Vax Consultants Pvt. Ltd.

, Construction of Grade Separator at Medavakkam


Foundation & Structural Engineers Detailed Design Calculations for Abutment Group - GA1

Load IDs LOADS & COMBINATIONS AT BOTTOM OF FOUNDATION, RL (+) 97.398


& LCs Load Details P, kN HL HT ML MT Size of Foundation
G1 Self Weight of Abutment System 3895.22 0.00 0.00 12493.01 0.00 Width 5.5 m
G2 Super-structure Dead Load Length 12.00 m
Dislodged Condition 0.00 0.00 0.00 0.00 0.00 Materials Used
Span existing Condition 1587.00 0.00 0.00 4602.30 0.00 Concrete, M 35
G3 Back-fill Weight 4083.80 0.00 0.00 15388.58 0.00 Steel, Fe 500
Fep Earth Pressure 0.00 2127.52 0.00 -7503.20 0.00 Foundation Area 66.00 m2
G4 SIDL, other than W/C 154.70 0.00 0.00 448.63 0.00 ZL 60.50 m3
G5 Wearing Coat Loading, W/C 74.84 0.00 0.00 217.04 0.00 ZT 132.00 m3
Q Vehicular Loading, without Impact
One Side Loaded Condition
70R W 729.49 0.00 0.00 2115.51 2502.41
70RW + Class A 1006.33 0.00 0.00 2918.36 1555.28
70RT 664.37 0.00 0.00 1926.67 2085.02
70RT + Class A 941.21 0.00 0.00 2729.52 1069.04 p4 12.00 p3
Class A - One Lane 276.85 0.00 0.00 802.85 1369.71
Class A - Two Lanes 553.69 0.00 0.00 1605.71 1598.11
Class A - Three Lanes 830.55 0.00 0.00 2408.58 650.95
Fh Breaking Forces
One Side Loaded Condition MT
70R W 33.98 100.00 0.00 -706.68 0.00 5.500
70RW + Class A 38.57 113.50 0.00 -802.08 0.00
70RT 23.79 70.00 0.00 -494.67 0.00 ML
70RT + Class A 28.37 83.50 0.00 -590.08 0.00
Class A - One Lane 18.35 54.00 0.00 -381.61 0.00
Class A - Two Lanes 36.70 108.00 0.00 -763.21 0.00
Class A - Three Lanes 41.28 121.50 0.00 -858.61 0.00
Ff Bearing Friction Effects 0.00 41.92 0.00 -254.94 0.00 p2 p1
Fcf Centrifugal Forces
One Side Loaded Condition
70R W 0.00 0.00 0.00 0.00 0.00
70RW + Class A 0.00 0.00 0.00 0.00 0.00
70RT 0.00 0.00 0.00 0.00 0.00
70RT + Class A 0.00 0.00 0.00 0.00 0.00
Class A - One Lane 0.00 0.00 0.00 0.00 0.00
Class A - Two Lanes 0.00 0.00 0.00 0.00 0.00
Class A - Three Lanes 0.00 0.00 0.00 0.00 0.00
Fcp Live Load Surcharge Pressure 0.00 608.08 0.00 -2553.02 0.00
W Wind Forces
One Side Loaded Condition 83.30 36.77 147.08 303.13 1212.54
Vc Buoyancy Effects 0.00 0.00 0.00 0.00 0.00
Ff Vehicular Collision Load 0.00 0.00 0.00 0.00 0.00
Seismic Forces 0.00 0.00 0.00 0.00 0.00
Seismic Foces - Long - Due to all Inertia Loads 0.00 262.87 0.00 1911.19 0.00
Seismic Foces - Tran. - Due to all Inertia Loads 0.00 0.00 262.87 0.00 1911.19
Seismic Foces - Tran. - Due to VLL
70R W 0.00 0.00 60.90 0.00 584.42
70RW + Class A 0.00 0.00 84.01 0.00 806.21
70RT 0.00 0.00 55.46 0.00 532.25
70RT + Class A 0.00 0.00 78.57 0.00 754.04
Class A - One Lane 0.00 0.00 23.11 0.00 221.79
Class A - Two Lanes 0.00 0.00 46.22 0.00 443.58
Class A - Three Lanes 0.00 0.00 69.33 0.00 665.38
Due to Backfill 0.00 568.78 0.00 2005.93 0.00

Divisional Engineer,
Chennai Metro Development Project - III, Division - IV,
Alandur, Chennai
Vax Consultants Pvt. Ltd., Construction of Grade Separator at Medavakkam
Foundation & Structural Engineers Detailed Design Calculations for Abutment Group - GA1

