vulnerable e.g. when construction is only partial, useful downward loading (of Bridge,
Hydro Mech Equip. etc) may not be placed etc. Stability under such conditions should be
checked as per construction planning of the project and it may vary from case to case.
During normal operation, the gates of barrage are partially or fully closed. The lateral
thrust of water is transferred from Gates to Pier and from Piers to footing / Raft. The
sliding / overturning of the structure is resisted by the weight of the structure.
The abutments are subjected to horizontal soil pressure (active or at rest). The stability
against sliding / overturning is resisted by weight / slab/beam action depending upon
whether the abutment is monolithic with floor or not.
Stability of the structure is also checked during design flood condition (usually 1 in 100
year return period flood for important / permanent barrages). However as per cl 5.4.5.2
of IS 11130 “Structural dEsign of Barrages and Weirs” :
B1 Bridge Self load i.e. Concrete weight of Bridge Deck, girder etc.
Seismic load due to inertia force of
B1.e B2
B2.1 Live Load class A or AA whichever applicable
B2.1.e Seismic load due to live load of Class A or AA
Gantry Live Load Normal (Travelling with
B3.1a Stoplog)
Gantry Live Load Normal
B3.1b (Stationary)
Seismic load due to Gantry (Dead
B3.1.e Load)
B3.2 Gantry Live Load BDT condition
Impact load due to live
B4 load
B5 Friction due to braking of vehicles and bearing restraint
B6 Temperature forces through Bridge Bearing
(Seismic load for BDT load of gantry is not considered)
One condition when only one Bridge span is in place has also been
considered
After the forces (and moments ) causing sliding or overturning as well as restoring forces
are estimated, they are compared to provide adequate factor of safety. As per IS 11130
“Structural Design of Barrages and Weirs:
For computing the forces resisting sliding, dead load normal to sliding surface is
multiplied with coeff of friction. As per IS 11130
FLOW
2.3 11.6
147.5 148.50
146.5 10.1
3 143.5
3 140.5
126.00 126.00
22.5
32.5
Sectional Elevation of Typical Pier
Area 1 Area 2
U/S Section D/S Section
3.5 3.5
130
128.5
126.00 126.00
8 8
Upstream Section Downstream Section
EL 134.7
2.9
EL 126 126.00 m
8.7 Bottom Level of Pier Footing :
The Hydrostatic force shall act over the gate and shall be transferred to Pier through wheels
of the gate.
Besides checking factor of safety against sliding and overturning, the stability is also checked
for following considerations:
1. The whole structure / its independent component when subjected to extreme uplift
may be subjected to floatation. The self weight of structure should be
2. For gravity floor type structure, the thickness of floor should be sufficient to resist the
uplift at all location for various design conditions i.e hydraulic jump formation, pond
level formation, high flood condition etc.
3. The Pier thickness is also checked for adequate slenderness ratio as per design.
Page 55 of 196
Chapter - 4
Various components of the diversion structures have to be very carefully designed for
ensuring safety and economy. Due to different types of foundation materials
encountered, such as clay, etc., some treatments may become necessary. These will
have to be carefully evolved and their effects taken into consideration while designing
the structure. The type of cut off proposed such as sheet piles or R.C.C. cut offs will
have to be suitably selected depending on the construction difficulty and these will
have to be carefully designed to ensure safety of the structure. In the ensuing
paragraph, guidelines for the design of some of the important components of the main
structure such as cut offs, pucca floor, pier, divide wall, abutment, flank wall and
return wall are elaborated.
In addition to the data listed in chapter 3 and analyzed values thereof, the following
data are also required to be collected out for carrying out the structural design. There
are some repetitions. However, these have been included for convenience.
(a) High flood level and Minimum water level in the river.
(c) The lowest and highest tide levels in case of tidal streams.
(d) Intensity of silt charge in the river during high and low flood stages.
(e) Log of boreholes to a depth of about 15 to 25 m below the deepest bed level
at a spacing of one per bay in at least three rows. One row of the bore holes
may be along barrage / weir axis, the second at a distance of about 15 m
upstream of the axis and third at a distance of about 30 – 40 m downstream
of the axis. The location of the boreholes along the axis will be staggered
with reference to those along the upstream and downstream lines. However,
these are essential whenever presence of clay stratum is detected in the
foundation. The extent, depth and location of clay layer should be carefully
assessed.
(f) In sandy strata, standard penetration test results for a depth of at least 8 to
12 m at a spacing of 40 -50 m along the transverse direction (along river
width) and at a spacing of 30 m in the longitudinal direction (along the
flow).
(g) Whenever clayey strata are encountered, undisturbed samples of the clay
layers from the proposed foundation level upto a depth of 8 m below the
foundation level for each bay. The analyzed values of shear parameters,
(h) For sandy soil, grain size distribution curves from undisturbed samples
obtained at 3 meter intervals from each bore hole. Dry densities, relative
densities and angle of internal friction.
(i) Modulus of sub grade reaction at the proposed foundation level. If the
structure is long or if there is wide variation in the properties of the
foundation material, the values of modulus of sub grade reaction in each
unit / block separated by double pier. If it is not feasible to determine the
modulus of sub grade reaction at site, the values given in Appendix 7.3 may
be adopted for design purposes, depending on the type of soil met with.
(j) Results of feasibility studies for driving sheet piles or otherwise if the river
bed consists of boulders or is made up of stiff clay.
The design criteria is generally considered as guidelines and may be modified to suit
the field conditions with due consideration for safety and economy. R.C.C. work shall
be done in accordance with IS : 456-1978.
Cut-Offs:
The upstream and downstream cut-offs of the diversion structure may be of steel sheet
piles anchored to the barrage/weir by means of R.C.C. caps, or of masonry or
reinforced cement concrete of R.C.C. diaphragm wall. The sheet pile cut-offs shall be
designed as sheet pile retaining walls anchored at top. They shall be designed to resist
the worst combination of forces and moments considering the possible scour on the
outer side, earth pressure and surcharge due to floor loads on the inner side, differential
hydrostatic pressure computed on the basis of the percentage of pressure of seepage
flow below the floor etc. The upstream and downstream masonry of R.C.C. cut-offs
shall be designed as cantilever walls casted monolithically with the floor of the
barrage/weir.
a) Gravity type where the uplift pressure is balanced by the self weight of the
floor only considering unit length of the floor and
b) Reinforced cement concrete raft type where the uplift pressure is balanced
by the weight of the floor, piers and other super-imposed dead loads
considering a span as single unit. While the gravity type can either be of
plain concrete or masonry, the raft type would be reinforced concrete only.
The uplift pressure at any point shall be calculated by any accepted practice taking into
account the effect of the upstream and downstream cut-offs, intermediate cut-offs (if
any), interference of cut-offs, thickness of floor and slope of the glacis.
The thickness of downstream floors shall also be checked under the hydraulic jump
conditions.
The thickness of the floor adopted for construction shall be at least 10 percent tmore
than the thickness required to counteract the uplift pressure at that point under the
worst possible combination of loads in different including seismic conditions
Abutments and piers may either be independent of the floor separated from it by means
of water tight seals or may be monolithic with the floor. The latter case may be
adopted only if the thickness of the floor is equal to or more than half the length of one
span.
Spans up to 6 m:
The design of the raft may generally be done as per the theory of beams on elastic
foundation. The design will depend on the value of modulus of subgrade reaction (K),
span length, total length of raft etc. However, for small spans upto 6 m, the floor shall
be designed as a continuous beam resting on a homogeneous foundation. The
abutment, if necessary, may be made independent by providing a joint in the raft with
suitable water seals. The raft shall be designed for the moments caused by the worst
combination of the following forces:
a) Uplift;
b) Soil reaction;
For this purpose, the loads transmitted by the abutments and piers may be assumed
to be distributed uniformly on the foundation.
The floor shall be designed as a finite beam resting on elastic foundation and subjected
to concentrated loads and moments at the pier and abutment points. Taking duly into
account the effect of the width of the raft actually provided, the value of the modulus
of subgrade reaction (Ks) shall be determined as prescribed in IS : 2950 (Part I) –
1973* and IS : 9214 – 1979.
For the purpose of analysis, the entire width of the raft may be divided into different
sections, depending on the loads and moments anticipated to act over the different
sections, such as upstream section (including glacis), downstream glacis and
downstream cistern sections.
Piers:
In barrages and weirs constructed as a reinforced cement concrete structure, the piers
are constructed monolithic with the floor of the diversion structure. However, the piers
in the gravity type of floor are generally constructed independent of the floor. Proper
joint and sealing arrangements between the gravity floor and the pier all around shall
be provided.
Thickness of Pier:
The thickness of the pier shall be fixed from consideration of (i) forces and moments
transferred by the pier to the floor/foundation (ii) minimum thickness required at the
block outs for the main gate and stoplog grooves and (iii) the mass of the pier required
for counter-acting the uplift pressure.
Length of pier:
In the case of a raft type floor of the diversion structure, the piers shall generally be
extended up to the full width of the raft to avoid cantilever action of the raft at the
ends. In the case of gravity type floor, the length of pier may however, be restricted
according to the minimum requirement, from considerations of road rail bridges, hoist
bridge, space required for housing instruments, if any, main gate grooves, stoplog
grooves, space for storage of stoplogs, adequate length to prevent cross flows occurring
which may cause damages to the floor and beyond.
Height of Pier:
On the upstream side, the pier shall generally be constructed above the pond level /
affluxed HFL with adequate free board. The height shall also be fixed as per
requirement of the mass of the pier in counteracting uplift pressure. The height of the
pier shall also be such that under fully raised position above the affluxed HFL/pond
level, about one metre of the gate still remains within the gate groove.
On the downstream side, the piers shall generally be constructed at least one metre
above the high flood level, upto 1 to 2 m as found necessary beyond the end of the
bridges and instrumentation platform, if any and thereafter the height could be reduced
according to low flood levels on the downstream side. In the portions where road/rail
In the main gate portion, the height of the pier shall be fixed such that during high
flood, the bottom of the gate is at least one metre clear of the affluxed high flood level.
In earthquake regions, however, the top level of the pier could be restricted to the top
level of the abutments and steel trestles provided over the piers for housing the hoist
bridges for operation of the gates and stoplogs. This arrangement would reduce the
loads and moments due to inertia during earthquake.
4.3 Design:
4.3.1 General:
For design of the pier, the worst combination of the following forces and moments
shall be considered.
a) Dead loads;
f) Dead and live loads of gates, stoplogs counter weights and the hoist bridges;
h) Buoyancy;
i) Differential hydrostatic pressure with one side gate open and the other adjacent
gate closed;
Apart from above, the other forces shall be as specified in relevant Indian Roads
Congress Bridge Codes available.
For checking the stability, two emergency conditions (like high flood level and
seismic) shall not be combined together.
a) The width of the pier between the blockouts on either face shall not be less than
60 cm.
b) The increase in the sectional area of the pier in the blockout zone due to the
second stage concrete shall be ignored while calculating the reinforcement.
4.3.4 Design:
Each unit of the double pier shall be structurally independent of the other without any
transfer of load and moments from one to the other. The design criteria specified for
single pier shall hold good for the design of double pier also. For this purpose, each
unit of the double pier shall be treated as acting completely independent of the other
pier.
Pier Cap:
Thickness:
The thickness of the pier cap shall not be less than 300 mm for spans up to 25 m.
Reinforcement:
The reinforcement for the pier cap should be distributed both at top and bottom in the
longitudinal and transverse directions. In addition to this, two layers of mesh
reinforcement of 6 mm diameter spaced at 75 mm centre to centre shall be placed
under the bearings of the road/rail bridge beams.
Final layout and exact length of the divide walls shall be determined on the basis of
hydraulic model studies to ensure adequacy of tall water depth in the under sluice and
river sluice bays for the formation of hydraulic jump and to avoid cross flow in the
close vicinity of the structure.
Foundation:
The foundation of the divide walls shall be extended below the bed upto a depth of
2.25 R below the high flood level at the nose portion with adequate grip lengths, where
R is the calculated Lacey’s depth of scour below high flood level. The depth of
foundation may be decreased progressively towards the pucca floor of the barrage /
weir up to a minimum depth of main cut-offs provided.
The foundation of the divide walls shall be made of steel sheet piles in portions,
wherever it is possible to drive the sheet piles of sufficient depths and in other portions,
it shall be made of walls. For design of well foundation, reference may be made to IS :
3955-1967
The upstream and downstream divide walls shall be separated out from the main pier
beyond the pucca floor of the barrage/weir by joints. Joints shall also be provided in
the divide walls at places where there are changes from sheet pile/cut-off foundation to
well foundation.
Height:
The top levels of the divide walls shall be fixed above the high flood levels with
sufficient free board.
Design:
The upstream divide wall shall be designed to resist the differential head on account of
the velocity of flow in the pocket due to the gates adjacent to the divide wall on either
side being kept in open and closed condition. The downstream divide wall shall be
designed to resist the moments due to the differential head caused by the closure of
gate on one side and opening of gate on the other side. The differential heads to be
considered in the design are indicated by hydraulic model tests wherever conducted.
However, for preliminary designs, a differential head of about 2m may be assumed.
The divide walls shall be checked for their overall stability. Forces due to self weight,
water (including ice wherever applicable), uplift, etc, shall be considered along with
earthquake forces acting on the walls. While checking the stability, two emergency
conditions (like HFL and seismic) shall not be combined together.
Abutments:
Abutments are generally designed as retaining walls separated from the main floor by
an expansion joint, settlement joint with seals. In some cases, if the total waterway
between the abutments does not exceed 40 to 50 m, the abutments are constructed
monolithic with the main floor and the whole section is designed as a trough. For
analysis and design, along the flow direction, the abutments are generally divided into
Top Width:
Top width of the abutment in each block shall be fixed as per the requirements due to
the loads and moments, minimum width required for block-outs of main gate and
stoplog grooves, bridge bearings, gate trestle foundation, etc. Minimum width of
abutment clear of the block-outs and behind bearing niches shall be 60 cm. In the gate
and road/rail bridge block, it is generally kept as 125 to 140 cm.
4.3.6 Design:
For design of the abutment blocks, worst combination of the following forces and
moments, pertaining to the block under consideration, shall be taken into account:
a) Dead load;
h) Uplift;
Apart from above, the other forces shall be as specified in relevant Indian Roads
Congress Bridge Codes available.
The abutment section shall be checked for safety against allowable bearing pressure,
overturning and sliding.
The factor of safety against overturning shall not be less than 2:0 under normal
conditions of loading and not less than 1:5 under seismic conditions of loading.
The factor of safety against sliding shall not be less than 1.75 under normal condition
and not less than 1:5 under seismic conditions of loading.
Top Width:
The top width of the flank wall shall not be less than 600 mm.
The top width of the flared out wall would be varying depending on the size of the
cement concrete block. Generally a size of 1500 mm is adopted.
Design:
For the design of the flank wall and flared out wall as an earth retaining structure,
worst combination of the following forces and moments shall be taken into account;
a) Dead loads;
b) Earth pressure, live load surcharges and saturation pressure;
c) Uplift;
d) Seismic forces and moments, if any, and
e) Hydrodynamic forces due to seismic condition if any. For checking the
stability, two emergency conditions (lie HFL and seismic) shall not be
combined together.
The flank wall and flared out wall sections shall be checked for safety against
allowable bearing pressure, overturning and sliding as in the case of abutment. For
calculation of earth pressures, any standard practice may be adopted.
Return Wall:
Return walls are generally provided at right angles to the abutment either at its ends or
at the flank wall portion. Wherever return walls are constructed as part of the flank
Length:
Where the return-walls are provided at the ends of the abutment, they shall be extended
atleast up to the end of the heel portion of the base slab of upstream or downstream
abutment blocks as the case may be. In the case of the head regulator, the return-walls
shall be keyed properly into the embankment of the canal for a length of at least 2 m
beyond the top edge. Where the return wall is part of the flank wall, the same shall be
extended up to the end of the heel portion of the base slab.
4.3.7 Design:
For design of the return wall, worst combination of the following forces and moments
shall be taken into account.
a) Dead loads;
b) Earth pressure, live load surcharge and saturation pressures;
c) Uplift;
d) Seismic forces and moments, if any ; and
e) Hydrodynamic forces.
For checking the stability, two emergency conditions (like HFL and seismic) shall not
be combined together.
Silt Excluder:
Silt excluder tunnels generally provided in the form of rectangular R.C.C. barrels. The
number of under sluice bays and the number of silt excluder tunnels in each bay to be
provided, their location, layout and dimensions shall be fixed on the basis of model
tests in order to obtain optimum silt exclusion from the waters emerging into the head
regulator.
4.3.8 Design:
For the design of silt excluders, the following loads shall be considered:
The silt excluder tunnels shall be designed for the worst combination of loadings and
moments with one or more tunnels considered empty at a time and all vertical loads
including the load of water inside the other tunnels.
Silt excluders shall be checked for floatation and sliding also with no silt load on top of
the tunnels and no water inside all the tunnels.
SEDIMENT EXCLUDER
The sediment excluders are provided on the barrages or diversion weirs in the river pocket
adjacent to the head regulator to minimize sediment entry into the canal water. On rivers, the
excluders have to deal with alluvial material such as boulder, gravel sand or silt depending upon
the parent bed material, that is, being transported by the river. The structural arrangement to
reduce the amount of sediment passing into a canal head regulator is made by constructing a
divide wall upstream so as to form a pocket in front of the canal intake. The wall divides the
stream flow as it approaches the barrages and weir so that part of the flow is diverted to the
sluiceway and part through spillway bays. The main function of the divide wall is to form a
sluicing pocket to produce a ponding area of low velocity in which the sediment will deposit rather
than enter the canal head works. The sediment thus deposited is to be scoured out by turbulent flow
through the sediment excluders pocket when the sluice gates are opened. Hydraulic model studies
are undertaken to finalize various parameters such as divide wall length and orientation, gate
regulation, etc. Different types of excluders have been tried on various head works. Generally the
excluders cover only a few bays of the undersluice but at certain head works they may cover
more number of bays. The heavy sediment laden bottom layers flow through excluder tunnels
towards the river stream downstream of undersluice leaving relatively sediment free top layers of
water to flow through head regulator.
Excessive sediment load can cause damage in a variety of ways which results in many serious
problems such as :
(viii) Destroying the value of streams for pisciculture and recreational utility, etc.
Silt excluders are required to be provided in the river pockets of weir/barrages when river
characteristics predominantly occur as given below:
Page 66 of 196
a) When there is high ponding upstream of the barrage to meet the canal discharge
requirements.
b) When the river/tributary is bringing sediment load of the order of 1500 ppm and above, and
contains significant percentage of coarse and medium sediment.
e) Due to adverse flow curvature upstream of the barrage head regulator, most of the
sediment load in high river stage may likely to settle in front of the head regulator
and may enter its way in the canal.
f) Inspite of suitable location of head regulator, river training measures for arriving
favorable curvature of flow, providing divide walls for separating pockets from
barrage bays and suitable gate regulation of barrages/undersluice bays for sand exclusion,
a large quantity of coarse material may find its way into the pocket. In such cases for
efficient working of canal, silt excluders are required to be provided in the pocket.
