1.0 Purpose:
To ensure safe start, stop and operation of Cement Mills.
2.0 Scope:
Cement Mill.
3.0 Responsibility:
H.O.D (Operation)/HOS Grinding (Operation) is responsible for implementation of this SOP.
All the equipments are stopped in reverse sequence for stopping the mill
Sr. Contingency
Reasons Corrective Action
No. Measures
Reduce feed rate
Mill outlet draught Excess feed rate
1. Check and confirm the jam and stop the
high Mill outlet duct jam
feed
Excess feed rate Reduce feed rate
Mill inlet draught
2 Mill inlet duct jam Check and confirm the jam and stop the
low
feed
Low feed rate Increase feed rate
3. Mill Sound level high
Mill outlet Mill inlet hot air % high Reduce hot air %
4.
temperature is high Mill is empty running Increase feed rate
Mill inlet hot air % low Reduce feed rate
Mill outlet
5. Mill is running with load Increase hot air %
temperature is low
Mill feed moisture% high
Reduce separator rpm
Input feed size high
6. Residue % is high Reduce vent fan rpm
Separator rpm is high
Title Standard Operating Procedure for startup/shutdown and operation of Cement Mills
CCR operator to be record the parameters hourly in APCL / PRO / F-05 or APCL / PRO / F-06
Or APCL / PRO / F-07
The quality parameters are intimated by the shift chemist or Tester from the QUAS Dept
Safety:
1. Take Line Clearance from Electrical, Mech and Inst dept. before starting the any equipment
Environment:
If any abnormal condition, inform Section Incharge/HOD (operation) and follow guidelines and
instructions.
EnMS:
2. Check the clinker and additives hoppers levels are in desired level
3. Inform to CPP people to before start the mill Main drive ,separator fan & Auxiliaries to
get the power in time
5. Calculate the power loss across the ID fans if any replaced with VFD
6. Identify the interlocks and implement the same for energy saving opportunities