Pu, kN HL HT MUX MUT X e MUL Contact Pressure Details, kN/m2


Load LCs Load Details
kN kN kN kNm kNm m m kN.m. P u /A M u L/ZL M u T/ZT p1 p2 p3 p4 p max p min
C1 10559.03 2877.52 0.00 24247.23 2502.41 2.296 -0.4537 -4790.1 159.99 -79.18 18.96 99.77 61.85 258.12 220.20 258.12 61.85
C2 10840.47 2891.02 0.00 24954.68 1555.28 2.302 -0.4480 -4856.6 164.25 -80.27 11.78 95.76 72.19 256.31 232.74 256.31 72.19
1.00 x G1 + 1.00 x G2 + 1.00 x G3 + 1.00 X Fep +
C3 10483.72 2847.52 0.00 24270.39 2085.02 2.315 -0.4349 -4559.8 158.84 -75.37 15.80 99.27 67.68 250.01 218.42 250.01 67.68
1.00 x G4 + 1.00 x G5 + 1.0 x Q - VLL (For one
C4 10765.15 2861.02 0.00 24977.84 1069.04 2.320 -0.4298 -4626.3 163.11 -76.47 8.10 94.74 78.54 247.68 231.48 247.68 78.54
span witout impact) + 1.00 x Fh - BF + 1.00 x Ff
C5 + 1.0 x Fcf + 1.00 x Fcp 10090.76 2831.52 0.00 23259.64 1369.71 2.305 -0.4450 -4489.9 152.89 -74.21 10.38 89.05 68.30 237.48 216.73 237.48 68.30
C6 10385.96 2885.52 0.00 23680.89 1598.11 2.280 -0.4699 -4880.5 157.36 -80.67 12.11 88.80 64.59 250.14 225.93 250.14 64.59
C7 10667.40 2899.02 0.00 24388.37 650.95 2.286 -0.4637 -4947.0 161.63 -81.77 4.93 84.79 74.93 248.33 238.46 248.33 74.93
C8 10642.33 2914.29 147.08 24550.37 3714.94 2.307 -0.4431 -4716.0 161.25 -77.95 28.14 111.44 55.15 267.34 211.06 267.34 55.15
C9 10923.76 2927.79 147.08 25257.82 2767.82 2.312 -0.4378 -4782.5 165.51 -79.05 20.97 107.43 65.49 265.53 223.59 265.53 65.49
C10 10567.02 2884.29 147.08 24573.52 3297.56 2.325 -0.4245 -4485.8 160.11 -74.15 24.98 110.94 60.98 259.23 209.27 259.23 60.98
C11 C1 to C7 + 1.00 x WIND LOAD, W 10848.45 2897.79 147.08 25280.97 2281.58 2.330 -0.4196 -4552.3 164.37 -75.24 17.28 106.41 71.84 256.90 222.33 256.90 71.84
C12 10174.06 2868.29 147.08 23562.78 2582.25 2.316 -0.4340 -4415.9 154.15 -72.99 19.56 100.73 61.60 246.70 207.58 246.70 61.60
C13 10469.25 2922.29 147.08 23984.03 2810.64 2.291 -0.4591 -4806.4 158.63 -79.45 21.29 100.47 57.89 259.36 216.78 259.36 57.89
C14 10750.70 2935.79 147.08 24691.50 1863.49 2.297 -0.4533 -4872.9 162.89 -80.54 14.12 96.46 68.23 257.55 229.32 257.55 68.23
C15 G1 + G3 + Fep + W 8062.33 2164.29 147.08 20681.53 1212.54 2.565 -0.1848 -1489.9 122.16 -24.63 9.19 106.72 88.34 155.97 137.60 155.97 88.34
C16 10559.03 3709.17 0.00 28164.36 2502.41 2.667 -0.0827 -873.0 159.99 -14.43 18.96 164.51 126.60 193.37 155.46 193.37 126.60
C17 10840.47 3722.67 0.00 28871.81 1555.28 2.663 -0.0867 -939.5 164.25 -15.53 11.78 160.50 136.94 191.56 168.00 191.56 136.94
C18 10483.72 3679.17 0.00 28187.51 2085.02 2.689 -0.0613 -642.7 158.84 -10.62 15.80 164.02 132.43 185.26 153.67 185.26 132.43
C19 C1 to C7 + SEISMIC - LONGITUDINAL 10765.15 3692.67 0.00 28894.96 1069.04 2.684 -0.0659 -709.2 163.11 -11.72 8.10 159.48 143.29 182.93 166.73 182.93 143.29
C20 10090.76 3663.17 0.00 27176.77 1369.71 2.693 -0.0568 -572.8 152.89 -9.47 10.38 153.80 133.05 172.74 151.98 172.74 133.05
C21 10385.96 3717.17 0.00 27598.01 1598.11 2.657 -0.0928 -963.4 157.36 -15.92 12.11 153.55 129.33 185.39 161.18 185.39 129.33