DATA REQUIRED:
Approach
The curvature of the river flow approaching the canal head regulator plays an effective role in the
efficient working of an excluder and as such the locations of the mouths of the tunnels have to
be decided, keeping in view the approach conditions. All possible river approach conditions are
to be examined carefully while deciding the layout of excluder tunnels. The tunnels are located
in front of the canal regulator and their alignment is kept parallel to the axis of the regulator as far
as possible. Any deviation in their alignment, found necessary towards their tail ends, should be
made on a smooth curve so that kinks are avoided.
Page 67 of 196
Location of Tunnels
In case the excluder tunnels are staggered, the mouths of the two successive tunnels are so located
that the zone of suction of the two adjacent tunnels adequately overlapped to avoid deposition
between the mouths of the two tunnels. Each tunnel should have an opening only at the front,
facing the approach. There should be no side openings.
Tunnels
Though circular or square tunnels are hydraulically more efficient, the experiments carried out
show that the rectangular tunnels with width less than height are generally more effective for
sediment transport. Generally sediment excluder tunnels are rectangular in shape. The design
of sediment excluders is tested in hydraulic model along with the barrage design for visualizing
hydraulic performance.
The excluder should normally span 25% of undersluice bays and shall be divided into an equal
number of compartments or tunnels by vanes gradually converging so as to accelerate the
escaping flow for delivering it to the outfall channel on downstream side of the barrage. The
dimensions of tunnels should be such that they run full bore for the designed discharge.
In excluders, tunnels at the inlet end should preferably be bell mouthed by decreasing head loss.
Each tunnel has a certain zone of influence which extends upstream to a certain distance in
straight direction as well as sideways up to some distance upstream. The two successive tunnels
should be so placed that the zone of suction of the second starts before the zone of suction of the
first tunnel ends. To create enough suction in tunnels and carry coarse material like gravel and
boulders in the river, a minimum head of 0.9 to 1.2m is necessary for satisfactory working.
Smaller head suffices for finer material. The extent of zone of influence and efficiency are
determined by models.
An excluder should be designed for minimum escape discharge which would secure maximum
efficiency as well as satisfactory exclusion of sediment. This is essential to avoid unnecessary
turbulence and churning in the pocket which is caused by higher discharges in the pocket. Escape
discharge may vary between 20 and 30% of the canal discharge.
The tunnel dimensions at the entry and the exit shall be so fixed as to ensure velocities that would
carry the size of sediment to be removed. The section of the tunnel at the entry shall be so chosen
that the velocity of flow at the intake is slightly higher than the velocity of bottom filaments of
water upstream of the excluder. The section of tunnels up to their exit, where these end into the
outfall channel shall be reduced gradually in such a way that there is an overall increase of 10 to
15% in velocity of emerging flow.
A velocity of 2 to 2.5 m/s is generally treated as self cleansing velocity inside the tunnels in
alluvial reach and 3 to 4 m/s as self cleansing velocity inside tunnels in shingles and cobbles
reach. For excluders, therefore, velocity more than self cleansing velocity may be assumed.
Design of Weirs, Barrages and Canals Page 54
Page 68 of 196
tunnel The velocity at the exit end of the may be worked out from the working head and throttling
effected to attain velocity higher than 3.0 to 3.5 m/s at the exit in alluvial reach and 4 to 5 m/s in
shingles and cobbles reach. If the width of the tunnel is kept the same, throttling is done by
lowering the underside level of the roof of tunnels in the case of excluders.
The tunnels normally run as pressure conduits. However, there could be situations when flow with
free surface may take place near the tail end of the tunnels. For such conditions, it should be
ensured that there is no possibility of a hydraulic jump forming inside the tunnel.
Each tunnel must take the same discharge as other in spite of their unequal lengths. This is
achieved by suitably adjusting the cross-section at intermediate points such that total loss of head
of each tunnel is the same.
The roof of a sediment excluder should normally be located at the sill level of the canal.
Preferably the height of tunnels should be kept adequate to facilitate inspection and repair work.
The tunnels shall be designed to run full fore to secure the maximum efficiency.
Control Structure
The discharge from sediment excluder is controlled by gated regulation at the downstream
end of the tunnels. The quantum of discharge to be run through sediment excluder and frequency
of its operation would vary in different parts of the year depending on the permissible sediment
load in the canal and the sediment load entering in the pocket. This is achieved by operating
regulating gate as required. However, in practice, the gates are either fully opened or fully closed.
FLUSHING
During the period when sediment excluder is not required to function, it is desirable to operate the
regulation gates frequently, for short periods to flush the tunnels. It is apprehended that if the silt
excluder tunnels are closed for considerable time it may lead to the choking of the tunnel to the
extent that it may become difficult to flush out hydraulically. Otherwise, the tunnels are likely to
get choked and may require manual clearance which maybe possible only during closure of the
canal.
At times during the normal operation of the sediment excluder, the approach channel and/or
tunnels may require flushing. This may be done by running the tunnels in rotation to achieve
higher velocities.
STRUCTURAL DESIGN
For the structural design of sediment excluders, load due to water of the pond and load due to the
silt deposited inside and outside of the tunnel should be considered.
The silt excluder has to be checked for floating and sliding also with no silt load on top of the
tunnels.
A trash rack may be provided at the inlet of tunnel to avoid entry of trees and big branches in
Design of Weirs, Barrages and Canals Page 55
Page 69 of 196
the tunnels. A provision of jetting water or compressed air in the tunnels may also be made for
convenience of flushing of consolidated sediment deposit in the tunnels.
The silt excluders which are in vogue in India are classified into two types, viz., Khanki type and
Kalabagh Type. These two types have derived their name from the diversion structure where they
have been provided. In the Khanki type, the location of the up-stream mouths of the tunnel is
staggered so that the length of the tunnels decreases in a series of steps, the longest tunnel being
nearest to the head regulator. In the Kalabagh type the mouths of the tunnels at the upstream end
are in one straight line. General layout of the two works, are shown below.
The efficiency of any type depends on a complex combination of factors like approach conditions
in the river, quality and quantity of the suspended and bed sediments, discharge, etc. Khanki
type has been more commonly used, probably on account of its greater flexibility.
Sediment ejector, also known as sediment extractor or silt ejector, is a contrivance to remove
excessive sediment load after it has entered a canal. The extraction of sediment is effected
by causing sediment concentration in the bottom layers and separating them in such a way
that there is least disturbance in the sediment distribution of the approaching flow. Sediment
ejectors are usually provided in head reaches of canals which carry heavy silt, especially canals
taking off from diversion weirs, anicut or barrages across rivers.
DATA REQUIRED:
The following data relating to the canal are needed for design of sediment ejector:
a) Site plan.
b) Gross section and other design data of the canal upstream and downstream of theproposed
location.
c) Canal discharge.
d) Sediment data.
i) Silt load both suspended and bed load daily, fortnightly or monthly, as available.For
suspended silt, data should be available at different depths along at least three
equidistant verticals across the width, at the proposed site of the ejector. The bed load
should be observed up to 0.2 d, where d is the depth of water(subject to a
maximum of 0.5 m).
ii) Permissible size of silt can safely be allowed downstream of the silt ejector. In case
of power channels generally sediment size larger than 0.2 mm is intended to been
ejected.
e) Data for existing reach of the outfall channel:
i) Contour plan.
ii) Cross sections.
iii) Stage discharge curve and the hydrograph of the stream at the outfall; and
iv) Discharging capacity.
LOCATION
While deciding the location of the silt ejector, availability of suitable outfall channel has to be
Design of Weirs, Barrages and Canals Page 56
Page 70 of 196
kept in view. The approach channel upstream of the ejector preferably be straight as otherwise
it is likely to change the sediment concentration across the channel ,and disturb the uniform
distribution of the flow in front of the ejector. In certain unavoidable cases where silt ejector
has to be provided in the curved reach of the channel, it should be done after conducting model
studies. The ejector should not be sited too near the head regulator as the residual turbulence
may cause the sediment load to remain in suspension and prevent its ejection to the desired extent.
At the same time it should not be far away from the head reach otherwise the sediment may settle
down earlier and reduce the channel capacity upstream.
The working head available, that is, the difference in water level in the canal upstream of the
ejector and the outfall channel at the exit of the ejector tunnel, shall be sufficient to extract the
desired sediment. A working head of about 1.0 m is generally considered satisfactory for the
purpose.
a) Approach channel.
b) Main structure which consists of:
1) diaphragm,
2) tunnels, and
3) control structure.
c) Outfall channel.
APPROACH CHANNEL
In order to increase the concentration of sediment in the bottom layers, the cross sections of the
approach channel should be increased by depressing suitably the bed and/or increasing the width,
to reduce the velocity of flow to the desired limit. At the start of approach channel suitable
transition/splay of the order of 1 in 5 should be provided so as to obtain streamline flow. The
setting velocity of the silt particles can be calculated by — Stoke's law which is given as under:
Where.
The layout of the approach channel may be decided with the above guidelines. The reduced
velocity should be maintained for a sufficient length to achieve the desired sediment concentration
in the bottom layers.
MAIN STRUCTURE
Diaphragm: The diaphragm shall be so designed that it causes least disturbance in the sediment
Page 71 of 196
concentration attained in the bottom layers of flow upstream of the ejector tunnels. In fixing the
diaphragm level due consideration should be given to the following factors:
The location of diaphragm can be determined by drawing the integrated discharge depth curve by
using Vanoni's logarithmic velocity distribution,
v = V+( l/k)*sqrt(gy0s)*(l+2.31ogioy/yo)
where
It is desirable to place the diaphragm at the downstream bed level of the canal. However, if the
diaphragm has to be placed higher from other considerations, the condition of all particularly for
low supplies should be checked and, if necessary, proper energy dissipation arrangements
provided.
The diaphragm should be properly tied to the supports as otherwise the diaphragm is likely to be
dislodged.
The diaphragm shall be extended beyond the pier noses and the underneath of the diaphragm shall
be given a streamlined bell mouth (elliptical) shape conforming to the following equation:
2
x y2
+ =1
4a 2 a 2
Where,
a = the thickness of the diaphragm
Tunnels — The ejector should normally span the entire width of the canal and shall be divided into
a number of compartments of tunnels by vanes gradually converging so as to accelerate the
escaping flow for delivering it to the outfall channel on one side of the canal. These main
compartments shall be subdivided into smaller compartments or sub-tunnels by vanes of radii
varying from 3 to 4 times the width of sub-tunnels to avoid cross flow in the transition section.
The upstream noses of vanes shall have cut water shapes. Downstream end of vanes shall be fish
tailed.
Page 72 of 196
The tunnel dimensions at the entry and exit shall be so fixed as to ensure velocities that would
carry the size of sediment to be removed. The section of the sub-tunnel at the entry shall be so
chosen that the velocity of flow at the intake is slightly higher than the velocity of bottom
filaments of water upstream of the ejector. The section of sub-tunnels up to their exit, where these
end into the main tunnels, shall be reduced gradually in such a way that there is an overall increase
of 10 to 15 percent in velocity of emerging flow.
At the exit of sub-tunnels the section of the main tunnel shall be designed such that the flow
velocities of the combined discharge are not less than the velocities emerging out from the sub-
tunnels. The section at the exit of the main tunnels shall be so designed as to attain a velocity of
2.5 to 6 m/s depending on the grade of sediment to be ejected, but in all cases, the exit velocity
shall be less than the critical velocity. The depth of the main tunnels should be kept about 1.8 m
to 2.2 m to facilitate inspection and repair work- Their width shall be so adjusted as to have equal
losses in each tunnel. The tunnels shall be designed to run full bore to secure maximum
efficiency.
Control Structure — The discharge from the sediment ejector is controlled by set of emergency
and regulating gates. The quantum of discharge to be run through sediment ejector and
frequency of its operation would vary in different parts of the year depending on the sediment
load carried in the canal and this is achieved by operating regulating gate as required. It would be
desirable to operate the gates fully open or fully closed.
OUTFALL CHANNEL
The outflow from the ejector is led to a natural drainage through an outfall channel. The outfall
channel should be designed to have a self-cleaning velocity so that the ejected material is
transported without deposition. Adequate drop between the full supply level of the outfall channel
at its tail end and the normal high flood level of the natural stream is desirable for efficient
functioning of the channel.
Of the several formulae available, the following equation by Neil can be adopted for working out
approximate flushing velocity:
Where
V c = Competent mean velocity for first displacement of bed material, P = Mass density of the fluid,
dg = Effective diameter of bed grains, yo - Depth of flow, and Dy = Specific weight of the bed
material in the fluid.
The velocity adopted should be well in excess of that worked out above. The adequacy of the
Page 73 of 196
section of the escape channel, especially when the available bed slope is not steep, should be tested
for its carrying capacity. A triangular distribution of sediment concentration can be assumed at the
mouth of the ejector to work out the quantity of sediment entering the ejector. The section of the
escape channel should be so designed as to have adequate capacity to transport the total quantity of
sediment entering it.
ESCAPE DISCHARGE
LOSSES IN TUNNELS
These shall comprise of the following losses:
1) Friction Losses
2) Loss Due to Bend
3) Contraction Losses
4) Expansion Losses.
FLUSHING
During the period when sediment ejector is not required to function, it is desirable to operate the
regulation gates occasionally for short periods to flush the tunnels consistent with the
economy in water requirements for irrigation and power generation. Otherwise, the tunnels are
likely to get choked and may require manual clearance which may be possible only during closure
of the canal.
At times during the normal operation of the sediment ejector, the approach channel and/or tunnels
or both may require flushing. This may be done by running the tunnels in rotation to achieve higher
velocities.
TYPICAL DESIGN
Page 74 of 196
Design of Weirs, Barrages and Canals Page 61
Page 75 of 196
.
Page 76 of 196
HYDRAULIC MODEL STUDIES
There are many unknown factors in the design of silt ejector, such as the capacity of the silting
basin in the approach channel, layout of the sub-tunnels and main tunnels, flushing velocity for the
particular characteristics of the sediment to be ejected, and flow pattern of the bottom layers of the
discharge, etc. As such it is essential that the layout based on the theoretical design be checked by
model studies to ascertain the efficiency of the silt ejector.
Page 77 of 196
Chapter-6
Planning and design of river training works
River training, in its broad aspects, covers all engineering works constructed on a river to
guide and confine the flow to the river channel, and to control and regulate the river bed
configuration for effective and safe movements of floods and river sediment.
River training for flood protection is also referred as high water training. It aims at
providing sufficient cross section area for safe passage of flood. It consists of proper
location, alignment and height of embankments for the design discharge.
This is sometimes referred as low water training. It aims to provide sufficient depths
in the channel during lean periods for smooth navigation. It is done by concentrating
the flow in a desired channel and closing other channels.
c) Sediment Control
This is referred as mean water training. This type of training aims at rectification of
river bed configuration and efficient movement of suspended and bed load for
keeping channel in good shape. The maximum aggrading capacity of a stream occurs
in the vicinity of mean water or dominant flood discharge and therefore changes in
the river bed should be attempted at this stage.
Bank erosion is a common feature during the process of meandering. The river
course also keeps on changing. There is a tendency of meanders either to shift
progressively downstream or form cut offs. The process of meandering and
consequently bank erosion continues and is often a recurring problem. Bank
protection is therefore an important part of river training.
This is often required to protect hydraulic structures like barrages and bridges to
avoid the risk of outflanking. It involves training over a considerable reach of a river.
The structures required are Guide banks or Bunds.
5.1 Types of River Training Works
The following list enumerates various types of river training & control works in vogue:-
Page 78 of 196
1) Levees or embankment
2) Bank protection and pitched bank
3) Groynes or Spurs
4) Guide bank system
5) Bed bars
6) Pitched islands
7) Miscellaneous methods.
The design flood for this type of embankment is kept 25 years for fixation of crest level.
Page 79 of 196
5.1.3.3 Alignment, spacing & length of embankment
5.1.3.1 Alignment
The embankments should be aligned on the natural bank of the river, where land is high
and soil available for the construction of embankments. The alignment should be such
that important township, vital installations, properties, cropped area is well protected by
the embankment. The alignment should be such that high velocity flow is quite distant
from the toe of embankment to avoid scouring of the same and if embankment’s
alignment is near the high velocity flow then slope and toe protection in the form of
pitching along with launching apron using the boulders, geo-bags, sand filled geo-
mattress may be given. RCC porcupine screens along the toe line may also be used to
retard the flow to induce siltation and check scouring of the toe-line. Alignment should
also be planned so that land acquisition is feasible and not prolonged.
5.1.3.2 Spacing
The spacing of the embankment and their alignment needs careful consideration with
respect to their vulnerability to the river and the rise of high flood levels on account of
reduction in flood plain storage by construction of the embankment.
The spacing of embankments along the jacketed reach of the river should not be less than
3 times Lacey’s wetted perimeter for the design flood discharge. The minimum distance
of the embankment from the river bank and midstream of the river should be one times
Lacey’s wetted perimeter and 1.5 times Lacey’s wetted perimeter [Lacey’s wetted
perimeter P = 4.75 (Qdesign)1/2] respectively.
In the tidal reach of the river, embankments should be constructed with due regard to
their effect on navigation requirements in the channel as embankments in such cases may
reduce the tidal influx causing a reduction in available navigation depth.
5.1.3.3 Length of the embankment
The length of the embankment directly depends upon the alignment. However, it is to be
ensured that both ends of the embankment are tied up to some high ground or existing
highway or railway or any other embankment nearby conforming to the design height of
the embankment.
5.2 Design of embankment
BIS code 12094: 2000 is used for design of the embankment
Page 80 of 196
homogenous section is generally provided with an internal drainage filter like horizontal
filter so that Hydraulic gradient line (HGL) is confined to the section. The length of
horizontal filter may be kept as 3 times the height of embankment.
Rock toe or Toe filter of (height = 25% To 35% of water height) consisting of fine sand,
coarse sand and gravel, as per filter criterion requirement, may also be provided to check
the seepage.
5.2.1.2 Zoned embankment
It consists of an inner core or section which is impervious and which checks the HGL.
The transition zone prevents piping through cracks which may be developed in the core
due to shrinkage and swelling of core material. The outer zone gives stability to the
central impervious core and also distributes the load over a larger area of foundations.
The core of the embankment may be constructed using the clay mixed with the fine sand
or fine gravel. Pure clay is not best material for core as it shrinks and swells too much.
Silt or silty-clay may also be used as core. Sand filled geo-tube, which is a relatively
impervious material, may also be used as core of the embankment.
5.2.1.3 Diaphragm type embankment
Diaphragm type embankment has a thin impervious core, which is surrounded by sand.
The impervious core, called as diaphragm, is made of imperious soils, concrete, steel,
timber or any other material. It acts as water barrier to prevent seepage. The diaphragm
must be tied to the bed rock or to a very impervious foundation material.
The diaphragm type of embankment is differentiated from zoned embankment,
depending upon thickness of core. If thickness of diaphragm is less than 10m or height of
embankment, the embankment is to be considered as diaphragm type embankment. Sand
filled geo-tube may also be used as core or diaphragm of the embankment.
5.2.1.4 Free board
The top of the embankment should be so fixed that there is no danger of overtopping.
Even with the intense wave wash or any other unexpected rise in water level due to
sudden change in river course or aggradations of river bed or settlement of embankment.
The waves are generated on the surface by the blowing winds. Height of water wave
mainly depends upon the wind velocity (V in km/hr) and fetch or straight length (F) of
water expanse in Km. Wave height may be calculated using the equation given below.
The freeboard for wave action may be taken as 1.5x wave height (hw).
