Item Description Unit Qty Rate Amount (KSHS.) : Qs Ii CGK 1 of 52 Food P Plant
Item Description Unit Qty Rate Amount (KSHS.) : Qs Ii CGK 1 of 52 Food P Plant
Item Description Unit Qty Rate Amount (KSHS.) : Qs Ii CGK 1 of 52 Food P Plant
NOTES:
Setting out
Program of works
Carried forward
Brought forward
Materials
A
Materials shall be sound and of good quality and shall be
supplied in accordance with the provisions and
recommendations of Kenyan and British standards. Whenever
requested, the Contractor shall certify the origin of the
materials supplied to the site by producing invoices,
certificates of origin etc. The Contractor shall submit at his
own expense in due time, a sample of each specified material
to the Engineer for approval. If this sample is accepted by the
Engineer, it shall remain deposited in the Engineer’s office
and serve as evidence for the reception of works of similar
quality. All materials that are not approved shall be removed
immediately by the Contractor when instructed by the
Engineer, who if his orders are not carried out into effect, shall
have the right to have the materials disposed of at the public
dump site and at the Contractors expense. ITEM
Cleaning up
A The contractor shall remove all rubbish from the site from
time to time and on completion he must thoroughly clean up
by sweeping or otherwise to leave the site for ready use. The
Contractor shall adopt all measures to ensure that floor tiles,
terrazzo work, windows etc, are left clear and free from dirt,
stains etc. ITEM
Watching
D The contractor shall allow for provision for all the Tools,
Plant, scaffolding etc, necessary for the proper execution of
the works. He should also allow for the removal, reinstating,
adapting from time to time as may be necessary and
maintaining all plant and equipment during the course of the
contract ITEM
Carried forward
Brought forward
Records
A The Contractor shall allow for keeping all records in English
appertaining to the works and shall keep on the site a daily
diary recording weather conditions, daily work done, delivery
notes for materials, visitors on site etc. The Contractor is to
supply to the Engineer with such information as he may
require in connection with work, including a statement
showing the number of men employed in all trades daily, and
delivery notes (Stating the name of the project) for all
materials delivered to the site. ITEM
Training levy
Performance security
Insurance
Carried forward
Brought forward
Test/Trial Pits
A Exacavate trial/test pit in soil to depth not exceeding 2m
below ground level rate to include necessary timbering
dewartering and backfilling after excavtion. Detail geological
logging of pit face and base including provision for
photograph NO 3.0
F
Excavating in hard rock for oversite commencing from
reduced level; 1.5 m - 3.0m deep CM 9.0
Carried forward
Brought forward
Sawn formwork: to
Walls
Hardcore
Blinding
Anti-termite treatment
Sawn formwork: to
E Columns CM 5.0
Structural Steel
Roof covering
D Covering SM 227.0
Carried forward
Brought forward
RAINWATER GOODS
A 2 mm thick aluminium sheet boxed gutter size 250 x 250 mm
including closed ends and outlets, secured on brackets (m/s). LM 24.0
Steel doors
FLOOR FINISHES
Terrazo paving
E Walls m2 214.0
1 SUBSTRUCTURE WORKS
2 R.C SUPERSTRUCTURE
3 WALLS
4 ROOF
5 DOORS
6 WINDOWS
7 FINISHES
DISPOSAL SHED
Carried forward
Brought forward
Sawn formwork: to
Walls
Hardcore
Blinding
Anti-termite treatment
Sawn formwork: to
E Columns CM 4.0
Structural Steel
Roof covering
D Covering SM 144.0
Carried forward
Brought forward
RAINWATER GOODS
Steel doors
TIMBER DOORS
Wrot mahogany in:-
D 15 x 15 mm quadrant/beading LM 11.4
A
Window size 1800 x 1500 mm high, part fixed part sliding. SM 6.0
FLOOR FINISHES
Terrazo paving
E Walls m2 226.0
1 SUBSTRUCTURE WORKS
2 R.C SUPERSTRUCTURE
3 WALLS
4 ROOF
5 DOORS
6 WINDOWS
7 FINISHES
BULKSTORE
Carried forward
Brought forward
Sawn formwork: to
Walls
Hardcore
Blinding
Anti-termite treatment
Sawn formwork: to
E Columns CM 7.0
Structural Steel
Roof covering
D Covering SM 372.0
Carried forward
Brought forward
RAINWATER GOODS
A 2 mm thick aluminium sheet boxed gutter size 250 x 250 mm
including closed ends and outlets, secured on brackets (m/s). LM 72.0
Steel doors
A Window size 1500 x 1100 mm high, part fixed part sliding. SM 43.0
FLOOR FINISHES
Terrazo paving
E Walls m2 48.0
1 SUBSTRUCTURE WORKS
2 R.C SUPERSTRUCTURE
3 WALLS
4 ROOF
5 DOORS
6 WINDOWS
6 FINISHES
BULDERS WORKS
2 Disposal Shed
3 Bulkstorage
b) 13Amps moulded plate switched socket outlet with neon NO. 10.0
indicator as BG,CLIPSAL or approved equivalent being Twin
Carried forward
Brought forward
b) 13Amps moulded plate switched socket outlet with neon NO. 6.0
indicator as BG,CLIPSAL or approved equivalent being Twin
Carried forward
Brought forward
Carried forward
Brought forward
b) 13Amps moulded plate switched socket outlet with neon NO. 17.0
indicator as BG,CLIPSAL or approved equivalent being Twin
Carried forward
Brought forward
Carried forward
Brought forward
ELECTRICAL WORKS
2 Disposal Shed
3 Bulkstorage
CIVIL WORKS
1.02 E.O. item 1.04 for Contractor's overheads and profits. % 500,000.0
1.03 Allow a PC SUM of Kshs. 600,000 for Survey works and PC 1.0
Design to be spent in whole or part as directed by the Engineer Sum
1.06 E.O. item 1.13 for Contractor's overheads and profits. % #########
8.09 Provide and place invert block drains with two course side slabs m -