C22 10667.40 3730.67 0.00 28305.49 650.95 2.653 -0.0965 -1029.9 161.63 -17.02 4.93 149.54 139.67 183.58 173.72 183.58 139.67
C23 10559.03 3446.30 323.77 26253.16 4998.02 2.486 -0.2637 -2784.2 159.99 -46.02 37.86 151.83 76.10 243.87 168.14 243.87 76.10
C24 10840.47 3459.80 346.88 26960.62 4272.69 2.487 -0.2630 -2850.7 164.25 -47.12 32.37 149.50 84.76 243.74 179.00 243.74 84.76
C25 10483.72 3416.30 318.33 26276.32 4528.47 2.506 -0.2436 -2553.9 158.84 -42.21 34.31 150.94 82.32 235.36 166.75 235.36 82.32
C26 C1 to C7 + SEISMIC - TRANSVERSE 10765.15 3429.80 341.44 26983.77 3734.28 2.507 -0.2434 -2620.4 163.11 -43.31 28.29 148.09 91.51 234.71 178.13 234.71 91.51
C27 10090.76 3400.30 285.98 25265.58 3502.69 2.504 -0.2462 -2484.0 152.89 -41.06 26.54 138.37 85.30 220.48 167.41 220.48 85.30
C28 10385.96 3454.30 309.09 25686.82 3952.88 2.473 -0.2768 -2874.6 157.36 -47.51 29.95 139.80 79.90 234.82 174.93 234.82 79.90
C29 10667.40 3467.80 332.20 26394.30 3227.53 2.474 -0.2757 -2941.0 161.63 -48.61 24.45 137.47 88.56 234.69 185.79 234.69 88.56
C30 10559.03 2877.52 0.00 24247.23 2502.41 2.296 -0.4537 -4790.1 159.99 -79.18 18.96 99.77 61.85 258.12 220.20 258.12 61.85
C31 10840.47 2891.02 0.00 24954.68 1555.28 2.302 -0.4480 -4856.6 164.25 -80.27 11.78 95.76 72.19 256.31 232.74 256.31 72.19
C32 10483.72 2847.52 0.00 24270.39 2085.02 2.315 -0.4349 -4559.8 158.84 -75.37 15.80 99.27 67.68 250.01 218.42 250.01 67.68
C33 C1 to C7 + 1.0 x Vc 10765.15 2861.02 0.00 24977.84 1069.04 2.320 -0.4298 -4626.3 163.11 -76.47 8.10 94.74 78.54 247.68 231.48 247.68 78.54
C34 10090.76 2831.52 0.00 23259.64 1369.71 2.305 -0.4450 -4489.9 152.89 -74.21 10.38 89.05 68.30 237.48 216.73 237.48 68.30
C35 10385.96 2885.52 0.00 23680.89 1598.11 2.280 -0.4699 -4880.5 157.36 -80.67 12.11 88.80 64.59 250.14 225.93 250.14 64.59
C36 10667.40 2899.02 0.00 24388.37 650.95 2.286 -0.4637 -4947.0 161.63 -81.77 4.93 84.79 74.93 248.33 238.46 248.33 74.93
C37 10642.33 2914.29 147.08 24550.37 3714.94 2.307 -0.4431 -4716.0 161.25 -77.95 28.14 111.44 55.15 267.34 211.06 267.34 55.15
C38 10923.76 2927.79 147.08 25257.82 2767.82 2.312 -0.4378 -4782.5 165.51 -79.05 20.97 107.43 65.49 265.53 223.59 265.53 65.49
C39 10567.02 2884.29 147.08 24573.52 3297.56 2.325 -0.4245 -4485.8 160.11 -74.15 24.98 110.94 60.98 259.23 209.27 259.23 60.98
C40 C30 to C36 + 1.0 x W 10848.45 2897.79 147.08 25280.97 2281.58 2.330 -0.4196 -4552.3 164.37 -75.24 17.28 106.41 71.84 256.90 222.33 256.90 71.84
C41 10174.06 2868.29 147.08 23562.78 2582.25 2.316 -0.4340 -4415.9 154.15 -72.99 19.56 100.73 61.60 246.70 207.58 246.70 61.60
C42 10469.25 2922.29 147.08 23984.03 2810.64 2.291 -0.4591 -4806.4 158.63 -79.45 21.29 100.47 57.89 259.36 216.78 259.36 57.89
C43 10750.70 2935.79 147.08 24691.50 1863.49 2.297 -0.4533 -4872.9 162.89 -80.54 14.12 96.46 68.23 257.55 229.32 257.55 68.23
C44 C15 + 1.0 x Vc 8062.33 2164.29 147.08 20681.53 1212.54 2.565 -0.1848 -1489.9 122.16 -24.63 9.19 106.72 88.34 155.97 137.60 155.97 88.34