However in the absence of the wave data, free board should be taken as 1.5 for
discharges less than 3000 cumecs and 1.8m for discharges more than 3000 cumecs. This
should be checked also for ensuring a minimum of about 1.0m of free board over HFL
corresponding to 100 years frequency.
The free board proposed above as 1.5m / 1.8m is recommended in case of less reliable
and short duration hydrological data to take care of uncertainty. In case hydrological data
Page 81 of 196
is collected using the reliable sources and length of such data is sufficient long like 35
years, then lesser values of freeboard like 1.0m / 1.5m may be adopted.
It is also suggested to work out the maximum discharge corresponding to the crest level
(adding the free board to the design HEL). So that this maximum discharge can be
compared with the higher return period discharges like SPF, PMF etc.
5.2.1.5 Top width
The top width of the embankment should be sufficiently enough to accommodate the
vehicular traffic. The top width of the embankment may be kept as 5.0m. Turning
platform of length 15m to 30m and 3m width a c/s side slope at an interval of 1km or
more may be provided.
5.2.1.6 Hydraulic gradient
It is desirable to know the approximated line of seepage or hydraulic gradient line
(HGL). The following guidelines may be used for determining the HGL.
Clayey soil : 4H : 1V
Clayey sand : 5H :1V
Sandy soil : 6H :1V
5.2.1.7 Side slope
The side slopes are dependent upon the material and height of the embankment. The side
slope should be flatter than the angle of repose of the material of the embankment. For
drainage purpose, longitudinal drains on the berm and cross drains at suitable places
should be provided to drain out the water. In order to provide communication from one
side of embankment to another side, ramps in a slope of 4H:1V at suitable places and all
village paths should be provided as per requirement.
5.2.1.8 River side slope
The river side (R/S) slope should be flatter than the under-water angle of repose of the
material. Up to an height of 4.5m, the slope should not be steeper than 2H:1V and in case
of high embankments, slope should not be steeper than 3H:1V, when the soil is good and
to be used in the most favorable condition of saturation and drawdown.
a) In case of higher embankment protected by rip-rap / pitching, the slope of
embankment up to 6m high may be 2H:1V or 2.5H:1V depending upon the
type of slope protection.
b) If the construction material is sandy, the slope should be protected with a cover
of 0.6m thick good soil; and
c) It is usually preferable to have more or less free draining material on the river
side to take care of sudden drawdown. In case of high and important
embankment, slopes may be protected by the stone pitching, concrete block
with open joints or sand filled geo-mattress to protect against sudden
drawdown or erosive action of river flow.
d) For embankment with height more than 6m, line of saturation should be found
by Kozeny’s base parabola method and stability analysis should be carried
by slip circle method for finalizing river side slope (IS 7894).
Page 82 of 196
5.2.1.9 Country side slope
A minimum cover of 0.6m over the HGL should be maintained. For embankment up to
height of 4.5m, the country side slope should be 2H:1V from the top up to the point
where the cover over HGL is 0.6m after which a berm of suitable width, with country
side slope of 2H:1V from the end of the berm up to the ground level should be provided.
For embankment of height from 4.5m to 6.0m, the country side slope should be 3H:1V
from the top up to the point where the cover over HGL is 0.6m after which a berm of
suitable width, with country side slope of 3H:1V from the end of the berm up to the
ground level should be provided.
For embankment of height more than 6m, detailed design should be done. Typical cross
section of an earthen embankment is shown as under as Figure given below.
As per BIS code 11532, for taking out soil for use in embankment, borrow pit should be
preferred on the river side and located at minimum distance of 25m from the toe of
embankment. In order to obviate development of flow parallel of embankment, cross-
bars of width 8 times the depth of borrow pits @ 50-60m c/c shall be let in the borrow
pits. When adding new earthwork to existing embankment, the old bank shall first be cut
and benched into steps with treads sloping slightly towards centre of the embankment.
Surface of old work should be properly wetted so that new earth may adhere to old.
5.2.1.11 Drainage
For drainage, longitudinal drains should be provided on the berm and cross drains at
suitable places should be provided to drain the water from the longitudinal drains. Toe
drain should be provided to prevent sloughing of toe. Perforated pipe embedded in
properly designed graded filter with arrangements for disposal of water in the country
side should be provided.
5.2.1.12 Causes of failure of embankment
As stipulated by the CBIP publication-1989 River Behavior Management and Training
Volume-I. In the absence of proper maintenance and supervision, embankments are
susceptible to breaches due to various causes given below.
a) Improper compaction and settlement of embankment.
Design of Weirs, Barrages and Canals Page 69
Page 83 of 196
b) Transverse cracks due to unequal settlement.
c) Inadequate drainage and pore pressure development.
d) Erosion of riverside slope due to river current and wave wash.
5.3 Preventive measures
As stipulated by the CBIP publication-1989 River Behaviors Management and Training
Volume-I, breaches/failures can be avoided by adopting suitable preventive measures
mentioned briefly underneath.
a) Toe drainage.
b) Placing sands bags near toe (with drains covered by wooden planks) in order
to increase shear resistance actuating forces causing slip.
c) Reducing seepage by lowering seepage head by constructing ring wells with
sand bags near the toe.
d) Plugging piping holes with divers using tarpaulins soaked with bitumen form
river side face of the hole.
e) Raising height of embankment (in case of overtopping) by using wooden
planks without endangering stability against slip.
5.4. Bank protection and pitched bank
5.4.1 Design of bank revetment
IS code 14262:1955 provides for following provisions regarding design of bank
revetment.
5.4.2 Weight of stones/boulders
Stones / boulders, used in revetment for bank protection, are subjected to hydrodynamic
drag and lift forces. These destabilizing forces are expressed in terms of velocity, tractive
forces etc. The stabilizing forces acting against these are component of submerged
weight of the stones and downward component of force caused by contact of the stones.
The weight of stones on slopes (W in kg) may be worked using the formula given below:
W = (0.02323 x Ss x V6) / [K x (Ss -1) 3]
Where,
K = correction factor of slope
K = [1-(Sin2 θ / Sin2 Ø)] ½
And,
Ss = specific gravity of stone
θ = angle of sloping bank
ø = angle of repose of material of protection works
v = velocity in m/s at bank
For pitching, the natural bank is to be graded to a stable slope depending upon the angle
of repose and cohesion of bank material under saturated condition. For high banks, berm
needs to be provided. For important works, stability of bank with designed slope and
Page 84 of 196
berm should be checked by slip circle method or by soil dynamic testing procedures. For
normal bank protection works, a slope of 2H:1V or flatter is recommended.
Generally, the size of stone should be such that its length, width and thickness are more
or less same is stones should be more or less cubical. Round stones or very flat stones
having small thickness should be avoided.
2.1.3 Thickness of Pitching
Page 85 of 196
Sm = (1-e) x Ss
Crates should be laid with long dimension along the slope of the bank. Crates must be
tied to each other by 5 mm GI wire as additional protection. If crates are being provided
in layers then each layers should be tied to each other at suitable interval using the 4mm
GI wire.
5.4.3.2 Filter
A graded filter of size 150 mm to 300 mm thickness may be laid beneath the pitching to
prevent failure by sucking action by high velocity. Geo-synthetic filter may also be used
as that is easy to lay, durable, efficient and quality control is easy. A 150 mm thick sand
layer over the geo-synthetic filter may be laid to avoid rupture of fabric by the stones.
5.4.3.3 Paneling
Paneling may be provided in the pitching where slope length is more so that slopes may
remain stable. The size of panel may be varied depending upon the length of river reach
to be protected and the length of slope length
5.4.3.4 Top key / Berm
In case of revetment on slopes up to NSL, which is below HFL, a top key or capping
berm should be provided for allowing flow of water over the top surface of the
revetment.
5.4.3.5 Pitching in mortar
Is code 14262:1995 mentions following provisions regarding pitching in mortar.
5.4.3.6 Size of stones
Stones bricks or concrete blocks may be used for construction of pitching in mortar. Size
of stones / bricks / concrete blocks in this type of pitching is not a critical aspect of
design as very individual complement is bounded by mortar. Average size of available
stone can be used for this purpose. But thickness of such pitching should be more than
minimum thickness of pitching (t).
5.4.3.7 Panelling
Mortar revetment should not be constructed in continuous or monolithic form. To avoid
cracks, joints at suitable interval may be provided. Generally revetment may be provided
in panels of size 3m x 3m or 3m x 5m. The size of panel may be varied depending upon
the length of river reach to be protected and length of slope. Standard stone filter or geo-
synthetic filter may be provided beneath the joints.
5.4.3.8 Drain holes
Drain holes or weep holes may be provided in each panel for free drainage of pore water
from saturated bank soil beneath it. Depending upon the size of panel, one or more weep
holes may be provided for a panel. The pipe provided in the drain hole should be up to
the natural bank. Stone graded filter or geo-synthetic filter may be provided at the end at
the conduct of the bank soil.
5.4.3.9 Pitching by geo-textile bags
As per design practices following guidelines may be adopted for pitching by geo-textile
bags.
Page 86 of 196
5.4.3.10 Size of geo-bag
The pitching may also be provided using sand filled geo-synthetic bags. The size of bags
may be 1.1m x 0.7m x 0.15m. The weight of such bags is around 126 kg which is
generally safe for the velocity up to 3 m/s. For higher velocities, size of Geo-bag may be
higher so that weight of bag is higher than the required weight which is the weight of
stones on slope. The geo-synthetic material should be safe against the UV rays and
abrasion.
5.4.3.11 Thickness of geo-bags pitching
The thickness of Geo-bag pitching may be decided as per procedure given above at para
2.1.3. To summarize again, thickness of pitching should be more than minimum
thickness of pitching (T). Pitching may be provided in double layers of geo-bags (in
loose) and single layer (encased with nylon / polypropylene ropes).
5.4.3.12 Filter
If the pitching is being provided in geo-bags, then generally filter is not provided because
material of Geo-bags itself work as filter. But for safety purpose (for taking care of bank
soil in joints), a geo-synthetic filter layers beneath the geo-bags may be provided.
5.5 Toe protection
IS code 14262:1955 mentions the following provisions regarding toe protection. To
prevent the sliding and failure of the revetment on slope, toe is required to be protected.
This may be in the form of simple toe-key, toe wall sheet pile or launching apron.
5.5.1 Toe key
Simple key may be provided at the toe (may be called as toe key) when rock or un-
erodible strata is available just below the river bed and the overlaying banks are erodible.
The key is in the form of stone / bricks or concrete blocks filled in the trench below the
hard river bed for depth equal to the thickness of pitching (t) for proper anchorage. Sole
purpose of this key is to provide lateral support to the pitching. The key may be of
mortar or in geo-bags, if the pitching is provided in mortar or geo-bags.
5.5.2 Toe wall
When a hard stratum is available below the river bed at reasonable depth, toe wall is
recommended. The thickness of the toe wall depends upon height of wall and height of
overlaying pitching. The toe wall may be design as retaining wall and be constructed in
masonry along with provisions of weep holes etc.
5.5.3 Sheet piles and launching apron
When a firm stratum is not available at reasonable depth below the river bed, toe
protection in the form of sheet pile or launching apron may be provided. The sheet pile
may be made of RCC, steel or bamboo. The sheet piles may be drilled below the river
bed up to maximum scour depth.
Sheet piles are difficult to drive; therefore Launching apron is preferred and provided
with revetment. Launching apron should be laid at low water level (L.W.L). The
launching apron may be laid using the stones or geo-bags. The stones/geo-bags in the
apron should be designed to launch along the slope of scour and provide a protection
layer so that scouring is checked. The size of launching apron should be such that it
should form a protection layer up to level of maximum scour depth. Slope of launching
Page 87 of 196
apron may be taken as 2H:1IV. Filter below the launching apron may also be provided so
that river bed material is safe against sanction.
5.5.4 Design of launching apron as per BIS 10751
The thickness of launched apron should be 25% to 50% more than the thickness of
pitching on slopes. (as shown in para 2.1.3)
Design of launching apron may be carried out as given below:
Depth of scour (D): depends on angle of attack, discharge intensity, duration of flood and
silt concentration etc and is given as:
For waterway ≥ lacey’s waterway and flow is non uniform then the depth of scour should
be as evaluated by
Depth of Scour (D) = 0.473(Q/f) 1/3 (Single channel)
For waterway < lacey’s waterway then the depth of scour should be as evaluated by
Page 88 of 196
Shape of launching apron: the quantity of stone so calculated may be provided in a width
of 1.5Ds and average thickness (T). Thickness of laid apron may be kept as 0.8Tnear the
toe of pitching and 1.2T at the river end.
Apron should be laid at lowest water level, as far as economically viable.
5.6 Anchoring
IS code 14262: 1955 mentions following provisions regarding anchoring.
Proper anchor is required for keeping the revetment in place and serving the desired
function. Upstream edge from where the revetment starts should be secured well to the
adjoining bank. Similarly, downstream edge where the revetment ends also needs to be
secured well to the adjoining bank. Anchorage is also required to be provided on the top
of submerged bank. If the top of bank is above HFL, the revetment should be provided
above HFL with an adequate free board say 1.0m. Under such situation, anchorage at
top is not required.
5.7. GROYNES OR SPURS
This type of protection comes under anti erosion works. Groynes are structures,
constructed transverse to the river flow and extended from the bank into river. These
types of works are provided to keep away flow from the erosion prone bank. The spurs
are provided along with launching apron to prevent scouring under the water.
5.7.1 General Design Features
5.7.1.1 Alignment
Groynes may be aligned either normal to the dominant flow direction or at an angle
pointing upstream or downstream.
A Groyne pointing upstream repells the river flow away from it and is known as
repelling groynes. It may be kept at an angle of 5o to 10o against the direction of flow. A
Groyne pointing downstream attracts the river flow towards it and is known as
attracting groynes. When a short length groyne changes only direction of flow without
repelling, it is known as deflecting groynes.
5.7.1.2 Functions of Groynes
They serve one or more of the following functions:
a) Training the river along the desired course to reduced the concentration of flow at
the point of attack.
b) Protecting the bank by keeping the flow away from it.
c) Creating a slack flow with the object of silting up the area in the vicinity of the
river bank.
d) Improving the depth of river for navigation purpose.
5.7.1.3 Classification of Groynes
These can be classified as follows:
a) The methods and material of construction, namely permeable, impermeable, and
slotted.
b) Height of groyne with respect to water level, namely submerged, non-submerged
and partially submerged (sloping).
c) Action, namely deflecting, attracting and repelling.
d) Special shapes, namely T-headed, hockey type or Burma type, kinked type.
Page 89 of 196
5.7.1.4 Orientation of Groynes
IS code 8408:1994 and draft for revision mention following provisions regarding
orientation of groynes / spurs.
It can be used single or in series, depending upon the reach of length to be protected. It
can be used in combination with other river training measures. The spacing, orientation
and length of groynes may be decided by model study.
5.8 Design of Groynes / Spurs
5.8.1 Design Discharge
The design discharge for the groyne should be equal to that for which structure in close
proximity is designed or 50 year flood whichever is higher.
5.8.2 Length of Groyne
Length of groyne should be decided on the basis of availability of land on the bank.
Length should not be less than that required to keep the scour hole formed at the nose
away from the bank. Thus assuming angle of repose of sand to be 2.5H:1V and
anticipated maximum depth of scour below bed be (ds). The length should be more than
2.5 (ds).
Normally the effective length of groyne should not exceed 1/5th of width of the flow in
the case of single channel. In case of wide, shallow and braided river, the protrusion of
the groyne in the deep channel should not exceed 1/5th of the width of channel on which
the groyne is proposed excluding the length over the bank.
The spacing of the groyne is normally 2 to 2.5 times of its effective length. For site
specific cases model studies may be conducted.
5.8.3 Top Level of Groyne
The top level of groyne will depend on the type namely, submerged, partially submerged
or non-submerged and will be best decided by model experiments. In case of non-
submerged groynes, the top level should be above design flood with adequate free board.
5.8.4 Top Width of Groyne & Freeboard
The top width of groyne should be 3 to 6 m as per requirements. A freeboard of 1 to 1.5
m should be provided above the design flood level.
5.8.5 Side Slopes
Slopes of the side and nose of the groyne would be 2:1 and 3:1 depending upon material
used.
5.9 GUIDE BANK SYSTEMS
Guide banks are constructed in the direction of flow both upstream and downstream of
structure, on one or both flanks as required.
5.9.1 Alignment
The alignment should be such that the pattern of flow is uniform with minimum
return currents.
The alignment and layout are best decided based on model studies.
Page 90 of 196
In case of a head regulator of a canal, constructed adjacent to the main structure,
the alignment of the guide bank should further endeavour to induce favorable
flow conditions for the entry of water with minimum silt into the canal.
In other cases, guide banks should be so aligned that the flow is uniformly
distributed across the waterway as far as possible.
5.9.2 Classification of Guide Banks
Guide banks can be classified according to
a) Their bank in plan, and
b) Their geometrical shape.
5.9.3 According to Form in Plan
Guide banks can be divergent upstream, parallel and convergent upstream.
5.9.3.1 Guide banks divergent upstream
They exercise an attracting influence on flow and they may be used where the river has
already formed a loop and the approaching flow has become oblique to keep flow active
in bays adjacent to them. However, the approach embankment gets relatively lesser
protection in worst possible embayments compared to equal bank length of parallel guide
banks.
Divergent guide banks require a longer length in comparison to parallel guide banks for
the same degree of protection to approach embankments. However, hydraulically they
give better distribution of flow across the waterway.
5.9.3.2 Parallel guide banks
Parallel guide banks with suitably curved heads have been found to give uniform flow
from the head of the guide banks to the axis of the structure.
5.9.3.3 Guide banks convergent upstream
Convergent guide banks have disadvantage of excessive attack and heavy scour at the
head and shoaling all along the bank rendering the end bays inactive.
5.9.3.4 According to Geometrical Shape
The guide banks can be straight or elliptical with a circular or multi-radii curved head
(see in Fig.). Elliptical guide banks have been found more suitable in case of wide flood
plain rivers for better hydraulic performance. In case of elliptical guide banks, the ratio
of major axis to the minor axis is generally in the range of 2 to 3.5.
Page 91 of 196
Due to gradual change in curvature in elliptical guide banks the flow hugs the guide
banks all along its length as against separation of flow occurring in case of straight guide
banks after the curved head which leads to obliquity and non-uniformity of flow.
5.10 Length of Guide Banks
5.10.1 Upstream Length
The general practice is to keep the upstream length of guide banks as 1.0 L to 1.5
L, where L is the length of structure between the abutments. For elliptical guide
banks the upstream length (that is semi major axis a) is generally kept as 1.0 L to
1.25 L. This practice is generally applicable where the waterway is within the
close range of L that is, Lacey’s waterway.
For wide alluvial belt the length of guide banks should be decided from two
important considerations. Namely (a) the maximum obliquity of current (it is
desirable that obliquity of flow to the rive axis should not be more than 30”), and
(b) the limit to which the main channel of the river can be allowed to flow near
the approach embankment in the event of the river developing excessive
embayment behind the guide bank. The radius of worst possible loop should be
ascertained from the data of acute loops formed by the river during past. In case
of river, where adequate past surveys are not available, the radius of worst loop
can be determined by dividing the average radius of loop worked out from the
available surveys of the river by 2.5 for river having a maximum discharge up to
5000m3/s and by 2.0 for discharging above 5000m3/s. The limit to which the
main channel of the river can be allowed to flow near approach embankment has
to be decided based on importance of structure and local conditions.
On the downstream side the river tries to find out to regain its natural width. The
function of guide bank is to ensure that the river action does not adversely affect the
approach embankment. The downstream length will therefore, has to be determined so
that swirls and turbulence likely to be caused by fanning out of the flow downstream the
guide bank do not endanger the structure and its approach. The length of 0.2 L to 0.4 L
is recommended.
Page 92 of 196
5.11 Radius of Curved Head and Tail
Function of curved head is to guide river flow smoothly and axially to the
structure, keeping end spans active. A too small radius gives a kick to river
current making it oblique and therefore larger radius to attract and guide the flow
is needed, but it is uneconomical. Radius should be kept as small as possible
consistent with proper functioning of bank. Radius of curve head equal to 0.45L
has been found to be satisfactory.
Radius of curved tail may be 0.3 to 0.5 times the radius of curved head.
Page 93 of 196
5.13.3 Free Board
A free board of 1.0 m to 2.0 m may be provided above the design flood level. Where
heavy wave action is apprehended and / or aggravation is anticipated, a higher free board
may be provided.
5.13.4 Side Slope
It depends on the angle of repose of the material of guide banks and the height Side
slopes of 2:1 to 3:1 are generally recommended.
5.13.5 Protection of Structures
Curved head is prone to damage due to concentration of discharge caused by
collection of over bank flow and direct attack of current obliquely. The shank is
subjected to attack by parallel / oblique flow. The curved tail is subject to attack
by fanning out of current.
The effect of these attacks is the formation of deep scour holes at toe and erosion
of river side slopes. Hence toe and slope both have to be protected
5.13.6 Toe Protection
Launching apron should be provided for protection of toe and it should form a
continuous flexible cover over the slope of the scour hole in continuation of pitching up
to the point of deepest scour. Launching apron should be laid at normal low water level,
or at as low a level, or at as low a level as techno-economically viable. The stone in the
apron should be designed to launch along the slope of the scour hole so as to provide a
strong layer that may prevent further scooping out of the river bed material. The size and
shape of apron depends on the size of stone, thickness of launched apron, the depth of
scour and slope of launched apron.
The size of stone, thickness of launched apron, the depth of scour and slope of launched
apron are covered in topic 2.13 &2.44.
5.14. BED BARS
A bed bar is a submerged structure dividing the flow horizontally. Flow above top level
of the bed bar is comparable with weir flow while flow below top level is obstructed by
the bar and diverted towards the nose as in case of a full height spur.
In case of flow over a weir, if its alignment is skewed with respect to approach flow, the
magnitude and direction of the flow downstream of the weir is governed by the head due
to afflux and that due to approach velocity. When the alignment of a bed bar is skewed, a
pressure gradient is formed. When bed bar is facing upstream this pressure gradient helps
sediment deposition on the upstream side of the bar while the surface flow gets deflected
away from the bank. On the other hand, bed bar facing downstream directs the bottom
current away from the bank while surface flow is deflected towards the bank protection
and bed bar facing downstream is provided upstream of an offtake point for Sediment
exclusion.
5.15. PITCHED ISLAND
Page 94 of 196
The device of a pitched island is a recent innovation in the armoury of river training
hydraulics. The basic principle underlying the behavior of a pitched island, used as a
river training measure, is its ability to cause re-distribution of velocity and tractive force.
The tractive force near a pitched island with the result that deep scour begins to form
round the island and gradually draws the main river channel into itself and, ultimately,
holds it permanently. Because of this property, the pitched island can be used, either
singly or in series, for the following purposes:
a) Correcting oblique approach upstream of weirs, barrages and bridges by training
the river to be axial.
b) Rectification of adverse curvature for effective sand exclusion.
c) Redistributing harmful concentration of flow for relieving attack on marginal
bunds, guide banks and river bends.
d) Training the river in the reach away from control points, such as weirs and
bridges.
e) Improving channels for navigation.
It has been found by experience that the working of the pitched island is effective,
especially in the vicinity of control points, such as weirs and bridges.
This is a special technique evolved on flashy streams in Burma and, in essence, amounts
to building fences along their banks. The method has been employed on two groups of
small streams emanating from the Pegu mountains, one flowing eastward and joining the
Rangoon River and the other flowing westward to join the Sittang River, The catchment
areas vary from 101 to 1,036 sq km (40 to 400 sq miles) and the maximum discharges
from 200 to 400 cusecs per sq mile of catchment area. The method depends, for its
effectiveness, upon the heavy sand charge carried by the streams during floods, the
maximum intensity of charge amounting to about one per cent by weight. These hill
streams develop and change their course, at random, on the plain and cause damage to
communications. The objects of training are reclamation of swampy areas for paddy
cultivation, improving the streams for transport of logs and facilitating their passage
through rail-road bridges.
The stream depression is aligned and demarcated while stake fences consisting of
bamboos 1.5 to 1.8m long spaced 25.4cm apart, are driven parallel to the selected
concrete 25.4cm apart, are driven parallel to the selected centre line a predetermined
distance. The fence is secured by lashing horizontal bamboos 15cm below the top. More
rows of fences are installed where strong fences are required, or if the line passes through
a depression, or again if the slope is steep. Sometimes, even 4 to 5 rows are driven on a
sloping ground with successive rows getting closer.
Page 95 of 196
During floods, the fences slacken velocity of flow and heavy sedimentation occurs. In
falling floods, banks form over these fences. Over the new banks a second system of
fences is erected and the process is repeated until a deep river channel is formed with
natural high banks on both sides. This bank formation is continued gradually from
upstream downwards. In the initial season, work is completed over a stretch of 2.4 to 3.2
km and then extended by a mile or so every season. The result is very beneficial.
Logging has been increased from 10,584 to 50,640 logs annually, while 20,230ha
(50,000 acres) of swamps have been converted into fertile lands with another 24,280 ha
(60,000 acres) improved to yield 2.5 tonnes of paddy per hectare per year instead of 0.8
tonnes before improvement, to say nothing of the uninterrupted communications and
diminished flood damage. Same type of construction is used for closing breaches and
building groynes.
This system of river training is not designed for facilitating flood flow nor to improve
navigation. It is more correctly, the systematic reclamation of low lands by guiding the
spill of flood flow with stakes and fences to induce uniform deposition. The method can
well be applied to reclamation works on heavy sediment carrying rivers.
Page 96 of 196
Chapter – 7
Chapter-I Barrage/Weirs
2. A contour plan of the area (on a scale of 1:4000) around the proposed site of the
barrage with contour intervals of not more than 0.5m up to an elevation of about
2.5m above HFL. The contour plan shall extend to about 5 Km. on the upstream
and downstream of the proposed site and up to an adequate distance on both
flanks up to which the effect of backwater is likely to extend. In case of
meandering river, the plan should cover atleast 2 meanders on upstream side and
one meander on downstream side of the axis.
3. Cross Sections of the river at the proposed site at intervals of 200m both on
upstream and downstream up to at least 600m from the proposed site. Besides
this, Cross sections may be taken at 2 Km interval up to the distance; the
backwater effect of ponding is likely to extend on the upstream of the site. The
cross levels in the river bed may be spaced at 10 to 30 m depending on
topography of the river. The cross section should extend on both banks to about
2.5m above HFL.
4. If clayey strata is met, undisturbed sample of clay layers from the proposed
foundation level or up to 8m or more depth may be taken. These samples may be
Page 97 of 196
analyzed for unconfined compressive strength, swelling index, consolidation
characteristics and other parameters of soil as stated above and results furnished.
5. Safe Bearing capacity of the soil at the proposed foundation level of abutment,
barrage floor in under-sluice and spillway bays, divide walls etc. by actual load
tests.
8. Water table data in monsoon and spring for past few years.
10. Salient features of other WR Structure in the immediate vicinity of the barrage.
1 Flood discharge corresponding to 50, 100 and 500 year frequency and
corresponding water levels as well as minimum water level in the river. HFL
observed during the last 50 years at barrage locations (as obtained from local
enquiry) may also be indicated.
3 Salient levels for the barrage i.e. the pond level, MDDL, if any, etc.
• Any data already provided with the Prefeasibility note may be confirmed to be
used for the purpose of DPR preparation.
• All the data especially the drawings may be provided in the soft copy as well.
• Any photographic or video graphic details of barrage site, if available, may also
be provided.
Page 98 of 196
Chapter -II CANAL SYSTEM
2.2 Capacities
Capacity of a canal system shall be fixed on the basis of the following
considerations:
Page 99 of 196
the overall costs of the alternative alignments. Carrying of a canal in high
embankment involves risk of breaches.
4. Strip contour plan covering 250m on either side of centre line of the canal
alignment or as per site requirement whichever is more. At the cross drainage
works, the strip contour plan should cover a distance of 500 m along the flow of
drain / river on either side of the centre line of the canal. The contour plan shall
be plotted at 0.5m contour interval with 1:10000 or 1:20000 H-scale. Levels shall
be taken at 50m or less interval along the C/L of Canal.
6. Catchment Area of drains/rivers and the assessed Max Flood Discharge shall be
indicated at the cross drainage works.
2. In situ voids ration, moisture content and density of the bank and bed material.
4. Ground water table, both in dry and monsoon condition along the alignment.
6. SPT values (in case of cohesion less soils) / unconfined compression test values
(in case of cohesive soil) and Safe bearing capacity of the foundation strata under
various canal regulation / cross drainage / cross masonry works.
7. If the canal runs through expansive soils, the swelling index tests may be
provided The soil report may be submitted in the sample tabular form as given in
Annexure-B.
2.3.3 Location for sub-soil exploration : exploratory holes and pits should follow the
central line of the proposed canal alignment and also the axis of the cross
drainage structures.
2.3.4 Spacing for sub-soil exploration: For canals, exploration by pits at a spacing of
500 m depending upon the nature of the soil may be carried out. However, where
there is an apparent change in characteristics, the pits may be dug at 200 to 300m
or even lesser spacing. Under the major cross drainage structures the holes or pits
In case of CD structures the depth of the holes or pits should be up to the bottom
of the expected bulb of pressure under the abutments or the piers or down to the
hard firm strata or rock, if available. In case of well foundation the depth of
exploration should reach the stable strata, which can support the foundation.
IS Codes:
1) Barrage
IS: 7720 Criteria for Investigation Planning and Layout of Barrages and Weirs
IS: 6966 Hydraulic design of Barrages and Weir Part 1 Alluvial Reaches
IS: 11130 Criteria for Structural Design of Barrages and weirs
IS: 13578 Code of Practice for subsurface exploration of Barrages and weirs
Canal offtake Structure Discharge R.D. Ground Command Head Section Slope Fall Proposed Head FSL at
Required metres level level Loss in Length ( 1 in X ) due FSL Loss in Distibutar
(NSL)mts required at structure to structur y head
distry. s/ slope es/
head working working
head head in
(MC) Dy.
(metres) (metres
) Remarks
U/S D/S
Branch Canal 1 7000 -
Cross Drainage 1 0.200 7000
Cross Drainage 2 0.200 7000
Branch Canal 2 0.100 7000 HR
Cross Drainage 3 0.200 7000
Cross Drainage 4 0.200 7000
Road crossing 0.000 7000
Distributary Cart track crossing 7000 CR & HR
Railway Line
Crossing
Canal Crossing
Major Pipe line
Crossing
FSL STATEMENT FOR L- SECTION OF Branch Canal-1 off take Metres xxxL Ujh Main Canal
Additional as per SOI
Canal offtake Structure R.D Discharge NSL Command Head Loss Section Slope Fall Head FSL at
. Required level in Length ( 1 in due to Loss in Distibutary
met required at structures/ X) slope structures/ head
res distry. working Proposed working
head head in MC FSL head in
(metres) Dy. Rema
(metres) rks
Distributary-1 5000 U/S D/S -
CD 5000
CD 5000
Minor-1. 0.100 5000 0.300 HR
CD 5000
Distributary- CR &
2. 0.200 5000 0.500 HR
Road Crossing CR/R
oad
0.100 5000 Xing
Road Crossing 0.100 5000
Distributary-n 0.200 5000 0.300 HR
Cart track Crossing 0.100 5000
Total No of Structures:
Cross drainage x
Kaccha/Pucca Rd.Crossing y
Head Regulator+Cross
regulator z
Cross Regulator a
Head Regulator b
Falls f
Railway line crossing r
Annexure C
. . . . . . . . . . . . . PROJECT - HYDRAULIC PARTICULARS OF . . . . . . . . MAIN CANAL
FROM KM. . . . . . . . TO KM.. . . . . . . .
STATEMENT SHOWING THE CROSS DRAINAGE WORKS
PARTICULARS OF PARENT
S.NO. NAME OF CHAINAGE PARTICULARS OF DRAIN CANAL LOSS OF REMARKS
BED
C.D.WORK IN K.M BED C.A. M.F.D O.M.F.L WIDTH F.S.D B.L F.S.L T.B.L HEAD
LEVEL SQ.KMS. CUMECS MTS IN MTS.
Annexure E
STATEMENT SHOWING THE DETAILS OF REGULATORS
LOSS
S.NO. STRUCTURE CHAINAGE EXISTING HYDRAULIC PARTICULARS OF CANAL OF REMARKS
ROAD
IN KM. LEVEL BED WIDTH F.S.D B.L F.S.L. T.B.L. HEAD
IN
U/S D/S U/S D/S U/S D/S U/S D/S U/S D/S MTS.
1.0 INTRODUCTION
Irrigation projects are very important for development of the country. It is therefore necessary
that irrigation projects need to be carefully planned and investigated so as to optimize benefits and
minimize the undesirable effects. An irrigation project consists of a dam /barrage /weir for storage and
diversion of water, a head regulator and a canal system. In case, demand for irrigation in an area is
high, then it is desirable that a storage dam is planned to meet the irrigation demand with a greater
degree of dependence. However, if suitable site for construction of dam does not exist, then a barrage
or weir is to be planned.
The first step in planning an irrigation project is assessment of availability of water. In order to
assess water availability, daily discharge data of the river at a nearby location is required. In case, the
canal off takes from a reservoir project, it should be designed for a discharge which depends upon the
live storage provided in the reservoir for irrigation and in case it off takes from a diversion work (
barrage / weir), it should be designed for 75% of the river discharge available as determined by flow
duration curves. The flow duration curves should be prepared for crucial months at suitable close
intervals. For canals off taking from diversion works, the study of discharge data will determine the
type of canal system to be planned and laid out, that is inundation canal, intermittent canal or
permanent canal.
The next step is to make a preliminary assessment of water demand for irrigation based on
command area, culturable command area, existing cropping pattern, proposed cropping pattern,
existing irrigation facilities and rainfall etc. The important crops of the area and their water
requirements shall be determined in consultation with the department of agriculture and the
agriculturist of the area proposed to be served allowing for the anticipated change in crop pattern due
to introduction of irrigation in the area.
Based on desktop studies and preliminary investigations, decision whether a dam or barrage /
weir is to be investigated is taken and tentative alignments for dam / barrage / weir are marked for
detailed investigation. Further the proposed command to be served is also identified for detailed
command area survey and marking the layout of the canal system.
The planning and layout of a canal system is controlled by the area to be irrigated and the
source of supply. Hence, first of all the daily flow data of the river at the head works should be
obtained. As already stated, if the canal takes off from a reservoir project, it should be designed for a
discharge depending on the live storage provided in the reservoir for irrigation and in case it takes off
from a diversion work, it should be designed for 75% of the river discharge. Then, the area to be
irrigated by canal system shall be worked out by carrying out command area survey and preparing
command area survey maps in a scale of 1:10000 or 1:15000 and contour interval of 0.5m. The
command area survey maps will show the contours of the area in a contour interval of 0.5 m, area
already under cultivation, soil types, roads, natural drainage, spot levels and important land features
for the whole area to be developed.
The intensity of irrigation to be provided on the project shall be decided after taking into
account the socio economic factors for the area and intensity of the irrigation being achieved on the
The layout of main canals and branches is marked on the command area maps on the
consideration of economy. For the layout of minors and distributaries, points of off take may be
suitably selected but their layout is more or less governed by the blocks of areas to be irrigated taking
into consideration watersheds and drainages. The main canals and branches are feeder channel for
distributaries and generally no irrigation is done directly from them. Irrigation outlets are provided on
distributaries or minors off taking from distributaries.
The following data is required for planning the layout of a canal system:
For collecting above data different surveys and investigations, as explained below, shall be
carried out.
2.1(A) Surveys:
a) Command Area Survey: Contour Plan of the area in a horizontal scale of 1:10000
or 1:15000 and contour interval of 0.5 m. This map is to be used for estimating crop
water requirement, fixing canal alignment etc.
b) Longitudinal Survey of Canal: Longitudinal survey along the main canal is to be
carried out on a horizontal scale of 1: 2000 and 1: 100 on a vertical scale. Leveling is
to be carried out at 50 m or less interval.
c) Cross-sections Survey of Canal: Cross sections of canal should be taken at an
interval of about 50 m on a horizontal scale of 1: 2000 and 1 : 100 on a vertical scale
d) Strip Contour Plan: It should cover about 150 m on either side of the centre line of
the canal at a horizontal scale of 1:1000 and contour interval of 0.5 m.
e) Survey for cross drainage structures: Grid Plan with contours of the site to
cover an area upto 300 m on either side of the centre line of the canal in a scale
of 1:2000 and contour interval of 0.5 m or upto 100m downstream of the point of exit
of water and 100 m upstream of the point of water inlet.
a) Canal System: Adequate investigation should be carried out to collect the data by
digging trial pits and bore holes, where necessary, to ascertain the nature of soil
encountered along different alternative alignments. Brief description of the
overburden shall be given classifying clay, silt, sand and depth of water table. Soil
characteristics including mechanical properties and shear parameters alongwith
permeability shall be ascertained. For general guidance regarding the suitability of
soils for use in canal embankment a reference may be made to IS 1498-1970
“Classification and identification of soils for general engineering purposes” and IS
4701 – 1982 “Code of practice for earthwork on canals”
b) Canal Structures: Test pit / borehole, as required, at each canal structure site is
necessary to ascertain the nature of the foundation.
The purpose of irrigation planning is to estimate the crop water requirement and finalise the
design discharge of the canal. In order to achieve this satisfactorily, proper field data is required in the
prescribed proforma.
1. Agro-climatic conditions
2. Rainfall
3. Temperature
4. Humidity
5. Sunshine
6. Wind velocity
7. Evaporation
8. Cloud Cover
9. Frost free days
Capacity of a canal system shall be fixed on the basis of the following considerations :
(a) Culturable command area
(b) Water allowance (The outlet capacity in cumec per thousand
hectares of culturable command area)
(c) Transmission losses (generally for lined canals a figure of 2
cusecs per million square feet and 8 cusecs per million
square feet for unlined canals in Gangatic alluvial plains is
taken)
The subsoil water level in the area, soil characteristics, drainage condition of the area may be
collected in order to assess possibility of water logging and salination so that decision regarding lining
can be taken.
The decision to line the canal should be taken at the time of planning any project. In the early
stages of a river development, water may be plentiful, and the immediate need for saving percolation
losses not so urgent. But it must be borne in mind that it is very difficult to provide lining later on.
Once an unlined canal has been designed and constructed, it comes in a regime. If the decision to line
is taken afterwards, the unlined section is much greater than that required for a lined canal. If the
lining is carried out on the same section then it will be difficult to maintain the required water levels
(FSLs) for the same discharge. It is therefore recommended that the desirability of lining a canal
should be carefully studied, when an irrigation scheme is formulated.