Divisional Engineer,
Chennai Metro Development Project - III, Division - IV,
Alandur, Chennai
Vax Consultants Pvt. Ltd., Construction of Grade Separator at Medavakkam
Foundation & Structural Engineers Detailed Design Calculations for Abutment Group - GA1

C45 10559.03 3709.17 0.00 28164.36 2502.41 2.667 -0.0827 -873.0 159.99 -14.43 18.96 164.51 126.60 193.37 155.46 193.37 126.60
C46 10840.47 3722.67 0.00 28871.81 1555.28 2.663 -0.0867 -939.5 164.25 -15.53 11.78 160.50 136.94 191.56 168.00 191.56 136.94
C47 10483.72 3679.17 0.00 28187.51 2085.02 2.689 -0.0613 -642.7 158.84 -10.62 15.80 164.02 132.43 185.26 153.67 185.26 132.43
C48 C16 to C22 + 1.0 x Vc 10765.15 3692.67 0.00 28894.96 1069.04 2.684 -0.0659 -709.2 163.11 -11.72 8.10 159.48 143.29 182.93 166.73 182.93 143.29
C49 10090.76 3663.17 0.00 27176.77 1369.71 2.693 -0.0568 -572.8 152.89 -9.47 10.38 153.80 133.05 172.74 151.98 172.74 133.05
C50 10385.96 3717.17 0.00 27598.01 1598.11 2.657 -0.0928 -963.4 157.36 -15.92 12.11 153.55 129.33 185.39 161.18 185.39 129.33
C51 10667.40 3730.67 0.00 28305.49 650.95 2.653 -0.0965 -1029.9 161.63 -17.02 4.93 149.54 139.67 183.58 173.72 183.58 139.67
C52 10559.03 3446.30 323.77 26253.16 4998.02 2.486 -0.2637 -2784.2 159.99 -46.02 37.86 151.83 76.10 243.87 168.14 243.87 76.10
C53 10840.47 3459.80 346.88 26960.62 4272.69 2.487 -0.2630 -2850.7 164.25 -47.12 32.37 149.50 84.76 243.74 179.00 243.74 84.76
C54 10483.72 3416.30 318.33 26276.32 4528.47 2.506 -0.2436 -2553.9 158.84 -42.21 34.31 150.94 82.32 235.36 166.75 235.36 82.32
C55 C23 to C29 + 1.0 x Vc 10765.15 3429.80 341.44 26983.77 3734.28 2.507 -0.2434 -2620.4 163.11 -43.31 28.29 148.09 91.51 234.71 178.13 234.71 91.51
C56 10090.76 3400.30 285.98 25265.58 3502.69 2.504 -0.2462 -2484.0 152.89 -41.06 26.54 138.37 85.30 220.48 167.41 220.48 85.30
C57 10385.96 3454.30 309.09 25686.82 3952.88 2.473 -0.2768 -2874.6 157.36 -47.51 29.95 139.80 79.90 234.82 174.93 234.82 79.90
C58 10667.40 3467.80 332.20 26394.30 3227.53 2.474 -0.2757 -2941.0 161.63 -48.61 24.45 137.47 88.56 234.69 185.79 234.69 88.56
164.51 143.29 267.34 238.46 267.34 55.15

2
Maximum Contact Pressure 267.34 kN/m
2
Allowable Maximum Pressure on Soil 400.00 kN/m
Check 1 PRESSURE ON SOIL IS WITHIN LIMITS, HENCE OKAY
2
Minimum Contact Pressure 55.15 kN/m
Check 2 NO SOIL-STRUCTURE IS OBSERVED, HENCE OKAY

Divisional Engineer,
Chennai Metro Development Project - III, Division - IV,
Alandur, Chennai