• The dividing ridge line between the catchment areas of two streams (drains) is called the
watershed or ridge canal.
• Thus between two major streams, there is the main watershed (ridge line), which divides the
drainage area of the two streams. Similarly, between a main stream and any of its tributary,
there are subsidiary watersheds (ridge lines), dividing the drainage between the two streams
on either side.
• The canal which is aligned along any natural watershed (ridge line) is called a watershed
canal, or a ridge canal. Aligning a canal (main canal or branch canal or distributary) on the
ridge ensures gravity irrigation on both sides of the canal.
• Since the drainage flows away from the ridge, no drainage can cross a canal aligned on the
ridge. Thus, a canal aligned on the watershed saves the cost of construction of cross-drainage
works.
Watershed canal along the ridge line are, however, not found economical in hill areas, since
the conditions in hills are vastly different compared to those of plains. In hills, the river flows in
the valley well below the watershed. In fact, the ridge line (watershed) may be hundreds of meters
above the river. It therefore becomes virtually impossible to take the canal on top of such a higher
ridge line. In such conditions, contour canals are usually constructed.
5
Side Slope
Channel
Ground
Counters
The main canal should be generally carried out on a contour alignment until it attains
the top of a watershed. From such a point, it should be aligned down to the watershed ceasing
to be a contour canal. After reaching the watershed the main canal should be located along the
main watershed and branch canals along secondary watersheds since it is generally observed
that the slope of main watersheds is less than slope of secondary watersheds and the branches
are required for irrigating the area upto the adjacent drainages on either side of the watershed
crest.
The alignment of contour canals, especially in the upper reaches shall be decided after
careful consideration of economy. Alternative alignments, their benefits and costs shall be
compared. Contour canals may irrigate only on one side and they themselves from the upper
boundaries of the irrigated area and cut across the natural drainage lines of the country.
Watershed and side slope canals have the advantage of non interception of any cross drainage,
but since they lie along the line of steepest possible slope, except in a very flay area, only the
smaller of distributary canals may be so located.
While selecting the alignment, consideration of economy shall be borne in mind. Deep
cuttings or high embankments should be generally avoided by suitable detouring, after
comparing the overall costs of the alternative alignments. Carrying of a canal in high
embankment involves the risk of branches from percolation. Careful judgment shall be
exercised in fixing the points of crossing of drainage.
The alignments of the canals shall consist of straight lines with circular curves. Radii
of the curves should be usually 3 to 7 times the water surface width subject to minimum given
below:
Radii of curves for canals
Unlined Canals Lined Canals
Discharge Radius Minimum Discharge Radius Minimum
(cumecs) (m) (cumecs) (m)
80 and above 1500 280 and above 900
Less than 80 to 30 1000 Less than 280 to 200 750
Less than 30 to 15 600 Less than 200 to 140 600
Less than 15 to 3 300 Less than 140 to 70 450
Less than 3 to 0.3 150 Less than 70 to 40 300
Less than 0.3 90 Less than 40 to 10 200
Less than 10 to 3 150
Less than 3 to 0.3 100
Less than 0.3 50
1. The above radii are not applicable to unlined canals located in hilly reaches and highly
permeable soils
2. On lined canals where the above radii may not be provided proper superelevation shall be
provided
Distributaries may be spaced suitably depending upon the configuration of the area.
After the alignment of canals and drains is drawn in plan, areas served by various
canals shall be calculated. The area depending on a branch/ distributary canal shall generally
be limited by the nearest drain.
After the tentative alignments of the canal system are marked, full supply levels shall
be decided beginning with outlets, minors, distributaries, branch canal and then obtaining the
full supply levels in main canal. This may be done by drawing longitudinal sections of the
main canals and its distributary canals. Longitudinal scale of about 1:10000 to 1:20000 and
vertical scale of about 1:100 is recommended. The following information shall be added
below the datum line on the longitudinal sections
a) Natural surface level
b) Full Supply Level
c) Bed Level
d) Subsoil Water levels
e) Water surface Slope
f) Bed widths; Value of ‘N’ side slope, F.S.D, F.S.Q. velocity
g) Free Board
h) Broad details of hydraulic data of outlets, regulators, bridges, drainage crossing, offtaking
channels etc.
The following principals should be kept in view for designing a canal system
a) The cross sectional area of a canal should generally not increase from upstream to
downstream
b) Cross section area of lined canals shall be designed in accordance with IS 10430-
2000 “Criteria for design of lined canals and guidelines for selection of type of
lining” and IS 7112-1973 “Criteria for design of cross section for unlined canals in
alluvial soil”.
c) Balancing depth shall be adopted wherever possible
In working out the longitudinal section, the provision of regulators, falls, escapes, cross
drainage works etc shall be considered. The losses shall be fully accounted for. A list of all
cross drainage structures, its location and other necessary details like HFL of the drain, bed
level/ bank level of the drain / nallah, FSL of canal at that location etc. is to be prepared.
Whenever water flows through a channel (artificial or natural), it tries to scour its
surface. Silt or gravel or even larger boulders are detached from the channel bed or banks.
These particles are swept downstream by the flowing water. This phenomenon is called
sediment transport.
It is desirable that a canal is non silting non scouring i.e. it should neither erode its
channel nor silt it up. Then it is in true regime. Various theories have been proposed for the
design of such channels. The theory mostly used in India for the design of canal cross section
in alluvial soils is Lacey’s regime theory.
According to Lacey, a canal is said to have attained regime condition when a balance
between silting and scouring and dynamic equilibrium in the forces generating and
maintaining the canal cross section and gradient are obtained. If a canal runs indefinitely with
constant discharge and sediment charge rate, it will attain a definite stable section having a
definite slope. If a canal is designed with a section too small for the given discharge and its
slope is kept steeper than required, scour will occur till final regime is achieved. On the other
hand if the section is too large for the discharge and the slope is flatter than required, silting
will occur till the true regime is achieved. In practice true regime conditions do not develop
because of variation in discharge and sediment rates.
On the analysis of data from a large number of natural drainage and canals running for
long, Lacey developed relations for determining regime slope and channel dimensions. He
postulated, firstly that the required slope and channel dimensions are dependent on the
characteristics of the boundary materials which he quantified in terms of silt factor (f) defined
as:
2.39v 2
f= ---- (1)
R
or
f = 1.76 D50 ---- (2)
Where
v = the mean velocity of flow in m/s
R = the hydraulic mean depth of an existing stable channel
D50 = the average particle size of the boundary material in mm.
Thus, in case, the conditions on a canal to be designed are similar to those on an existing
stable canal, the value of silt factor (f) may be determined by the use of formula (1) using the
observed value of v and R on the existing stable canal. Alternatively, the value of (f) may be
determined by use of formula (2) after determining the D50 size of the boundary material.
Having determined the value of (f) the following three relationships may be used for
determining the required slope and canal dimensions:
5
3
0.0003 f
S = 1
Q6
10
1
Q 3
R = 0.47
f
1
Qf 2 6
V =
140
Where
Having known the desirable values of P, R the curves given in fig 2 may be used for
determining the corresponding canal bed width (B) and Depth (D) for a canal having internal
side slopes of ½: 1 (it is assumed that the canal attains a slope of ½ : 1 after running in
regime).
Alternatively cross section can be designed from Regime type fitted equations evolved
on the basis of data collected from various states in India or by modified Lacey’s equation as
given in IS 7112 -: 2002 “ CRITERIA FOR DESIGN OF CROSS SECTION FOR LINED
CANALS IN ALLUVIAL SOIL”.
Problem
Design a regime channel for a discharge of 50 cumecs and silt factor 1.1, using Lacey’s
Theory?
Solution:
Q = 50m3/s And Silt factor (f )= 1.1
V= [Qf2/140]1/6 = [50 x (1.1)2/140]1/6
V = 0.896 m/s
A= Q/V = 50/0.896 = 56.3 m2
R = (5/2) (V2/f) = (5/2) (0.8962/1.1) = 1.675m
P = 4.75 (Q)1/2 = 4.75 (50)1/2 = 33.56m
For a trapezoidal channel with 0.5H : 1V slopes. Therefore, Perimeter of channel
P = b + (5)1/2 y and Area of trapezoidal channel
A = (b + y/2) y
Where,
b = width of channel
y = depth of channel
Therefore,
33.56 = b + (5)1/2 y ------------(1)
56.30 = (b + y/2) y ------------(2)
Solving the equations 1 & 2, we get
b = 33.56 - 2.24 y
Put this value of b in equation (2)
11
Depth y = 1.85m
Width b = 29.77m
Slope,
S = f 5/3/ 3340 Q1/6 = (1.1) 5/3/ 3340 (50)1/6
S = 5420
Use a bed slope of 1 in 5420.
This shall depend on the local soil characteristics and shall be designed to withstand
the following conditions during the operation of the canal
Canal in filling will generally have side slopes of 1.5:1, for canals in cutting the side slopes
can be between 1:1 to 1.5:1 depending upon the type of soil.
12
Freeboard in the canal is governed by the consideration of canal size and location, rain
water inflow, water surface fluctuation caused by the regulators, wind action, soil
characteristics, hydraulic gradient, service road requirement and availability of excavated
material. A minimum freeboard of 0.5 m for discharge less than 10 cumecs and 0.75 m for
discharge greater than 10 cumecs is recommended
For the design of other cross section elements for example Bank top width, radii of
curvature, Berms, dowels , fall etc, guidelines given in IS 7112 -: 2002 “ CRITERIA FOR
DESIGN OF CROSS SECTION FOR LINED CANALS IN ALLUVIAL SOIL” may be
followed.
13
Terminology
1) Branch Canal
A canal receiving its supply from the main canal and acting as feeder for distributaries.
It is also called lateral.
2) Contour Canal
Canal conforming generally to the contours of the country traversed having, however,
such slopes as necessary to produce required velocity of flow.
3) Crop Ratio
The crop ratio is defined as the ratio of areas under different crops to be irrigated
during a year.
5) Distributary
A channel receiving its supply from the main canal or branch canal. It supplies water
to the minors and water courses. It is called major distributary when it supplies water to
another distributary called a minor distributary.
8) Intensity of Irrigation
The percentage of culturable commanded area proposed to be irrigated annually.
9) Inundation Canal
A canal taking off from a river in flood without a permanent diversion work.
9) Main Canal
The principal channel of a canal system offtaking from a river or a reservoir or tail
reach of a feeder. Also called “Main Line”.
15
Basic Relationship
1) ∆ = 864B/D cm
Where
∆ = Delta of crop is in cm
B= Base period is in days
D = duty in hectare / cumecs
16
(1) S. no.
(3) Reach to
(24) Remarks
* Transmission Losses for lined canal shall be assumed as given in IS 10430 2000 “Criteria for design of lined
canals and guidelines for selection of type of lining”
17
18
Whenever natural ground slope is steeper than the designed bed slope of the canal, the
difference is adjusted by constructing vertical ‘drops’ in the canal bed at suitable interval.
A canal fall is a structure designed to secure lowering of the water surface in a
canal and to dissipate safely the surplus energy so liberated.
Necessity of Fall:
It is a well known fact that the velocity in a canal is a function of slope and that
there is a certain limiting velocity which can be allowed in a canal, depending upon
the nature of the soil through which it passes, without causing it to erode its bed and
sides. It follows therefore that there is a limiting water surface slope which cannot he
exceeded without detriment to the canal. The slope of country -which a canal has to
irrigate, is visually steeper than the water surface slope required for the canal as
shown in figure below.
The necessity of providing falls in our country became apparent early in the 19th century
when big irrigation projects like Western and the Eastern Yamuna, the Cauvery, the
Ganges, the Bari Doab canals etc. were constructed which called for economy and
efficiency in the working of irrigation systems.
The introduction of falls, however, required the devising of ways and means to
counteract its harmful effects, briefly described below, before they do damage to the bed
and sides and endanger the safety of structure.
(i) When water passes over a fall, the water surface begins to drop down,
starting from a small distance upstream of it so that the depth of water at the
fall with its crest at bed level may have a minimum value of 2/3 of the full
supply depth in a canal. This local drop increases the velocity upstream
causing erosion in bed and sides. This action may extend upstream from a
few metres to a considerable distance depending upon the crest length and
its height above bed.
(ii) Considerable impact force is produced by a large mass of failing water at the
foot of fall.
(iii) The flow immediately downstream of the fall is highly turbulent and the
velocity distribution down-stream along a vertical plane, is not normal for a
long distance lower down. This causes eddies, irregular currents, scour on the
bed and the erosion on the sides of a canal, thus endangering the safety of the
structure due to steepening of the exit gradient. Various types of falls, with
different shapes, length and height of crest have been tried to ensure that for
all discharges in the canal, the water surface level at the crest is the same as
in the canal upstream. The vertical trapezoidal notch fall proved a success
in maintaining depth discharge relation and was very widely used in India
and even in other parts of the world. But on account of the greater difficulty,
To safeguard against the destructive effects at (ii) and (iii) above, vertical falls with
deep water cushion on downstream, have been found quite successful for low drops.
Occasionally grating were used to divide the flow into a large number of smaller
stream and reduce the force of impact of falling water. Their action was similar to that
of a large number of notch openings in a trapezoidal notch fall adopted later on. The
main objection to this type of fall arose out of the difficulty of construction and the
narrow openings which caused obstruction to the free passage of detritus. The
dissipation of energy downstream, was also not complete for large discharges and
high drops inspite of deep cistern and the addition of semi-circular lip to notches
which helped to spread out the water in a fan like shape to reduce the force of impact.
With the phenomenon of standing wave or hydraulic jump being more clearly
understood the glacis type of fall came for adoption, the glacis being straight or half
parabolic and half straight with baffle wall placed across the path of flowing water in
certain cases. The use of standing wave along with various types of energy dissipators
has proved a great success in the safe dissipation of surplus energy with the result
that glacis type falls have come into use extensively, particularly for large discharges
and high drops. With the development of irrigation and ever increasing necessity to
bring more and more area under irrigation, requiring economical use of water, it
became extremely necessary to ensure accurate measurement of discharge, involving
comparatively small time, labour and cost. The falls provided the most convenient
points for measuring discharges along the canal. With this object in view, broad crest
which .ensures constant coefficient of discharge under varying conditions of flow, came
in use. The consequent slight increase in cost was proposed to be offset by reducing the
crest width i.e. the idea of fluming or constricting laterally came to be adopted when a
fall was combined with a bridge. The fluming does create severe conditions downstream,
but proper downstream expansion and provision of energy dissipators can effectively
prevent scouring on bed and sides.
The location of fall in a canal depends upon the topography of the country through
which the canal is passing. In case of the main canal which does not directly irrigate any
area, the site of a fall is determined by considerations of economy in ‘cost of excavation
and filling’ versus ‘cost of falls’. The excavation and filling on two sides of a fall should
be tried to be balanced. By providing a larger drop in one stop, the quantity of
unbalanced earthwork increases. But the number of fall reduces. An economy between
these two factors has to be worked out before deciding the location and extent of falls.
The location of falls may also be influenced by the possibility of combining it with a
bridge, regulator or some other masonry work for economy and better regulation.
To fix the site of falls on the canal full supply levels required at the heads of all off take
canal and outlets of the canal are determined from the contour plan of area to be irrigated
and plotted on the L-Section of the canal. The full supply level in the canal is then so
marked that it covers all the command points and allows for a minimum working head of
0-30 metre for the off-take regulators and 0-15 metre for the outlets. The approximate
position of the falls thus determine on the L-Section, may then be verified at site to see
that it does not lie in a local depression or at a high land and that the soil is suitable for
the foundations.
Various types of falls have been designed and tried since the inception of idea ‘fall
construction’ came into being. The important types of such falls which were used/are
being used in modern days are as below :-
In this type of fall, the nappe impinges clear into the water cushion below. There is no
standing wave and the dissipation of energy is effected by the turbulent diffusion as the
high velocity jet enters the deep pool of water downstream.
This type takes full advantage of the fact that a- standing wave is an effective natural
means of energy dissipation. This type may be divided into three classes:
(a) Straight glacis with baffle platform and baffle wall: provided at a calculated height
and distance from the toe of glacis, commonly known as Poona type or Baffle fall.
(b) Straight glacis without baffle platform and baffle wall: The straight glacis may also
be replaced by half gravity parabolic glacis commonly known as Montague profile, in
the case of bigger discharges.
(c) Modified Glacis Type: The modifications are in respect of glacis, pavement length
and spacing, location and design of friction and toe blocks. This works satisfactorily
under drowned conditions in unflumed small falls.
Suitability of notch type fall as an alternative to glacis type fall may be studied and
adopted if found economical.
A Chute structure usually consists of an inlet section, a chute canal in which the excess
energy is dissipated and an outlet section through which water is discharged to the
downstream canal. Inlet and outlet transitions are generally special type of transition.
This type of fall consists of an inlet well with a pipe at its bottom, carrying water
from the inlet well to the downstream well or a cistern. The water falls into the inlet well
through a trapezoidal notch constructed in the steining of the well, from where it emerges
near the bottom, dissipating its energy in turbulence inside the well.
Flumed or unflumed falls: Depending upon the crest width being smaller or equal to
bed width of the canal.
Meter or non-meter fall: Depending upon the purpose, if the fall, is also to serve as a
discharge meter or not.
In selecting a type of fall most suitable for particular site, the main consideration is the
height of drop and the discharge passing over the fall or in other words, the amount of
energy to be dissipated downstream of the fall. The type which dissipates this energy
most satisfactorily is to be preferred.
In cases, where full dissipation of energy does not take place on the masonry structure of
the fall, the issuing jet has still got higher bed velocities than what the soil can withstand,
in such cases a baffle design, though costly in construction may prove economical in the
long run, from the maintenance point of view. Where the bed material is hard enough to
withstand scouring action of the strong current, the type of design that is just. enough to
dissipate the surplus energy should be adopted.
When a fall is to be used as a meter, a standard baffle design is most satisfactory. But in
actual practice, it is neither necessary nor economical to design every fall as a meter
flume. A modified design of crest and approaches of the baffle fall reduces its cost but
the coefficient of discharge for a short crest does not remain constant. In order that it
may be adopted for metering, the fall has to be fully calibrated. This involves
considerable research work. The calibration curves will vary with different factors and as
they are to be used by the field staff, it is feared they may cause confusion and serious
errors in metering may result. From this point of view alone, the standard broad crested
meters are to be preferred. They will not add much to the cost as they will be few in
number.
For Unflumed Designs : The Baffle design is well suited under clear overfall conditions
specially where the soil is easily erodable. Under drowned conditions, the design may be.
adopted on the lines suggested in the accompanying table. For discharge between 15 to 8
cumecs, whenever soil is erodable, baffle type design, may be adopted due to its
efficiency in energy dissipation. Below 8 cumecs, the choice may be based on cost
considerations alone.
For Flumed Designs: The vertical type is not suitable as effective dissipation of energy
is not possible and results in. harmful scouring. The choice of design is limited only to
baffle type and sloping glacis type. Under drowned conditions, baffle type may be
rejected in view of the experiments conducted at Central Water and Power Research
Station, Poona, which have revealed its unsuitability under drowned conditions, and the
straight glacis type with three to four rows of friction blocks and a deflector may be
adopted.
Baffle type design, is also recommended for retrogressed conditions, when there is a
likelihood of formation of hydraulic jump due to lowering of the tail water levels, both in
flumed and un-flumed designs.
The following Table serves as a guideline for selecting the type of fall to be adopted.
Design Principle :
i) Upstream approach
ii) Throat
iii) Downstream Glacis
iv) D/s. Expansion
v) Energy dissipater.
Upstream Approach:
The design requirements of the upstream approach depend upon the functions of fall. If it
combines with it the function of discharge meter as well, the side and bed approaches to
the crest have necessarily to be gradual and smooth so as to avoid eddies and impact
losses and reduce concentration of flow. A bell-mouth approach such that the change of
velocity is smooth throughout the transition, is desirable.
Throat:
It is quite rational to design such discharges per metre run of crest width which with the
height of drop available, gives a value of total energy (Ef2) on the downstream side equal
to the full supply depth of canal. It does not then require deep cistern downstream and
avoids difficult construction in foundations when the sub-soil water level is high.
Length of the Throat (Lt): A narrow crest gives a higher value of co-efficient of
discharge and consequently a higher discharging capacity than a broad crest. It is
therefore economical to keep a short crest as it reduces the cost of the work both
transversely and longitudinally. A narrow crest does not however ensure a constant co-
efficient of discharge for all conditions of working. If therefore a fall is to be used as a
meter, broad crest should be used. The length of crest should then be such that the not
only the convex flow dies out on the crest, followed by critical conditions of flow, but it
ensures hypercritical flow below the critical section for a sufficient length. To ensure this
the length of crest should be kept equal to a little more than 2D, the minimum required
for broad crest.
For non-metered falls, narrow crest may be adopted for the sake of economy.
Experiments on model has shown that a crest length of 2/3 D for glacis fall and 0.55 D
for vertical falls is quite suitable and may be adopted.
4Y
X =U +Y
g
Where,
X = The horizontal ordinate measured from the downstream edge of crest.
Y = The vertical ordinate measured below crest level.
U = Critical Velocity = (q2 /g)1/ 3
g = Acceleration due to gravity.
Downstream Expansion:
It is a sound practice confirmed by experiments to extend the parallel and vertical side
down to the toe of the glacis in the case of glacis fall and to the end of baffle platform
for baffle fall i.e. the point of formation of standing wave. In the case of vertical fall,
however, these shall extend only up to the downstream end of crest. The expansion
afterwards should be gradual so that expanding flow adheres to the sides. This prevents
formation of back rollers on sides, which cause harmful scour on the downstream side.
Energy Dissipators:
Followings are the broad catagorisation of types of phenomenon used for carrying out
energy dissipations in canal falls:
In the case of vertical falls, the energy is dissipated by means of impact and sudden
deflection of velocity from vertical to horizontal direction. A water cushion is provided
Various types of energy dissipators have been used from time to time. Each has its
usefulness to a varying degree depending upon its shape and location in stabilizing the
flow, reducing its turbulent action; forming positive horizontal vortices and thus
preventing scour in bed and on sides.
. Friction blocks:
—These are found most effective and serve the following purposes:—-
(a) to fan out the flow and thus prevent return fow at sides causing eddies and scour.
(b) to deflect upward the high speed flow above the bed which reduces scour action
below the work.
(c) to withstand impact of high speed jet and thus dissipate energy.
(d) to assist in the formation of standing wave in the case of glacis fall without baffle.
Deflector Wall::
In glacis falls a deflector wall of height d3/10 (d3 = full supply depth of canal downstream
of the fall) is provided at downstream end of cistern. This helps in the formation of
horizontal positive vortices. The result is piling up of the bed material against the curtain
wall which ensures the latter's safety. Minimum height should be 15 cm..
The non-alluvial channels are excavated in non-alluvial soils such as loam, clay,
moorum, boulders, etc. Generally, there is no silt problem in these channels and they are
relatively stable.
In rigid boundary channels, the surface of the channels is lined. The quantity of silt
transported by such channels remains more or less the same as that entered the channel at
its head.
In the case of alluvial channels, the quantity of silt may vary from section to section
along reach. The silt quantity may increase due to scouring bed and sides of channel or
may decrease at some sections due to silting. Scouring occurs when the velocity is high
and silting takes place when the velocity is low. Both scouring and silting will lead to
loss of command due to reduced FSL and carrying capacity. Channels in alluvium are to
be designed for a non-scouring & non-silting velocity called the critical velocity.
Before getting into design of lined canals it is necessary discuss the type of linings
available, the need for lining and economics of lining.
Typical cross section of the lined canal in cutting and filling are given in fig 1 and 2.
Typical cross section of the lined canal in stone cutting is shown in fig 3
Types of lining
1) Water Conservation
Lining of canal does not altogether eliminate seepage. Reduction in seepage depends
upon the type of lining, surface area of lining, surrounding water table, sub grade
material, operation characteristics of canal system etc. As a rough estimate seepage from
a properly lined canal does not exceed 0.03 m3/m2/day.
Seepage water causes water logging in the nearby low lying areas especially if the
drainage of that area is not proper. Vast tracts of lands have been rendered uncultivable
due to water logging. Lowering of water table in the surrounding area of unlined canal
increases seepage. Lining reduces seepage from the canal and thereby helps in
preventing waterlogging.
However to prevent waterlogging lining of entire canal system falling in the problem
area may be necessary. Besides, water should not be excessively applied to the fields and
proper drainage arrangement should be made.
By provision of lining, much higher velocities can be adopted in the canal. Therefore the
section of the canal is reduced. Also with lining, steeper slopes can be provided thereby
further reducing the land required for canals. Narrower water way implies lower cost on
account of cross shorter drainage works and bridges
Aquatic weed growth is discouraged in the lined channels thereby reducing its
maintenance and operation costs. Silt removal is also less and with improved
Rugositycoeff, the removal of silt is also easier. Lined channels are more stable than
unlined channels and require less maintenance. Overall as a rough estimate it may be
said that in Indian conditions, the maintenance costs can be reduced by about 50% by
provision of lining.
A lined channel withstands erosion in a much better way than unlined channel. Steeper
slopes are also more stable in lined channels. Flatter slopes can be provided in power
channels and available generation head can be increased. Sometimes lining is
necessitated by the poor stability of the subgrades.
Economics of lining
Provision of lining and type of lining depends upon relative economics of the
alternatives. A lining is justified only when the benefits accrued from providing the
lining outweigh the cost of lining. When soil is very impermeable and its stability is also
good, the lining may not be justified.
While deciding a particular type of lining it may also be considered whether the entire
canal system is to be lined or a part can serve the purpose. Lining of the distribution
system can save more water as the percentage losses are more in the smaller channels,
because the perimeter of the smaller channels is more in proportion to the area of the
channel and smaller channels may be running intermittently. Therefore techo-economic
studies should be carried out for each case in detail and system approach using acquifer
modeling and optimization techniques may be adopted to study the complete water
balance of the area. As all the seepage water is not lost in Besides it may also be studied
if the water saved from lining the canal can be put to beneficial use.
Lining of the canals at the time of original construction itself is more advantageous than
at a later stage because the size of associated structures such as cross drainage works,
bridges, pumping stations and distributaries necessary to provide given amount of water
is reduced. Major economic in construction is possible when concrete lining is planned
and placed at the time of original canal construction. Unlined or earth lined canal require
much larger cross section area than lined canals to avoid damaging high velocities which
may be safely provided in lined canals. Hence at the time of providing lining to existing
canals, unnecessary large lining shall have to provided or backfilling and reshaping of
canal shall have to be done. Both of these alternatives are costlier than properly designed
lined canals.
The calculations needed for economic study of canal are given as under:
However for making a choice between various types of lining following factors should
be considered carefully:
A lot of construction materials are required for the construction of lining. Therefore,
generally the most economic lining is the one which makes the best use of locally
available materials. But usually thesematerials have to be brought from some
considerable distance to the work site. In such case the transportation issues and
economics may be considered carefully.
Some linings are labour intensive e.g Tile lining or brick lining. Whereas some linings
can be speedily constructed with the help of machines. The relative economics of each
alternative may be considered before selecting a type of lining.
The canal lining should be able to with stand the effects of flowing water, rain, sunshine,
thermal and moisture changes, chemical action etc. It should also be able to withstand
damaging effects caused by cattle movement, rodents and weed growth.
The durability of lining depends on the type of lining, the quality of construction and
canal operation and maintenance. However some types of lining e.g. brick or tile linings
are more easily repairable than cement concrete lining. Therefore before selecting any
type of lining cost benefit calculation in this regard is also needed to be carried out.
4) Structural stability
Although the lining is supported by the subgrade and it transmits all the load to subgrade.
But it must be structurally strong enough to withstand the subsoil pressure from behind
when the sub soil gets saturated through rains or in case of sudden draw down. It must be
structurally strong enough to withstand any local cavity formed due to incomplete
compaction of sub grade.
Pressure relief valves and drains are also provided behind the lining to dissipate the
excess differential pressure due to saturation of soil.
Discharge carrying capacity of the canal increases with decrease in the value of
Rugositycoeff. The Rugositycoeff of a lining depends upon its material and it increases
with deterioration and time. A lining with lower Rugositycoeff during its lifetime will be
more efficient and economical.
6) Water tightness
The seepage losses from the canal depends upon type of lining, water table of the
surrounding area, type of sub grade, continuous or intermittent canal operation etc.
Relative economics of conserving water and extra expenditure on account of lining may
be undertaken.
Type of Lining selected depends upon the type of subgrade on which it is supported. For
example concrete or some other type of rigid lining if laid over subgrades containing
swelling type clays or gypsum are likely to get damaged. Sometimes it is advantageous
to remove unsuitable soils in a short reach.. Suitability of various types of subgrades as
classified under IS 1498- 1970 “Classification and identification of soils for general
engineering purposes” has been given below.
If the operation of the canal requires frequent running and closing or large water level
fluctuations, a hard surface lining will be preferred. In case of earth linings or earth
covered membrane linings, such conditions would speed up the deterioration process. As
regard to weed control, small repairs and silt removal etc. hard surface lining s have
greater advantage over the latter type of the linings. Ability of the lining to withstand
weed growth and burrowing by the rodent should also be considered as these affect the
maintenance.
If water table is above the canal bed, closing the canal will subject the lining to external
hydrostatic pressure. Some pressure relief arrangement may have to be incorporated as in
this case no lining can resist such pressures
9) Land Value
Where the land value is high, providing lining with lower Rugosity coefficient, higher
velocities can be allowed and land required for canal can be reduced to achieve overall
economy.
1 2 / 3 1/ 2
V= R S
n
Where
V = Mean velocity in m/s
R = hydraulic mean depth
S = Slope of canal
n = Manning’s Rugosity Coefficient
1) Cross Section
2) Inner Slope of lined canal cross section
3) Rugosity Coefficient
4) Free Board
5) Velocity
6) Under Drainage
7) Other Cross Section elements like Berm, Bank top Width, Dowla, Roadway etc
1) Cross Section
Lining is usually made to rest on stable slopes of the natural soil; So slopes should be
such that no earth pressure or any other external pressure is exerted over the back of the
lining. Sudden drawdown in the lined canal should be controlled by strict operation rules
and regulations to avoid external pressure on the lining. However where the chances of
sudden drawdown in the channel is considerable., the canal slopes should be checked for
stability using slip circle analysis as given in IS 7894. In addition proper drainage behind
he lining should also be ensured.
Steeper slopes are economical but stable slopes depending on the type of soil are
preferred. The following slopes depending upon the soil are recommended as per IS
10430-2000:
The above slopes are recommended for depths of cutting / height of embankment upto
6.0 m . For depth / height in excess of the above, special studies for the stability of
slopes are recommended
The outer slopes of the lined sections should be based on the engineering properties of
the soil. Where the fill height is more than 6.0 m need for introduction of berms should
be kept in view.
3) Rugosity Coefficient
As per IS 10430-200, the rugosity coefficient values for different types of linings are as
follows:
Equivalent roughness;
Where side and bed slopes have different types of linings, the equivalent rugosity
coefficient can be calculated by the following formula:
N
2/3
∑ [n ]
3/ 2
i Pi
i =1
n=
P2/3
where
N
P= ∑P
i =1
i
4) Free Board
Free Board is measured from the full supply level to the top of the lining. It depends
upon size of canal, velocity of canal, curvature, wind and wave action and method of
operation. USBR recommends the following values of free board:
(cumecs)
However as given in Manual on Canal Lining published by INCID, the Central Water
Commission recommends the following values of freeboard
5) Velocity
Maximum permissible velocities for guidance for some types of linings are as follows:
however to ensure that silting does not take place in the lined canals, the critical velocity
ratio should be as higher than unity.
6) Other Cross Section elements like Berm, Bank top Width, Dowla, Roadway etc
These cross section elements can be taken as per guidelines given in IS 10430-200
“CRITERIA FOR DESIGN OF LINED CANALS AND GUIDANCE FOR
SELECTION OF TYPE OF LINING”
Embankments of relatively permeable soils (e.g gravels with sandy soil having
permeability greater than 10-4 cm/s) do not need drainage measures behind the lining.
However, the following conditions require suitable drainage measures to be provided to
protect the lining in accordance with IS 4558-1983.
i) Where the lined canals passes through an area with seasonal ground water level
likely to be higher than water level inside the canal
ii) Where sub grade is sufficiently impermeable to prevent the free drainage of
seepage or leakage from the canal
iii) Where there is built up pressure due to time lag between the drainage of the sub
grade following draw down of canal.
Under the above conditions, stability of the lining is threatened. In such cases it becomes
essential to design the drainage arrangement behind the lining. The drainage consists of
following arrangements:
a) Longitudinal Drains
b) Transverse Drains
c) Pressure Relief Valves
d) Dwarf Regulators
a) Longitudinal Drains
The number of longitudinal drains in a canal depends upon the bed width. In the bed of
the canal generally one drain every 10 m should be provided. For bed width minimum
one drain and for bed width more than 10 m minimum two drains should be provided.
The drainage pipe may be asbestos cement or PVC. Usually 150 mm diameter pipes are
b) Transverse Drains
Transverse drains should be provided, where necessary in the bed and on side slopes
upto free board level. Generally transverse drains are provided on 10 m interval.
However their spacing depends upon the size, location and efficiency of pressure relief
valves.
Pressure relief valves which open into the canal are provided to relieve excessive
hydrostatic pressure behind lining. These are to be provided in pockets of suitable sizes
and shapes and filled with graded filter underneath the lining. The PVR’s can be
classified according to their material of construction e.g metallic or non-metallic. These
can be further termed according to their mode of placement such as horizontal or
vertical. Still further they can be classified according to their closing member such as
flap type or ball type. At present usually non-metallic PVR’s are used as they have clear
advantages over metallic PVR’s. It is suggested that before finally selecting any
particular type of PVR, their suitability in field conditions should be ascertained by
getting them tested from any Lab. U.P. Research Institute, Roorkeehas such testing
facility available.
Generally PVR’s are installed in horizontal and vertical position and their size is
generally 150 mm for bed and 75 mm for side slopes. The PVR’s should be provided on
the longitudinal / transverse drains. If there are no transverse drains, the PVR’s can be
provided in pockets filled with graded filter underneath the lining. Pockets may be 600
mm square or cylindrical with diameter 600 mm. Pockets on the side slopes should be
excavated with their sides at right angle to the slope.
The spacing of PVR should be decided as per site conditions. However one PVR for
every 100 square meter area and in canal bed one PVR for every 40 square meter in side
should be provided. On the sides in general one row at every 4 meter spacing should be
provided. The first row should be provided about 50 cm above bottom and top row at 50
cm to 100 cm below full supply level. Valves in adjacent rows should be staggered.
Model studies or semi field studies are sometimes adopted to optimize the spacing and
other features of PVR’s. Performance of any particular PVR installed earlier is also helps
in selecting any particular type / spacing etc.
c) Dwarf Regulators
Where water table remains continuously high and the conventional pressure release
arrangement as mentioned above are not likely to prove adequate, dwarf regulators re
provided. These are regulators of part height and constructed across lined canal at
suitable intervals for ponding up water to counteract excess uplift pressure below the
lining. The height and spacing of Dwarf Regulators will depend on the minimum depth
The design is same as that of the lined canals except appropriate change in maximum
permitted velocity and rugosity coefficient as given below
Lacey’s design equations are in terms of two known quantities namely the design
discharge Q and the mean diameter d, these are:
4.75
0.0003
/ //
0.47/ / /
Where f is Lacey’s silt factor and is given by
1.76√ where d is mean particle size in mm
A channel can be designed for known Q, d and assumed side slope of a trapezoidal
channel Z:1.
The unit tractive force exerted on bed of a running canal can be calculated from the
formula:
where
= unit tractive force in kg/m2,
= the unit weight of water in kg/m3 (usually 1000 kg/m3),
R - the hydraulic mean radius in m, and
S = the canal slope.
The permissible tractive force may be defined as the maximum tractive force that will
not cause serious erosion of the material forming the canal bed on a level surface. The
permissible tractive force is afunction of average particle size (d50) of canal bed in case
of canals in sandy soils and void ratio in case ofcanals in clayey soils and sediment
concentration. Thevalues of permissible tractive force for straight canal
have been given by some authors on the basis of laboratory experiments but the same can
better be determined by analysis of observed data on existing canals. Once this is done
this would provide a rationalapproach to the design of section of regime channels.The
values of permissible tractive force for sinuouscanals may be reduced by 10 percent for
slightly sinuous ones, by 25 percent for moderately sinuousones and by 40 percent for
very sinuous ones.
A suitable bed slope is to be selected either with referenceto average ground slope along
the canal alignment oron the basis of experience and the value of R shall heobtained
from above equation. Knowing the value of Rand assuming a suitable value of n for the
canal,referring to Table 3(IS 7112:2002) as a guide, the average desirablevelocity of
flow in the canal may be determined by using the Manning’s formula given below
The Head Regulator or intake provided at the diversion structure/ at the head of the off-
taking channel has the following functions to fulfill :
(i) Regulation of the supply of water into the canal or water conductor system for
purposes of irrigation, hydel power generation, industrial or domestic water supply
etc.
(ii) Prevention of high floods from entering into the canal
(iii) Control of the entry of silt into the canal.
A Cross Regulator in the main parent channel has the following main functions to
perform:
Layout:
From the point of view of sediment exclusion, the head regulator is generally aligned with its
axis perpendicular to that of the diversion structure and located near the abutment. However,
in some cased, it has been observed that keeping the axis of the head regulator oblique to the
barrage/weir axis at an angle varying upto 110° or so gives better performance from sediment
exclusion and smooth entry point of view. Hence aid of hydraulic model studies is generally
taken for location and alignment of head regulator axis. The head regulator may be located on
one or both the banks as per requirements.
While the location of the head regulator adjacent to the abutment of the diversion structure is
preferred, it may not sometimes be possible to locate it there due to topographical feature
such as hills, etc. In that case the head regulator may have to be sited upstream near the
periphery of the pond, but very far from the main structure. If the discharge requirements are
small, sometimes the head regulator or intake is provided in the form of an opening in the
wing wall of the abutment, constructed at a suitable angle to the latter.
The head regulator could be constructed independent of the abutment separated from it by
suitable joints and seals or it can be monolithic with it, say in the case of gravity type of
abutments of the main structure and the head regulator, with a valley line forming in between.
The abutments of the head regulator themselves can be separated from its floor by
longitudinal joints and seals or they can be made monolithic with the raft floor of the head
regulator and the whole structure designed as a trough section.
The regulation of the head regulator is provided usually by vertical lift gates. The gates can
be a single or double or double or triple tiered one depending on the silt content of the river
water and the purpose for which water is required to be diverted. The required discharge into
the canal including about 10 to 15% of discharge for sediment extractors can be passed at
pond level for which a gate controlled opening from the crest level to the pond level only is
required to be provided. To reduce the uneconomical height of the gate right upto the high
flood level due to higher flood level due to higher cost of the gates, heavier machinery to
operate them and high level of operating platform required, breast walls are provided instead
above pond level and upto the high flood level plus a little free board or upto the top of the
abutments.
Usually a road bridge is provided across the head regulator for vehicular traffic or for
inspection and would be suitably connected to the bridge across the main structure. For the
operation of the gates, a working platform across the head regulator would also be provided.
In the case of head regulators feeding hydel channels, usually trash racks are provided in
front of the gates and stop logs to prevent floating debris from getting past the head
Often times, the waterway of the head regulator may be more than the bed width of the canal
downstream. In such cases, suitable transition would need to be provided beyond the
downstream end of the head regulator to reach the normal section of the canal.
Sometimes, water may have to be diverted from the river to serve two main canals in
different territories. It has to be analysed in such cases to determine whether a single head
regulator with the combined discharging capacity and the two canals branching off after some
common length could be had or two independent head regulators with two separate canals
can be had. Apart from economical considerations the operating conveniences including
disputes likely to arise should also be considered. If two separate head regulators are to be
provided, it would be desirable to determine their best locations and alignments with the help
of model studies so that their hydraulic performances are not impaired.
Hydraulic Design:
In the hydraulic design of the head regulator, the following items are decided : Crest level,
waterway, profile of the floor & energy dissipation arrangement are decided.
Crest level : The crest level and waterway of a head regulator are inter-related. For
prevention of silt entry into the canal, the crest level should normally be kept about 1.2 to 1.5
meter above the crest level of undersluices if silt excluders are not provided and it would be
about 1.75 to 2.5 m above, if silt excluders are provided. The crest level could be kept at the
top level of the silt excluder tunnels or about 0.5 m higher depending on the silt charge.
Waterway : The waterway should be adequate to pass the required discharge through the
head regulator without difficulty. In important structures, a stand bye bay also could be
provided to take care of any bay under repairs. The required waterway is calculated by using
Q =Cd Lo H3/2
The spans of head regulators usually vary from 5 to 10 m. Hence as per the required
waterway calculated, the number of spans and their widths can be decided. As already
mentioned under layout, stand bye bays could be provided wherever needed.
When the head regulator is located close to the under sluice bays of the main structure, the
upstream cut off/sheet pile would be taken down to the same level as that of the under sluice
bays. If it is located away from the main structure, it has to be taken down to the level
governed by the usual considerations of scour on the upstream. The downstream cut off/sheet
pile level would be governed by the consideration of exit gradient and scour.
The upstream floor is usually kept horizontal at the crest level. The upstream floor would
have to accommodate the grooves for trash rack bottom, stoplog and gates. It should also be
fixed from the overall length required for a safe exit gradient which should be checked with
canal closed and high flood on the upstream. The downstream glacis is usually kept as 3(H) :
1 (V) as for the main structure.
Structural Designs:
The structural designs of a head regulator are more or less similar to those of the main
structure. As the canal is usually completely closed when the highest flood is passing in the
river, it provides the worst static condition and the floor should be able to resist uplift
pressures under this condition. These pressures are usually high and a gravity type of floor
may not be economical. A concrete raft floor may prove to be economical in such places.
The breast wall of the head regulator generally consists of two parts viz., vertical stem and
horizontal beam. The two parts can be constructed monolithic or separated by a joint and
provided with a seal in between. The vertical stem would be designed as a slab spanning
between the piers or pier and abutment, fixed at the two ends and loaded by the horizontal
water thrust on the upstream side. The horizontal beam would be designed for bending in
both the horizontal and vertical directions. The loads to be taken care of in the analysis
include the self weight, horizontal water thrust on the upstream, uplift acting below the beam
and self weight of the vertical stem transferred at the beam eccentrically. Since the vertical
stem is fixed to the piers and abutments, full weight of the stem may not transferred to the
beam. A fair proportion at the discretion of the designer may be taken as the transferred load.
When the stem and beam are monolithic, the breast wall has to be checked for torsion also
caused by the water trust. The area of the second stage concrete for the embedded parts
should be neglected while analyzing the beams.
Wherever two tier or three tier gates are provided, for normal conditions when the silt charge
is not much, the lower most tier of gates would be in operation. When the silt charge of water
increases, the lower most tier would be kept in closed position and the other tiers of gates
operated.
Wherever trash racks are provided to prevent the floating debris from entering through the
head regulator, it is necessary that they are cleaned regularly so that the openings are not
allowed to be chocked. Apart from increasing the differential head over the trash rack, the
required discharge through the head regulator cannot be fed if they are allowed to get
clogged.
Instructions regarding the closure of head regulator gates beyond a permissible silt charge of
diverted water should be strictly followed.
In whatever way the canal is aligned, such cross drainage works generally become
unavoidable. In order to reduce the cross drainage works, the artificial canals are
generally aligned along the ridge line called water-shed. When once the canal reaches the
watershed line, cross drainage works are generally not required, unless the canal
alignment is deviated from the watershed line. However, before the watershed is reached,
the canal which takes off from the river has to cross a number of drains, which move
from the watershed towards the river, as shown in Fig. below. At all such crossings c1,
c2, c3, c4, etc. cross drainage works are required.
A cross drainage work is generally a costly construction and must be avoided as far as
possible. Since a watershed canal crosses minimum number of drains, such an alignment
is preferred to a contour canal which crosses maximum number of drains. The number of
cross drainage works may also be reduced by diverting one drain into another and by
changing the alignment of the canal such that it crosses below the junction of two drains.
Cross drainage works can be classified under the three broad categories, based on the
type of the structure to negotiate a canal over, below or at the same level of the drainage
channel.
The structures falling under this category are aqueducts, syphon aqueducts and culverts.
Maintenance of structures in this category is relatively more convenient, as these are
generally above the ground and hence open for inspection.
The structures falling under this category are superpas-sages and syphons including well
syphons. In case of syphons the maintenance is difficult as these run below the natural
drainage channel and are, therefore, not easily accessible to inspection.
3. Structures for Canal Crossing a Natural Drainage Channel at the Same Level
Structures falling under this category are level crossings and inlets, with or without
escapes.
While aligning the canal, the type of cross drainage work envisaged should always be
kept in view. The economics of various types of cross drainage works vis-a-vis
alternative alignments should be considered before deciding upon the site and type of
crossing. As a general guide, for deciding upon the type of the cross drainage work,
important considerations are as given below:
a) Full supply level and functions of canal — vis-a-vis high flood level of the drainage
channel,
b) Topography of terrain,
c) Regime of the stream,
d) Foundation strata,
e) Dewatering requirements,
f) Ratio of design flood to be provided in drainage channel to the discharge in the
canal, and
g) Envisaged head loss.
Full Supply Levels of Canal vis-a-vis High Flood Level (HFL) of Draiiiage Channel:
The choice of any particular type of cross drainage work is dependent on the high flood
level (HFL) in the drainage channel to be negotiated. Aqueducts are generally proposed
when the bed level of canal is well above the HFL of the drainage channel.
Superpassages are generally proposed when the full supply level (FSL) of the canal is
well below the bed level of the drainage channel. When the bed level of the canal is at, or
below, the HFL of the drainage channel, the depression of the bed of the drainage
channel is often a more economical proposal and in such cases syphon aqueducts may be
considered.
Topography of Terrain:
Detailed examination of the topography of the terrain is essential to locate a stable reach
of the drainage channel with good foundations permitting, preferably, a right-angle
crossing. Topography of the terrain may also permit diversion of one channel into
another and locating the cross drainage work below the confluence of the two channel for
greater economy.
The regime of a drainage channel requires careful examination. For drainage channel
carrying high sediment charges or drift materials, the possibility of choking up of the
syphon and the effect of fluming of the drainage channel should be kept in view.
Foundation Strata:
The selection of the most suitable site and a good design, for any cross drainage work is
intimately related to the engineering properties of the foundation sub-strata at various
alternative sites. These properties have, therefore, to be determined by site explorations.
Where an alternative site, meeting other criteria, is available, the final choice would
obviously depend on the location where the sub-strata available close to the bed of the
stream is firm.
Dewatering Requirements:
Negotiating a canal below the drainage channel is generally more difficult and involves
more head loss. However, if the topography and other features warrant a choice to be
made between canal syphon and syphon aqueduct, then canal syphon may be preferred,
only if the ratio of canal discharge to the design flood is substantially low.
The choice of any particular type of cross drainage work is also dependent on the head
loss that can be permitted in the canal. Whereas higher head loss can throw some area
out of command, restriction on head loss may necessitate provision of wider sections
making tie structure costly.
DATA REQUIREMENT
General:
a) A location map for the work with results of subsurface exploration conducted at
site, cross sections of the stream, upstream and downstream of the proposed
site, should be prepared.
b) An index map to a suitable scale showing the recommended location of the cross
drainage structure, the alternative sites of crossings investigated and rejected, the
existing communications, the general topography of the country and the
important habitations in the vicinity.
f) A cross section of the drainage channel at the proposed site of the crossing to
appropriate vertical and horizontal scales indicating the following information:
i) Cross section covering the bed and banks of the channel portion and the
ground levels beyond the banks covering the entire flood plane
ii) Nature of the soil in bed, banks and approaches, with trial pit or bore-hole
sections showing the levels and natures of the various strata down to
stratum suitable from foundation considerations.
iii) Low-water level.
iv) Maximum flood level.
Hydraulic data:
Canal:
Drainage Channel:
Design flood for drainage channel to be adopted for cross drainage works should depend
upon the size of the canal, size of the drainage channel and location of the cross drainage.
A very long canal, crossing a drainage channel in the initial reach, damage to which is
likely to affect the canal supplies over a large area and for a long period, should
be given proper weightage.
To safeguard against unforeseen nature of flood intensities the foundation of the cross
drainage structure should be checked for a check flood discharge of value twenty percent
higher than the design flood.
Waterway:
The value of wetted perimeter obtained is the total waterway between the two faces of
the abutments.
In works with rigid floors, however, waterway' can be further flumed within the
permissible limits of velocity negotiated through the available vents.
For mountainous terrains with flashy flows, the waterway is provided within the width
of the existing stream. Where the slope of the natural drainage channel is quite steep
suitable methods may be adopted to bring the velocity within the desired limits.
The clearance will depend upon the relative levels of the canal bed and high flood level
of the drainage channel. Values given in IS 7784 (Part 1) : 1993 are suggested as
suitable minimum clearances (taking into account allowable afflux) for purposes of
design, where available.
In the case of drainage channels, where a bed rise due to progressive silting is
anticipated, the permissible clearance should be increased to allow for such aggradations
depending upon the extent of silting.
Free Board:
On aqueduct structures, the free board is reckoned from the high Hood level (including
afflux) in case of drainage channel and from the full supply level in case of canals, to the
formation level of guide bank or canal embankment. The free board should not be less
than 900 mm. Wherever heavy wave actions are anticipated, the free board should be
suitably increased.
Afflux:
The afflux to be adopted in the design should be that which would correspond to the
design flood.
The afflux should be restricted to such a value that the resulting velocity does not cause
serious bed scour in the drainage or does not create submergence which cannot be
permitted.
Depth of Scour:
The mean depth of scour (dm) in metres below the check/high flood level may be
calculated. The value obtained should take into account any concentration of flow
through a portion of the waterway assessed from the study of the cross section of the
drainage channel. The maximum depth of scour below the Highest Flood Level (H.F.L.)
When water flows through any structure there are head losses due to various factors.
The total loss of head occurring for a flow is represented as the sum of these losses as
applicable. Thus, if the total loss of head is denoted by H then :
H= h1 +h2+h3+h4
Where,
h1 = losses at the inlet and outlet.
h2 = losses at elbows or bends.
h3 = losses due to transitions.
h4 = losses due to skin friction
Transition Walls:
Transition walls as seen in plan, should at their ends, turn nearly at right angles to the
flow in the channel and should extend for a minimum length of 0.6 in into the earth bank.
Suitable pitching may be provided to the slopes, beyond the transition end.
.
Flumiug Ratio:
Except when dictated by conditions particular to a specific structure, a fluming ratio less
than seventy percent may not be adopted. For the purpose of com puting the fluming
ratio of canal, the width at mid depth may be taken as one hundred percent In drainage
channel. When the course is undefined, a fluming ratio from seventy to ninety percent of
the Lacey's waterway may be adopted.
The earth mass in vicinity of the rigid structure is the connection between rigid structure
and flexible earthwork. The rigid structure is mm settling, relative to the earthwork. The
deflections, settlements and other movements in the rigid structure are comparatively
very small. The rigid structure may consist of masonry, PCC, RCC, etc. The connection
between rigid structures and earthwork is to be designed so as to reduce the differential
settlement, and to avoid the possibility of formation of a separation (cleavage) between
the two. The condition of connection between tbe rigid structure and the earth work
affects the seepage, creep coefficient and piping and thus affects the stability of the
earthwork.
Exit gradient :
Exit gradient of seepage water should be limited within the permissible limit.Adequate
foundation depth or cut-off or curtain walls maybe provided of suitable depth so as to get
safe exit gradient, which may be worked out in accordance with Khosla’s theory.
The foundations should be taken sufficiently deep lo secure firm strata from
considerations of settlement, overall stability and avoidance of undermining due to
erosion. The depth of foundation of various members should be such that these are safe
against scour or are protected against it.
Miscellaneous details:
Waterstops:
Waterstops, also referred to as water seals, are generally of three types, namely :
(a) rubber water seals.
(b) metal water seals and
(c) synthetic material seals.
The waterstops are used in and across all joints where leakages are detrimental to
structural safety or the water needs are to be conserved. The locations where waterstops
are provided in various types of cross drainage works are as below:
Aqueduct — In R.C.C. through side walls and bottom slab over each pier in a
continuous length and at the junction of transition and R.C.C. trough, both in the floor
and wing walls.
Syphon—At expansion joints and at the junction of each of the sloping limbs in a con-
tinuous form and at the junction of the transition walls and floors with the barrel, both
at the entry and exit in a continuous form.
Superpassage — At the junction between the drainage trough wing walls, namely,
trough wall of R.C.C. and wing wall of masonry and all the expansion joints in a
continuous length.
Weep Holes:
Weep holes are small openings in the retaining walls, like wings (i.e. transitions of
natural stream). These are to facilitate the drainage of backfills and avoid build up of
pressure. Weep holes may be provided above the flow net line of zero water pressure,
under the condition of canal flowing full and natural stream with lowest annual flow.
Weep holes should have filters with graded material suitably provided to avoid piping of
earth fill behind the wall and also to avoid choking of the holes.
Typical plan and elevation of three different types of cross-drainage structure are given
below.
ABSTRACT
1. Introduction:
But why do we need to consider automation of canals? Many irrigation schemes are not
producing expected returns, are experiencing water quality problems, or are under
pressure to reduce irrigation diversions. Many of the problems associated with these
irrigation schemes are linked, at least partially, to ineffective operation of the water
distribution system, typically a canal network. Rehabilitation of such systems suggests
the need not to rebuild them as originally designed, but to rebuild them so that they can
be operated effectively.
In the future, canal distribution systems will have to allow more flexibility in operations
to meet the needs of users. This often implies more flexible delivery rules, which some
systems might have difficulty satisfying. In many cases, improvements can be made
with simple structural changes or with improved manual operating procedures, and these
should be examined first. In other cases, one of a variety of canal automation
technologies can be useful for improving delivery performance, provided they are
appropriately applied – that is, with the goal of improved operations.
Unfortunately, defining the benefits of improved flexibility has been an elusive target – it
is hard to quantify. Thus, it has been difficult to determine the level of flexibility that is
economically justified, thereby making the cost/benefit justification for canal automation
2. MODERNIZATION:
The need for modernization of canals has developed because of a number of factors,
including the updating of systems objectives and purposes, changes in the demand
patterns, increased costs of operation and maintenance, the need for reduced operational
From the perspective of the on-farm water users, these primary criteria judge the
flexibility of water supply systems, namely frequency, rate, and duration. The frequency
at which water is available at the farm needs to be related to many items, each often
resulting in a different answer and affecting yield and financial return. Rate of flow
available at the farm affects labour and irrigation efficiency, irrigation methods
adaptability, and economics of operation. The upgrading of the scheduling capability
through the use of techniques such as pipelines, increased capacities, or automation, can
almost always permit improved on-farm management with increased net returns capable
of repaying both the on-farm and project costs.
3. SCADA:
Supervisory control and data acquisition (SCADA) is a system that allows an operator to
monitor and control processes that are remotely located. There are many processes that
use SCADA systems: hydroelectric, water distribution and treatment utilities, natural
gas, etc. SCADA systems allow remote sites to communicate with a control facility and
provide the necessary data to control processes. For many of its uses, SCADA provides
an economic advantage. As the distance and inaccessibility to remote sites increases,
SCADA becomes a better alternative than an operator or repairman’s visiting the site for
adjustments and inspections. Distance and accessibility are two major factors for
implementing SCADA systems.
Evolution - SCADA vendors release one major version and one to two additional minor
versions once per year. These products evolve thus very rapidly so as to take advantage
of new market opportunities, to meet new requirements of their customers and to take
advantage of new technologies.
Canal water distribution utilities use some type of remote monitoring and/or control
system to aid in proper and efficient operation. Control systems designed to monitor a
process are referred to as data acquisition systems (DAS). If the system also allows
remote control to occur based upon the acquired data, it is referred to as a supervisory
control and data acquisition system, or SCADA system.
Dynamic processes like canal water distribution require continuous process monitoring
and control to achieve minimum standards of cost, flow regulations and safety. Majority
of irrigation departments still rely heavily on expensive periodic visits by maintenance
The use of simulation models to improve canal control strategies is the motivation
behind studies on canal control. Mathematical models for unsteady open channel flows
are commercially available for around three decades, which can be used to study the
control of irrigation canals. There are a number of tradeoffs between simplicity and
functionality. All these models present difficulties and have limitations. The hope is to
provide an introduction on the next generation of unsteady-flow canal simulation
models.
BASIC EQUATIONS
Unsteady flow in open channels is based upon one-dimensional Saint Venant equations
for conservation of mass and momentum. The equations have five key fundamental
assumptions:
(i) The flow is one dimensional – i.e. the velocity is uniform in a cross-section and
the free surface profile is horizontal.
(ii) The streamline curvature is very small and the vertical fluid accelerations are
very negligible; as a result the pressure distribution is hydrostatic.
(iii)The flow resistance and turbulent losses are same as for a steady uniform flow
for the same depth and velocity, regardless of trends of depths.
(iv) The bed slope is small enough to satisfy following approximations: cos θ ≈ 1
and sin θ ≈ tan θ.
(v) The water density is constant.
These assumptions are valid for any channel cross-section shape. The conservation of
momentum and conservation of energy are equivalent if the two relevant variables (e.g.
velocity and water level) are continuous functions. At a discontinuity (e.g. hydraulic
jump), the equivalence turns invalid. Unsteady flow equations must be based upon the
continuity and momentum principles, which are applicable to both the continuous and
discontinuous flow situations.
Continuity equation
Where Q = VA = Discharge
V = Flow velocity & A = Flow cross-sectional area
d = Water depth
So = Bed slope
Sf = Friction slope
These are hyperbolic nonlinear partial differential equations that cannot be solved
analytically, except for a few simplified conditions. Therefore all unsteady simulation
programs solve the governing equations numerically. Early models of unsteady canal
flow used the method of characteristics.
Many canal control methods and algorithms have been developed, but only some of them
are being used on operating canal projects. These algorithms are categorized as implicit
algorithms in self-regulating gates, local automatic feedback controllers, and supervisory
control algorithms.
Facing the conflict between water supply and demand, proper water management is
absolutely necessary. Hence, more accurate and flexible irrigation systems are required
i.e. the actual water supply matches the desired supply. In order to fulfill the two
functions of an irrigation canal, all the infrastructures, like check and lateral gates or
weirs, pumps and power stations, should be manipulated properly to efficiently transport
large amount of water. In practice, considerable amount of water is wasted due to the
inaccurate manual operation or the lack of control. Therefore, it is useful to apply
automatic control to those check structures to control the water level or flow and
efficiently distribute the incoming water, finally, minimize the water losses. Several
control methods can be applied to the canal, like classic Feedback Control, Feedforward
Control and more advanced Model Predictive Control (MPC). They have different
applications to different systems depending on the actual situations.
Classic control types are feed forward control, feedback control and their combination.
Control variables, like water level, discharge and volume, are commonly used in the
irrigation canal control. The following descriptions will present all these different
methods and their comparisons.
Feedforward control:
Feedforward control is also called open-loop control. The control action is independent
to the output, but it is calculated from the disturbances, the target variables and the
process simulation. In the irrigation canals, disturbances can be the incoming flow from
the most upstream, and the farmer offtakes along the canal. If these disturbances are
already known in advance or can be anticipated, the feedforward control can improve the
control performance considerably. It can compensate for the time delay, especially in
those long canals. But in reality, the single feedforward control is not so practical,
because of the change in the irrigation system or the inaccuracy of anticipations. In
summary, the limitations of the feedforward control are:
• the accurate control is difficult due to inaccurate anticipation
• the performance of feedforward control is sensitive to the system changes
• it reacts only on the known disturbances
Therefore, feedforward control always combines with the feedback control, in order to
overcome its limitations.
Feedback control
Feedback control is a closed-loop control which takes the output variables into account.
It is thought to be a very robust control algorithm. In the feedback control, the controlled
variables, water level and discharge, are obtained from the measurements. Those
deviations from the set points are calculated and sent back into the controller which will
compute the control actions to correct the deviations. After the control actions are
executed, the output variables are measured again and the new control actions are
generated. This creates a closed loop. In summary, advantages of feedback control are:
• the accurate control is possible due to the consecutive correctness of deviations
• the performance is not sensitive to the system changes
• the deviations caused by any factors (known or unknown) can be compensated
Because of both the advantages and the disadvantages of feedback and feedforward
controllers, a combination is often used to control the irrigation canal system. The
advantages are added together and compensate for the disadvantages each other. If the
disturbances are already known, it is recommended to use the information by applying
the feedforward controller in order to make a quick response. The controller does not
need to be very accurate, because the feedback can compensate for the deviation. The
properties of the combined feedforward and feedback control system are:
• the disturbances can be anticipated due to feedforward control
• the accurate control is possible due to the feedback control
• the performance is not sensitive to the system changes
• the deviations caused by both known and unknown disturbances are corrected
Public concepts of how to share and manage the finite supplies of water are changing.
Increasing competition exists between power, irrigation, municipal, industrial, recreation,
aesthetic, and fish and wildlife uses. Best management measures and practices without
exception depend upon conservation of water. The key to conservation is good water
measurement practices.
Besides proper billing for water usage, many benefits are derived by upgrading water
measurement programs and systems. Although some of the benefits are intangible, they
should be considered during system design or when planning a water measurement
upgrade. Good water management requires accurate water measurement. Some benefits
of water measurement are:
• Accurate accounting and good records help allocate equitable shares of water
between competitive uses both on and off the farm.
• Good water measurement practices facilitate accurate and equitable
distribution of water within district or farm, resulting in fewer problems and
easier operation.
• Accurate water measurement provides the on-farm irrigation decision-maker
with the information needed to achieve the best use of the irrigation water
applied while typically minimizing negative environmental impacts.
As the name implies, a long crested weir has the length of its crest perpendicular to the
flow direction elongated to minimize the effect of the flow change on the variation of the
head on the weir and hence the variation in its upstream water level. To study the effect
of increasing the length of the weir crest we follow the same procedure utilised above in
making the comparison between weirs and orifices. Here we assume that the flow is
constant while the length of the weir crest (b) varies. If we consider a case of making the
weir crest ten times longer then:
Q = Cd b √g (2/3 h)3/2
7. CONCLUSION
The technology for sensors, communication and soft computing is changing rapidly and
is likely to continue to change and become more flexible, more intuitive and available at
lower cost. Automation will be implemented with greater regularity as water districts
transform themselves into modern service utilities. Knowledge of irrigation canal control
has improved substantially over the last decade. Supervisory Control And Data
Acquisition (SCADA) systems are now affordable and cost effective for irrigation
distribution systems, large and small. With the advances in electronics and
communications and in canal control theory and methods, significant improvements in
canal control are now possible with minimal cost and infrastructure changes. It is time
for irrigation to join the information age in a big way.
When the silt is deposited on the bed and sides, the capacity of the canal reduces. It is
better to exclude silt by providing silt excluder and silt ejector. However, none of the
methods can put a complete check over the entry of silt into the channel even after the best
care as certain amount of silt can definitely enter into the canal. Other sources of silt
deposition might be canal regulation, scouring/ erosion within the channel etc.
However, if the canal functions properly and is in regime and taking its full supply, it is not
necessary to clear the silt to the theoretical cross section of the canal.
But if the canal is not functioning properly, desilting is required but only to the extent of
clearing a portion of it so as to get the canal back into efficient working order.
(a) Flushing
Flushing of the canal with clear water will lift up deposited silt. Absolutely clear water
should be used for flushing but if this is not available, then, the water which contains
minimum quantity of silt should be used for flushing. Flushing should generally be over
done to cause some scour in case of unlined canal. This will create room for further silting
and thus reduce the frequency of flushing.
The method consists of having three barges connected to the upper barge by a cable
operated by winch. The lower barges have moveable shutters. The silt is kept agitated
by maneuvering the barge up and down. The method was used in Punjab but was
unsuccessful.
(c) Bundle of thorny bushes tied together and pressed down by weight of stones are
pulled inside the channel by animals. They are quite useful in dislodging the fine
muddy silt.
Loaded boats are put across the section to reduce the area of flow and increase the
velocity of flow.
(g) Dredging
A dredger is very rarely employed for removing silt from canal as it is a very costly
method.
(h) Excavation
The silt deposited in a channel is cleared off by manual labour. The method is quite
costly as it requires recurring expenditure. This method is generally adopted for silt
clearance in distributaries and minors. The silt must be deposited clear off the channel
so that it does not find its way back to the channel.
Water is allowed to get into the compartment from upstream side and is held there for
some time before discharging it back to the canal from outlet end.
When the cross bunds are separated by a distance of 150 to 300 m, the capacity of the
tank is small and only a portion of full supply discharge is taken into the compartment. It
is then known as into out system.
In this system the canal banks are set back away from their original positions. The section
of the canal provided is larger than required and therefore, its velocity is low. The section,
therefore, gets silted up very quickly. To induce silting and accelerate the process, low
submersible spurs may be constructed.
Canal breaches are the openings or gaps created in the canal banks due to breaking up of
the banks. The breaches in canal banks may be caused due to various reasons such as:
• Breach due to faulty design or construction of banks
• Breach due to overflow of the canal
Design of Weirs, Barrages and Canals Page 156
• Sometimes due to increased discharge in the canal, the banks may be overtopped.
This overflow will definitely damage the banks.
(c) Breach due to piping
Sometimes the banks may not be overtopped but the water depth may go above full supply
depth due to:
• Increased discharge or
• Reduced section of the silted canal.
In such a case, the hydraulic gradient line within the filled canal bank section will also rise.
If the provided cover over hydraulic gradient line is not sufficient, it may pass out of the
banks.
In this way dislodgement of the soil particles will take place from the outer slopes of the
banks.
This will consequently weaken and erode the banks which may ultimately lead to
complete breach and water may rush out of the canal.
If the events of exceeding the full supply level are dominant and the HGL crosses the outer
slopes owing to certain circumstances, the banks may be strengthened by providing
counter berms.
Water may start leaking through the holes created within the body of the bank by insects or
burrowing animals.
• The leaking water will go on removing the sand particles with it.
• If this goes on unnoticed, the holes may go on increasing in size.
• Ultimately the canal bank may breach with a rush of water.
• Normally these holes are smaller in size and as such do not pose a serious problem if
timely inspection and remedial plugging is done.
• As a preventive measure, a sand core is sometimes provided within the bank
embankment, which will settle and fill the holes. In such cases the banks will
Design of Weirs, Barrages and Canals Page 157
• When the country area gets flooded due to excessive rains or poor drainage, the
cultivators cut the canal banks in order to pass the drainage water to the other side.
• This sometimes rather proves detrimental to their expectations as the canal supplies
may also enter the low lying area, thus it may further aggravate the water congestion
in the area.
• Similarly, sometimes, the cultivators cut the banks to obtain illegal water supply
from the canal. These small cuts may widen and take the shape of a big breach in a
short time consequently damaging the crops.
• In order to avoid such occurrence, a strict vigil should be kept on the points of
possible cuts.
CLOSURE OF BREACHES
• If the breach of the bank takes place inspite of all the measures taken or otherwise, it
has to be closed and the canal restored to its original shape and size.
Minor or Distributary
• As the water of the breach spreads on the adjoining land, there is usually no outside
nearby place from where earth may be taken for closing the breach.
The earth has, therefore, to be collected either
– (i) by cutting the outer slope of the existing bank or
– (ii) from the spoil banks (if existing) or
– (iii) from berms of the canal
• It is essential to store huge quantities of earth on both sides of the gap before closing
the breach.
• The spots from where the earth has been borrowed should be made good after the
closure of the breach.
The huge discharge from the canals/ branch canals/ major distributaries may completely
wash away the earth dumped in the gap. Therefore simply dumping earth in the gap does
not provide a solution to breach problem. The following procedure is adopted in such
cases:
• Huge quantities of earth is collected on either sides of the breach from the
sources as stated in case of minors and distributaries.
• No dumping of earth should be started before the flow through the gap has
reduced considerably to the satisfaction.
• The deposited earth should now be dumped simultaneously from both the ends
to form a ring bund on outer side of the breach.
• The opening is then filled with suitable earth in layers, each layer being
compacted as per specifications.
• (i) All jungle from the ring bund site should be removed before earth work
progresses.
(ii) The dumped earth should be freed from grasses or bushes.
• The canal service road is unmettalled and therefore in monsoon season grass and
small bushes grow on the road surface. The surface of road also wears and
tears off due to some traffic over it. Some time unauthorized traffic also passes over
canal roads which make the condition still worse.
• The maintenance of service roads therefore consists of:
(i) Removal of grass and small bushes
( ii ) Levelling of road surface
(iii) Ramming and watering of top of wearing surface.
• Maintenance is usually carried out after the monsoon season.
• To check unauthorized traffic of carts, sometimes a check barrier is constructed at
every crossing. The check barrier consists of a small earth mound with a slope of 1
: 4 on upstream and downstream side with some top width. Jeeps can easily be
crossed over these mounds but for trucks and bullock carts it becomes a real barrier.
Maintenance of Banks
• Regular cross-sections should be surveyed to see settlement pattern of banks. Banks
shall be brought up and maintained to full section. The minimum width and free
board of the bank should be in accordance original design.
• Before continuous bank repairs are started, profiles should be made 30m apart. These
should be at the correct height and width of the bank repaired and should be checked
before work is started.
• All the holes and rain cuts should be fully opened up to the bottom by digging steps
not more than 0.5m deep in the sides and removing all the fallen or loose lumps of
earth, bushes, grass roots etc. Filling and repairing should be done by placing level
layers of earth ( not more than 15 cm deep).
• The earth in each layer should be free from clods, roots, grass, brickbats and other
debris and it should be compacted at adequate moisture content.
• Leaks should be stopped from the upstream side by cutting off the penetrating water.
Regular and careful inspection and maintenance of civil works must be carried out for all
the components, both under water and above. Necessary repair should be carried out in
time before damages are extended.
Upstream and Downstream Aprons
After the monsoon, sounding and probing should be done both on the upstream and
downstream sides. These would be carried out by sounding rods or echo sounders over the
cc blocks and loose stone protections.
Contour maps and sections should be prepared to determine the places of scour, its
extent, launching etc.
The effectiveness of the down stream inverted filter may also be determined.
Wherever scours have taken place extensively, the apron should be replenished to
the designed values.
Pucca Floor
The pucca floor, both upstream and downstream should be thoroughly inspected
for cracks, wear and tear, cavitations etc.
Energy dissipating devices like chute blocks, friction blocks, sills etc. should also be
checked for damages.
While dewatering deep downstream basins for inspection, it should be ensured that
the design uplift values for the pond level condition are not exceeded. Necessary
repairs should be carried out immediately.
Piers
The piers should be inspected carefully for settlement,cracks, tilting etc. The noses of the
piers should be checked for damages if any due to boulders, floating debris etc. Necessary
repair must be attended to immediately for proper functioning of the gate, stop logs,
bridges etc.
Abutments
Inspection of abutments should be carried out similar to the piers. In addition, the backfill
should also be examined for settlement and if need be, it should be made up and properly
compacted.
Flankwalls
Inspection and maintenance of flank walls are similar to those for the abutments. Damaged
CC blocks of the flared out walls, if any , should be replaced so that hydraulic performance
of the structure is not impaired.
Divide Walls
In addition to the inspection like that for the piers, the effectiveness of the divide walls for
satisfactory hydraulic performance should also be observed and necessary corrective
measures adopted. The protection works around the noses and shank of the divide walls
should be checked up by sounding and replenished to designed values wherever necessary.
Bridges
The beams , slabs and the wearing coats of the bridges should all be checked for cracks,
wear and tear, joints, etc. and repairs carried out so that smooth traffic is ensured.
Fish pass
Apart from the usual inspection necessary for the concrete structure of the fishpass, its
effectiveness for the smooth movement of fish from upstream to downstream and vice
versa should be studied and corrective measures adopted wherever necessary.
Navigation lock
• The concrete structure of the navigation lock should be thoroughly inspected for
cracks, settlements etc. and repairs carried out.
• If the lock chamber and also the navigation channel are silted up, necessary
desilting operation should be carried out. It must be ensured that the filling and
empting times are maintained as per designed values. Any difficulties in the same
should be removed so that free flow of navigation is maintained.
Design of Weirs, Barrages and Canals Page 161
Head Regulators
The inspection and maintenance of the head regulator are similar to those of the main
barrage/ weir. The discharging capacity of the head regulator should be measured and if
difficulties are experienced in passing the required discharge, necessary corrective
measure should be adopted, if need be, through model studies.
Instruments
It is necessary that every year, performance reports are prepared,based on the different
instrument observations and other observations. The observations could be broadly
classified under:
• Uplift pressure
• Suspended sediment
• Settlement
• Retrogression
• Upstream aggradation
• Discharge distribution and Cross flow
Maintenance- Instruments
1) Uplift pressure
It may be adequate to take observations once a month during non-monsoon period and
more frequently during monsoon period. However, it should be ensured that:
• The mouths of all pipes are kept closed by caps to avoid the chances of
extraneous materials getting into pipes and clogging them.
• The pipes are properly and clearly numbered for identification.
• The pipes are frequently tested to make sure that the strainers are not choked.
The quantity and quality of the sediment content of the water coming out of pressure
release pipes on the downstream floor should be tested during dry season. This would
indicate their efficiency and also the event of undermining the foundations, so that
necessary remedial measures can be adopted in time.
2) Suspended Sediment
The silt charge of the water upstream and downstream of the under sluices and in the canal
below the head regulator should be observed frequently so that the efficiency of the silt
excluding devices can be assessed and the gate regulation can be modified suitably to
improve the efficiency.
3) Retrogression
4) Upstream aggradations
Upstream aggradations of the river bed increases the afflux and consequent encroachment
into the free board in the components of the diversion structure including the river training
works.
Hence it is necessary to know the aggradations taking place so that the top level of the
components can be raised wherever necessary.
Designs are carried out assuming certain concentration of flow through the different bays
of the diversion structure. Hence it is necessary to know the discharge distribution through
the bays so that the designs could be checked up for the safety of the structure. Similarly
cross flow should also be observed and proper remedial measures taken for ensuring the
safety of the structure. This could be done by suitable modification of the gate regulation
pattern.
It is necessary to have maps of the river showing the configuration of the river every year
so that the effectiveness of the river training works could be studied and modified if
necessary.The point of attack of the flowing water should be observed and strengthened.
For this purpose, a good stock of loose stone boulders should be kept near vulnerable
spots.
In addition to the inspection and maintenance of the civil works, the mechanical and
electrical works also should be inspected and maintained regularly. If they are not kept
clean, tidy and in proper working order, they will fail at the time of emergency leading to
damage of the entire structure. Under the mechanical and electrical works the following
could be included
.
(i) Gates and falling shutter (ii) gate grooves and seals (iii) Steel wire ropes(iv) roller
trains and fixed roller (v) Winches /hoists (vi) Flood Lighting (vii) Bridge bearings
and super structures.
The gates and falling shutters should be kept clear of the debris and silt accumulations and
Design of Weirs, Barrages and Canals Page 163
they should not be allowed to rust due to improper drainage.The upstream face of the skin
plate coming into the contact with water should preferably be painted with suitable primer
and subsequently with sanded aluminum paint for long life. While painting the surfaces,
all necessary precautions should be observed.
Gate grooves and particularly the machined faces should be kept clean and lubricated well
and their sticky deposits should be scrapped off before applying the lubricant. The
efficiency of the rubber seal should be tested and also examined for wear & tear and
deterioration. Their replacement whenever necessary should be done immediately.
Steel wire ropes should be cleaned to remove all the dust accumulation and lubricated with
suitable greases at least once a year. After lubrication, the portion of the wire ropes
submerged in water should be wrapped with gunny bags which should be securely
fastened to the ropes. The clamping devices also should be inspected for their efficacy.
The roller trains and fixed rollers should be clean, free movement ensured and greased for
smooth operation. Worn out rollers and pins should be replaced and bolts etc. tightened.
Winches/ Hoists
Winches and lifting drums should be kept clean and greased properly for smooth and easy
operation. Alignments of shafts should be checked and coupling bolts tightened.
In the case of electrically operated hoists, all the electrical wirings, switches, bearings
,reducing gears etc. should be checked for a safe and trouble free operation. The platform
should also be examined and properly protected.
Flood Lighting
During the flood season, all flood lightings and site illumination should be checked daily.
During non-monsoon season, it may be done once a week.
The bridge bearings over the piers and abutment should be cleaned and greased once a
year after the monsoon season. The painting of superstructure should be done once in two
years.